CN218509070U - Rag bolt installation positioner - Google Patents

Rag bolt installation positioner Download PDF

Info

Publication number
CN218509070U
CN218509070U CN202222917984.2U CN202222917984U CN218509070U CN 218509070 U CN218509070 U CN 218509070U CN 202222917984 U CN202222917984 U CN 202222917984U CN 218509070 U CN218509070 U CN 218509070U
Authority
CN
China
Prior art keywords
steel pipe
positioning device
horizontal pole
rag bolt
support body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222917984.2U
Other languages
Chinese (zh)
Inventor
韩通
杜小乐
李明
杨森
刘兰杰
王晓菲
孙丹丹
陈祥军
王伟
刘功斌
孔鲁绪
刘中秋
李祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN202222917984.2U priority Critical patent/CN218509070U/en
Application granted granted Critical
Publication of CN218509070U publication Critical patent/CN218509070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a rag bolt installation positioner, comprising a frame body, the support body includes four parallel arrangement's steel pipe stand, adjacent two be equipped with the steel pipe horizontal pole between the steel pipe stand respectively, relative two that sets up be equipped with the support horizontal pole that is used for supporting rag bolt group between the steel pipe horizontal pole. The utility model discloses a support body that steel pipe stand and steel pipe horizontal pole are constituteed is fixed a position and is fixed to rag bolt group, can realize the accurate location to rag bolt group, improves the installation accuracy of rag bolt group promptly and accelerates the concrete placement progress again. The support body independence is good, and the installation rate is fast, and is whole effectual. The frame body can be circulated and recycled, is convenient to recycle after use, and has low comprehensive cost.

Description

Rag bolt installation positioner
Technical Field
The utility model belongs to the technical field of building erection equipment technique and specifically relates to a rag bolt installation positioner is related to.
Background
At present, foundation bolt mounting methods are various on a construction site, and the mounting accuracy and efficiency of foundation bolts directly influence the mounting of steel columns and the overall mounting progress of an upper steel structure, so that the foundation bolts are important nodes for steel structure construction. Because steel construction building individual layer height is higher, the span is great, consequently need set up more rag bolt as the basis.
However, the traditional mode for installing the foundation bolt singly is low in speed and precision, the precision positioning of the foundation bolt in the pouring process of the concrete independent column is difficult to guarantee, secondary chiseling and reinforcing treatment is often performed on the bottom of the concrete independent column, and the construction efficiency is low. Therefore, a new construction apparatus capable of mass-installing anchor bolts is required to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rag bolt installation positioner can improve the installation accuracy when rag bolt installs to can effectively improve rag bolt's installation effect.
According to the utility model discloses an aim, the utility model provides a rag bolt installation positioner, comprising a frame body, the support body includes four parallel arrangement's steel pipe stand, adjacent two be equipped with the steel pipe horizontal pole between the steel pipe stand respectively, relative two that sets up be equipped with the support horizontal pole that is used for supporting rag bolt group between the steel pipe horizontal pole.
Furthermore, the four steel pipe stand columns are vertically arranged and are respectively positioned at four vertex positions of the rectangular structure.
Furthermore, the four steel pipe cross bars are respectively fixed between the two adjacent steel pipe upright posts through pipe clamps.
Furthermore, the periphery of the frame body is also provided with inclined struts.
Furthermore, each steel pipe horizontal pole is equipped with one respectively the bracing, the top of bracing is connected with the steel pipe horizontal pole that corresponds, the bottom sprag is subaerial.
Further, the number of the supporting cross rods is not less than two.
Furthermore, the two ends of the supporting cross rod are respectively connected with the corresponding steel tube cross rods through tube clamps.
Furthermore, the foundation bolt group comprises a plurality of foundation bolts which are connected through connecting ribs, and the foundation bolts are arranged on the supporting cross rod through the connecting ribs.
Further, a protective sleeve is arranged at the bottom of the steel pipe stand column, and the steel pipe stand column is arranged in the bearing platform through the protective sleeve.
Further, the steel tube stand column is drawn with an axis and an elevation point.
The technical scheme of the utility model support body that constitutes through steel pipe stand and steel pipe horizontal pole is fixed a position and is fixed rag bolt group, can realize the accurate location to rag bolt group, improves the installation accuracy of rag bolt group promptly and accelerates the concrete placement progress again. The support body independence is good, and the installation rate is fast, and is whole effectual. The frame body can be circulated and recycled, is convenient to recycle after use, and has low comprehensive cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is another schematic structural diagram of the embodiment of the present invention;
fig. 3 is a top view of an embodiment of the present invention;
FIG. 4 is a schematic structural view of an embodiment of the present invention in use;
in the figure, 1, a steel pipe upright post; 2. a steel pipe cross bar; 3. bracing; 4. a support rail; 5. a foundation bolt group; 6. connecting reinforcing steel bars; 7. protecting the sleeve; 8. a bearing platform; 9. and (7) anchor bolts.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the following embodiments, and it should be understood that the described embodiments are some, but not all embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and to simplify the description, but do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", may explicitly or implicitly include one or more of the described features. In the description of the present invention, "a plurality" means two or more unless specifically limited otherwise. Furthermore, the terms "mounted," "connected," and "connected" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example 1
As shown in figures 1-4 of the drawings,
the utility model provides a rag bolt installation positioner, includes the support body, and the support body includes four parallel arrangement's steel pipe stand 1, and four vertical settings of steel pipe stand 1 are in four summit positions departments of rectangle structure respectively. Be equipped with steel pipe horizontal pole 2 between two adjacent steel pipe stand 1 respectively, four steel pipe horizontal poles 2 are fixed between two adjacent steel pipe stand 1 through the pipe strap respectively.
For the stability that improves the support body, every steel pipe horizontal pole 2 still is connected with bracing 3 through the pipe strap, and the bottom of bracing 3 supports subaerial, supports the support body through four bracing 3, improves the stability of support body.
Wherein be equipped with two support horizontal poles 4 between two steel pipe horizontal poles 2 of relative setting, two support horizontal poles 4 can move between two steel pipe horizontal poles 2 to can fix on steel pipe horizontal pole 2 through the pipe strap.
Rag bolt group 5 includes a plurality of rag bolts, a plurality of rag bolts link together through connecting reinforcement 6, in this embodiment, the example of six rag bolts 9 installations together has been demonstrated, six rag bolts 9 fall into two sets ofly, wherein three rag bolt 9 is a set of, be in the same place through the reinforcing bar welding between every rag bolt of group, also be in the same place through reinforcing bar (meet reinforcing bar 6) welding and connect between two sets of rag bolts 9, the reinforcing bar that will connect two sets of rag bolts is taken and is established on supporting horizontal pole 4, after the connection height through adjusting steel pipe horizontal pole 2 and steel pipe stand 1, it is fixed with steel pipe horizontal pole 2 through the pipe strap, can make rag bolt keep prescribed horizontal positioning and elevation, it has higher precision positioning to make things convenient for follow-up independent mounting means of the relative transmission of the in-process rag bolt of pouring. By adopting the mode, the foundation bolts can be installed in batches, the installation precision of the foundation bolts during installation can be improved, and the installation effect of the foundation bolts can be effectively improved.
In the embodiment, steel pipe stand 1 adopts two steel pipe structures, and during the support body installation, steel pipe stand 1 inserts in cushion cap 8, and steel pipe stand 1 bottom adopts the PVC pipe as protective case 7, and protective case 7 exceeds 8 top surfaces of cushion cap 100mm, through setting up protective case 7, makes things convenient for steel pipe stand 1 to extract, realizes subsequent turnover and uses.
The steel tube upright posts 1 and the steel tube cross bars 2 adopted in the embodiment can be assembled and used by adopting structures such as steel tube structures and square steel structures.
In order to ensure the installation accuracy of the foundation bolts, axes and elevation points can be drawn on the steel pipe upright post 1, the elevation of the steel pipe cross rod 2 can be conveniently determined through the axes and the elevation points on the steel pipe upright post 1, the installation elevation of the foundation bolts can be conveniently determined, and the installation speed of the foundation bolt group 5 can be effectively improved.
When the utility model is used, firstly, the bearing platform 8 and the steel bars of the independent column are bound according to the drawing requirements, and the frame body is erected according to the plane size and the height of the independent column (the net size inside the frame body is about 150mm larger than the size of the independent column); after 8 templates of the bearing platform are installed, the erected support body falls into the bearing platform 8, the bottom of the steel pipe upright post 1 is wrapped by a PVC pipe, 8 concrete of the bearing platform is poured after positioning and checking, the strength of the 8 concrete of the bearing platform reaches the design strength, and then the support body on the bearing platform 8 is operated.
Adjusting the height of the steel pipe cross rod 2 according to the installation elevation requirement of the foundation bolt, and fixing the steel pipe cross rod 2 on the steel pipe upright post 1 through a pipe clamp; then will place on the steel pipe horizontal pole 2 of support body through the rag bolt group 5 of reinforcing bar connection in advance, the rag bolt group 5 supports through supporting horizontal pole 4, supports horizontal pole 4 and passes behind the reinforcing bar of connecting rag bolt, sets up can realize the location to rag bolt group 5 on two earlier right steel pipe horizontal poles 2, can fix on steel pipe horizontal pole 2 through the pipe strap with supporting horizontal pole 4 this moment.
And after the level and the elevation of the foundation bolt are determined to be correct, pouring concrete of the independent column, finally, pulling the steel pipe column 1 out of the PVC pipe, removing the frame body, and recycling.
The utility model discloses the device is light, the construction is convenient, overall stability is strong, easy operation, work efficiency are high, improve the installation accuracy of rag bolt group 5 promptly and accelerate the concrete placement progress again. The support body independence is good, avoids colliding with the independent column reinforcing bar, and the installation rate is fast, and is whole effectual. The frame body can be circulated and recycled, is convenient to recycle after use, and has low comprehensive cost. Green construction, energy conservation and environmental protection, and avoids material waste.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.

Claims (10)

1. The utility model provides a rag bolt installation positioner, its characterized in that, includes the support body, the support body includes four parallel arrangement's steel pipe stand, adjacent two be equipped with the steel pipe horizontal pole between the steel pipe stand respectively, relative two that set up be equipped with the support horizontal pole that is used for supporting rag bolt group between the steel pipe horizontal pole.
2. The foundation bolt mounting and positioning device according to claim 1, wherein four steel pipe columns are vertically arranged and are respectively located at four vertex positions of a rectangular structure.
3. The foundation bolt mounting and positioning device according to claim 1, wherein four steel pipe cross bars are respectively fixed between two adjacent steel pipe columns through pipe clamps.
4. The foundation bolt mounting and positioning device according to claim 1, wherein the frame body is further provided with inclined struts around the frame body.
5. The foundation bolt mounting and positioning device according to claim 4, wherein each steel pipe cross rod is provided with one inclined strut, the top of each inclined strut is connected with the corresponding steel pipe cross rod, and the bottom of each inclined strut is supported on the ground.
6. The anchor bolt positioning apparatus according to claim 1, wherein the number of the support cross bars is not less than two.
7. The foundation bolt mounting and positioning device according to claim 1, wherein two ends of the supporting cross bar are respectively connected with the corresponding steel pipe cross bars through pipe clamps.
8. The anchor bolt installing and positioning device of claim 1, wherein the anchor bolt group comprises a plurality of anchor bolts, the anchor bolts are connected through connecting ribs, and the anchor bolts are arranged on the supporting cross rod through the connecting ribs.
9. The foundation bolt mounting and positioning device according to claim 1, wherein a protective sleeve is arranged at the bottom of the steel tube stand column, and the steel tube stand column is arranged in the bearing platform through the protective sleeve.
10. The anchor bolt installing and positioning device according to claim 1, wherein the steel tube column is drawn with an axis and an elevation point.
CN202222917984.2U 2022-10-31 2022-10-31 Rag bolt installation positioner Active CN218509070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222917984.2U CN218509070U (en) 2022-10-31 2022-10-31 Rag bolt installation positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222917984.2U CN218509070U (en) 2022-10-31 2022-10-31 Rag bolt installation positioner

Publications (1)

Publication Number Publication Date
CN218509070U true CN218509070U (en) 2023-02-21

Family

ID=85219349

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222917984.2U Active CN218509070U (en) 2022-10-31 2022-10-31 Rag bolt installation positioner

Country Status (1)

Country Link
CN (1) CN218509070U (en)

Similar Documents

Publication Publication Date Title
CN107090932B (en) Construction method of large-span thin-wall plane arch truss based on stiff ring beam
CN111254968A (en) Installation device and installation method for large-diameter embedded bolt of large-scale equipment foundation
CN212175502U (en) Can dismantle bent cap construction support
CN113293694B (en) Turnover formwork frame structure for efficient pier body construction and construction process
CN111749457A (en) Early-support later-fixing early-dismantling formwork system and construction method thereof
CN109113335B (en) Parapet wall formwork support and construction method
CN218509070U (en) Rag bolt installation positioner
CN212129960U (en) Overhead installation device for frame beam reinforcing steel bars
CN210766497U (en) Left and right truss middle flange connection two-side double-column portal frame
CN217840818U (en) Overhanging type wall-connected operation platform support frame and overhanging type wall-connected operation platform
CN210946829U (en) Regularization standard festival sectional shelf-unit
CN210977265U (en) Can have enough to meet need unitized lattice tower crane basis and go up people's device
CN214939283U (en) Pier shaft template safety protection operation platform
CN202114437U (en) Positioning device for foundation bolts
CN219412130U (en) Building site encloses fender structure
CN111188489A (en) External frame-free safety protection structure of fabricated building and construction method thereof
CN112411568B (en) Foundation pit concrete support beam bottom form removal device and form removal method
CN214462403U (en) Elevator shaft tool type steel platform
CN212795378U (en) Vertical steel bar connection operating means of prefabricated post of normal position
CN210216127U (en) Assembled concrete-filled steel tube super-high lattice pier
CN220580041U (en) Open caisson formwork platform
CN217810514U (en) Pier inner supporting frame capable of being used for binding pier body steel bars and being used for turnover
CN216129988U (en) Assembling pushing beam falling support for pushing steel box beam of overpass bridge
CN217204223U (en) Retaining wall unilateral founds mould and supports reinforcement assembly
CN215369949U (en) Middle plate and frame body reserved door type channel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant