CN218441136U - Petrochemical acid gas's deodorization clarification plant - Google Patents

Petrochemical acid gas's deodorization clarification plant Download PDF

Info

Publication number
CN218441136U
CN218441136U CN202223018248.XU CN202223018248U CN218441136U CN 218441136 U CN218441136 U CN 218441136U CN 202223018248 U CN202223018248 U CN 202223018248U CN 218441136 U CN218441136 U CN 218441136U
Authority
CN
China
Prior art keywords
fixedly connected
connecting pipe
equal fixedly
acid gas
petrochemical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223018248.XU
Other languages
Chinese (zh)
Inventor
崔玉华
蒋洋洋
王磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shengxing New Energy Co ltd
Original Assignee
Shandong Shengxing New Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shengxing New Energy Co ltd filed Critical Shandong Shengxing New Energy Co ltd
Priority to CN202223018248.XU priority Critical patent/CN218441136U/en
Application granted granted Critical
Publication of CN218441136U publication Critical patent/CN218441136U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The utility model relates to a petrochemical technical field discloses a petrochemical acid gas's deodorization clarification plant, including equipment body and vice connecting pipe, the equal fixedly connected with connecting rod in both ends about the vice connecting pipe, the equal fixedly connected with connecting plate in one end of vice connecting pipe is kept away from to the connecting rod, the equal fixedly connected with extension spring of outside one end of connecting plate through-hole department, the other end fixedly connected with pulling plate of extension spring, the equal sliding connection of connecting plate through-hole department has the lifter, the lifter external diameter all is provided with the extension spring, the one end of connecting plate and for the equal fixedly connected with pulling plate in inboard of extension spring are kept away from to the lifter. The utility model discloses in, through dwang, pulling plate and stopper isotructure, realized installing fast and the purpose of dismantling vice connecting pipe and main connecting pipe, prevented when pipeline transportation handles acid gas that the emergence gas leaks outward.

Description

Petrochemical acid gas's deodorization clarification plant
Technical Field
The utility model relates to a petrochemical technical field especially relates to a petrochemical acid gas's deodorization clarification plant.
Background
The petrochemical industry refers to the field of producing chemicals by using petroleum as a raw material in the chemical industry, and broadly includes natural gas chemical industry, and at present, the petrochemical industry becomes the backbone industry in the chemical industry, plays an extremely important role in national economy, and can produce corresponding acid gas in the process of producing energy.
At present, when the acid gas is deodorized and purified, the pipeline is required to be used for transporting the acid gas, the acid gas has certain corrosivity to the pipeline, the pipeline is required to be checked frequently in order to avoid the problems of pipeline leakage and the like, the pipeline connected with the equipment is fixedly connected with the machine body and does not have a detachable function, a main connecting pipe of a machine connected with the deodorization and purification equipment is generally integrated and is inconvenient to detach, so that the machine is discarded together after the pipeline is damaged, the service life of the machine is further shortened, and corresponding cost is increased.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the defects existing in the prior art and providing a petrochemical acid gas deodorization and purification device.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a petrochemical acid gas's deodorization clarification plant, includes equipment body and vice connecting pipe, the equal fixedly connected with connecting rod in both ends about the vice connecting pipe, the equal fixedly connected with connecting plate in one end that vice connecting pipe was kept away from to the connecting rod, the equal fixedly connected with extension spring of outside one end of connecting plate through-hole department, the other end fixedly connected with pulling plate of extension spring, the equal sliding connection of connecting plate through-hole department has the lifter, the lifter external diameter all is provided with the extension spring, the lifter is kept away from the one end of connecting plate and is connected with the pulling plate for the inboard equal fixedly connected with pulling plate of extension spring, the lifter is kept away from the front and back both sides of the one end of pulling plate and all is rotated and is connected with the dwang, the equal fixedly connected with baffle in connecting plate inner wall middle part, the equal fixedly connected with solid fixed cylinder in both ends around the baffle, the equal fixedly connected with spring in solid fixed cylinder inner wall, the equal fixedly connected with telescopic link in one end that the baffle was kept away from to the spring, the equal fixedly connected with stopper in one end of baffle back mutually.
As a further description of the above technical solution:
equipment body left end through-hole department sliding connection has main connecting pipe, both ends all are provided with around the main connecting pipe and inlay the groove, the equal fixedly connected with fixed plate in both sides around the equipment body left end, the equal fixedly connected with electric putter of the inboard one end of fixed plate, the equal fixedly connected with arc splint of electric putter drive end, arc splint back of the body in the equal fixedly connected with mosaic block of one end of fixed plate mutually.
As a further description of the above technical solution:
the size of the mosaic block is equal to the inner diameter of the mosaic groove.
As a further description of the above technical solution:
the inner walls of the upper end and the lower end of the main connecting pipe are provided with sliding grooves, and connecting plates are connected to the inner walls of the sliding grooves in a sliding mode.
As a further description of the above technical solution:
two the spout all is provided with first spacing groove for the front and back both ends of the inboard of main connecting pipe.
As a further description of the above technical solution:
the inner diameter of the first limiting groove is matched with the size of the limiting block.
As a further description of the above technical solution:
the dwang all rotates in the outside one end of telescopic link in the one end of lifter back to the back of the body.
As a further description of the above technical solution:
and the inner wall of the main connecting pipe is connected with an auxiliary connecting pipe in a sliding manner.
The utility model discloses following beneficial effect has:
1. the utility model discloses in, through dwang, pulling plate and stopper isotructure, realized the purpose of installing fast and dismantling vice connecting pipe and main connecting pipe to can have damaged phenomenon to vice connecting pipe short-term test its existence, prevented when pipeline transportation handles acid gas, the phenomenon that takes place gas and leak outward.
2. The utility model discloses in, through arc splint, fixed plate and mosaic block isotructure, realized the purpose to the quick installation of main connecting pipe and dismantlement to improve the life of this machine, reduced the cost of qualification.
Drawings
FIG. 1 is a perspective view of a petrochemical acid gas deodorizing and purifying apparatus according to the present invention;
FIG. 2 is an enlarged view of A in FIG. 1;
FIG. 3 is a perspective view of an auxiliary connection pipe in the deodorizing and purifying apparatus for petrochemical acid gas according to the present invention;
FIG. 4 is an enlarged view of B in FIG. 3;
FIG. 5 is a sectional view of a connection plate in the deodorizing and purifying device for petrochemical acid gas according to the present invention;
FIG. 6 is a perspective view of a main connection pipe in the deodorizing and purifying apparatus for petrochemical acid gas according to the present invention;
FIG. 7 is a sectional view of a main connection pipe of the deodorizing and purifying apparatus for petrochemical acid gas in accordance with the present invention;
fig. 8 is a perspective view of a fixing plate in the deodorizing and purifying device for petrochemical acid gas according to the present invention.
Illustration of the drawings:
1. an apparatus body; 2. a main connection pipe; 3. an auxiliary connecting pipe; 4. a connecting rod; 5. a connecting plate; 6. pulling the movable plate; 7. a lifting rod; 8. a tension spring; 9. rotating the rod; 10. a baffle plate; 11. a fixed cylinder; 12. a spring; 13. a telescopic rod; 14. a limiting block; 15. a chute; 16. a first limit groove; 17. a fixing plate; 18. an electric push rod; 19. an arc-shaped splint; 20. embedding blocks; 21. and (5) embedding the grooves.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
Referring to fig. 1-8, the present invention provides an embodiment: a deodorizing and purifying device for petrochemical acid gas comprises a device body 1 and an auxiliary connecting pipe 3, wherein the upper end and the lower end of the auxiliary connecting pipe 3 are fixedly connected with a connecting rod 4, one end of the connecting rod 4, which is far away from the auxiliary connecting pipe 3, is fixedly connected with a connecting plate 5, one end of the connecting plate 5, which is outside a through hole, is fixedly connected with a tension spring 8, the through hole of the connecting plate 5 is slidably connected with a lifting rod 7, the outer diameter of the lifting rod 7 is provided with a tension spring 8, the other end of the tension spring 8 is fixedly connected with a pulling plate 6, the lifting rod 7, which is far away from one end of the connecting plate 5 and is opposite to the inner side of the tension spring 8, both the front side and the rear side of the end of the lifting rod 7, are rotatably connected with a fixed cylinder 11, the inner wall of the fixed cylinder 11 is fixedly connected with a spring 12, one end of the spring 12, which is far away from the pulling plate 10, is fixedly connected with a telescopic rod 13, one end of the telescopic rod 13, which is opposite to the baffle 10, is fixedly connected with a stopper 14, the end of the rotating rod 9, which is opposite to the main connecting pipe 3, the auxiliary connecting pipe 3, thereby improving the efficiency of the pipeline connection by moving the pipeline 14, and the auxiliary connecting pipe 14, thereby the pipeline connecting pipe 3, and prevents the leakage of the acid gas.
Wherein, a main connecting pipe 2 is connected with the left end through hole of the equipment body 1 in a sliding way, the front and the back ends of the main connecting pipe 2 are respectively provided with an embedding groove 21, the front and the back sides of the left end of the equipment body 1 are respectively fixedly connected with a fixing plate 17, one end of the inner side of the fixing plate 17 is respectively fixedly connected with an electric push rod 18, the driving end of the electric push rod 18 is respectively fixedly connected with an arc-shaped clamping plate 19, one end of the arc-shaped clamping plate 19 opposite to the fixing plate 17 is respectively fixedly connected with an embedding block 20, the inner diameter of the arc-shaped clamping plate 19 is matched with the size of the main connecting pipe 2, the size of the embedding block 20 is equal to the size of the inner diameter of the embedding groove 21, the inner walls of the upper and the lower ends of the main connecting pipe 2 are respectively provided with a sliding groove 15, and the inner walls of the sliding grooves 15 are respectively connected with a connecting plate 5 in a sliding way, two spouts 15 all are provided with first spacing groove 16 for the front and back both ends of the inboard of main connecting pipe 2, the internal diameter size of first spacing groove 16 and stopper 14 size of a dimension looks adaptation, 2 inner wall sliding connection of main connecting pipe have vice connecting pipe 3, slide into partial area with the left end through-hole department of 2 slave unit bodies 1 of main connecting pipe, and make the inlay groove 21 that main connecting pipe 2 was equipped with be in same level with inlay piece 20 that arc splint 19 is connected, and when driving two electric putter 18 through the controller and pressing from both sides tightly main connecting pipe 2, and make inlay piece 20 enter into inlay the inslot 21, thereby realized installing and dismantling main connecting pipe 2 the mesh, and improved the life of equipment body 1.
The working principle is as follows: the method comprises the steps of firstly, sliding a main connecting pipe 2 into a partial area from a through hole at the left end of an equipment body 1, enabling an embedding groove 21 arranged on the main connecting pipe 2 to be in the same level with an embedding block 20 connected with an arc-shaped clamping plate 19, driving two electric push rods 18 to clamp the main connecting pipe 2 through a controller, enabling the embedding block 20 to enter the embedding groove 21, then sliding an auxiliary connecting pipe 3 into the main connecting pipe 2, enabling a limiting block 14 to move inwards by enabling a pulling plate 6 to move upwards and enabling the pulling plate 6 to drive a rotating rod 9 to move inwards, enabling the limiting block 14 to move inwards, enabling the auxiliary connecting pipe 3 to be installed on the main connecting pipe 2, enabling a pipeline to be detected quickly after acid gas treatment is carried out, namely, enabling the pulling plate 6 to move upwards and enabling the pulling plate 6 to drive the rotating rod 9 to move inwards and enabling the limiting block 14 to move inwards, enabling the auxiliary connecting pipe 3 to be installed on the main connecting pipe 2, enabling the pipeline to be detected after acid gas treatment, and enabling the pipeline to be detected to be installed and damaged at once.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (8)

1. The utility model provides a petrochemical acid gas's deodorization clarification plant, includes equipment body (1) and vice connecting pipe (3), its characterized in that: the utility model discloses a fixing device for the wall of a connecting pipe, including vice connecting pipe (3), the equal fixedly connected with connecting rod (4) in both ends about vice connecting pipe (3), the equal fixedly connected with connecting plate (5) of one end of vice connecting pipe (3) are kept away from in connecting rod (4), the equal fixedly connected with extension spring (8) of outside one end of connecting plate (5) through-hole department, the other end fixedly connected with pulling plate (6) of extension spring (8), the equal sliding connection of connecting plate (5) through-hole department has lifter (7), lifter (7) outer diameter all is provided with extension spring (8), the one end of connecting plate (5) is kept away from in lifter (7) and for the equal fixedly connected with pulling plate (6) in inboard of extension spring (8), the equal fixedly connected with spring (12) of fixed section of thick bamboo (11) inner wall around both sides all rotate and are connected with dwang (9) of the one end of pulling plate (6), the equal fixedly connected with baffle (10) in connecting plate (5) inner wall middle part, the equal fixedly connected with fixed section of thick bamboo (11) in both ends around baffle (10) in the back of fixed section of thick bamboo (11), the equal fixedly connected with spring (12) of one end stopper (13) that baffle (10) was kept away from in spring (12) back to the other hand is all fixedly connected with stopper (14).
2. The apparatus for deodorizing and purifying a petrochemical acid gas according to claim 1, wherein: equipment body (1) left end through-hole department sliding connection has main connecting pipe (2), both ends all are provided with around main connecting pipe (2) and inlay groove (21), the equal fixedly connected with fixed plate (17) in both sides around equipment body (1) left end, the equal fixedly connected with electric putter (18) of fixed plate (17) inboard one end, the equal fixedly connected with arc splint (19) of electric putter (18) drive end, arc splint (19) are carried on the back in the equal fixedly connected with mosaic block (20) of one end of fixed plate (17).
3. The apparatus for deodorizing and purifying petrochemical acid gas according to claim 2, wherein: the size of the mosaic block (20) is equal to the size of the inner diameter of the mosaic groove (21).
4. The apparatus for deodorizing and purifying a petrochemical acid gas according to claim 2, wherein: the inner walls of the upper end and the lower end of the main connecting pipe (2) are provided with sliding grooves (15), and the inner walls of the sliding grooves (15) are connected with connecting plates (5) in a sliding mode.
5. The apparatus for deodorizing and purifying petrochemical acid gas according to claim 4, wherein: two the spout (15) all are provided with first spacing groove (16) for the front and back both ends of main connecting pipe (2) inboard.
6. The apparatus for deodorizing and purifying petrochemical acid gas according to claim 5, wherein: the inner diameter of the first limiting groove (16) is matched with the size of the limiting block (14).
7. The apparatus for deodorizing and purifying a petrochemical acid gas according to claim 1, wherein: dwang (9) are all rotated in the outside one end of connecting at telescopic link (13) in the one end of lifter (7) back to the back of the body.
8. The apparatus for deodorizing and purifying petrochemical acid gas according to claim 2, wherein: the inner wall of the main connecting pipe (2) is connected with an auxiliary connecting pipe (3) in a sliding manner.
CN202223018248.XU 2022-11-14 2022-11-14 Petrochemical acid gas's deodorization clarification plant Active CN218441136U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223018248.XU CN218441136U (en) 2022-11-14 2022-11-14 Petrochemical acid gas's deodorization clarification plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223018248.XU CN218441136U (en) 2022-11-14 2022-11-14 Petrochemical acid gas's deodorization clarification plant

Publications (1)

Publication Number Publication Date
CN218441136U true CN218441136U (en) 2023-02-03

Family

ID=85074580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223018248.XU Active CN218441136U (en) 2022-11-14 2022-11-14 Petrochemical acid gas's deodorization clarification plant

Country Status (1)

Country Link
CN (1) CN218441136U (en)

Similar Documents

Publication Publication Date Title
CN218441136U (en) Petrochemical acid gas's deodorization clarification plant
CN208058128U (en) A kind of effective detachable stainless steel stent of aeration
CN210660277U (en) Tail gas collecting device for automobile maintenance
CN209664546U (en) A kind of auto parts and components bolt column weld clip lamps structure
CN2493817Y (en) Leakage repairing device for pipe line
CN214579272U (en) Optimized laying structure for municipal water supply and drainage pipeline
CN207703406U (en) Quick pressure measurement plugging device
CN213210042U (en) Oil gas pipeline crossing engineering detection platform
CN211668323U (en) Waste heat recovery device for chemical wastewater treatment
CN214937274U (en) Natural gas three-phase separation precise filtering pry
CN218011257U (en) High concentration chemical industry chlorine-containing waste water treatment device
CN213902983U (en) Sampling device for water quality testing
CN219639729U (en) Pipeline joint convenient to connect
CN213177726U (en) Air leakage detection equipment for air-entrapping mother station connector
CN214921607U (en) Quick welding mould for end plate
CN218937667U (en) Gas-cooker valve body gas tightness detection device
CN211059548U (en) Sealing device of water pump for sewage treatment plant
CN211125864U (en) Full-automatic battery processing equipment
CN215630571U (en) Anti-floating type buried box pump integrated equipment
CN217784399U (en) Fixing device of conveying pipeline
CN210603756U (en) Semi-automatic pressure test tool for low-pressure pump pipe
CN214836538U (en) Pipeline clamp holder for three times
CN220063273U (en) Sealing detection device for vacuum equipment production
CN218066682U (en) Airtightness detection tool for oil quantity sensor
CN218226427U (en) Puller tool for maintaining DTRO

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant