CN218491611U - Sludge drying pretreatment tank - Google Patents
Sludge drying pretreatment tank Download PDFInfo
- Publication number
- CN218491611U CN218491611U CN202222806959.7U CN202222806959U CN218491611U CN 218491611 U CN218491611 U CN 218491611U CN 202222806959 U CN202222806959 U CN 202222806959U CN 218491611 U CN218491611 U CN 218491611U
- Authority
- CN
- China
- Prior art keywords
- pipe
- preliminary treatment
- water
- treatment pond
- electric putter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Drying Of Solid Materials (AREA)
Abstract
The utility model discloses a belong to sludge treatment technical field, specifically be a sludge drying preliminary treatment pond, including preliminary treatment pond, preliminary treatment pond upside is provided with the pipe that absorbs water, the union coupling that absorbs water has the hose, the hose connection has the drain pipe, install the water pump on the pipeline of drain pipe, preliminary treatment pond left side is provided with the support, there is electric putter through bolted connection on the support, the flexible end downside of electric putter is provided with the connecting seat, lets in mud preliminary treatment pond, makes mud deposit to the bottom after a period of stewing, and sewage appears in the upper strata, and water pump work is through the pipe that absorbs water with sewage suction to discharge through the drain pipe, drive the pipe that absorbs water through electric putter and reciprocate, the flexible control that is convenient for absorb water the height of absorbing water of pipe, convenient comparatively comprehensive upper sewage of getting rid of, the upper sewage that can significantly reduce remains, makes things convenient for the follow-up mummification of mud.
Description
Technical Field
The utility model relates to a sludge treatment field specifically is a sludge drying preliminary treatment pond.
Background
In the process of sewage treatment, the agent is added into the sewage to generate sludge, the sludge is settled by standing the sludge, then the sewage is sucked out, and the sludge is dried and pretreated, so that the subsequent treatment of the sludge is facilitated.
Chinese patent No. CN205241451U discloses a "sewage treatment system", wherein the sludge treatment tank includes a sludge settling tank, a sludge concentration tank and a sludge drying tank, the upper part and the lower part of the sludge settling tank are respectively provided with a water outlet and a sludge outlet, during the use process, after the sludge is introduced into the sludge settling tank for settling, the water is discharged through the water outlet on the upper part of the sludge settling tank, then the sludge at the bottom of the sludge settling tank flows into the sludge storage chamber of the sludge concentration tank through the first sludge outlet, but the water outlet height of the water outlet is not easy to adjust, if the water outlet height is too high, more sewage cannot be discharged, if the water outlet height is too low, the sewage is not easy to flow out due to the obstruction of the sludge, thereby bringing inconvenience for use.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a sludge drying preliminary treatment pond to when solving the current sludge drying preliminary treatment that proposes in the above-mentioned background art, the play water height of delivery port is difficult for adjusting, if the delivery port height is too high, then has the unable discharge of more sewage, if the delivery port height is low excessively, then can lead to sewage to be difficult for flowing, thereby brings awkward problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a sludge drying preliminary treatment pond, includes preliminary treatment pond, preliminary treatment pond upside is provided with the pipe that absorbs water, the union coupling that absorbs water has the hose, the hose connection has the drain pipe, install the water pump on the pipeline of drain pipe, preliminary treatment pond left side is provided with the support, there is electric putter through bolted connection on the support, the flexible end downside of electric putter is provided with the connecting seat, the connecting seat side is provided with clamping device, it is fixed that the pipe that absorbs water passes through clamping device, be provided with the backup pad on the support, backup pad lower extreme front side fixedly connected with guide bar, sliding connection has the guide block on the guide bar, pass through bolted connection between guide block and the connecting seat, the flexible end of electric putter is parallel to each other with the guide bar.
Preferably, a supporting table is arranged on the left side of the pretreatment tank, and the water pump is fixed on the supporting table through bolts.
Preferably, clamping device includes annular holder, annular holder left side is provided with the breach, breach department is provided with the connecting block, the contact of water absorption pipe outer wall and annular holder inner wall, install bolt and nut between the connecting block.
Preferably, a rubber layer is bonded on the inner wall of the annular clamping seat.
Compared with the prior art, the beneficial effects of the utility model are that:
1) The sludge is introduced into the pretreatment tank, the sludge is settled to the bottom after standing for a period of time, sewage appears on the upper layer, the water pump works, the sewage is sucked out through the water suction pipe and is discharged through the drain pipe, the water suction pipe is driven by the electric push rod to move up and down, the water suction height of the water suction pipe is conveniently and comprehensively controlled, the upper-layer sewage is conveniently removed, the upper-layer sewage residue can be greatly reduced, and the subsequent drying of the sludge is facilitated;
2) The stability of the water suction pipe in the moving process is improved through the sliding connection of the guide rod and the guide block;
3) Through clamping device's setting, the pipe that absorbs water is easy to assemble and dismantlement.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of a partial structure of the present invention;
fig. 3 is a schematic view of the top view structure of the clamping device of the present invention.
In the figure: 1. a pretreatment tank; 2. a support table; 3. a water pump; 4. a drain pipe; 5. a hose; 6. a support; 7. a suction pipe; 8. an electric push rod; 9. a support plate; 10. a guide bar; 11. a guide block; 12. a connecting seat; 13. a clamping device; 14. a notch; 15. connecting blocks; 16. annular holder.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The embodiment is as follows:
referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a sludge drying preliminary treatment pond, includes preliminary treatment pond 1, 1 upside in preliminary treatment pond is provided with the pipe 7 that absorbs water, the pipe 7 that absorbs water is connected with hose 5, avoids influencing the reciprocating of the pipe 7 that absorbs water, hose 5 is connected with drain pipe 4, install water pump 3 on the pipeline of drain pipe 4, 1 left side in preliminary treatment pond is provided with support 6, there is electric putter 8 through bolted connection on the support 6, 8 flexible end downside of electric putter is provided with connecting seat 12, connecting seat 12 side is provided with clamping device 13, it is fixed that the pipe 7 that absorbs water passes through clamping device 13, drives the pipe 7 that absorbs water through electric putter 8 and reciprocates, adjusts the height that absorbs water, be provided with backup pad 9 on the support 6, backup pad 9 lower extreme front side fixedly connected with guide bar 10, sliding connection has guide block 11 on the guide bar 10, through bolted connection between guide block 11 and the connecting seat 12, 8 flexible ends of electric putter are parallel to each other with guide bar 10, make the pipe 7 that absorbs water can steadily reciprocate.
A supporting table 2 is arranged on the left side of the pretreatment pool 1, and the water pump 3 is fixed on the supporting table 2 through bolts.
The inner wall of the annular clamping seat 16 is bonded with a rubber layer, so that better clamping and fixing are facilitated.
The working principle is as follows: let in preliminary treatment pond 1 with mud, make sludge settling to the bottom after a period of stewing, sewage appears in the upper strata, 3 works of water pump, through absorbing water pipe 7 with sewage suction, and discharge through drain pipe 4, it reciprocates to drive through electric putter 8 and absorb water pipe 7, be convenient for control the height that absorbs water of pipe 7 in a flexible way, convenient comparatively comprehensive upper sewage of getting rid of, upper sewage that can significantly reduce remains, make things convenient for the follow-up mummification of mud, sliding connection through guide bar 10 and guide block 11, improve the stability that absorbs water pipe 7 removal in-process, setting through clamping device 13, easy to assemble and dismantlement absorb water pipe 7.
Having shown and described the basic principles and principal features of the invention and advantages thereof, it will be apparent to those skilled in the art that the invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other specific forms without departing from the spirit or essential characteristics thereof; the present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (4)
1. The utility model provides a sludge drying preliminary treatment pond, includes preliminary treatment pond (1), its characterized in that: pretreatment pond (1) upside is provided with absorbs water pipe (7), it is connected with hose (5) to absorb water pipe (7), hose (5) are connected with drain pipe (4), install water pump (3) on the pipeline of drain pipe (4), pretreatment pond (1) left side is provided with support (6), there are electric putter (8) through bolted connection on support (6), electric putter (8) flexible end downside is provided with connecting seat (12), connecting seat (12) side is provided with clamping device (13), it is fixed that pipe (7) absorb water passes through clamping device (13), be provided with backup pad (9) on support (6), backup pad (9) lower extreme front side fixedly connected with guide bar (10), sliding connection has guide block (11) on guide bar (10), pass through bolted connection between guide block (11) and connecting seat (12), electric putter (8) flexible end is parallel to each other with guide bar (10).
2. The sludge drying pretreatment tank of claim 1, which is characterized in that: a supporting table (2) is arranged on the left side of the pretreatment tank (1), and the water pump (3) is fixed on the supporting table (2) through bolts.
3. The sludge drying pretreatment tank of claim 1, which is characterized in that: clamping device (13) include annular holder (16), annular holder (16) left side is provided with breach (14), breach (14) department is provided with connecting block (15), the contact of pipe (7) outer wall and annular holder (16) inner wall absorbs water, install bolt and nut between connecting block (15).
4. The sludge drying pretreatment tank of claim 3, which is characterized in that: the inner wall of the annular clamping seat (16) is bonded with a rubber layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222806959.7U CN218491611U (en) | 2022-10-25 | 2022-10-25 | Sludge drying pretreatment tank |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222806959.7U CN218491611U (en) | 2022-10-25 | 2022-10-25 | Sludge drying pretreatment tank |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218491611U true CN218491611U (en) | 2023-02-17 |
Family
ID=85196480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222806959.7U Active CN218491611U (en) | 2022-10-25 | 2022-10-25 | Sludge drying pretreatment tank |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218491611U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118637733A (en) * | 2024-08-12 | 2024-09-13 | 同济大学 | Device and method for removing fluoride ions in wastewater |
-
2022
- 2022-10-25 CN CN202222806959.7U patent/CN218491611U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118637733A (en) * | 2024-08-12 | 2024-09-13 | 同济大学 | Device and method for removing fluoride ions in wastewater |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218491611U (en) | Sludge drying pretreatment tank | |
CN211813850U (en) | High-efficient sewage treatment device | |
CN116020802A (en) | Solar photovoltaic board dust removal cleaning equipment | |
CN210122513U (en) | Domestic sewage filtering device with multi-stage filtering function | |
CN216938172U (en) | Cutting device is used in reinforcing bar processing | |
CN213823569U (en) | High-pressure washing device of sedimentation tank | |
CN211770691U (en) | Precipitation device is used in production of high-efficient phosphorus removal agent | |
CN211874840U (en) | High-efficiency energy-saving circulating water pump | |
CN216223100U (en) | A improve device for two heavy pond sedimentation efficiency | |
CN221703788U (en) | Ponding processing apparatus based on tunnel construction | |
CN210635868U (en) | Sludge treatment fermentation vat mud eduction gear | |
CN219701357U (en) | Coating auxiliary agent extraction filter equipment | |
CN212091381U (en) | Novel vacuum knockout system | |
CN221431725U (en) | Gastric lavage device | |
CN213112869U (en) | Medium filter for water treatment | |
CN216472612U (en) | Be used for automatic degassing unit that clears up of domestic water tank | |
CN217924056U (en) | Municipal administration sewage aftertreatment silt remover | |
CN212662792U (en) | Mud scraping device for environment-friendly sewage treatment tank | |
CN219167838U (en) | Highway tunnel cleaning and recycling water recycling device | |
CN221608303U (en) | Water receiving device of water jet loom | |
CN217379198U (en) | Integrated rainwater drainage pump station | |
CN219098785U (en) | Filtering structure for sewage treatment | |
CN212425481U (en) | Sewage treatment pond for sewage treatment system based on plc programming | |
CN219914158U (en) | Cleaning device of plate heat exchanger | |
CN220897794U (en) | Painless electric shock slaughtering device for cattle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |