CN218437783U - One-step forming multi-span energy-saving precast beam - Google Patents
One-step forming multi-span energy-saving precast beam Download PDFInfo
- Publication number
- CN218437783U CN218437783U CN202222589891.1U CN202222589891U CN218437783U CN 218437783 U CN218437783 U CN 218437783U CN 202222589891 U CN202222589891 U CN 202222589891U CN 218437783 U CN218437783 U CN 218437783U
- Authority
- CN
- China
- Prior art keywords
- concrete body
- concrete
- precast beam
- column
- reference column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model belongs to the technical field of the precast beam, especially, for energy-conserving precast beam of formula is striden to one shot forming more, including the concrete body, the inboard of the concrete body is provided with horizontal muscle, and the inboard of the concrete body is provided with vertical muscle, and the inboard of the concrete body is provided with the recess, and the inboard of recess is pegged graft and is had the reference column, and the outside of reference column is provided with the concrete column, and one side of the concrete body is provided with inserts the hole, and the opposite side of the concrete body is provided with the connection reference column. This energy-conserving precast beam of one shot forming multispan formula, through setting up horizontal muscle, vertical muscle, a groove, the reference column, the concrete column, the longitudinal joint muscle, the plug-in hole, the reference column, make a plurality of horizontal muscle, the setting of vertical muscle has promoted the holistic structural stability of roof beam, simultaneously through prefabricated recess, the through hole has avoided also can not conveniently hoist and mount when setting up the increase that leads to the cost of transportation of formula as an organic whole between roof beam and the post, thereby still conveniently be under construction when saving the cost, the setting person of facilitating the use of recess installs between roof beam and the post.
Description
Technical Field
The utility model relates to a precast beam technical field specifically is the energy-conserving precast beam of one shot forming multi-span formula.
Background
Precast beam adopts mill's prefabrication, transports again to the job site and carries out the roof beam of installation fixing according to the design requirement position, and at present, reinforced concrete roof beam exists two kinds of construction methods: traditional cast-in-place and prefabricated assembly. With the national strong advocated building industrialization, the construction mode of prefabrication and assembly is more and more emphasized. The traditional cast-in-place construction mode has the defects of long construction period, poor construction quality, high environmental pollution degree and the like.
Most of the existing precast beams and concrete are integrally cast, so that the transportation cost is increased while the precast beams are inconvenient to transport.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides an energy-conserving precast beam of formula is striden more to one shot forming has solved the design of pouring that is the integral type mostly between present precast beam and the concrete that exists today, has still increased the problem of cost of transportation when leading to its inconvenient transportation.
In order to achieve the above object, the utility model provides a following technical scheme: energy-conserving precast beam of one shot forming multispan formula, including the concrete body, the inboard of concrete body is provided with horizontal muscle, and the inboard of concrete body is provided with vertical muscle, and the inboard of concrete body is provided with the recess, and it has the reference column to peg graft in the inboard of recess, and the outside of reference column is provided with the concrete column, and the outside of reference column is provided with the longitudinal connection muscle, and one side of concrete body is provided with inserts the hole, and the opposite side of concrete body is provided with the connection reference column.
As an optimized technical scheme of the utility model, the outside frame of roof beam is constituteed to horizontal muscle, vertical muscle.
As an optimal technical scheme of the utility model, horizontal muscle has at least that the equidistant setting of horizontal muscle in two-layer and every layer and the horizontal muscle between every group passes through the stirrup and connects.
As a preferred technical scheme of the utility model, vertical muscle has at least two sets of and two sets of vertical muscle all to run through the concrete body, and two sets of vertical muscle respectively with every layer horizontal muscle between be connected and two sets of vertical muscle pass through the stirrup and be connected.
As a preferred technical scheme of the utility model, the specification and the reference column phase-match of recess.
As a preferred technical scheme of the utility model, the inboard of the concrete body is provided with the through hole, and the vertical splice bar setting is inboard at the through hole.
As a preferred technical scheme of the utility model, the position of inserting the hole with be connected the reference column corresponding and the specification of inserting the hole with be connected the reference column phase-match.
Compared with the prior art, the utility model provides an energy-conserving precast beam of one shot forming multispan formula possesses following beneficial effect:
this energy-conserving precast beam of one shot forming multispan formula, through setting up horizontal muscle, vertical muscle, a groove, the reference column, the concrete column, the longitudinal joint muscle, the plug-in hole, the reference column, make a plurality of horizontal muscle, the setting of vertical muscle has promoted the holistic structural stability of roof beam, simultaneously through prefabricated recess, the through hole has avoided also can not conveniently hoist and mount when setting up the increase that leads to the cost of transportation of formula as an organic whole between roof beam and the post, thereby still conveniently be under construction when saving the cost, the setting person of facilitating the use of recess installs between roof beam and the post.
Drawings
FIG. 1 is a front view of the present invention;
fig. 2 is a three-dimensional schematic diagram of the local structure of the present invention.
In the figure: 1. a concrete body; 2. a transverse rib; 3. longitudinal ribs; 4. a groove; 5. a positioning column; 6. a concrete column; 7. longitudinal connecting ribs; 8. inserting into the hole; 9. and is connected with the positioning column.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-2, in this embodiment: energy-conserving precast beam of one shot forming multispan formula, including concrete body 1, concrete body 1's inboard is provided with horizontal muscle 2, concrete body 1's inboard is provided with vertical muscle 3, concrete body 1's inboard is provided with recess 4, the inboard of recess 4 is pegged graft and is had reference column 5, reference column 5's outside is provided with concrete column 6, reference column 5's outside is provided with longitudinal joint muscle 7, one side of concrete body 1 is provided with inserts hole 8, concrete body 1's opposite side is provided with connects reference column 9.
The utility model discloses a theory of operation and use flow: when prefabricating, the beam is prefabricated according to the size of the positioning column 5 outside the concrete column 6, then when mounting, the groove 4 in the beam is connected with the positioning column 5 through hoisting, then concrete is poured, at the moment, the beam is connected with the concrete column 6, when mounting needs to be carried out between the beams, the connecting positioning column 9 at one end of the mounting beam is inserted into the inserting hole 8 outside the other beam, so that the connection between the two beams is realized, and then concrete pouring is carried out through the outside, so that the connection between the two beams is realized.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described above, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (7)
1. Energy-conserving precast beam of one shot forming multispan formula, including concrete body (1), its characterized in that: the concrete column is characterized in that a transverse rib (2) is arranged on the inner side of the concrete body (1), a longitudinal rib (3) is arranged on the inner side of the concrete body (1), a groove (4) is formed in the inner side of the concrete body (1), a positioning column (5) is inserted into the inner side of the groove (4), a concrete column (6) is arranged outside the positioning column (5), a longitudinal connecting rib (7) is arranged outside the positioning column (5), an inserting hole (8) is formed in one side of the concrete body (1), and a connecting positioning column (9) is arranged on the other side of the concrete body (1).
2. The one-shot forming multi-span energy-saving precast beam of claim 1, wherein: the transverse ribs (2) and the longitudinal ribs (3) form an external framework of the beam.
3. The one-step forming multi-span energy-saving precast beam according to claim 1, characterized in that: the transverse ribs (2) are at least two layers, the transverse ribs (2) in each layer are arranged at equal intervals, and the transverse ribs (2) between each group are connected through stirrups.
4. The one-shot forming multi-span energy-saving precast beam of claim 1, wherein: the concrete is characterized in that at least two groups of longitudinal ribs (3) penetrate through the concrete body (1), the longitudinal ribs (3) are connected with each layer of transverse ribs (2) through stirrups, and the longitudinal ribs (3) are connected through the stirrups.
5. The one-shot forming multi-span energy-saving precast beam of claim 1, wherein: the specification of the groove (4) is matched with that of the positioning column (5).
6. The one-shot forming multi-span energy-saving precast beam of claim 1, wherein: the inner side of the concrete body (1) is provided with a through hole, and the longitudinal connecting rib (7) is arranged on the inner side of the through hole.
7. The one-step forming multi-span energy-saving precast beam according to claim 1, characterized in that: the position of the inserting hole (8) corresponds to the connecting positioning column (9) and the specification of the inserting hole (8) is matched with the connecting positioning column (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222589891.1U CN218437783U (en) | 2022-09-29 | 2022-09-29 | One-step forming multi-span energy-saving precast beam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222589891.1U CN218437783U (en) | 2022-09-29 | 2022-09-29 | One-step forming multi-span energy-saving precast beam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218437783U true CN218437783U (en) | 2023-02-03 |
Family
ID=85083552
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222589891.1U Active CN218437783U (en) | 2022-09-29 | 2022-09-29 | One-step forming multi-span energy-saving precast beam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218437783U (en) |
-
2022
- 2022-09-29 CN CN202222589891.1U patent/CN218437783U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112281633A (en) | Back-loading cantilever arm of spine beam bridge and longitudinal joint structure thereof | |
CN208981528U (en) | Assembled overlaps board wall grouting behind shaft or drift lining connecting joint structure | |
CN111075015A (en) | Socket joint type prefabricated steel-concrete joint | |
CN218437783U (en) | One-step forming multi-span energy-saving precast beam | |
CN208024178U (en) | The prefabricated assembled window that floats | |
CN214574621U (en) | Node dry joining method assembly structure | |
CN113530051B (en) | Prefabricated rib-free laminated slab | |
CN212427568U (en) | Prefabricated assembly type steel concrete beam column connection structure | |
CN212773578U (en) | Independent support system of assembled building quick detach | |
CN210598985U (en) | Simply supported shield tunnel mid-board mounting structure | |
CN113737966A (en) | Assembled RCS lotus root beam column connecting node and application thereof | |
CN216379984U (en) | Positioning connection structure of assembled structure | |
CN216195401U (en) | Assembly type structure connected by UHPC | |
CN207092260U (en) | A kind of tenon riveting steel structure modularization house | |
CN214194661U (en) | Prefabricated cable shaft of assembled lightweight | |
CN109707069A (en) | One kind connecting detachable prefabricated modularization shear wall and its assembly method based on fashioned iron | |
CN215331036U (en) | Structure of hollow steel stair | |
CN216475972U (en) | Prefabricated ancient building gable upcomer | |
CN218562324U (en) | Be suitable for precast module of cushion cap of single pile | |
CN112627509B (en) | Assembly type wedge-shaped inner support device for shaft-shaped steel-clad concrete wall and construction method thereof | |
CN217299555U (en) | Environment-friendly energy-saving prefabricated reinforced concrete slab type stair | |
CN218758788U (en) | Die carrier structure is used in insulation template installation | |
CN214695113U (en) | Back-loading cantilever arm structure of spine beam bridge | |
CN220226285U (en) | Assembled building superimposed sheet installation strutting arrangement | |
CN217398303U (en) | Novel interior climbing formula tower crane attaches wall frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |