CN218508214U - Temporary bridge for water conservancy construction - Google Patents
Temporary bridge for water conservancy construction Download PDFInfo
- Publication number
- CN218508214U CN218508214U CN202222719934.3U CN202222719934U CN218508214U CN 218508214 U CN218508214 U CN 218508214U CN 202222719934 U CN202222719934 U CN 202222719934U CN 218508214 U CN218508214 U CN 218508214U
- Authority
- CN
- China
- Prior art keywords
- plate
- water conservancy
- fixedly mounted
- connecting plate
- conservancy construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a suspension bridge for water conservancy construction, including fixed plate and connecting plate, the upside fixed mounting of fixed plate has the mount, one side fixed mounting of mount has the connecting seat, one side fixedly connected with connecting block of connecting plate, the connecting block is articulated mutually with the connecting seat, the inside fixed spout of having seted up of connecting plate, the inside sliding connection of spout has the slide bar, first screw hole has been seted up on the surface of slide bar, has placed the bracing piece between two slide bars, the equal fixed mounting in both ends of bracing piece has the connection piece. The utility model discloses a motor drives the haulage rope and convolutes on the spool, and the haulage rope drives the connecting plate tilt up through first connecting axle and second connecting axle, and the quantity of first connecting axle and second connecting axle all has two, can effectively reduce the pulling force that stimulates the haulage rope for the connecting plate lifts up more easily, thereby reaches the purpose of blocking, avoids irrelevant personnel's entering, convenient to use.
Description
Technical Field
The utility model relates to a water conservancy field specifically is a suspension bridge for water conservancy construction.
Background
The hydraulic engineering mainly researches basic knowledge and skills in the aspects of engineering hydrology, hydraulic engineering measurement, hydraulic reinforced concrete, hydraulic structures, engineering drawing and the like, and carries out engineering planning design, engineering site construction, engineering budget and hydraulic equipment maintenance and repair in the hydraulic engineering field. For example: building various types of hydraulic buildings such as dams, dikes, spillways, water gates, channels, crossing tanks, rafts, fishways and the like.
Some temporary bridges need to be erected during water conservancy construction, the utility model is convenient for the constructors to pass through, at non-operating time mostly only through the warning sign warning passerby and do not need to get into, but the protective effect is relatively poor, can hardly have the pedestrian mistake and go into.
SUMMERY OF THE UTILITY MODEL
The utility model discloses solve the technical problem that above-mentioned prior art exists, provide a temporary bridge for water conservancy construction.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a suspension bridge for water conservancy construction, includes fixed plate and connecting plate, the upside fixed mounting of fixed plate has the mount, one side fixed mounting of mount has the connecting seat, one side fixedly connected with connecting block of connecting plate, the connecting block is articulated mutually with the connecting seat, the inside fixed spout of having seted up of connecting plate, the inside sliding connection of spout has the slide bar, first screw hole has been seted up on the surface of slide bar, has placed the bracing piece between two slide bars, the equal fixed mounting in both ends of bracing piece has the connection piece, the inside of connection piece is provided with first bolt, and first bolt and first screw hole threaded connection, the outside fixed mounting of mount has first connecting axle, the tip fixed mounting of first connecting axle has first baffle, the outside fixed mounting of connecting plate has the second connecting axle, the tip fixed mounting of second connecting axle has the second baffle, the outside fixed mounting of mount has the rivet, one side fixed mounting of mount has the fixed block, one side fixed mounting of fixed block has the motor, the output fixed mounting of motor has the spool, the haulage rope is convoluteed in the outside of spool, the haulage rope passes first connecting axle and second connecting axle in proper order, and the tip and rivet fixed connection of haulage rope.
Preferably, a second threaded hole is formed in one side of the sliding rod, a second bolt is connected to one side of the connecting plate in a threaded mode, and the second bolt is connected with the second threaded hole in a threaded mode.
Preferably, an inclined strut is fixedly connected between the fixing plate and the fixing frame.
Preferably, one side of the fixing plate is fixedly connected with an anchor post.
Preferably, the number of the first connecting shaft and the second connecting shaft is two.
Preferably, the end of the sliding rod is fixedly connected with a guide plate.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a motor drives the haulage rope and convolutes on the spool, and the haulage rope drives the connecting plate tilt up through first connecting axle and second connecting axle, and the quantity of first connecting axle and second connecting axle all has two, can effectively reduce the pulling force that stimulates the haulage rope for the connecting plate lifts up more easily, thereby reaches the purpose of blocking, avoids irrelevant personnel's entering, convenient to use.
2. The utility model discloses a set up the slide bar, cooperate the setting of second bolt for the slide bar can slide to the suitable position of spout, makes this suspension bridge can adjust use length as required, and through the setting of bracing piece, connection piece and first bolt, can lay the bracing piece between two slide bars, and convenient to use improves the practicality.
Drawings
Fig. 1 is a schematic view of a first three-dimensional structure of the present invention;
fig. 2 is a schematic view of a second three-dimensional structure of the present invention;
fig. 3 is a schematic view of a third three-dimensional structure of the present invention;
fig. 4 is a schematic structural diagram of a top view section of the connecting plate of the present invention.
In the figure: the device comprises a fixing plate 1, a connecting plate 2, a fixing frame 3, an inclined supporting rod 4, a fixing block 5, a motor 6, a reel 7, a first connecting shaft 8, a first baffle 9, a second connecting shaft 10, a second baffle 11, a rivet 12, a traction rope 13, a sliding rod 14, a guide plate 15, a supporting rod 16, a connecting plate 17, a first bolt 18, a first threaded hole 19, a sliding groove 20, a second threaded hole 21, a second bolt 22 and an anchor post 23.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a temporary bridge for water conservancy construction includes a fixed plate 1 and a connecting plate 2, a fixed frame 3 is fixedly installed on the upper side of the fixed plate 1, a connecting seat 25 is fixedly installed on one side of the fixed frame 3, a connecting block 24 is fixedly connected to one side of the connecting plate 2, the connecting block 24 is hinged to the connecting seat 25, a chute 20 is fixedly installed inside the connecting plate 2, a slide bar 14 is slidably connected inside the chute 20, a first threaded hole 19 is formed in the surface of the slide bar 14, a support bar 16 is placed between the two slide bars 14, connecting pieces 17 are fixedly installed at both ends of the support bar 16, a first bolt 18 is arranged inside the connecting piece 17, the first bolt 18 is in threaded connection with the first threaded hole 19, a guide plate 15 is fixedly connected to the end of the slide bar 14, a first connecting shaft 8 is fixedly installed on the outer side of the fixed frame 3, a first baffle plate 9 is fixedly installed at the end of the first connecting shaft 8, a second baffle plate 10 is fixedly installed on the outer side of the connecting plate 2, a second connecting shaft 10 is fixedly installed at the end of the second connecting shaft 10, two baffles are fixedly installed on one side of the connecting shaft 8, a fixed frame 3, a fixing frame 5 is fixedly installed on one side of the connecting shaft 5, a fixing frame 7 of the connecting shaft 6, a motor, a fixed frame 13 is connected to a winding shaft 13, a winding shaft 13 fixed frame 13, a winding shaft 13 of the connecting shaft is connected to the connecting shaft 13, and a motor, a winding shaft 13 fixed frame 13, and a winding shaft 13 fixed frame 13 connected to one side of the connecting shaft, a winding shaft, and a winding shaft 13 fixed frame 13 connected to the connecting shaft, a motor;
drive haulage rope 13 through motor 3 and convolute on spool 7, haulage rope 13 drives connecting plate 2 tilt up through first connecting axle 8 and second connecting axle 10, and the quantity of first connecting axle 8 and second connecting axle 10 all has two, can effectively reduce the pulling force that stimulates haulage rope 13 for connecting plate 2 lifts up more easily, thereby reaches the purpose of blocking, avoids irrelevant personnel's entering, convenient to use.
In summary, the following steps: this a suspension bridge for water conservancy construction, it convolutes on spool 7 to drive haulage rope 13 through motor 3, haulage rope 13 drives connecting plate 2 tilt up through first connecting axle 8 and second connecting axle 10, and the quantity of first connecting axle 8 and second connecting axle 10 all has two, can effectively reduce the pulling force that stimulates haulage rope 13, make connecting plate 2 lift up more easily, thereby reach the mesh of blocking, avoid irrelevant personnel's entering, through setting up slide bar 14, the setting of cooperation second bolt 22, make slide bar 14 can slide to the suitable position of spout 20, make this suspension bridge can adjust service length as required, and pass through bracing piece 16, connection piece 17 and the setting of first bolt 18, can lay bracing piece 16 between two slide bars 14, high durability and convenient use, and high practicability, all consumer in this scheme all supply power through external power source.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a temporary bridge for water conservancy construction, includes fixed plate (1) and connecting plate (2), its characterized in that: the fixing device is characterized in that a fixing frame (3) is fixedly mounted on the upper side of the fixing plate (1), a connecting seat (25) is fixedly mounted on one side of the fixing frame (3), a connecting block (24) is fixedly connected to one side of the connecting plate (2), the connecting block (24) is hinged to the connecting seat (25), a sliding chute (20) is fixedly formed in the connecting plate (2), a sliding rod (14) is slidably connected to the inside of the sliding chute (20), a first threaded hole (19) is formed in the surface of the sliding rod (14), a supporting rod (16) is placed between the two sliding rods (14), connecting plates (17) are fixedly mounted at two ends of the supporting rod (16), a first bolt (18) is arranged in the connecting plate (17), the first bolt (18) is in threaded connection with the first threaded hole (19), a first connecting shaft (8) is fixedly mounted on the outer side of the fixing frame (3), a first baffle plate (9) is fixedly mounted at the end of the first connecting shaft (8), a second connecting shaft (10) is fixedly mounted at the outer side of the connecting plate (2), a second baffle (11) is fixedly mounted at the end of the second connecting shaft (10), a second baffle (11) is fixedly mounted at the outer side of the fixing frame (3), a rivet (5) is fixedly mounted on one side of the fixing frame (12), one side fixed mounting of fixed block (5) has motor (6), the output fixed mounting of motor (6) has spool (7), haulage rope (13) have been convoluteed in the outside of spool (7), haulage rope (13) pass first connecting axle (8) and second connecting axle (10) in proper order, and the tip and rivet (12) fixed connection of haulage rope (13).
2. The temporary bridge for water conservancy construction according to claim 1, characterized in that: a second threaded hole (21) is formed in one side of the sliding rod (14), a second bolt (22) is connected to one side of the connecting plate (2) in a threaded mode, and the second bolt (22) is connected with the second threaded hole (21) in a threaded mode.
3. The temporary bridge for water conservancy construction according to claim 1, characterized in that: an inclined stay bar (4) is fixedly connected between the fixing plate (1) and the fixing frame (3).
4. The temporary bridge for water conservancy construction according to claim 1, characterized in that: one side of the fixed plate (1) is fixedly connected with an anchor post (23).
5. The temporary bridge for water conservancy construction according to claim 1, characterized in that: the number of the first connecting shafts (8) and the number of the second connecting shafts (10) are two.
6. The temporary bridge for water conservancy construction according to claim 1, characterized in that: the end part of the sliding rod (14) is fixedly connected with a guide plate (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222719934.3U CN218508214U (en) | 2022-10-17 | 2022-10-17 | Temporary bridge for water conservancy construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222719934.3U CN218508214U (en) | 2022-10-17 | 2022-10-17 | Temporary bridge for water conservancy construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218508214U true CN218508214U (en) | 2023-02-21 |
Family
ID=85216906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222719934.3U Withdrawn - After Issue CN218508214U (en) | 2022-10-17 | 2022-10-17 | Temporary bridge for water conservancy construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218508214U (en) |
-
2022
- 2022-10-17 CN CN202222719934.3U patent/CN218508214U/en not_active Withdrawn - After Issue
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110424270B (en) | Anti-falling device for urban bridge construction | |
CN218508214U (en) | Temporary bridge for water conservancy construction | |
CN206346120U (en) | A kind of pin-connected panel tower with suspended cable system | |
CN210368667U (en) | Construction formwork for bridge construction joint | |
CN210658398U (en) | Foundation pit protection device | |
CN209976163U (en) | Building construction protective fence with steel rope structure | |
CN1473994A (en) | Movable combined flood cut-off dam | |
CN216275702U (en) | Slip form device suitable for steep slope concrete construction | |
CN213171212U (en) | A hoisting apparatus for building engineering | |
CN211368403U (en) | Bridge maintenance device | |
CN215201590U (en) | Caisson installation positioner of high accuracy | |
CN213537187U (en) | Hydraulic engineering is with overhauing cat ladder | |
CN219508650U (en) | Road mud pit inner wall repair trowelling tool | |
CN219434173U (en) | Reservoir safety precaution monitoring devices | |
CN217300096U (en) | A building guardrail for civil engineering | |
CN218970850U (en) | Outdoor buried hydraulic night vision lifting safety fence | |
CN219195976U (en) | Foundation pit supporting structure | |
CN219412147U (en) | Municipal works construction encloses fender | |
CN216553041U (en) | A novel creeping formwork support body for floor structure department uses | |
CN211922330U (en) | T-beam traversing device for highway and railway bridge construction | |
CN219365655U (en) | Safety device is used in civil engineering construction | |
CN219752986U (en) | Bridge overhauls hanging flower basket construction platform | |
CN212926070U (en) | Assembled slope mixes earth frame board | |
CN215593879U (en) | Assembled flood control wall | |
CN220156086U (en) | Electric power construction crossing frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20230221 Effective date of abandoning: 20230323 |
|
AV01 | Patent right actively abandoned |
Granted publication date: 20230221 Effective date of abandoning: 20230323 |
|
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |