CN220848708U - Assembled superimposed sheet post-cast strip connection structure - Google Patents

Assembled superimposed sheet post-cast strip connection structure Download PDF

Info

Publication number
CN220848708U
CN220848708U CN202322549837.9U CN202322549837U CN220848708U CN 220848708 U CN220848708 U CN 220848708U CN 202322549837 U CN202322549837 U CN 202322549837U CN 220848708 U CN220848708 U CN 220848708U
Authority
CN
China
Prior art keywords
post
laminated slab
aluminum
supporting system
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202322549837.9U
Other languages
Chinese (zh)
Inventor
李守富
康苗
骆发江
朱晶
杜正宇
许广兴
李鹏
汪艳兵
黎建宁
王腾
姚尔可
崔继伟
张伟
林良
王燕云
严新建
郭昆
马铁丁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Bureau Group Co Ltd
Original Assignee
China Construction Third Bureau Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Bureau Construction Engineering Co Ltd filed Critical China Construction Third Bureau Construction Engineering Co Ltd
Priority to CN202322549837.9U priority Critical patent/CN220848708U/en
Application granted granted Critical
Publication of CN220848708U publication Critical patent/CN220848708U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an assembled laminated slab post-pouring plate and strip connecting structure, which comprises an assembled laminated slab, a post-pouring plate and strip and an aluminum mould supporting system; the post-pouring plate and strip joint of the laminated slab comprises an aluminum mould supporting system and a plate and strip reinforcing system, wherein the aluminum mould supporting system is supported under the bottom of the post-pouring plate and strip reinforcing system is used for fixing the plate and strip reinforcing system and the assembled laminated slab in opposite pulling after the post-pouring plate and strip steel is bound. The utility model has the advantages that: the slurry leakage at the joint of the post-pouring plate band is avoided, the molding appearance quality of the post-pouring plate band is good, and the later polishing repair quantity is reduced.

Description

Assembled superimposed sheet post-cast strip connection structure
Technical Field
The utility model relates to the technical field of building construction, in particular to an assembled superimposed sheet post-pouring plate and strip connecting structure.
Background
Along with the rapid development of the construction technology in China, the assembly type structure is promoted more and more widely, and when the traditional superimposed sheet post-cast strip is constructed in the main structure, hidden quality hazards such as slurry leakage, poor plate and strip impression and the like can be generated, so that the overall construction impression quality is influenced. Therefore, an assembled laminated slab post-pouring plate belt connecting structure is provided for solving the problems.
Disclosure of utility model
The utility model aims to solve the problems and provide an assembled laminated slab post-pouring plate and strip connecting structure.
The utility model realizes the aim through the following technical scheme that the post-pouring plate and strip connecting structure of the assembled laminated slab comprises prefabricated laminated slabs, a first opposite-pulling screw rod, a vertical rod supporting system, an aluminum template supporting system, a second opposite-pulling screw rod and a double-steel-tube main rib reinforcing system, wherein every two adjacent prefabricated laminated slabs are mutually pre-fixed through the first opposite-pulling screw rod, an aluminum template supporting system is arranged between the bottom surfaces of every two adjacent prefabricated laminated slabs, a plurality of double-steel-tube main rib reinforcing systems are equidistantly arranged at the bottom of the aluminum template supporting system, the bottoms of the double-steel-tube main rib reinforcing systems are fixedly connected with the corresponding vertical rod supporting systems, the middle part of the first opposite-pulling screw rod is connected with the middle part of the second opposite-pulling screw rod up and down through the same screw rod, and the screw rod part is in sliding contact with the corresponding part of the aluminum template in the aluminum template supporting system.
Preferably, the edges of the two sides of the top of the prefabricated laminated slab are respectively provided with an edge wave-shaped reinforcing steel bar band, and a plurality of opposite-pulling screws which are distributed at equal intervals are fixedly connected with one end and the other end of each opposite-pulling screw between the two edge wave-shaped reinforcing steel bar bands between two adjacent prefabricated laminated slabs.
Preferably, the aluminum mould plate top space equidistance is equipped with a plurality of connection formula reinforcing bar, and each connection formula reinforcing bar both ends respectively with prefabricated superimposed sheet lateral wall on the reinforcing bar corresponding tie up fixed connection each other.
Preferably, the aluminum template supporting system comprises a plurality of aluminum templates and a plurality of opposite-pulling screws II.
Preferably, the aluminum templates extend to the two sides of the assembly laminated slab by 100mm respectively, and the two side edges of the aluminum templates are mutually sealed and bonded with the contact edges of the bottom of the prefabricated laminated slab through double faced adhesive tape.
The beneficial effects of the utility model are as follows: the slurry leakage at the joint of the post-pouring plate and the band plate is avoided, and the molding appearance quality of the post-pouring plate and band plate is good.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained from these drawings without inventive faculty for a person skilled in the art.
Fig. 1 and 2 are perspective views of the overall structure of the present utility model from different perspectives, respectively.
In the figure: 1. prefabricating a laminated plate; 11. connecting type reinforcing steel bars; 12. edge wave-shaped reinforcing steel bar belt; 2. a first opposite-pulling screw rod; 3. a pole support system; 4. an aluminum template support system; 41. an aluminum template; 42. a second opposite-pulling screw rod; 5. a double steel pipe main ridge reinforcement system.
Detailed Description
In order to make the objects, features and advantages of the present utility model more obvious and understandable, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the drawings in the embodiments of the present utility model, and it is apparent that the embodiments described below are only some embodiments of the present utility model, not all embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The technical scheme of the utility model is further described below by the specific embodiments with reference to the accompanying drawings.
In the description of the present utility model, it should be understood that the directions or positional relationships indicated by the terms "upper", "lower", "top", "bottom", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present utility model.
Referring to fig. 1-2, an assembled laminated slab post-pouring plate and strip connection structure comprises prefabricated laminated slabs 1, a first opposite-pulling screw rod 2, a vertical rod supporting system 3, an aluminum template 41 supporting system 4, a second opposite-pulling screw rod 42 and a double-steel-pipe main ridge reinforcing system 5, wherein every two adjacent prefabricated laminated slabs 1 are mutually pre-fixed through the first opposite-pulling screw rod 2, an aluminum template 41 supporting system 4 is arranged between the bottom surfaces of every two adjacent prefabricated laminated slabs 1, a plurality of double-steel-pipe main ridge reinforcing systems 5 are equidistantly arranged at the bottom of the aluminum template 41 supporting system 4, the bottoms of the double-steel-pipe main ridge reinforcing systems 5 are fixedly connected with the corresponding vertical rod supporting systems 3, the middle parts of the first opposite-pulling screw rods 2 and the middle parts of the second opposite-pulling screw rods 42 are mutually connected up and down through the same screw rods, and the screw rod parts are in sliding contact with corresponding parts of the aluminum templates 41 in the aluminum template 41 supporting system 4.
The two edges of the top of the prefabricated laminated slab 1 are respectively provided with an edge wavy reinforced bar 12, and two ends of a plurality of opposite-pulling screws I2 which are distributed at equal intervals between the two edge wavy reinforced bars 12 between two adjacent prefabricated laminated slabs 1 are fixedly connected with each other; the top space of the aluminum template 41 is provided with a plurality of connecting type reinforcing bars 11 at equal intervals, and two ends of each connecting type reinforcing bar 11 are respectively and mutually bound and fixedly connected with corresponding reinforcing bars on the side wall of the prefabricated laminated slab 1; the aluminum template 41 supporting system 4 comprises a plurality of aluminum templates 41 and a plurality of opposite-pulling screws II 42; the aluminum templates 41 extend to the two sides of the assembly laminated slab by 100mm respectively, and the two side edges of the aluminum templates 41 are mutually sealed and bonded with the contact edge of the bottom of the prefabricated laminated slab 1 through double faced adhesive tape.
When the utility model is used, the construction process flow is as follows: preparing materials, supporting an aluminum mould upright rod, supporting and leveling an aluminum mould plate belt, pasting double-sided adhesive on the contact edge of a laminated plate and a bottom aluminum mould plate, hoisting the laminated plate, binding a post-cast plate steel bar, perforating the bottom aluminum mould of the post-cast plate belt, fixing by counter-pulling a screw rod, pouring concrete, removing the aluminum mould plate, cutting off the counter-pulling screw rod, polishing and leveling, and brushing antirust paint.
In the construction technology system of the junction of the post-pouring plate and the strip of the assembled laminated slab, after the aluminum mould vertical rod is erected, the aluminum mould strip is erected and leveled, the assembled laminated slab is positioned, double faced adhesive tape is attached to the contact edge of the laminated slab and the bottom aluminum mould, the assembled laminated slab is hoisted, the assembled laminated slab is leveled, steel bars at the post-pouring plate and strip are bound after the leveling, the intervals are less than or equal to 1500mm, electric drill holes (diameter 15 mm) are drilled, the aluminum mould is fastened and fixed by a pull screw rod with the installation diameter phi 14, and finally the post-pouring plate and strip are poured and molded once during main concrete pouring.
In addition, after the reinforcement of the construction system at the joint of the post-pouring plate and the strip of the superimposed sheet is finished, the concrete construction can be carried out after the post-pouring plate and strip of the superimposed sheet is qualified by inspection, and the frame body is frequently inspected and maintained in the use process. The flatness of the adhesive tape and the tightness of the opposite-pulling screw are checked, the flatness of the template is checked, and whether the support is loose or not is checked.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
The above embodiments are only for illustrating the technical solution of the present utility model, and not for limiting the same; although the utility model has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical scheme described in the foregoing embodiments can be modified or some technical features thereof can be replaced by equivalents; such modifications and substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present utility model.

Claims (5)

1. The utility model provides an assembled superimposed sheet post-cast strip connection structure which characterized in that: including prefabricated superimposed sheet (1), first (2) of counter-pulling screw, pole setting supporting system (3), aluminum mould board (41) supporting system (4), second (42) of counter-pulling screw and two steel pipe owner are stupefied reinforcing system (5), fix each other through first (2) of counter-pulling screw between every two adjacent prefabricated superimposed sheets (1), and be located and be equipped with aluminum mould board (41) supporting system (4) between the bottom surface between every two adjacent prefabricated superimposed sheets (1), aluminum mould board (41) supporting system (4) bottom equidistance is equipped with a plurality of two steel pipe owner and stupefied reinforcing system (5), and two steel pipe owner consolidate system (5) bottom and the pole setting supporting system (3) each other fixed connection that correspond, connect from top to bottom through same screw rod between first (2) middle part of counter-pulling screw and the second (42) middle part, and the corresponding position mutual sliding contact of aluminum mould board (41) in aluminum mould board (41) supporting system (4).
2. The fabricated laminated slab post-cast strip connection structure according to claim 1, wherein: the two edges of the top of the prefabricated laminated slab (1) are respectively provided with an edge waveform reinforcing steel bar band (12), and a plurality of opposite-pulling screw rods (2) which are distributed at equal intervals are fixedly connected with two ends of each opposite-pulling screw rod (2) between two edge waveform reinforcing steel bar bands (12) between two adjacent prefabricated laminated slabs (1).
3. The fabricated laminated slab post-cast strip connection structure according to claim 1, wherein: the top space of the aluminum template (41) is provided with a plurality of connection type reinforcing bars (11) at equal intervals, and two ends of each connection type reinforcing bar (11) are respectively and fixedly connected with corresponding reinforcing bars on the side wall of the prefabricated laminated slab (1) in a binding manner.
4. The fabricated laminated slab post-cast strip connection structure according to claim 1, wherein: the aluminum template (41) supporting system (4) comprises a plurality of aluminum templates (41) and a plurality of opposite-pulling screws (42).
5. The fabricated laminated slab post-cast strip connection structure according to claim 1, wherein: the aluminum templates (41) extend to the two sides of the assembly laminated slab by 100mm respectively, and the edges of the two sides of the aluminum templates (41) are mutually sealed and bonded with the contact edges of the bottom of the prefabricated laminated slab (1) through double faced adhesive tape.
CN202322549837.9U 2023-09-20 2023-09-20 Assembled superimposed sheet post-cast strip connection structure Active CN220848708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202322549837.9U CN220848708U (en) 2023-09-20 2023-09-20 Assembled superimposed sheet post-cast strip connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202322549837.9U CN220848708U (en) 2023-09-20 2023-09-20 Assembled superimposed sheet post-cast strip connection structure

Publications (1)

Publication Number Publication Date
CN220848708U true CN220848708U (en) 2024-04-26

Family

ID=90783846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202322549837.9U Active CN220848708U (en) 2023-09-20 2023-09-20 Assembled superimposed sheet post-cast strip connection structure

Country Status (1)

Country Link
CN (1) CN220848708U (en)

Similar Documents

Publication Publication Date Title
CN110206210B (en) Fabricated composite floor slab and construction method thereof
CN103397700A (en) Connection structure of building composite floor slab and steel tube shear wall
CN205171994U (en) A stencil assembly for clear water concrete construction
CN209040349U (en) A kind of ring muscle fastening shear wall structure being easily installed
CN212200076U (en) Formwork apparatus for wet joints
CN220848708U (en) Assembled superimposed sheet post-cast strip connection structure
CN110644663B (en) Assembled coincide floor
CN208039585U (en) The assembled architecture roof truss of nested type steel construction
CN203475609U (en) Connecting structure of composite floor slab and steel tube shear wall of building
CN216533287U (en) Ecological fish reef hollow square mould
CN110374241B (en) Floor bottom module, floor and method for constructing floor
CN115653188A (en) Production and construction method of steel rib outer wall large plate with multilayer heat-insulating bridge composite structure
CN212773578U (en) Independent support system of assembled building quick detach
CN210976598U (en) External corner template for building
CN211622203U (en) Roofing component and assembled multilayer house
CN211775070U (en) Floor support plate connected by its shaped folded plate
CN209637071U (en) A kind of laminated floor slab and assembled connecting node
CN210173850U (en) Window opening mold for prefabricated wall board
CN209737913U (en) Coincide floor mould convenient to drawing of patterns
CN2749653Y (en) Rapid forming die set for cement tank applied for farmland irrigation
CN111648490A (en) But green heat preservation wallboard of integral type installation
CN112064850A (en) Truss floor plate
CN208219847U (en) A kind of light steel gently mixes cavity net mould and builds a house fastly
CN110843095A (en) Concrete box mould, manufacturing method thereof and mould-dismantling-free building method
CN206428851U (en) A kind of light steel skeleton solid wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant