CN209976163U - Building construction protective fence with steel rope structure - Google Patents

Building construction protective fence with steel rope structure Download PDF

Info

Publication number
CN209976163U
CN209976163U CN201920575530.7U CN201920575530U CN209976163U CN 209976163 U CN209976163 U CN 209976163U CN 201920575530 U CN201920575530 U CN 201920575530U CN 209976163 U CN209976163 U CN 209976163U
Authority
CN
China
Prior art keywords
guardrail
steel rope
connecting rod
rope
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920575530.7U
Other languages
Chinese (zh)
Inventor
戴龙强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yixing Xuanxingyuan Metal Technology Co Ltd
Original Assignee
Yixing Xuanxingyuan Metal Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yixing Xuanxingyuan Metal Technology Co Ltd filed Critical Yixing Xuanxingyuan Metal Technology Co Ltd
Priority to CN201920575530.7U priority Critical patent/CN209976163U/en
Application granted granted Critical
Publication of CN209976163U publication Critical patent/CN209976163U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本实用新型公开了一种钢绳结构的建筑施工防护栏,属于防护栏技术领域,包括底座和护栏杆,所述底座的顶部竖直固定有护栏杆,且所述护栏杆的内部中空,所述护栏杆的一侧固定有夹板,该种钢绳结构的建筑施工防护栏,使用者将护栏杆通地脚螺栓进行安装,然后工作人员拉动连接杆,根据施工地的地形调节钢绳的长度,调节好长度后,工作人员将另一个护栏杆搬运至连接杆处,并将连接杆一侧的连接板插入夹板中,使用插销插入通孔对连接杆进行固定,从而完成对护栏的安装,并重复上述步骤对工地外围安装护栏,操作简单,安装方便,当使用完成后,使用者将插销抽出,在扭力弹簧的作用下将钢绳拉回,重新缠绕在绳套上,方便下次使用。

Figure 201920575530

The utility model discloses a building construction guardrail with a steel rope structure, belonging to the technical field of guardrails, comprising a base and a guardrail. The top of the base is vertically fixed with a guardrail, and the interior of the guardrail is hollow, so One side of the guardrail is fixed with a splint. For this kind of steel rope structure construction guardrail, the user installs the guardrail through the anchor bolts, and then the staff pulls the connecting rod to adjust the length of the steel rope according to the terrain of the construction site. , After adjusting the length, the staff transports another guardrail to the connecting rod, inserts the connecting plate on one side of the connecting rod into the splint, and uses the bolt to insert the through hole to fix the connecting rod, thus completing the installation of the guardrail. And repeat the above steps to install the guardrail on the periphery of the construction site, the operation is simple and the installation is convenient. When the use is completed, the user pulls out the latch, pulls the steel rope back under the action of the torsion spring, and rewinds it on the rope sleeve, which is convenient for the next use. .

Figure 201920575530

Description

一种钢绳结构的建筑施工防护栏A kind of building construction protection fence of steel rope structure

技术领域technical field

本实用新型涉及防护栏技术领域,具体为一种钢绳结构的建筑施工防护栏。The utility model relates to the technical field of guardrails, in particular to a building construction guardrail with a steel rope structure.

背景技术Background technique

防护栏也叫防撞护栏,主要用于建筑施工工地内部设施的防护与保护场合,建筑工程防护栏是建筑工程中常用的装置,用来将建筑施工地点与正常的生活环境隔绝开来,也能够用来隔绝人群,对行人起到保护的作用,相当于临时围墙,在施工的外围通常安装有防护栏,防护栏能够阻挡行人车辆靠近施工区域。The guardrail is also called the anti-collision guardrail, which is mainly used for the protection and protection of the internal facilities of the construction site. The construction engineering guardrail is a commonly used device in the construction project. It can be used to isolate people and protect pedestrians. It is equivalent to a temporary fence. A guardrail is usually installed on the periphery of the construction. The guardrail can prevent pedestrians and vehicles from approaching the construction area.

现有的建筑施工防护栏,大多是通过杆状和主体进行组装拼接或焊接,其长度和高度大多固定,无法根据施工现场的长度来进行调节,同时在外围设置防护栏时,当出现拐角后,现有防护栏的长度固定,因此无法使用,需要更换另一长度的护栏,比较麻烦,且现有的护栏与护栏之间的连接方式比较麻烦,对护栏的安装效率较低,需要消耗较多的时间,不方便使用。Existing building construction guardrails are mostly assembled, spliced or welded through rods and the main body, and their length and height are mostly fixed and cannot be adjusted according to the length of the construction site. , the length of the existing guardrail is fixed, so it cannot be used, and it is more troublesome to replace the guardrail with another length, and the connection between the existing guardrail and the guardrail is troublesome, the installation efficiency of the guardrail is low, and the consumption is relatively high. Too much time and inconvenient to use.

实用新型内容Utility model content

本实用新型的目的在于提供一种钢绳结构的建筑施工防护栏,以解决上述背景技术中提出现有防护栏的适用性差,无法满足大多数工地的防护需求和护栏的安装效率低,不方便使用的问题。The purpose of this utility model is to provide a kind of building construction guardrail of steel rope structure, in order to solve the problem of the poor applicability of the existing guardrail proposed in the above-mentioned background technology, unable to meet the protection requirements of most construction sites and the low installation efficiency of the guardrail, which is inconvenient problem of use.

为实现上述目的,本实用新型提供如下技术方案:一种钢绳结构的建筑施工防护栏,包括底座和护栏杆,所述底座的顶部竖直固定有护栏杆,且所述护栏杆的内部中空,所述护栏杆的一侧固定有夹板,所述护栏杆的内部下方安装有第一轴承,所述护栏杆的内部上方安装有第二轴承,所述第一轴承和第二轴承之间连接有转轴,所述转轴的外表面上方连接有扭力弹簧,所述转轴的外表面套接有多个绳套,多个所述绳套的外表面缠绕有钢绳,所述钢绳的一端贯穿护栏杆的另一侧并连接有连接杆,所述连接杆远离钢绳的一侧固定有连接板,所述连接板和夹板的顶端均贯穿有通孔,所述通孔的内部贯穿有插销。In order to achieve the above purpose, the utility model provides the following technical solutions: a steel rope structure construction guardrail, comprising a base and a guardrail, the top of the base is vertically fixed with a guardrail, and the interior of the guardrail is hollow. , a splint is fixed on one side of the guardrail, a first bearing is installed under the interior of the guardrail, a second bearing is installed above the interior of the guardrail, and the first bearing and the second bearing are connected There is a rotating shaft, a torsion spring is connected above the outer surface of the rotating shaft, a plurality of rope sleeves are sleeved on the outer surface of the rotating shaft, and steel ropes are wound on the outer surfaces of the plurality of rope sleeves, and one end of the steel rope passes through The other side of the guardrail is connected with a connecting rod, the side of the connecting rod away from the steel rope is fixed with a connecting plate, the top of the connecting plate and the splint are both penetrated with through holes, and the interior of the through holes is penetrated with a plug .

优选地,所述连接板的厚度与夹板之间的距离相同,且所述连接板与连接杆焊接。Preferably, the thickness of the connecting plate is the same as the distance between the clamping plates, and the connecting plate and the connecting rod are welded.

优选地,所述绳套设置有多个,且多个所述绳套自上而下等距分布于转轴的外表面。Preferably, a plurality of the rope sets are provided, and the plurality of the rope sets are equally spaced from top to bottom on the outer surface of the rotating shaft.

优选地,所述底座的顶部两侧均贯穿有地脚螺栓。Preferably, both sides of the top of the base are provided with anchor bolts.

优选地,所述连接板设置有两个,且两个所述连接板以连接杆的长度中心线为中心对称设置。Preferably, there are two connecting plates, and the two connecting plates are symmetrically arranged around the length center line of the connecting rod.

优选地,所述连接板通过插销与夹板固定。Preferably, the connecting plate is fixed to the clamping plate by means of bolts.

与现有技术相比,本实用新型的有益效果是:该种钢绳结构的建筑施工防护栏,设置有第一轴承、第二轴承、转轴、绳套、钢绳、连接杆、连接板、夹板、通孔和扭力弹簧,在使用时,使用者将多个护栏杆搬运至施工地点,并将护栏杆通地脚螺栓进行安装,然后工作人员拉动连接杆,根据施工地的地形调节钢绳的长度,调节好长度后,工作人员将另一个护栏杆搬运至连接杆处,并将连接杆一侧的连接板插入夹板中,使用插销插入通孔对连接杆进行固定,从而完成对护栏的安装,并重复上述步骤对工地外围安装护栏,操作简单,安装方便,当使用完成后,使用者将插销抽出,在扭力弹簧的作用下将钢绳拉回,重新缠绕在绳套上,方便下次使用,解决了现有防护栏的适用性差,无法满足大多数工地的防护需求和护栏的安装效率低,不方便使用的问题。Compared with the prior art, the beneficial effect of the utility model is that the construction protection fence of the steel rope structure is provided with a first bearing, a second bearing, a rotating shaft, a rope sleeve, a steel rope, a connecting rod, a connecting plate, a Plywood, through holes and torsion springs. When in use, the user transports multiple guardrails to the construction site, and installs the guardrails with anchor bolts. Then the staff pulls the connecting rods to adjust the steel rope according to the terrain of the construction site. After adjusting the length, the staff transports another guardrail to the connecting rod, inserts the connecting plate on one side of the connecting rod into the splint, and uses the bolt to insert the through hole to fix the connecting rod, so as to complete the installation of the guardrail. Installation, and repeat the above steps to install guardrails on the periphery of the construction site. The operation is simple and the installation is convenient. When the use is completed, the user pulls out the latch, pulls the steel rope back under the action of the torsion spring, and rewinds it on the rope sleeve for easy removal. The second use solves the problems of poor applicability of the existing guardrail, inability to meet the protection requirements of most construction sites, and low installation efficiency of the guardrail, which is inconvenient to use.

附图说明Description of drawings

图1为本实用新型结构示意图;Fig. 1 is the structural representation of the utility model;

图2为本实用新型护栏杆剖面结构示意图;Fig. 2 is the cross-sectional structure schematic diagram of the guardrail of the utility model;

图3为本实用新型绳套局部结构示意图;3 is a schematic diagram of the partial structure of the rope cover of the present invention;

图4为本实用新型连接杆局部结构示意图。FIG. 4 is a schematic diagram of the partial structure of the connecting rod of the present invention.

图中:1、底座;2、第一轴承;3、护栏杆;4、转轴;5、夹板;6、插销;7、绳套;8、钢绳;9、扭力弹簧;10、第二轴承;11、通孔;12、连接板;13、连接杆;14、地脚螺栓。In the figure: 1. base; 2. first bearing; 3. guardrail; 4. shaft; 5. splint; 6. latch; 7. rope sleeve; 8. steel rope; 9. torsion spring; 10. second bearing ; 11, through hole; 12, connecting plate; 13, connecting rod; 14, anchor bolt.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

在本实用新型中,除非另有明确的规定和限定,术语“设置”、“安装”、“相连”、“连接”、“固定”、“套接”、等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present utility model, unless otherwise expressly specified and limited, the terms "arrangement", "installation", "connection", "connection", "fixation", "socket connection", etc. should be understood in a broad sense, for example, It can be a fixed connection, a detachable connection, or an integral body; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two components or two. For the interaction relationship between the elements, those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

请参阅图1-4,本实用新型提供一种技术方案:一种钢绳结构的建筑施工防护栏,包括底座1、第一轴承2、护栏杆3、转轴4、夹板5、插销6、绳套7、钢绳8、扭力弹簧9、第二轴承10、通孔11、连接板12、连接杆13和地脚螺栓14,所述底座1的顶部竖直固定有护栏杆3,且所述护栏杆3的内部中空,所述护栏杆3的一侧固定有夹板5,所述护栏杆3的内部下方安装有第一轴承2,所述护栏杆3的内部上方安装有第二轴承10,所述第一轴承2和第二轴承10之间连接有转轴4,所述转轴4的外表面上方连接有扭力弹簧9,所述转轴4的外表面套接有多个绳套7,多个所述绳套7的外表面缠绕有钢绳8,所述钢绳8的一端贯穿护栏杆3的另一侧并连接有连接杆13,所述连接杆13远离钢绳8的一侧固定有连接板12,所述连接板12和夹板5的顶端均贯穿有通孔11,所述通孔11的内部贯穿有插销6,当使用完成后,使用者将插销6抽出,在扭力弹簧9的作用下将钢绳8拉回,重新缠绕在绳套7上,方便下次使用。Please refer to Figures 1-4, the present utility model provides a technical solution: a steel rope structure construction guardrail, comprising a base 1, a first bearing 2, a guardrail 3, a rotating shaft 4, a splint 5, a latch 6, a rope The sleeve 7, the steel rope 8, the torsion spring 9, the second bearing 10, the through hole 11, the connecting plate 12, the connecting rod 13 and the anchor bolt 14, the top of the base 1 is vertically fixed with the guardrail 3, and the said The interior of the guardrail 3 is hollow, a splint 5 is fixed on one side of the guardrail 3, a first bearing 2 is installed below the interior of the guardrail 3, and a second bearing 10 is installed above the interior of the guardrail 3, A rotating shaft 4 is connected between the first bearing 2 and the second bearing 10 , a torsion spring 9 is connected above the outer surface of the rotating shaft 4 , and a plurality of rope sleeves 7 are sleeved on the outer surface of the rotating shaft 4 . The outer surface of the rope cover 7 is wound with a steel rope 8 , one end of the steel rope 8 penetrates the other side of the guardrail 3 and is connected with a connecting rod 13 , and the side of the connecting rod 13 away from the steel rope 8 is fixed with a connecting rod 13 . The connecting plate 12, the top of the connecting plate 12 and the clamping plate 5 all have through holes 11, and the inside of the through holes 11 has a plug 6. After the use is completed, the user pulls out the plug 6. Under the action, the steel rope 8 is pulled back and rewound on the rope sleeve 7, which is convenient for the next use.

请参阅图1-4,所述连接板12的厚度与夹板5之间的距离相同,且所述连接板12与连接杆13焊接,方便将连接板12与夹板5通过插销6固定,提高连接的稳定性,所述绳套7设置有多个,且多个所述绳套7自上而下等距分布于转轴4的外表面,可以提高护栏的防护性,防止行人闯入。1-4, the thickness of the connecting plate 12 is the same as the distance between the clamping plates 5, and the connecting plate 12 and the connecting rod 13 are welded, which facilitates the fixing of the connecting plate 12 and the clamping plate 5 by the bolts 6 and improves the connection. To improve the stability, there are a plurality of the rope sets 7, and the plurality of the rope sets 7 are equally distributed on the outer surface of the rotating shaft 4 from top to bottom, which can improve the protection of the guardrail and prevent pedestrians from intruding.

请参阅图1、图3和图4,所述底座1的顶部两侧均贯穿有地脚螺栓14,提高了护栏杆3的稳定性,方便工作人员安装,所述连接板12设置有两个,且两个所述连接板12以连接杆13的长度中心线为中心对称设置,提高了连接杆13与护栏杆3之间连接的稳定性,方便工作人员操作。Please refer to FIG. 1 , FIG. 3 and FIG. 4 , anchor bolts 14 are penetrated on both sides of the top of the base 1 , which improves the stability of the guardrail 3 and facilitates the installation of the staff. The connecting plate 12 is provided with two , and the two connecting plates 12 are symmetrically arranged with the length center line of the connecting rod 13 as the center, which improves the stability of the connection between the connecting rod 13 and the guardrail 3 and facilitates the operation of the staff.

请参阅图1、图3和图4,所述连接板12通过插销6与夹板5固定,方便工作人员对护栏杆3进行连接安装,操作简单。Please refer to FIG. 1 , FIG. 3 and FIG. 4 , the connecting plate 12 is fixed to the splint 5 by the bolt 6 , which is convenient for the staff to connect and install the guardrail 3 , and the operation is simple.

工作原理:首先在使用时,使用者将多个护栏杆3搬运至施工地点,并将护栏杆3通地脚螺栓14进行安装,然后工作人员拉动连接杆13,根据施工地的地形调节钢绳8的长度,调节好长度后,工作人员将另一个护栏杆3搬运至连接杆13处,并将连接杆13一侧的连接板12插入夹板5中,使用插销6插入通孔11对连接杆13进行固定,从而完成对护栏的安装,并重复上述步骤对工地外围安装护栏,然后进行正常施工,当施工完成后,使用者将插销6抽出,在扭力弹簧9的作用下将钢绳8拉回,重新缠绕在绳套7上,并将护栏杆3拆卸,方便下次使用。Working principle: First, when in use, the user transports multiple guardrails 3 to the construction site, and installs the guardrails 3 through the anchor bolts 14, and then the staff pulls the connecting rod 13 to adjust the steel rope according to the terrain of the construction site. After adjusting the length of 8, the staff transports another guardrail 3 to the connecting rod 13, inserts the connecting plate 12 on one side of the connecting rod 13 into the splint 5, and uses the plug 6 to insert the through hole 11 to the connecting rod. 13. Fix it to complete the installation of the guardrail, and repeat the above steps to install the guardrail on the periphery of the construction site, and then carry out normal construction. When the construction is completed, the user pulls out the latch 6 and pulls the steel rope 8 under the action of the torsion spring 9. Back, rewound it on the rope cover 7, and disassemble the guardrail 3 for the convenience of next use.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes and modifications can be made to these embodiments without departing from the principles and spirit of the present invention , alternatives and modifications, the scope of the present invention is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a steel cable structure's construction rail guard, includes base (1) and guardrail bar (3), its characterized in that: the guardrail rod (3) is vertically fixed at the top of the base (1), the guardrail rod (3) is hollow inside, one side of the guardrail rod (3) is fixed with a clamping plate (5), a first bearing (2) is installed below the inside of the guardrail rod (3), a second bearing (10) is installed above the inside of the guardrail rod (3), a rotating shaft (4) is connected between the first bearing (2) and the second bearing (10), a torsion spring (9) is connected above the outer surface of the rotating shaft (4), a plurality of rope sleeves (7) are sleeved on the outer surface of the rotating shaft (4), a plurality of steel ropes (8) are wound on the outer surface of the rope sleeves (7), one end of each steel rope (8) penetrates through the other side of the guardrail rod (3) and is connected with a connecting rod (13), one side of each connecting rod (13) far away from the steel rope (8) is fixed with a connecting plate (12), the top of connecting plate (12) and splint (5) all runs through there is through-hole (11), the inside of through-hole (11) runs through has bolt (6).
2. A building construction guard rail of steel rope structure as claimed in claim 1, wherein: the thickness of the connecting plate (12) is the same as the distance between the clamping plates (5), and the connecting plate (12) is welded with the connecting rod (13).
3. A building construction guard rail of steel rope structure as claimed in claim 1, wherein: the rope sling (7) is provided with a plurality of rope slings (7), and the rope sling (7) is equidistantly distributed on the outer surface of the rotating shaft (4) from top to bottom.
4. A building construction guard rail of steel rope structure as claimed in claim 1, wherein: foundation bolts (14) penetrate through two sides of the top of the base (1).
5. A building construction guard rail of steel rope structure as claimed in claim 1, wherein: the connecting plates (12) are arranged in two numbers, and the two connecting plates (12) are symmetrically arranged by taking the length center line of the connecting rod (13) as the center.
6. A building construction guard rail of steel rope structure as claimed in claim 1, wherein: the connecting plate (12) is fixed with the clamping plate (5) through a bolt (6).
CN201920575530.7U 2019-04-25 2019-04-25 Building construction protective fence with steel rope structure Expired - Fee Related CN209976163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920575530.7U CN209976163U (en) 2019-04-25 2019-04-25 Building construction protective fence with steel rope structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920575530.7U CN209976163U (en) 2019-04-25 2019-04-25 Building construction protective fence with steel rope structure

Publications (1)

Publication Number Publication Date
CN209976163U true CN209976163U (en) 2020-01-21

Family

ID=69259489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920575530.7U Expired - Fee Related CN209976163U (en) 2019-04-25 2019-04-25 Building construction protective fence with steel rope structure

Country Status (1)

Country Link
CN (1) CN209976163U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144956A (en) * 2020-08-30 2020-12-29 朱陶园 Protective partition device and method for civil and industrial buildings
CN113585063A (en) * 2021-08-04 2021-11-02 江苏柏芸金属科技有限公司 Glass guardrail mounting equipment with lateral screw locking mechanism

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144956A (en) * 2020-08-30 2020-12-29 朱陶园 Protective partition device and method for civil and industrial buildings
CN113585063A (en) * 2021-08-04 2021-11-02 江苏柏芸金属科技有限公司 Glass guardrail mounting equipment with lateral screw locking mechanism

Similar Documents

Publication Publication Date Title
CN209976163U (en) Building construction protective fence with steel rope structure
CN203967625U (en) A kind of overhead facility crossing frame
CN203296451U (en) Pole straightening device
CN208454342U (en) A kind of safety of tower crane platform and standard knot install conjoined device
CN105298205B (en) A device for strengthening and heightening power grid poles and its construction method
CN105350816A (en) Power grid telegraph pole strengthening and heightening device and construction method thereof
CN203352045U (en) Drainage wiring ladder
CN205335796U (en) Transmission line windage yaw defensive installation
CN204079316U (en) A kind of harmless circular steel tube concrete post tower crane attachment anchor ear device
CN204592570U (en) A kind of rotary townhouse cable bearer
CN203096620U (en) Steel pipe arch rib operation platform
CN102916366B (en) Scaffolding type motor-driven cutter mill
CN206053545U (en) Simple construction protection hurdle
CN210013453U (en) Scalable concatenation hoisting frame footboard
CN203322485U (en) Novel petroleum platform pipeline protecting tube
CN207032001U (en) A kind of bridge structure
CN206477601U (en) A kind of prestressed cable support oriented device
CN203977834U (en) A kind of construction of lift well protective platform
CN105788816B (en) A kind of combined type distribution transformer stand and its application method
CN203783229U (en) Chuck for fixing telegraph pole
CN221914530U (en) Gravity anchor of floating type photovoltaic system
CN217327147U (en) Special cat ladder of iron tower
CN201649613U (en) Electric hanging basket steel wire rope fixing mechanism
CN205638201U (en) Novel electric power that improves structure overhauls cat ladder support frame
CN205692652U (en) A kind of combination type distribution transformer stand

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200121

CF01 Termination of patent right due to non-payment of annual fee