CN214836538U - Pipeline clamp holder for three times - Google Patents

Pipeline clamp holder for three times Download PDF

Info

Publication number
CN214836538U
CN214836538U CN202121360488.0U CN202121360488U CN214836538U CN 214836538 U CN214836538 U CN 214836538U CN 202121360488 U CN202121360488 U CN 202121360488U CN 214836538 U CN214836538 U CN 214836538U
Authority
CN
China
Prior art keywords
pipeline
semicircle
chuck
clamp
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121360488.0U
Other languages
Chinese (zh)
Inventor
苗利伟
毛建伟
巩华
赵向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Hydrogeological Team Of China General Administration Of Coal Geology
Original Assignee
Second Hydrogeological Team Of China General Administration Of Coal Geology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Hydrogeological Team Of China General Administration Of Coal Geology filed Critical Second Hydrogeological Team Of China General Administration Of Coal Geology
Priority to CN202121360488.0U priority Critical patent/CN214836538U/en
Application granted granted Critical
Publication of CN214836538U publication Critical patent/CN214836538U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model relates to a three times pipeline holder belongs to pipeline centre gripping equipment technical field. Three pipeline holders, including three semicircle pipe clamp covers, two semicircle chuck and two hoist and mount splint, two the semicircle chuck merges into the cylindric circular chuck of complete cavity, one the inboard interval of semicircle chuck is fixed and is equipped with two the semicircle pipe clamp covers, another the inboard of semicircle chuck is fixed and is equipped with the semicircle pipe clamp covers, two the equal fixedly connected with in both ends of semicircle chuck hoist and mount splint, and lie in two with one side hoist and mount splint pass through the mounting and fix. Has the advantages that: three pipelines are simultaneously put in, so that the time, labor and material cost are saved; when the clearance between the pipeline and the well is small for three times, the pipeline winding caused by the fact that the pipeline is repeatedly put into the well is avoided.

Description

Pipeline clamp holder for three times
Technical Field
The utility model belongs to pipeline centre gripping equipment field, concretely relates to pipeline holder three times.
Background
At present, a pipeline is put into a well or a hole in a well, the pipeline is generally put into the well one time or a plurality of times, an elevator or a clamp is generally adopted to hoist the pipeline in the process of putting into the pipeline, the elevator or the clamp is used on the pipeline in one time, the working efficiency is not high, and a device for clamping the pipeline in three times simultaneously does not exist.
Therefore, a three-pass pipeline clamp is provided to solve the defects in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model provides a pipeline clamp holder for three times to solve the technical problems, and the three times of pipelines are simultaneously put in, thus saving time, labor and material cost; when the clearance between the pipeline and the well is small for three times, the pipeline winding caused by the fact that the pipeline is repeatedly put into the well is avoided.
The utility model provides an above-mentioned technical problem's technical scheme as follows: this three-time pipeline holder includes that three semicircle pipe presss from both sides cover, two semi-circular chuck and two hoist and mount splint, two the semi-circular chuck merges into the cylindric circular chuck of complete cavity, one the inboard interval of semi-circular chuck is fixed and is equipped with two the semi-circular pipe presss from both sides the cover, another the inboard of semi-circular chuck is fixed and is equipped with the semi-circular pipe presss from both sides the cover, two the equal fixedly connected with in both ends of semi-circular chuck hoist and mount splint, and lie in two with one side hoist and mount splint pass through the mounting and fix.
Has the advantages that: three pipelines are simultaneously put in, so that the time, labor and material cost are saved; when the clearance between the pipeline and the well is small for three times, the pipeline winding caused by the fact that the pipeline is repeatedly put into the well is avoided.
Further, the fixing piece is a screw, and a mounting hole for mounting the screw is formed in the hoisting clamping plate.
The beneficial effect of adopting the further scheme is that: simple structure, fixed effectual, the equipment and the dismantlement of being convenient for.
Further, the fixing piece is a bolt, and a mounting hole for mounting the bolt is formed in the hoisting clamping plate.
The beneficial effect of adopting the further scheme is that: simple structure, fixed effectual, the equipment and the dismantlement of being convenient for.
Furthermore, the bottom of the hoisting clamping plate is provided with a hoisting opening convenient for hoisting.
The beneficial effect of adopting the further scheme is that: the hoisting is convenient, and the transportation of the pipeline is not influenced.
Further, the size of the semicircular pipe jacket is phi 73 x 4 mm.
The beneficial effect of adopting the further scheme is that: the clamping is convenient according to the size design of the conventional pipeline.
Further, the size of the semicircular chuck is phi 194 multiplied by 8.94 mm.
The beneficial effect of adopting the further scheme is that: the clamping is convenient according to the size design of the conventional pipeline.
Drawings
Fig. 1 is a top view of the present invention;
FIG. 2 is a front view of the present invention;
in the drawings, the components represented by the respective reference numerals are listed below:
1. a semicircular pipe jacket; 2. a semicircular chuck; 3. hoisting the clamping plate; 4. mounting holes; 5. and (6) hoisting holes.
Detailed Description
The principles and features of the present invention are described below in conjunction with the following drawings, the examples given are only intended to illustrate the present invention and are not intended to limit the scope of the present invention.
Example 1
As shown in fig. 1-2, the present embodiment provides a three-pass pipeline clamp, comprising three semicircular pipe clamps 1, two semicircular chucks 2 and two lifting clamps 3, the semi-circular clamp 2 is an oil casing pipe with the size of phi 194 multiplied by 8.94mm, the semi-circular pipe clamp 1 is a seamless steel pipe with the size of phi 73 multiplied by 4mm, the two semi-circular clamp 2 are combined into a complete hollow cylindrical round clamp, the two semi-circular pipe clamps 1 are welded at intervals on the inner side of one semi-circular clamp 2, the semi-circular pipe clamp 1 is welded on the inner side of the other semi-circular clamp 2, the inner side and the outer side of the semi-circular clamp are welded in place, the welding strength is ensured, the hoisting clamp plates 3 are welded at the two ends of the two semi-circular clamps 2, and two hoisting clamp plates 3 positioned on the same side are fixed by a fixing piece, and the clamp holder can smoothly clamp a pipeline with the depth of 220m below the pipeline with the diameter of 60mm for three times.
As a further scheme of the above embodiment, the fixing member is a screw, and the hoisting clamp plate 3 is provided with a mounting hole 4 for mounting the screw.
In a further aspect of the above embodiment, the fixing member is a bolt, and the hoisting clamp plate 3 is provided with a mounting hole 4 for mounting the bolt.
Of course, the fixing manner is many as long as the function is satisfied.
As a further scheme of the embodiment, the bottom end of the hoisting clamping plate 3 is provided with the hoisting port 5 convenient for hoisting, so that the steel wire rope is convenient to fix, and the transportation is not influenced.
During construction, the pipelines are welded together in a shape like a Chinese character 'pin', the lower part of a pipeline coupling is clamped by the pipeline clamp holders for three times, and the tops of the clamp holders are close to the pipeline coupling, so that the purpose of fixing the pipelines for three times is achieved.
In the description of the present invention, it is to be understood that the terms "center", "length", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "inner", "outer", "circumferential", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the system or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the description of the present invention, "a plurality" means at least two, e.g., two, three, etc., unless specifically limited otherwise.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or they may be connected internally or in any other suitable relationship, unless expressly stated otherwise. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
In the description herein, references to the description of the term "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above are not necessarily intended to refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples. Furthermore, various embodiments or examples and features of different embodiments or examples described in this specification can be combined and combined by one skilled in the art without contradiction.
The above description is only for the preferred embodiment of the present invention, and should not be construed as limiting the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included within the protection scope of the present invention.

Claims (6)

1. A three-pass line clamp, comprising:
three semicircle pipe presss from both sides cover (1), two semicircle chuck (2) and two hoisting clamp plate (3), two semicircle chuck (2) merge into the cylindric circular chuck of complete cavity, one the inboard interval of semicircle chuck (2) is fixed to be equipped with two semicircle pipe presss from both sides cover (1), another the inboard of semicircle chuck (2) is fixed to be equipped with semicircle pipe presss from both sides cover (1), two the equal fixedly connected with in both ends of semicircle chuck (2) hoisting clamp plate (3), and lie in two with one side hoisting clamp plate (3) are fixed through the mounting.
2. The pipeline clamp holder according to claim 1, wherein the fixing member is a screw, and the hoisting clamp plate (3) is provided with a mounting hole (4) for mounting the screw.
3. The pipeline clamp holder according to claim 1, wherein the fixing part is a bolt, and the hoisting clamp plate (3) is provided with a mounting hole (4) for mounting the bolt.
4. Three-way pipe clamp according to any one of claims 1-3, characterized in that the bottom end of the lifting clamp plate (3) is provided with a lifting opening (5) for facilitating lifting.
5. Three-pass pipe clamp according to any of claims 1 to 3, characterized in that the semicircular pipe jacket (1) has dimensions of phi 73 x 4 mm.
6. Three-pass line clamp according to claim 4, characterized in that the semicircular collet (2) has dimensions of phi 194 x 8.94 mm.
CN202121360488.0U 2021-06-18 2021-06-18 Pipeline clamp holder for three times Active CN214836538U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121360488.0U CN214836538U (en) 2021-06-18 2021-06-18 Pipeline clamp holder for three times

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121360488.0U CN214836538U (en) 2021-06-18 2021-06-18 Pipeline clamp holder for three times

Publications (1)

Publication Number Publication Date
CN214836538U true CN214836538U (en) 2021-11-23

Family

ID=78808107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121360488.0U Active CN214836538U (en) 2021-06-18 2021-06-18 Pipeline clamp holder for three times

Country Status (1)

Country Link
CN (1) CN214836538U (en)

Similar Documents

Publication Publication Date Title
CN214836538U (en) Pipeline clamp holder for three times
CN218579457U (en) A harmless hoist device for vertical pipeline
CN218373308U (en) Steel bar connecting device
CN211517265U (en) Fatigue test fixture for axle housing shaft head
CN215747457U (en) Forming and fixing device for processing metal cylinder
CN213387382U (en) Detachable movable hoisting lug
CN211649355U (en) Natural gas line is welded junction group and is assembled device speedily carries out rescue work
CN211589310U (en) Positioning fixture for pipeline machining
CN211167330U (en) Ship underwater transducer carrying device
CN211517278U (en) Support arrangement for pressure vessel processing usefulness
CN211569863U (en) Hoisting clamp for honeycomb core type equipment built-in pipe
CN213969759U (en) Pipe clamping device for pipeline welding equipment
CN211028777U (en) Welding tool clamp
CN216990507U (en) Argon filling auxiliary device for pipeline welding
CN218663130U (en) Drinking water bucket
CN209977476U (en) Easily weld jar body and connect
CN212885881U (en) Tin-plated post-welding cooling device
CN214960180U (en) Detachable spiral heating pipe
CN210193172U (en) Steel wire rope rigging support
CN210313177U (en) Novel copper handling anchor clamps
CN218657398U (en) Clamping structure, device and packaging system for LD tube packaging welding positioning
CN218441136U (en) Petrochemical acid gas's deodorization clarification plant
CN215326474U (en) Detachable tubular shaft lifting lug for hoisting light equipment
CN216371890U (en) Hook type three-jaw clamping device
CN218272190U (en) Positioning detection device for automobile accessory machining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant