CN218454308U - Railway track support convenient to dismouting - Google Patents

Railway track support convenient to dismouting Download PDF

Info

Publication number
CN218454308U
CN218454308U CN202221419562.6U CN202221419562U CN218454308U CN 218454308 U CN218454308 U CN 218454308U CN 202221419562 U CN202221419562 U CN 202221419562U CN 218454308 U CN218454308 U CN 218454308U
Authority
CN
China
Prior art keywords
base
fixing
groove
block
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221419562.6U
Other languages
Chinese (zh)
Inventor
别军民
武玉雪
陈春龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Yulong Railway Equipment Co ltd
Original Assignee
Qingdao Yulong Railway Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Yulong Railway Equipment Co ltd filed Critical Qingdao Yulong Railway Equipment Co ltd
Priority to CN202221419562.6U priority Critical patent/CN218454308U/en
Application granted granted Critical
Publication of CN218454308U publication Critical patent/CN218454308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model discloses a railway track support convenient to dismouting, including first base, the right side of first base is provided with the second base, the front of first base and second base is the first rail of fixedly connected with and second rail respectively, the right side fixedly connected with joint piece of first base, the joint groove has been seted up in the left side of second base, and the joint groove agrees with each other with the joint piece, the extrusion mouth has been seted up to the top and the bottom in joint groove. The utility model discloses a first base, second base, first rail, second rail, joint piece, joint groove, extrusion mouth, extrusion piece, first fixed slot, second fixed slot, pivot, fixed block, screw hole and fixing bolt's setting has solved current railway rails and has adopted multiunit fastening bolt's mode to fix the problem that is unfavorable for the staff to dismantle, change and overhaul, has possessed the advantage that railway rails can install fast, convenient to detach and overhaul.

Description

Railway track support convenient to dismouting
Technical Field
The utility model relates to a railway rails support technical field convenient to dismouting specifically is a railway rails support convenient to dismouting.
Background
Railway rails, rail, track, etc., are used on railway, and cooperate with a switch to make a train walk without steering, and railway rails made of steel can bear a greater weight than other materials, and sleepers, also called sleepers, or sleepers, are used to distribute the weight of the rails and the pressure applied to the rails separately, and to maintain a fixed gauge and to maintain the gauge of the rails.
When the staff installs the railway rails, current railway rails mounting structure is comparatively complicated, adopts multiunit fastening bolt's mode to fix mostly, receives vibrations when fastening bolt and becomes flexible easily, need dismantle multiunit fastening bolt when the staff overhauls to a large amount of time has been wasted, thereby be unfavorable for staff's dismantlement, change and maintenance.
SUMMERY OF THE UTILITY MODEL
For solving the problem that provides among the above-mentioned background art, the utility model aims to provide a railway rails support convenient to dismouting has possessed the advantage that railway rails can install fast, convenient to detach and overhaul, has solved current railway rails and has adopted multiunit fastening bolt's mode to fix the problem that is unfavorable for staff to dismantle, change and overhaul.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a railway rails support convenient to dismouting, includes first base, the right side of first base is provided with the second base, the front of first base and second base is first rail of fixedly connected with and second rail respectively, the right side fixedly connected with joint piece of first base, the joint groove has been seted up in the left side of second base, and the joint groove agrees with each other with the joint piece, the extrusion mouth has been seted up to the top and the bottom in joint groove, and extrudees mouth and joint groove intercommunication, the right side of first base is about joint piece symmetry fixedly connected with extrusion piece, and the right side of extrusion piece extends to the inside and the extrusion mouth joint in joint groove, first fixed slot has been seted up on the positive right side of first base, the second fixed slot has been seted up in the positive left side of second base, the inside of second fixed slot is rotated and is connected with the pivot, the surface cover of pivot is equipped with the fixed block, the left end and the first fixed slot cooperation of fixed block are used, the screw hole has been seted up in the positive left side of first fixed slot, positive left side is provided with fixing bolt, and runs through the fixed block and threaded connection with screw hole fixed block.
As the utility model discloses preferred, the right side fixedly connected with auxiliary block of first rail, the auxiliary tank has been seted up in the left side of second rail, and the mutual joint of auxiliary tank and auxiliary block.
As the utility model discloses it is preferred, the shape of first fixed slot and second fixed slot is the T font, the shape of fixed block is the I-shaped, and the fixed block agrees with each other with first fixed slot and second fixed slot.
As the utility model discloses it is preferred, the quantity of first fixed slot, second fixed slot, pivot and fixed block is two sets of, and just two sets of first fixed slot, second fixed slot, pivot and fixed block are the symmetry setting about first rail and second rail.
As the utility model discloses it is preferred, the front of first fixed slot is provided with the elastic webbing, and the elastic webbing uses with the fixed block cooperation, the equal fixedly connected with boss in top and the bottom of elastic webbing, and boss and first base fixed connection.
As the utility model discloses it is preferred, the first magnet of the equal fixedly connected with of tank bottom of first fixed slot and second fixed slot, and first magnet is connected with fixed block magnetism, the hole bottom fixedly connected with second magnet of screw hole, and second magnet and fixing bolt magnetism are connected.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a first base, the second base, first rail, the second rail, the joint piece, the joint groove, the extrusion mouth, the extrusion piece, first fixed slot, the second fixed slot, the apparatus further comprises a rotating shaft, the fixed block, screw hole and fixing bolt's setting, the mode of having solved current railway track and adopting multiunit fastening bolt is fixed and is unfavorable for the staff to dismantle, the problem of change and maintenance, when the staff installs railway track, at first align the joint piece on the first base with the joint groove on the second base, then press the extrusion piece and impel to the joint inslot of second base right, extrusion piece and extrusion mouth chucking this moment, joint piece and joint groove in close contact with, then rotate the fixed block in the second fixed slot to first fixed slot through the pivot, then it is fixed with it in through rotatory fixing bolt to the screw hole, thereby reach the effect of installation railway rail, when needs are dismantled the maintenance operation otherwise can, railway track can install fast, convenient to dismantle and overhaul's advantage.
2. The utility model discloses a setting of supplementary piece and supplementary groove, the further relation of being connected between first rail of reinforceing and the second rail makes first rail and second rail joint inseparabler.
3. The utility model discloses a setting of the first fixed slot of T font and second fixed slot and I-shaped fixed block has avoided the fixed block to rock about first fixed slot and second fixed slot, has reduced the pulling force that fixing bolt bore simultaneously.
4. The utility model discloses a setting of two sets of first fixed slots, second fixed slot, pivot and fixed block further reinforces the relation of connection of first base and second base, makes being connected between first base and the second base more stable.
5. The utility model discloses a thereby the not hard up problem that drives the fixed block rebound of fixing bolt when preventing first base vibration from appearing in the setting of elastic webbing and boss.
6. The utility model discloses a setting of first magnet, the further joint relation of strengthening fixed block and first fixed slot and second fixed slot through the setting of second magnet, increases fixing bolt gravity, has promoted the fixed effect of fixing bolt.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a schematic bottom view of the present invention;
fig. 3 is a left side schematic view of the joint block and the joint groove of the present invention.
In the figure: 1. a first base; 2. a second base; 3. a first rail; 4. a second rail; 5. a clamping block; 6. a clamping groove; 7. an extrusion port; 8. extruding the block; 9. a first fixing groove; 10. a second fixing groove; 11. a rotating shaft; 12. a fixed block; 13. a threaded hole; 14. fixing the bolt; 15. an auxiliary block; 16. an auxiliary groove; 17. an elastic band; 18. a reinforcing block; 19. a first magnet; 20. a second magnet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1 to 3, the utility model provides a pair of railway track support convenient to dismouting, including first base 1, first base 1's right side is provided with second base 2, first base 1 and second base 2's front difference fixedly connected with first rail 3 and second rail 4, first base 1's right side fixedly connected with joint piece 5, joint groove 6 has been seted up in second base 2's left side, and joint groove 6 agrees with each other with joint piece 5, extrusion mouth 7 has been seted up to joint groove 6's top and bottom, and extrusion mouth 7 and joint groove 6 intercommunication, first base 1's right side is about joint piece 5 symmetrical fixedly connected with extrusion piece 8, and extrusion piece 8's right side extends to joint groove 6's inside and extrusion mouth 7 joint, first fixed slot 9 has been seted up on first base 1 positive right side, second fixed slot 10 has been seted up in the positive left side of second base 2, the inside rotation of second fixed slot 10 is connected with pivot 11, pivot 11's surface cover is equipped with fixed block 12, the left end of fixed block 12 uses with first fixed slot 9, the positive fixed slot 9 complex is seted up on the left side of fixed bolt 12, the fixed bolt threaded hole 13 and the left side of fixed bolt connection screw hole 14, the fixed block 13 is provided with screw hole 14.
Referring to fig. 2, an auxiliary block 15 is fixedly connected to the right side of the first rail 3, an auxiliary groove 16 is formed in the left side of the second rail 4, and the auxiliary groove 16 and the auxiliary block 15 are clamped to each other.
As a technical optimization scheme of the utility model, through the setting of supplementary piece 15 and supplementary groove 16, the further connected relation of strengthening between first rail 3 and the second rail 4 makes first rail 3 inseparabler with second rail 4 joint.
Referring to fig. 1, the first fixing groove 9 and the second fixing groove 10 are both T-shaped, the fixing block 12 is i-shaped, and the fixing block 12 is fitted with the first fixing groove 9 and the second fixing groove 10.
As a technical optimization scheme of the utility model, through the setting of the first fixed slot 9 of T font and second fixed slot 10 and I-shaped fixed block 12, avoided fixed block 12 to rock about in first fixed slot 9 and second fixed slot 10, reduced the pulling force that fixing bolt 14 was undertaken simultaneously.
Referring to fig. 1, the number of the first fixing grooves 9, the second fixing grooves 10, the rotation shafts 11, and the fixing blocks 12 is two, and the two sets of the first fixing grooves 9, the second fixing grooves 10, the rotation shafts 11, and the fixing blocks 12 are symmetrically disposed with respect to the first rail 3 and the second rail 4.
As a technical optimization scheme of the utility model, through the setting of two sets of first fixed slot 9, second fixed slot 10, pivot 11 and fixed block 12, further strengthen first base 1 and second base 2's relation of connection, make the connection between first base 1 and the second base 2 more stable.
Referring to fig. 1 and 2, an elastic belt 17 is disposed on the front surface of the first fixing groove 9, the elastic belt 17 is used in cooperation with the fixing block 12, reinforcing blocks 18 are fixedly connected to the top and the bottom of the elastic belt 17, and the reinforcing blocks 18 are fixedly connected to the first base 1.
As a technical optimization scheme of the utility model, through the setting of elastic webbing 17 and boss 18, thereby 14 not hard up problems that drive fixed block 12 rebound of fixing bolt when preventing first base 1 vibration from appearing.
Referring to fig. 2, a first magnet 19 is fixedly connected to the bottom of each of the first fixing groove 9 and the second fixing groove 10, the first magnet 19 is magnetically connected to the fixing block 12, and a second magnet 20 is fixedly connected to the bottom of the threaded hole 13, and the second magnet 20 is magnetically connected to the fixing bolt 14.
As the utility model discloses a technical optimization scheme, through the setting of first magnet 19, the further joint relation of strengthening fixed block 12 and first fixed slot 9 and second fixed slot 10 through the setting of second magnet 20, increases 14 gravity to fixing bolt, has promoted the fixed effect of fixing bolt 14.
The utility model discloses a theory of operation and use flow: when a worker installs a railway track, firstly, the clamping blocks 5 on the first base 1 are aligned with the clamping grooves 6 on the second base 2, then the two extrusion blocks 8 are pressed and pushed rightwards into the clamping grooves 6 of the second base 2, the extrusion blocks 8 are tightly clamped with the extrusion ports 7, the clamping blocks 5 are tightly contacted with the clamping grooves 6, at the moment, the auxiliary blocks 15 on the first rail 3 are clamped into the auxiliary grooves 16 on the second rail 4, the first rail 3 is more tightly connected with the second rail 4, then the elastic belts 17 are pulled upwards, then the fixing blocks 12 in the second fixing grooves 10 are rotated into the first fixing grooves 9 through the rotating shafts 11, at the moment, the first magnets 19 play a role of assisting in fixing the fixing blocks 12, then the fixing blocks are fixed in the threaded holes 13 through rotating the fixing bolts 14, at the moment, the second magnets 20 play a role of reinforcing the fixing bolts 14, so that the effect of installing the railway track is achieved, and vice versa operation can be performed when the railway track needs to be disassembled and overhauled.
In summary, the following steps: this railway rails support convenient to dismouting, through first base 1, second base 2, first rail 3, second rail 4, joint piece 5, joint groove 6, extrusion mouth 7, extrusion piece 8, first fixed slot 9, second fixed slot 10, pivot 11, fixed block 12, screw hole 13 and fixing bolt 14's cooperation is used, solved current railway rails and adopted multiunit fastening bolt's mode to fix the problem that is unfavorable for the staff to dismantle, change and overhaul.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a railway rails support convenient to dismouting, includes first base (1), its characterized in that: the right side of the first base (1) is provided with a second base (2), the front of the first base (1) and the front of the second base (2) are respectively fixedly connected with a first rail (3) and a second rail (4), the right side of the first base (1) is fixedly connected with a joint block (5), the left side of the second base (2) is provided with a joint groove (6), the joint groove (6) and the joint block (5) are mutually matched, the top and the bottom of the joint groove (6) are provided with an extrusion port (7), the extrusion port (7) is communicated with the joint groove (6), the right side of the first base (1) is symmetrically and fixedly connected with an extrusion block (8) relative to the joint block (5), the right side of the extrusion block (8) extends to the inside of the joint groove (6) and is clamped with the extrusion port (7), the right side of the front of the first base (1) is provided with a first fixing groove (9), the left side of the front of the second base (2) is provided with a second fixing groove (10), the inside of the second base (10) rotates to be connected with a rotating shaft (11), and the surface of the first fixing groove (9) is sleeved with a left fixing groove (12), and the left side of the fixing groove (9) is provided with a left fixing groove (12), the left side of the front face of the fixing block (12) is provided with a fixing bolt (14), and the fixing bolt (14) penetrates through the fixing block (12) and is in threaded connection with the threaded hole (13).
2. A readily demountable railway track support according to claim 1, wherein: the right side fixedly connected with auxiliary block (15) of first rail (3), auxiliary groove (16) have been seted up in the left side of second rail (4), and auxiliary groove (16) and auxiliary block (15) joint each other.
3. A readily demountable railway track support according to claim 1, wherein: the shape of the first fixing groove (9) and the shape of the second fixing groove (10) are both T-shaped, the shape of the fixing block (12) is I-shaped, and the fixing block (12) is matched with the first fixing groove (9) and the second fixing groove (10) mutually.
4. A readily demountable railway track support according to claim 1, wherein: the number of the first fixing grooves (9), the second fixing grooves (10), the rotating shafts (11) and the fixing blocks (12) is two, and the two groups of the first fixing grooves (9), the second fixing grooves (10), the rotating shafts (11) and the fixing blocks (12) are symmetrically arranged relative to the first rail (3) and the second rail (4).
5. A railway track support for ready disassembly according to claim 4 wherein: the front of first fixed slot (9) is provided with elastic webbing (17), and elastic webbing (17) and fixed block (12) cooperation use, the equal fixedly connected with boss (18) in top and the bottom of elastic webbing (17), and boss (18) and first base (1) fixed connection.
6. A readily removable railway track support according to claim 5, wherein: the equal fixedly connected with first magnet (19) of tank bottom of first fixed slot (9) and second fixed slot (10), and first magnet (19) are connected with fixed block (12) magnetism, the hole bottom fixedly connected with second magnet (20) of screw hole (13), and second magnet (20) and fixing bolt (14) magnetism are connected.
CN202221419562.6U 2022-06-07 2022-06-07 Railway track support convenient to dismouting Active CN218454308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221419562.6U CN218454308U (en) 2022-06-07 2022-06-07 Railway track support convenient to dismouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221419562.6U CN218454308U (en) 2022-06-07 2022-06-07 Railway track support convenient to dismouting

Publications (1)

Publication Number Publication Date
CN218454308U true CN218454308U (en) 2023-02-07

Family

ID=85123364

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221419562.6U Active CN218454308U (en) 2022-06-07 2022-06-07 Railway track support convenient to dismouting

Country Status (1)

Country Link
CN (1) CN218454308U (en)

Similar Documents

Publication Publication Date Title
CN210396166U (en) Concrete vibrator
CN108381461B (en) Efficient bearing dismounting device
CN110051114B (en) Quick-dismantling mechanism for lifting table
CN218454308U (en) Railway track support convenient to dismouting
CN203401060U (en) Framework structure of fan-shaped section of continuous casting machine
CN106079043A (en) A kind of gang form
CN206844715U (en) A kind of novel building ergonomic support device
CN202416094U (en) Fixing device for embedded iron seats of heavy-load sleeper and switch tie
CN106079042A (en) A kind of gang form
CN205915482U (en) Built -up plate
CN218286010U (en) Sleeper sign forming device
CN208148128U (en) A kind of vibratile building mould
CN220621059U (en) Construction template device for building engineering
CN212684994U (en) Printing module installation mechanism convenient to assemble and disassemble for pad printing machine
CN217080687U (en) Anticorrosive support of wind power generation tower section of thick bamboo
CN220226903U (en) Two lining trolleys
CN219865967U (en) High-efficiency wear-resistant type spline shaft seat fork for vehicle
CN216892242U (en) Sliding template assembly for river retaining wall
CN219432275U (en) Can dismantle support seat of quick replacement riding wheel of being convenient for
CN220015258U (en) Grouting and crack plugging equipment for coal gangue overlying strata separation layer
CN2773240Y (en) Clamp for connecting templates
CN217353566U (en) Connecting and locking device for building template
CN214696819U (en) Aluminum formwork connecting assembly for building
CN216974925U (en) Detachable extension joint
CN220114176U (en) Nickel-steel explosion composite board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant