CN218405733U - Settlement-preventing construction auxiliary device for road construction underground pipeline - Google Patents

Settlement-preventing construction auxiliary device for road construction underground pipeline Download PDF

Info

Publication number
CN218405733U
CN218405733U CN202222731230.8U CN202222731230U CN218405733U CN 218405733 U CN218405733 U CN 218405733U CN 202222731230 U CN202222731230 U CN 202222731230U CN 218405733 U CN218405733 U CN 218405733U
Authority
CN
China
Prior art keywords
connecting rod
construction
clamping
jacket
clamping block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222731230.8U
Other languages
Chinese (zh)
Inventor
钟建
周永
张庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongurban Rural Ecological Environmental Protection Engineering Co ltd
Original Assignee
Zhongurban Rural Ecological Environmental Protection Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongurban Rural Ecological Environmental Protection Engineering Co ltd filed Critical Zhongurban Rural Ecological Environmental Protection Engineering Co ltd
Priority to CN202222731230.8U priority Critical patent/CN218405733U/en
Application granted granted Critical
Publication of CN218405733U publication Critical patent/CN218405733U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to an anti-sedimentation construction auxiliary device for an underground pipeline in road construction, which belongs to the field of pipeline construction assistance and comprises a support plate, an upper clamping sleeve, a lower clamping sleeve, a connecting rod and a clamping block; the upper clamping sleeve is arranged below the supporting plate in a sliding manner; an adjusting mechanism for driving the upper jacket to move in the vertical direction is arranged on the supporting plate; the lower jacket is arranged below the upper jacket in a sliding manner; the upper jacket is abutted with the lower jacket; the connecting rod is arranged on the lower clamping sleeve; the connecting rod is connected with the upper jacket in a sliding way; the clamping block is arranged on the upper clamping sleeve in a sliding manner; a plurality of clamping grooves are formed in the connecting rod; one end of the clamping block is embedded into the clamping groove, and the clamping block is clamped with the connecting rod; the upper clamping sleeve is provided with a pushing mechanism for driving the clamping block to move. The utility model discloses can hoist the pipeline, support the pipeline and make things convenient for the pipeline to splice, and can reduce the influence of subsiding the pipeline.

Description

Settlement-preventing construction auxiliary device for road construction underground pipeline
Technical Field
The utility model relates to a pipeline construction auxiliary field especially relates to a road construction underground piping prevents subsiding construction auxiliary device.
Background
According to the current situation of the facilities under the municipal roads in China, different pipelines such as electric power, communication, coal gas, water supply, drainage pipelines and the like are generally arranged, and the municipal drainage pipes comprise two pipelines of rainwater and sewage because the drainage pipelines take measures of rainwater and sewage diversion into consideration, namely rainwater is generally drained into rivers nearby and sewage is drained into sewage treatment plants.
Because municipal administration pipeline's nature is generally installed in the road both sides, so it subsides mainly to receive self weight to influence more, when installing the pipeline, need use support equipment to support the pipeline, makes things convenient for the pipeline to splice, and need reduce to subside the influence to the construction, prevents to connect the department dislocation or fracture.
SUMMERY OF THE UTILITY MODEL
The utility model aims at the problem that exists among the background art, provide one kind and can hoist the pipeline, support the pipeline and make things convenient for the pipeline to splice, and can reduce to subside the road construction underground pipeline of the influence to the pipeline and prevent subsiding construction auxiliary device.
The technical scheme of the utility model: an anti-settling construction auxiliary device for an underground pipeline in road construction comprises a supporting plate, an upper clamping sleeve, a lower clamping sleeve, a connecting rod and a clamping block;
the upper clamping sleeve is arranged below the supporting plate in a sliding manner; an adjusting mechanism for driving the upper jacket to move along the vertical direction is arranged on the supporting plate; the lower jacket is arranged below the upper jacket in a sliding manner; the upper jacket is abutted with the lower jacket; the connecting rod is arranged on the lower clamping sleeve; the connecting rod is connected with the upper jacket in a sliding way; the clamping block is arranged on the upper clamping sleeve in a sliding manner; a plurality of clamping grooves are formed in the connecting rod; one end of the clamping block is embedded into the clamping groove, and the clamping block is clamped with the connecting rod; the upper clamping sleeve is provided with a pushing mechanism for driving the clamping block to move.
Preferably, the upper jacket is provided with a mounting rack; the clamping block is connected with the mounting frame in a sliding manner; the pushing mechanism is arranged on the mounting frame.
Preferably, the pushing mechanism comprises a sliding column, an elastic piece and a push plate; the sliding column is arranged on the mounting frame, the push plate is arranged on the clamping block, and the push plate is interactively arranged on the sliding column and the upper clamping sleeve; the elastic component sets up the periphery side at the slip post, and the both ends of elastic component are connected with push pedal and mounting bracket respectively.
Preferably, the lower end of the clamping block is provided with a guide inclined plane.
Preferably, the adjusting mechanism comprises a bidirectional screw rod, a moving block, a guide rail and a connecting rod; two moving blocks and two connecting rods are arranged; the bidirectional screw rod is rotatably arranged on the supporting plate; the guide rail is arranged on the support plate; the moving block is arranged on the guide rail in a sliding manner; the bidirectional screw rod comprises a first thread part and a second thread part with opposite thread directions; the two moving blocks are respectively in threaded connection with the first threaded part and the second threaded part; two ends of the connecting rod are respectively connected with the moving block and the upper jacket in a rotating way.
Preferably, two ends of the bidirectional screw rod are provided with rotating blocks; the turning block is in a hexagonal structure.
Preferably, the supporting plate is provided with a reinforcing rod; the reinforcing rod is provided in plurality.
Compared with the prior art, the utility model discloses following profitable technological effect has:
the utility model discloses in, fix the backup pad to the ground, support the backup pad through the ground, can avoid subsiding the influence to the pipeline, press from both sides the cover down and place the lower extreme of pipeline, and be located the below that presss from both sides the cover, press from both sides the cover downstream in the drive of adjustment mechanism, it contacts with the connecting rod to press from both sides the cover on, the connecting rod contacts with the direction inclined plane earlier, thereby can promote the shrink of joint piece, can make things convenient for the connecting rod to insert in the last clamp cover, when pressing from both sides the cover and press from both sides the cover and carry out the clamping back elastic component to the pipeline jointly and promote the push pedal and remove, the sliding column supports and leads the push pedal, the push pedal drives the joint piece and removes, make joint piece card go into the joint inslot, and the upper end of joint piece supports the connecting rod, prevent that connecting rod and last clamp cover from breaking away from, the cover upstream in the drive of adjustment mechanism, it drives the connecting rod upstream to press from both sides the cover upstream to press from the cover downstream to drive, thereby can adjust the height of pipeline, make things convenient for earthing concatenation between the pipeline concatenation to carry out the backfill operation after the concatenation is accomplished.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention;
fig. 2 is a partial structural sectional view of an embodiment of the present invention;
fig. 3 is a schematic view of a part a of the enlarged structure in fig. 1.
Reference numerals: 1. a support plate; 2. a reinforcing bar; 3. an upper jacket; 4. a lower jacket; 5. a connecting rod; 501. a clamping groove; 6. a clamping block; 7. a pushing mechanism; 701. a sliding post; 702. an elastic member; 703. pushing the plate; 8. a mounting frame; 9. an adjustment mechanism; 901. a bidirectional screw rod; 902. a moving block; 903. a guide rail; 904. a connecting rod; 10. and (6) rotating the block.
Detailed Description
Example one
As shown in fig. 1-3, the utility model provides an anti-settling construction auxiliary device for road construction underground pipeline, which comprises a support plate 1, an upper jacket 3, a lower jacket 4, a connecting rod 5 and a clamping block 6;
the upper jacket 3 is arranged below the support plate 1 in a sliding manner; an adjusting mechanism 9 for driving the upper jacket 3 to move along the vertical direction is arranged on the supporting plate 1; the lower jacket 4 is arranged below the upper jacket 3 in a sliding manner; the upper jacket 3 is abutted with the lower jacket 4; the connecting rod 5 is arranged on the lower jacket 4; the connecting rod 5 is connected with the upper jacket 3 in a sliding way; the clamping block 6 is arranged on the upper clamping sleeve 3 in a sliding manner; the connecting rod 5 is provided with a plurality of clamping grooves 501; one end of the clamping block 6 is embedded in the clamping groove 501, and the clamping block 6 is clamped with the connecting rod 5; the upper jacket 3 is provided with a pushing mechanism 7 for driving the clamping block 6 to move.
The upper jacket 3 is provided with a mounting rack 8; the clamping block 6 is connected with the mounting frame 8 in a sliding manner; the pushing mechanism 7 is arranged on the mounting frame 8. The pushing mechanism 7 comprises a sliding column 701, an elastic piece 702 and a push plate 703; the sliding column 701 is arranged on the mounting frame 8, the push plate 703 is arranged on the clamping block 6, and the push plate 703 is interactively arranged on the sliding column 701 and the upper jacket 3; the elastic member 702 is disposed on the outer peripheral side of the sliding column 701, and both ends of the elastic member 702 are connected to the push plate 703 and the mounting bracket 8, respectively. The lower end of the clamping block 6 is provided with a guide inclined plane.
A reinforcing rod 2 is arranged on the supporting plate 1; the reinforcing rods 2 are provided in plurality; the stiffener 2 can conveniently install the backup pad 1 to the ground with around the clod, can be better support backup pad 1, can effectually take precautions against the influence of subsiding to the pipeline.
In this embodiment, fix backup pad 1 to the ground, support backup pad 1 through the ground, can avoid subsiding the influence to the pipeline, press from both sides the lower extreme that the cover 4 placed the pipeline down, and be located the below that presss from both sides cover 3, press from both sides cover 3 downstream on the drive through adjustment mechanism 9, it contacts with connecting rod 5 to press from both sides cover 3, connecting rod 5 contacts with the direction inclined plane earlier, thereby can promote the shrink of joint piece 6, can make things convenient for connecting rod 5 to insert in the cover 3, press from both sides cover 3 and lower clamp cover 4 to carry out clamping back elastic component 702 to the pipeline jointly and promote push pedal 703 and remove, sliding column 701 supports and leads push pedal 703, push pedal 703 drives joint piece 6 and removes, make joint piece 6 card go into joint groove 501, and the upper end of joint piece 6 supports connecting rod 5, prevent connecting rod 5 and last clamp cover 3 from breaking away from, the cover 3 upward movement on the drive of adjustment mechanism 9, it drives connecting rod 5 upward movement to press from both sides cover 3, connecting rod 5 drives lower clamp cover 4 upward movement, thereby can adjust the height of pipeline, make things convenient for the concatenation between the pipeline, make things convenient for the backfill operation after the completion.
Example two
As shown in fig. 1-3, compared with the first embodiment, the adjusting mechanism 9 of the utility model comprises a bidirectional screw 901, a moving block 902, a guide rail 903 and a connecting rod 904; two moving blocks 902 and two connecting rods 904 are arranged; the bidirectional screw 901 is rotationally arranged on the support plate 1; the guide rail 903 is arranged on the support plate 1; the moving block 902 is arranged on the guide rail 903 in a sliding manner; the bidirectional screw 901 comprises a first thread part and a second thread part with opposite thread directions; the two moving blocks 902 are respectively in threaded connection with the first threaded portion and the second threaded portion; both ends of the connecting rod 904 are respectively connected with the moving block 902 and the upper jacket 3 in a rotating manner.
Two ends of the bidirectional screw 901 are provided with rotating blocks 10; the turning block 10 has a hexagonal structure.
In this embodiment, the turning block 10 of hexagon structure can make things convenient for the spanner to rotate turning block 10 to drive two-way lead screw 901 and rotate, two moving blocks 902 of two-way lead screw 901 drive move, two moving blocks 902 drive two connecting rods 904 respectively and move, connecting rod 904 drives and presss from both sides the cover 3 and moves, it drives connecting rod 5 and removes to press from both sides cover 3 on, connecting rod 5 drives down presss from both sides cover 4 and removes, it drives the pipeline and removes to press from both sides cover 4 down, thereby can remove the pipeline to appointed height, conveniently splice.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited thereto, and various changes can be made without departing from the gist of the present invention within the scope of knowledge possessed by those skilled in the art.

Claims (7)

1. The auxiliary device for the anti-sedimentation construction of the underground pipeline for the road construction is characterized by comprising a supporting plate (1), an upper clamping sleeve (3), a lower clamping sleeve (4), a connecting rod (5) and a clamping block (6);
the upper clamping sleeve (3) is arranged below the supporting plate (1) in a sliding manner; an adjusting mechanism (9) for driving the upper jacket (3) to move along the vertical direction is arranged on the supporting plate (1); the lower jacket (4) is arranged below the upper jacket (3) in a sliding manner; the upper jacket (3) is abutted with the lower jacket (4); the connecting rod (5) is arranged on the lower jacket (4); the connecting rod (5) is connected with the upper jacket (3) in a sliding way; the clamping block (6) is arranged on the upper jacket (3) in a sliding manner; a plurality of clamping grooves (501) are formed in the connecting rod (5); one end of the clamping block (6) is embedded into the clamping groove (501), and the clamping block (6) is clamped with the connecting rod (5); the upper clamping sleeve (3) is provided with a pushing mechanism (7) for driving the clamping block (6) to move.
2. The anti-settling construction auxiliary device for the road construction underground pipeline as claimed in claim 1, wherein a mounting rack (8) is arranged on the upper jacket (3); the clamping block (6) is connected with the mounting frame (8) in a sliding manner; the pushing mechanism (7) is arranged on the mounting frame (8).
3. The anti-settling construction auxiliary device for the underground pipeline of the road construction as claimed in claim 2, wherein the pushing mechanism (7) comprises a sliding column (701), an elastic member (702) and a push plate (703); the sliding column (701) is arranged on the mounting frame (8), the push plate (703) is arranged on the clamping block (6), and the push plate (703) is interactively arranged on the sliding column (701) and the upper jacket (3); the elastic piece (702) is arranged on the outer periphery side of the sliding column (701), and two ends of the elastic piece (702) are respectively connected with the push plate (703) and the mounting rack (8).
4. The auxiliary device for the anti-sedimentation construction of the underground pipeline for the road construction as claimed in claim 3, wherein the lower end of the clamping block (6) is provided with a guide slope.
5. The anti-settling construction auxiliary device for the underground pipeline in road construction as claimed in claim 1, wherein the adjusting mechanism (9) comprises a bidirectional screw rod (901), a moving block (902), a guide rail (903) and a connecting rod (904); two moving blocks (902) and two connecting rods (904) are arranged; the bidirectional screw rod (901) is rotationally arranged on the support plate (1); the guide rail (903) is arranged on the support plate (1); the moving block (902) is arranged on the guide rail (903) in a sliding manner; the bidirectional screw rod (901) comprises a first thread part and a second thread part with opposite thread directions; the two moving blocks (902) are respectively in threaded connection with the first threaded part and the second threaded part; two ends of the connecting rod (904) are respectively connected with the moving block (902) and the upper jacket (3) in a rotating way.
6. The auxiliary device for the anti-sedimentation construction of the underground pipeline for the road construction as claimed in claim 5, wherein the two-way screw rod (901) is provided with a rotating block (10) at both ends; the rotating block (10) is in a hexagonal structure.
7. The underground pipeline anti-settling construction auxiliary device for road construction according to claim 1 is characterized in that a reinforcing rod (2) is arranged on the support plate (1); the number of the reinforcing rods (2) is multiple.
CN202222731230.8U 2022-10-13 2022-10-13 Settlement-preventing construction auxiliary device for road construction underground pipeline Active CN218405733U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222731230.8U CN218405733U (en) 2022-10-13 2022-10-13 Settlement-preventing construction auxiliary device for road construction underground pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222731230.8U CN218405733U (en) 2022-10-13 2022-10-13 Settlement-preventing construction auxiliary device for road construction underground pipeline

Publications (1)

Publication Number Publication Date
CN218405733U true CN218405733U (en) 2023-01-31

Family

ID=85003677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222731230.8U Active CN218405733U (en) 2022-10-13 2022-10-13 Settlement-preventing construction auxiliary device for road construction underground pipeline

Country Status (1)

Country Link
CN (1) CN218405733U (en)

Similar Documents

Publication Publication Date Title
CN218405733U (en) Settlement-preventing construction auxiliary device for road construction underground pipeline
CN210088169U (en) Soft foundation reinforcing structure for pipeline laying
CN208455646U (en) Municipal drainage pipeline pit slot supporting construction
CN210134934U (en) Protection device for underground pipeline during shield tunneling
CN213954538U (en) Pipeline positioning device for water supply and drainage installation
CN211901801U (en) Mounting structure of underground pipeline
CN211040105U (en) Fixing device for buried steam pipeline
CN210307475U (en) Clamping device is used in processing of HDPE with layer drainage pipe
CN210713133U (en) Socket joint formula corrugated pipe installs auxiliary device
CN219242813U (en) Drainage pipeline supporting base
CN217130616U (en) Water supply and drainage pipeline connecting component for environmental engineering
CN220488476U (en) Water supply and drainage pipeline limiting frame
CN215410546U (en) Municipal administration is pipeline locating support for water supply and drainage engineering
CN219364844U (en) Mounting structure for sewage drainage pipeline
CN213805727U (en) Municipal drainage pipe lays and uses protector
CN216377862U (en) A mount pad structure for glass tempering manure pit
CN216948641U (en) Municipal administration road drain pipe connecting device
CN219102230U (en) Pipeline stabilizing device for municipal works
CN217914926U (en) Limiting device for municipal road bridge water supply and drainage pipeline
CN220680735U (en) Maintenance strutting arrangement based on water supply and drainage pipeline
CN214360061U (en) Municipal administration sewage pipe network reforms transform engineering device
CN218377981U (en) Municipal administration road piping laying structure
CN211821082U (en) Municipal administration water supply and drainage pipeline strutting arrangement
CN218719356U (en) Strutting arrangement is used in drainage pipe installation for municipal works
CN216479290U (en) Fixing device for water conservancy and hydropower buried pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant