CN218438187U - A novel system for cornicing construction hanging basket hoist installation - Google Patents
A novel system for cornicing construction hanging basket hoist installation Download PDFInfo
- Publication number
- CN218438187U CN218438187U CN202222396028.4U CN202222396028U CN218438187U CN 218438187 U CN218438187 U CN 218438187U CN 202222396028 U CN202222396028 U CN 202222396028U CN 218438187 U CN218438187 U CN 218438187U
- Authority
- CN
- China
- Prior art keywords
- cornice
- hoist
- hanging
- outside
- basket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model discloses a novel system for building hanging flower basket hoist installation cornices, including the longeron of cornicing crossbeam that is fixed in the building wall outside and its top, it still includes embraces hoop frame, switching component and hoist and mount roof beam, and hoop frame overlaps on the crossbeam cornicing, and the floorbar of embracing hoop frame stretches out the hoist and mount roof beam that a pair of inside and outside was arranged of supporting to the outside, and the hoist and mount roof beam in the outside is used for hanging establishes the hanging flower basket, and inboard hoist and mount roof beam is used for installing the hoist, and the switching component is connected for floorbar position department in the hoist and mount roof beam outside, can dismantle with the floorbar through the switching component and be connected. The utility model discloses the hoist and mount roof beam in the outside provides the hanging point for the hanging flower basket, avoids carrying out putting up of scaffold frame, and conventional hanging flower basket volume is less, can set up a plurality of hanging flower baskets on the hoist and mount roof beam and carry out the large face construction. And a lifting appliance is arranged on the inner lifting beam, and construction materials are lifted through the lifting appliance, so that the construction cost is reduced. The cornice cross beam is connected with the cornice longitudinal beam through the reinforcing component, so that the cornice cross beam is reinforced, and the hanging safety of the hanging basket is guaranteed.
Description
Technical Field
The utility model relates to a building curtain construction technical field that cornices specifically is a novel system for cornicing construction hanging basket hoist installation.
Background
When the facade curtain construction outside the building of cornicing at present, set up the scaffold frame in facade department outside the building usually, the staff carries out curtain erection construction on the scaffold frame, nevertheless sets up the scaffold frame and needs great working area, influences other professional cross constructions in curtain erection work in-process to it is longer to set up the scaffold frame in earlier stage and leads to the time limit for a project, influences the efficiency of construction. The construction project of the curtain wall of the outer vertical surface of a part of cornice building is to shorten the construction period, a crank arm vehicle is adopted to be matched with a crane for construction, workers carry out construction operation on an operation platform of the crank arm vehicle, when the outer vertical surface of the building is large and wide, a plurality of crank arm vehicles and cranes are usually needed, however, the use cost of the crank arm vehicles and the cranes is high, and the construction cost is increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a novel system for cornice construction hanging basket hoist installation, it can promote the efficiency of construction and reduce construction cost.
The utility model provides a novel system for be used for cornicing construction hanging basket hoist installation, including the longeron of cornicing crossbeam and its top that is fixed in the building wall outside, it still includes the hoop frame, switching component and hoist and mount roof beam, and the hoop frame overlaps on the crossbeam of cornicing, and the floorbar of hoop frame stretches out the hoist and mount roof beam that the supporting was arranged inside and outside a pair of to the outside, and the hoist and mount roof beam in the outside is used for hanging and establishes the hanging flower basket, and inboard hoist and mount roof beam is used for installing the hoist, and the switching component is connected for floorbar position department in the hoist and mount roof beam outside, can dismantle with the floorbar through the switching component and be connected.
In an embodiment of the above technical scheme, the hoop frame comprises a top beam, a bottom beam and side upright columns, wherein the rear ends of the top beam and the bottom beam are parallel and level, the bottom beam is longer than the top beam, the front end section of the bottom beam extends out, and a pair of side upright columns are fixedly connected between the top beam and the bottom beam to form a rectangular sleeve frame matched with the cornice cross beam.
In one embodiment of the above technical solution, a diagonal draw beam is connected between the side columns and the extending sections of the bottom beam for reinforcing the structural strength.
In one embodiment of the above technical solution, the adapting member is a galvanized channel steel, an end plate thereof is attached to the bottom beam and detachably connected by a fastener, and an inner side arm thereof is fixedly connected to the hoisting beam.
In one embodiment of the above technical scheme, a reinforcing member is arranged between the cornice cross beam and the cornice longitudinal beam for connection and reinforcement.
In one embodiment of the technical scheme, the reinforcing member comprises a connecting bottom plate and a connecting column vertically fixed with the connecting bottom plate, the upper surface of the connecting bottom plate is attached to the bottom surface of the cornice longitudinal beam and fixedly connected with the cornice longitudinal beam through a fastener, and the lower end surface of the connecting column is fixedly welded with the top surface of the cornice cross beam.
The hoisting beam outside the utility model provides a hanging point for the hanging basket, avoids building a scaffold, and shortens the construction period; and conventional hanging flower basket volume is less, sets up a plurality of hanging flower baskets on the hoist and mount roof beam and carries out the large face construction, and simultaneously, hanging flower basket area is little and unsettled, can effectively reduce the influence to other professions cross construction, promotes the efficiency of construction. Hanging the hanging flower basket on the hoist and mount roof beam in the outside, constructor constructs in the hanging flower basket, installs hoisting machines on the hoist and mount roof beam of inboard, carries out the hoist and mount of construction material through hoisting machines, avoids the use of cranking arm car and crane, reduces construction cost. The cornice cross beam is connected with the cornice longitudinal beam through the reinforcing component, the cornice cross beam is reinforced, and the hanging safety of the hanging basket is guaranteed. In short, the utility model discloses can promote the efficiency of construction, reduce construction cost and guarantee the security that the hanging flower basket was hung.
Drawings
Fig. 1 is a schematic longitudinal sectional view of an embodiment of the present invention.
Fig. 2 is a schematic cross-sectional structure of fig. 1.
Detailed Description
As shown in fig. 1 to fig. 2, the novel system for installing a cornice construction basket spreader disclosed in this embodiment includes a cornice cross beam 1, a cornice longitudinal beam 2, a hoop frame 3, an adapter member 4, a hoisting beam 5 and a reinforcing member 6.
The cornice beam 1 is made of I-shaped steel and is horizontally arranged on the outer side of the wall body, and the cornice beam 1 is fixedly connected with a steel corbel extending out of the outer side of the wall body.
The cornice longitudinal beam 2 is positioned above the cornice cross beam 1, and the inner end of the cornice longitudinal beam 2 is vertically fixed with the outer vertical surface of the wall body.
The hoop frame 3 comprises a top beam 31, a bottom beam 32, side columns 33 and diagonal draw beams 34.
The top beam 31 and the bottom beam 32 are arranged flush and parallel at their rear ends, and the bottom beam 32 is longer than the top beam 31 and has its front end portion extended. A pair of side uprights 34 is fixedly connected between the top beam 31 and the bottom beam 32 to form a rectangular frame matched with the cornice beam 1. One end of the diagonal draw beam 34 is welded and fixed with the side upright column, and the other end is connected and fixed with the extending section of the bottom beam 32, so as to improve the structural strength of the hoop frame 3.
When the hoop frame 3 is sleeved on the cornice beam 1, the bottom beam 32, the side upright columns 33 and the diagonal tension beam 34 can be welded and then sleeved below the cornice beam 1, and then the top beam 31 is welded with the upper ends of the side upright columns 34. It should be noted that the top beam 31 and the bottom beam 32 may be welded and fixed to the joint surface of the cornice cross beam 1 to ensure the connection strength of the hoop frame 3.
According to the mode, the plurality of hoop frames 3 are arranged along the length direction of the cornice beam 1.
The switching member 4 adopts the galvanized channel steel, and a pair of switching member 4 sets up in one side of the section that stretches out of floorbar 32 and can dismantle the connection through split bolt, and switching member 4 upper end section stretches out for connect hoist and mount roof beam 5.
The hoisting beams 5 are made of galvanized steel pipes, and a pair of hoisting beams 2 cross the extending sections of the bottom beams 32 of the anchor ear frames 3 and are welded and fixed with the inner side arms of the switching components 4 at the corresponding positions.
The reinforcement member 6 includes a connection base plate and a connection post vertically fixed thereto.
The upper surface of the connecting bottom plate is attached to the bottom surface of the cornice longitudinal beam 2 and fixedly connected with the bottom surface of the cornice longitudinal beam through bolts, and the lower end surface of the connecting column is fixedly welded with the top surface of the cornice cross beam 1, so that the cornice cross beam 1 is reinforced.
When the system is used, a hanging point is provided for the hanging basket through the hoisting beam 5 on the outer side, and hoisting machines are installed through the hoisting beam 5 on the inner side. A plurality of hanging baskets and hoisting tools can be installed along the length direction of the hoisting beam 5 according to actual needs.
The utility model has the advantages that:
the construction efficiency is improved: the hoisting beams on the outer side provide hanging points for the hanging basket, so that the construction of a scaffold is avoided, and the construction period is shortened; and conventional hanging flower basket volume is less, sets up a plurality of hanging flower baskets on the hoist and mount roof beam and carries out the large face construction, and simultaneously, hanging flower basket area is little and unsettled, does not influence the cross construction of other specialty, promotes the efficiency of construction.
The construction cost is low: hanging the hanging flower basket on the hoist and mount roof beam in the outside, constructor constructs in the hanging flower basket, installs hoisting machines on the hoist and mount roof beam of inboard, carries out the hoist and mount of construction material through hoisting machines, avoids the use of cranking arm car and crane, reduces construction cost.
The hanging safety of the hanging basket is ensured: the cornice cross beam is connected with the cornice longitudinal beam through the reinforcing component, the cornice cross beam is reinforced, and safety is guaranteed.
Claims (6)
1. The utility model provides a novel system for cornice construction hanging basket hoist installation, is including being fixed in the crossbeam of cornice in the building wall outside and the longeron of cornice of top, its characterized in that: the hanging basket comprises a hanging bracket frame and is characterized by further comprising a hoop frame, a switching member and a hoisting beam, wherein the hoop frame is sleeved on the cornice beam, the bottom beam of the hoop frame extends outwards to support a pair of hoisting beams arranged inside and outside, the hoisting beam outside is used for hanging a hanging basket, the hoisting beam inside is used for installing a lifting appliance, the switching member is connected to the outer side of the hoisting beam relative to the position of the bottom beam, and the switching member is detachably connected with the bottom beam through the switching member.
2. A novel system for eave construction basket spreader installation as claimed in claim 1, wherein: staple bolt frame includes back timber, floorbar and side stand, back timber and floorbar rear end parallel and parallel arrangement, and the floorbar is compared longer in the back timber, and its front end section stretches out, a pair of side stand fixed connection between back timber and floorbar, form with cornice crossbeam assorted rectangle cover frame.
3. A novel system for eave construction basket spreader installation as claimed in claim 2, wherein: and an inclined pull beam is connected between the side upright post and the extending section of the bottom beam for enhancing the structural strength.
4. A novel system for eave construction basket spreader installation as claimed in claim 3, wherein: the switching member adopts galvanized channel steel, the end plate of the switching member is attached to the bottom beam and detachably connected through a fastener, and the inner side arm of the switching member is fixedly connected with the hoisting beam.
5. A novel system for eave construction basket spreader installation as claimed in claim 1, wherein: and a reinforcing member is arranged between the cornice cross beam and the cornice longitudinal beam for connection and reinforcement.
6. A novel system for eave construction basket spreader installation as claimed in claim 5, wherein: the reinforcing member comprises a connecting base plate and a connecting column vertically fixed with the connecting base plate, the upper surface of the connecting base plate is attached to the bottom surface of the cornice longitudinal beam and fixedly connected through a fastener, and the lower end surface of the connecting column is fixedly welded with the top surface of the cornice cross beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222396028.4U CN218438187U (en) | 2022-09-07 | 2022-09-07 | A novel system for cornicing construction hanging basket hoist installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222396028.4U CN218438187U (en) | 2022-09-07 | 2022-09-07 | A novel system for cornicing construction hanging basket hoist installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218438187U true CN218438187U (en) | 2023-02-03 |
Family
ID=85102774
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222396028.4U Active CN218438187U (en) | 2022-09-07 | 2022-09-07 | A novel system for cornicing construction hanging basket hoist installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218438187U (en) |
-
2022
- 2022-09-07 CN CN202222396028.4U patent/CN218438187U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201598820U (en) | Single point suspension external hanging bracket | |
CN207268073U (en) | Novel flexible formwork bearing frame | |
EP0480683A1 (en) | Erection workbench and construction process | |
WO2020098394A1 (en) | Gob-side entry confined concrete supporting construction device and mechanized construction method | |
CN211173007U (en) | Novel tripod of encorbelmenting | |
CN218438187U (en) | A novel system for cornicing construction hanging basket hoist installation | |
CN209585654U (en) | Adhesion type goes up and down discharging platform | |
CN201943350U (en) | Supporting steel frame for die holder of high-altitude large span overhanging structure | |
CN101768925A (en) | Mounting equipment of beam falling prevention stopping block and construction method thereof | |
CN211895796U (en) | Core cylinder movable arm type tower crane installation climbing structure | |
CN210316599U (en) | A curtain ring rail for roofing truss beam position | |
CN211499699U (en) | Ladder-climbing type operation rack for hanging cage | |
CN209780229U (en) | Jacking platform system of integrated tower crane | |
CN210508326U (en) | Liftable well operation platform | |
CN111706060A (en) | Steel wire rope inclined-pulling type hanging basket device | |
CN218522201U (en) | Hanging basket supporting platform at high parapet wall | |
CN217782808U (en) | Hanging basket support for installing tower crown structure of building | |
CN217172928U (en) | Hoisting fixing device | |
CN214885569U (en) | Aluminum template lifting device | |
CN211873783U (en) | Fixing part for replacing front bracket of high-altitude operation hanging basket | |
CN214498357U (en) | Overhanging type hanging basket support | |
CN213329962U (en) | Split type lifting scaffold | |
CN217420443U (en) | Special-shaped hanging basket rear support reinforcing and stabilizing mechanism | |
CN215402720U (en) | Double-rail hoisting system for curtain wall | |
CN210598209U (en) | Cladding plate bearing diagonal fixing tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |