CN218492722U - Ready-package steel construction based on building energy saving technology - Google Patents

Ready-package steel construction based on building energy saving technology Download PDF

Info

Publication number
CN218492722U
CN218492722U CN202222136120.7U CN202222136120U CN218492722U CN 218492722 U CN218492722 U CN 218492722U CN 202222136120 U CN202222136120 U CN 202222136120U CN 218492722 U CN218492722 U CN 218492722U
Authority
CN
China
Prior art keywords
groove
steel construction
mobile jib
opening
construction mobile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222136120.7U
Other languages
Chinese (zh)
Inventor
蒋乙伦
沈续著
程浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Naran Construction Co ltd
Original Assignee
Zhejiang Naran Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Naran Construction Co ltd filed Critical Zhejiang Naran Construction Co ltd
Priority to CN202222136120.7U priority Critical patent/CN218492722U/en
Application granted granted Critical
Publication of CN218492722U publication Critical patent/CN218492722U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a ready-package steel construction based on building energy saving technology, including the steel construction mobile jib, the one end of steel construction mobile jib is provided with first opening, just be provided with the connecting block in steel construction mobile jib inner chamber in the first opening, the terminal surface of nearly first opening is provided with first logical groove on the connecting block, nearly its inner tank terminal surface is provided with the spacing groove section of two relative distributions in the first logical groove, two the both ends that the spacing groove section of arc is separated from just communicate with each other at first logical groove lateral wall and be provided with the draw-in groove, the terminal surface in the first logical groove of perpendicular to on the connecting block is provided with the second and leads to the groove, the other end of steel construction mobile jib is provided with the second opening, just be provided with the inserted block in the second opening in steel construction mobile jib inner chamber, the periphery terminal surface of inserted block is provided with two fixture blocks relatively. The utility model discloses a fast-assembling of a plurality of steel construction mobile jib, and realized the connection of the perpendicular facade of two steel construction mobile jib and the connection of horizontal plane.

Description

Ready-package steel construction based on building energy saving technology
Technical Field
The utility model relates to a relevant technical field is connected to the steel construction, specifically is a ready-package steel construction based on building energy saving technology.
Background
Steel structures are generally structures composed of steel materials and are one of the main building structure types. The structure mainly comprises steel beams, steel columns, steel trusses and other members made of section steel, steel plates and the like, and is widely applied to the fields of large-scale plants, venues, super-high buildings and the like.
However, adopt a large amount of bolts to fix when current a large amount of steel construction carry out fixed connection, the troublesome poeration and waste time and energy, assembly efficiency is low, and the bolt is easy to be corroded under adverse circumstances, inconvenient later stage dismantlement maintenance.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a ready-package steel construction based on building energy saving technology to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a ready-package steel construction based on building energy-saving technology, includes the steel construction mobile jib, the one end of steel construction mobile jib is provided with first opening, just be provided with the connecting block in steel construction mobile jib inner chamber in the first opening, the terminal surface of nearly first opening is provided with first logical groove on the connecting block, nearly its inner tank terminal surface in first logical groove is provided with the spacing groove section of two relative distributions's arc, two the both ends that the spacing groove section of arc is separated from just communicate with each other at first logical groove lateral wall and be provided with the draw-in groove, the terminal surface in the first logical groove of perpendicular to on the connecting block is provided with the second and leads to the groove, the other end of steel construction mobile jib is provided with the second opening, just be provided with the inserted block in steel construction mobile jib inner chamber in the second opening, the periphery terminal surface of inserted block is provided with two fixture blocks, and two relatively the fixture block sets up the edge in the nearly outer end of inserted block.
Preferably, the second is led to the groove and is provided with the third opening with the terminal surface that the steel construction mobile jib contacted.
Preferably, two arc-shaped limiting groove sections and two clamping groove structures which are distributed oppositely are also arranged in the second through groove.
Preferably, the clamping groove and the clamping block are arranged in a matched mode.
Preferably, a damping rubber pad is fixedly arranged on the inner groove wall of the arc-shaped limiting groove section.
Preferably, the inner diameters of the first through hole and the third through hole are consistent with the outer diameter specification of the insert block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses the arc spacing groove section and two draw-in groove structures of installing in the first logical groove of connecting block terminal surface in the first logical groove of steel construction mobile jib and the arc spacing groove section and two draw-in groove structures of installing in the second logical groove in the third through hole, the inserted block of installing in the second through hole of steel construction mobile jib that set up, realized the fast-assembling of two or more steel construction mobile jib, the simple operation, insert earlier the back spiral can, replaced traditional bolted connection, assembly efficiency is high;
2. the utility model discloses steel construction mobile jib one side connecting block that still set up simultaneously leads to the groove towards the first of first opening and the second of connecting block towards the third opening, both can carry out the fast-assembling of two steel construction mobile jib of perpendicular facade and connect, can carry out the fast-assembling of two steel construction mobile jib of horizontal plane again and meet, excellent in use effect.
Drawings
FIG. 1 is a sectional view of the whole main view of the present invention;
FIG. 2 is a three-dimensional structure diagram of the through groove and the insert block structure of the present invention;
FIG. 3 is a structural diagram of the assembly of a plurality of steel structural main rods of the present invention;
fig. 4 is an enlarged view of a structure in fig. 3 according to the present invention.
In the figure: 1. a steel structure main rod; 2. a first port; 3. connecting blocks; 4. a first through groove; 5. an arc-shaped limiting groove section; 6. a card slot; 7. a second through groove; 8. a second port; 9. inserting a block; 10. a clamping block; 11. a third port; 12. damping rubber pad.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a ready-package steel construction based on building energy-saving technology, including steel construction mobile jib 1, first opening 2 has been seted up to steel construction mobile jib 1's one end, in first opening 2 and at 1 inner chamber welded mounting of steel construction mobile jib there is connecting block 3, the terminal surface fluting of nearly first opening 2 on connecting block 3 is equipped with first logical groove 4, the arc spacing groove section 5 that has two relative distributions has been seted up to nearly its inner groove terminal surface in first logical groove 4, the both ends that two arc spacing groove sections 5 leave mutually just communicate with each other at first logical groove 4 lateral wall and be equipped with draw-in groove 6, the terminal surface fluting of the first logical groove 4 of perpendicular to on connecting block 3 is equipped with the logical groove 7 of second, second opening 8 has been seted up to steel construction mobile jib 1's the other end, in the second opening 8 and at 1 inner chamber welded fixed mounting of steel construction mobile jib there is inserted block 9, two fixture blocks 10 are installed to butt welding mutually in the peripheral terminal surface of inserted block 9, and the edge of the nearly outer end of two fixture block 10 welded fastening at inserted block 9.
A third through hole 11 is formed in the end face, which is in contact with the steel structure main rod 1, of the second through groove 7 and penetrates through the outer wall of the steel structure main rod 1; the second through groove 7 is also provided with two arc-shaped limiting groove sections 5 and two clamping grooves 6 which are oppositely distributed; the clamping groove 6 is matched and connected with the clamping block 10; a damping rubber pad 12 is adhered to the inner groove wall of the arc-shaped limiting groove section 5; the inner diameters of the first through opening 2 and the third through opening 11 are consistent with the outer diameter specification of the insert block 9.
The working principle is as follows: the utility model discloses a when using, through getting a plurality of steel construction mobile jib 1 that adopt this application to use, after that carry out end to end operation at two steel construction mobile jib 1, only need insert the inserted block 9 of 8 departments of second opening of one of them steel construction mobile jib 1 and insert the first logical groove 4 of installation in the first opening 2 of another steel construction mobile jib 1 that meets, because the draw-in groove 6 that two fixture blocks 10 of inserted block 9 periphery end face installation and first logical groove 4 lateral wall were equipped with, can imbed behind the draw-in groove 6 with fixture block 10, then rotating steel construction mobile jib 1, make fixture block 10 joint at 5 inner chambers of arc spacing groove section, the fast-assembling that has kept two steel construction mobile jib 1 is connected, when carrying out two steel construction mobile jib 1 vertical connections in addition, equally with fixture block 10 embedding draw-in groove 6 back, then rotating mobile jib 1, make fixture block 10 joint at 5 inner chambers of arc spacing groove section, but, the operation at this moment is the third opening 11 of seting one of the inserted block 9 of one of them mobile jib 1 to another steel construction 1 terminal surface, and accomplish 10 and draw-in second opening 7, the rotary joint of fixture block 6 has the advantage of simple in structure, and good use effect.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a ready-package steel construction based on building energy saving technology, includes steel construction mobile jib (1), its characterized in that: the one end of steel construction mobile jib (1) is provided with first opening (2), just be provided with connecting block (3) in steel construction mobile jib (1) inner chamber in first opening (2), the terminal surface of nearly first opening (2) is provided with first logical groove (4) on connecting block (3), its inner groove terminal surface is provided with two relative distribution's arc spacing groove section (5) in first logical groove (4), two arc spacing groove section (5) both ends of separating from each other just communicate with each other at first logical groove (4) lateral wall and be provided with draw-in groove (6), the terminal surface that the first logical groove of perpendicular to (4) was provided with second through groove (7) on connecting block (3), the other end of steel construction mobile jib (1) is provided with second opening (8), just be provided with inserted block (9) in second opening (8) in steel construction mobile jib (1) inner chamber, the periphery terminal surface of inserted block (9) is provided with two fixture blocks (10) relatively, and two fixture block (10) set up the edge in the nearly outer end of inserted block (9).
2. The quick-assembly steel structure based on the building energy-saving technology is characterized in that: and a third through hole (11) is formed in the end surface, which is in contact with the steel structure main rod (1), of the second through groove (7).
3. The quick-assembly steel structure based on the building energy-saving technology is characterized in that: two arc-shaped limiting groove sections (5) and two clamping groove (6) structures which are distributed oppositely are also arranged in the second through groove (7).
4. The quick-assembly steel structure based on the building energy-saving technology is characterized in that: the clamping groove (6) and the clamping block (10) are arranged in a matched mode.
5. The quick-assembly steel structure based on the building energy-saving technology is characterized in that: and a damping rubber pad (12) is fixedly arranged on the inner groove wall of the arc-shaped limiting groove section (5).
6. The quick-assembly steel structure based on the building energy-saving technology is characterized in that: the inner diameters of the first through hole (2) and the third through hole (11) are consistent with the outer diameter specification of the insert block (9).
CN202222136120.7U 2022-08-15 2022-08-15 Ready-package steel construction based on building energy saving technology Active CN218492722U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222136120.7U CN218492722U (en) 2022-08-15 2022-08-15 Ready-package steel construction based on building energy saving technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222136120.7U CN218492722U (en) 2022-08-15 2022-08-15 Ready-package steel construction based on building energy saving technology

Publications (1)

Publication Number Publication Date
CN218492722U true CN218492722U (en) 2023-02-17

Family

ID=85185688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222136120.7U Active CN218492722U (en) 2022-08-15 2022-08-15 Ready-package steel construction based on building energy saving technology

Country Status (1)

Country Link
CN (1) CN218492722U (en)

Similar Documents

Publication Publication Date Title
CN211735781U (en) Modular assembly type steel structure house body
CN112538985A (en) Quickly-built house and dismounting and mounting method thereof
CN218492722U (en) Ready-package steel construction based on building energy saving technology
CN215486167U (en) Aluminum alloy pipe gallery trailing arm
CN214462450U (en) Double-groove supporting and hanging type connecting piece
CN213508987U (en) Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate
CN214498508U (en) House capable of being built quickly
CN211667332U (en) A pipeline connection structure for municipal administration plumbing
CN209780071U (en) Building roof heat insulation board
CN106836481B (en) A kind of lightweight steel construction quarter bend beam-column connection
CN214461644U (en) Detachable split open type floor support plate
CN214786311U (en) Rain-shielding sun-proof device for building construction
CN214839246U (en) Pipeline supporting construction for municipal works
CN111426084A (en) Medium-deep layer efficient heat exchange geothermal well system
CN210288003U (en) Recyclable rapid assembled safety channel
CN208056397U (en) A kind of big plate of novel prefabricated partition wall and connecting node
CN212129464U (en) Special-shaped steel beam
CN221143198U (en) Super high-rise back bolt stone curtain wall
CN217603575U (en) Connecting device for water conservancy pipeline installation
CN218540771U (en) Waterproof structure for structural joint of underground pipe gallery
CN218580828U (en) Assembly type integrated house convenient to install
CN212053227U (en) Mounting structure for gusset plate
CN212104532U (en) Steel structure node connecting component
CN219158547U (en) Multilayer assembled energy-saving building
CN215253441U (en) Energy-conserving fire prevention steel construction of green building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant