CN216479290U - Fixing device for water conservancy and hydropower buried pipe - Google Patents

Fixing device for water conservancy and hydropower buried pipe Download PDF

Info

Publication number
CN216479290U
CN216479290U CN202123332549.5U CN202123332549U CN216479290U CN 216479290 U CN216479290 U CN 216479290U CN 202123332549 U CN202123332549 U CN 202123332549U CN 216479290 U CN216479290 U CN 216479290U
Authority
CN
China
Prior art keywords
fixed frame
fixed
water conservancy
gag lever
lever post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123332549.5U
Other languages
Chinese (zh)
Inventor
吴冬灿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123332549.5U priority Critical patent/CN216479290U/en
Application granted granted Critical
Publication of CN216479290U publication Critical patent/CN216479290U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a fixing device for water conservancy water and electricity pipe laying, including fixed frame No. one, fixed frame top movable mounting has No. two fixed frames, fixed surface installs the picture peg under the fixed frame No. one, fixed surface installs the snap ring No. one under the fixed frame inboard, No. two fixed frame inboard movable mounting has the snap ring No. two, No. two fixed frame upper surface activity embedding installs the double-screw bolt, No. two fixed frame top movable mounting has the gag lever post No. two, No. two fixed frame one side fixed surface installs the cardboard, a gag lever post is installed in the embedding of cardboard one side surface activity. A fixing device for water conservancy water and electricity pipe laying, can replace spanner fastening bolt when the fastening, reduce the loaded down with trivial details degree of installation of pipeline, and make fixing device and the passageway of burying the pipeline underground fixed to fixing device can remove along with the removal of pipeline, improves the structural stability of pipeline.

Description

Fixing device for water conservancy and hydropower buried pipe
Technical Field
The utility model relates to a fixing device field, in particular to a fixing device for water conservancy water and electricity buried pipe.
Background
The water conservancy refers to the development of hydraulic resources and the prevention of flood disasters, and the hydropower belongs to the term of water conservancy science and technology, and means water and electricity, hydroelectric power generation and the like, wherein the hydropower is a clean energy source, is renewable, pollution-free and low in operating cost, is convenient for carrying out electric power peak regulation, and is beneficial to improving the resource utilization rate and the comprehensive benefits of the economic society;
the notice number is: CN211901833U, the utility model discloses a "a fixing device for water conservancy water and electricity buried pipe, comprising a base plate, the middle part fixedly connected with supporting seat on bottom plate surface top, movable groove, two have all been seted up to the both sides on bottom plate surface top first mounting hole has all been seted up to the both sides on movable groove surface top. The fixing device for the water conservancy and hydropower buried pipe is characterized in that the middle part of the top surface of the bottom plate is fixedly connected with a supporting seat, and two sides of the top surface of the bottom plate are slidably connected with a clamping plate, wherein the supporting seat can support the pipeline, and the side plates at the two sides of the bottom plate can limit the position of the pipeline, and the clamping plates in sliding connection can achieve the purpose of fixing pipelines with different diameters, thereby increasing the practicability of the whole device, thereby solving the problems that the fixing is realized by manually utilizing tools such as a wrench and the like, the labor intensity of workers is increased and the steps are complicated, when in use, certain disadvantages still exist, when in fastening, a plurality of bolts need to be fastened by a spanner, the complexity of the installation of the pipeline can not be reduced, and the fixing device is not fixed with the channel for burying the pipeline, and the fixing device can move along with the movement of the pipeline, so that the stability is not high.
SUMMERY OF THE UTILITY MODEL
A main object of the utility model is to provide a fixing device for water conservancy water and electricity buried pipe can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a fixing device for water conservancy water and electricity pipe laying, includes fixed frame No. one, fixed frame top movable mounting has fixed frame No. two, fixed surface mounting has the picture peg under the fixed frame No. one, fixed frame inboard lower fixed surface mounting has the snap ring No. one, No. two inboard movable mounting of fixed frame has the snap ring No. two, No. two fixed frame upper surface activity embeddings installs the double-screw bolt, No. two fixed frame top movable mounting has the gag lever post No. two, No. two fixed frame one side fixed surface installs the cardboard, a gag lever post is installed in cardboard side surface activity embedding.
Preferably, fixed frame opposite side surface fixed mounting of No. two has the hinge, No. two fixed frames pass through the hinge with fixed frame swing joint No. one, the thread groove has been seted up to No. two fixed frame upper surfaces, No. two fixed frame upper surface fixed mounting has the fixed plate.
Preferably, the double-screw bolt passes through the thread groove with No. two fixed frame swing joint, double-screw bolt upper end fixed surface installs the carousel, the draw-in groove has been seted up to double-screw bolt outside surface.
Preferably, the fixed surface of double-screw bolt lower extreme installs the movable block, fixed surface installs the movable ring on No. two snap rings, the double-screw bolt passes through the movable block with movable ring swing joint, No. one the snap ring with No. two snap ring one side surfaces has all seted up the spread groove.
Preferably, the snap ring and No. two equal movable mounting in snap ring one side have a rubber pad, the equal fixed mounting in rubber pad side surface has the spliced pole, the rubber pad passes through the spliced pole with spread groove swing joint, spacing hole has been seted up to fixed frame one side surface, a gag lever post runs through the cardboard with spacing hole swing joint.
Preferably, the second limiting rod penetrates through the fixed plate and is movably connected with the clamping groove, springs are movably sleeved on the outer sides of the first limiting rod and the second limiting rod respectively, one ends of the springs are fixedly connected with the first limiting rod and the second limiting rod respectively, and the other ends of the springs are fixedly connected with the clamping plate and the fixed plate respectively.
Compared with the prior art, the utility model discloses following beneficial effect has:
in the utility model, the first limiting rod is pulled to be separated from the limiting hole, the second fixing frame is opened through the hinge, the inserting plate is inserted into the soil embedded with the channel, the pipeline is placed in the inner side of the first fixing frame, the second fixing frame is reset, the first limiting rod pulls the first limiting rod to be inserted into the limiting hole under the action of the contraction force of the spring, the first fixing frame and the second fixing frame are fixed, the second limiting rod is pulled to be separated from the clamping groove, the rotary disc is rotated to enable the stud to push the second clamping ring to move downwards to clamp the pipeline, the clamping groove is aligned with the second limiting rod, the second limiting rod is pulled to be inserted into the clamping groove under the action of the contraction force of the spring to fix the stud, so that the second clamping ring is fixed, and further, when fastening can be carried out, a fastening bolt is replaced, the installation complexity degree of the pipeline is reduced, and the fixing device is fixed with the channel embedded with the pipeline, in order to avoid fixing device can remove along with the removal of pipeline, improve the structural stability of pipeline, the rubber pad increases the frictional force between snap ring and the pipeline, through spliced pole and spread groove, makes rubber pad convenient to detach and change.
Drawings
Fig. 1 is a schematic view of the overall structure of a fixing device for water conservancy and hydropower buried pipes of the utility model;
fig. 2 is a split view of the whole structure of the fixing device for the water conservancy and hydropower buried pipe of the utility model;
fig. 3 is a cross-sectional view of a fixing device for a water conservancy and hydropower buried pipe of the present invention;
fig. 4 is a sectional view of a snap ring and a snap ring of the fixing device for water conservancy and hydropower buried pipes of the utility model.
In the figure: 1. a first fixing frame; 101. a second fixing frame; 102. a hinge; 103. a thread groove; 104. a limiting hole; 2. a first snap ring; 201. a second snap ring; 202. a rubber pad; 203. connecting columns; 204. connecting grooves; 205. a movable ring; 3. clamping a plate; 301. a first limiting rod; 302. a spring; 4. a stud; 401. a movable block; 402. a card slot; 403. a turntable; 5. a second limiting rod; 501. a fixing plate; 6. and (4) inserting plates.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
The first embodiment is as follows:
as shown in fig. 1-4, a fixing device for a water conservancy and hydropower buried pipe comprises a first fixing frame 1, a second fixing frame 101 is movably installed above the first fixing frame 1, a plug board 6 is fixedly installed on the lower surface of the first fixing frame 1, a first snap ring 2 is fixedly installed on the lower surface of the inner side of the first fixing frame 1, a second snap ring 201 is movably installed on the inner side of the second fixing frame 101, a stud 4 is movably embedded and installed on the upper surface of the second fixing frame 101, a second limiting rod 5 is movably installed above the second fixing frame 101, a clamping plate 3 is fixedly installed on the surface of one side of the second fixing frame 101, and a first limiting rod 301 is movably embedded and installed on the surface of one side of the clamping plate 3;
a hinge 102 is fixedly arranged on the other side surface of the second fixing frame 101, the second fixing frame 101 is movably connected with the first fixing frame 1 through the hinge 102, a threaded groove 103 is formed in the upper surface of the second fixing frame 101, and a fixing plate 501 is fixedly arranged on the upper surface of the second fixing frame 101; the stud 4 is movably connected with the second fixing frame 101 through a thread groove 103, a turntable 403 is fixedly mounted on the surface of the upper end of the stud 4, and a clamping groove 402 is formed in the surface of the outer side of the stud 4; the surface of the lower end of the stud 4 is fixedly provided with a movable block 401, the upper surface of the second snap ring 201 is fixedly provided with a movable ring 205, the stud 4 is movably connected with the movable ring 205 through the movable block 401, and the surfaces of one sides of the first snap ring 2 and the second snap ring 201 are both provided with a connecting groove 204; rubber pads 202 are movably mounted on one sides of the first snap ring 2 and the second snap ring 201, connecting columns 203 are fixedly mounted on the surfaces of one sides of the rubber pads 202, the rubber pads 202 are movably connected with connecting grooves 204 through the connecting columns 203, a limiting hole 104 is formed in the surface of one side of the first fixing frame 1, and a first limiting rod 301 penetrates through the clamping plate 3 and is movably connected with the limiting hole 104; the second limiting rod 5 penetrates through the fixing plate 501 to be movably connected with the clamping groove 402, springs 302 are movably sleeved on the outer sides of the first limiting rod 301 and the second limiting rod 5, one ends of the two springs 302 are fixedly connected with the first limiting rod 301 and the second limiting rod 5 respectively, the other ends of the two springs 302 are fixedly connected with the clamping plate 3 and the fixing plate 501 respectively, the clamping groove 402 is aligned with the second limiting rod 5, the second limiting rod 5 is pulled to be inserted into the clamping groove 402 under the action of contraction force of the springs 302, the stud 4 is fixed, the second clamping ring 201 is fixed, wrench fastening bolts can be replaced during fastening, the complexity degree of installation of a pipeline is reduced, the fixing device is fixed with a channel for embedding the pipeline so as to prevent the fixing device from moving along with the movement of the pipeline, the structural stability of the pipeline is improved, the rubber pad 202 increases the friction force between the clamping ring and the pipeline, and passes through the connecting column 203 and the connecting groove 204, making rubber pad 202 easy to remove and replace.
Example two:
it should be noted that the utility model relates to a fixing device for water conservancy and hydropower buried pipes, when in use, the first limiting rod 301 is pulled to separate from the limiting hole 104, the second fixing frame 101 is opened through the hinge 102, the plug board 6 is inserted into the soil of the buried channel, then the pipeline is placed into the inner side of the first fixing frame 1, finally the second fixing frame 101 is reset, the first limiting rod 301 pulls the first limiting rod 301 to insert into the limiting hole 104 under the contractile force of the spring 302, the first fixing frame 1 and the second fixing frame 101 are fixed, the second limiting rod 5 is pulled to separate the second limiting rod 5 from the clamping groove 402, the rotary disc is rotated to push the stud 4 to move the second limiting rod 201 downwards to clamp the pipeline, then the clamping groove 402 is aligned with the second limiting rod 403, the second limiting rod 5 is pulled to insert into the clamping groove 402 under the contractile force of the spring 302 to fix the stud 4, thereby make No. two snap rings 201 fixed, and then can replace spanner fastening bolt when the fastening, reduce the loaded down with trivial details degree of installation of pipeline, and make fixing device and bury the passageway of pipeline underground fixed to fixing device can remove along with the removal of pipeline, improve the structural stability of pipeline, rubber pad 202 increases the frictional force between snap ring and the pipeline, through spliced pole 203 and spread groove 204, makes rubber pad 202 convenient to detach and change.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. A fixing device for water conservancy water and electricity pipe laying which characterized in that: including fixed frame (1), fixed frame (1) top movable mounting has fixed frame (101) No. two, fixed frame (1) lower fixed surface installs picture peg (6) No. one, snap ring (2) are installed to fixed frame (1) inboard lower fixed surface, No. two fixed frame (101) inboard movable mounting has snap ring (201) No. two, No. two fixed frame (101) upper surface activity embedding is installed double-screw bolt (4), No. two fixed frame (101) top movable mounting has gag lever post (5) No. two, No. two fixed frame (101) one side fixed surface installs cardboard (3), gag lever post (301) are installed in cardboard (3) one side surface activity embedding.
2. A securing device for a water conservancy and hydropower buried pipe according to claim 1, characterized in that: no. two fixed frame (101) opposite side fixed mounting has hinge (102), No. two fixed frame (101) pass through hinge (102) with fixed frame (1) swing joint, thread groove (103) have been seted up to No. two fixed frame (101) upper surface, fixed surface mounting has fixed plate (501) on No. two fixed frame (101).
3. A securing device for a water conservancy and hydropower buried pipe according to claim 2, characterized in that: the double-screw bolt (4) pass through thread groove (103) with fixed frame (101) swing joint No. two, double-screw bolt (4) upper end fixed surface installs carousel (403), draw-in groove (402) have been seted up to double-screw bolt (4) outside surface.
4. A securing device for a water conservancy and hydropower buried pipe according to claim 3, characterized in that: stud (4) lower extreme fixed surface installs movable block (401), fixed surface installs movable ring (205) on No. two snap rings (201), stud (4) pass through movable block (401) with movable ring (205) swing joint, snap ring (2) with No. two snap rings (201) side surface has all seted up spread groove (204).
5. A securing device for a water conservancy and hydropower buried pipe according to claim 4, characterized in that: no. one snap ring (2) with No. two equal movable mounting in snap ring (201) one side have rubber pad (202), the equal fixed mounting in rubber pad (202) side surface has spliced pole (203), rubber pad (202) pass through spliced pole (203) with spread groove (204) swing joint, spacing hole (104) have been seted up to fixed frame (1) side surface, gag lever post (301) run through cardboard (3) with spacing hole (104) swing joint.
6. A securing device for a water conservancy and hydropower buried pipe according to claim 5, wherein: no. two gag lever post (5) run through fixed plate (501) with draw-in groove (402) swing joint, gag lever post (301) with No. two gag lever post (5) outside all movable sleeves are equipped with spring (302), two spring (302) one end respectively with gag lever post (301) with No. two gag lever post (5) fixed connection, two the spring (302) other end respectively with cardboard (3) with fixed plate (501) fixed connection.
CN202123332549.5U 2021-12-28 2021-12-28 Fixing device for water conservancy and hydropower buried pipe Active CN216479290U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123332549.5U CN216479290U (en) 2021-12-28 2021-12-28 Fixing device for water conservancy and hydropower buried pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123332549.5U CN216479290U (en) 2021-12-28 2021-12-28 Fixing device for water conservancy and hydropower buried pipe

Publications (1)

Publication Number Publication Date
CN216479290U true CN216479290U (en) 2022-05-10

Family

ID=81430701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123332549.5U Active CN216479290U (en) 2021-12-28 2021-12-28 Fixing device for water conservancy and hydropower buried pipe

Country Status (1)

Country Link
CN (1) CN216479290U (en)

Similar Documents

Publication Publication Date Title
CN216479290U (en) Fixing device for water conservancy and hydropower buried pipe
CN204843629U (en) Pipeline cutting anchor clamps
CN206786133U (en) A kind of fixing device for water conservancy and hydropower pipe laying
CN218063672U (en) Water supply and drainage pipeline spreads and buries fixed knot and constructs
CN214303009U (en) Pipe jacking back wall reinforcing apparatus
CN211036915U (en) Strutting arrangement is used in water conservancy water and electricity construction
CN201284631Y (en) Hinge lever type dual self-locking drilling rod calipers
CN210343602U (en) Base with good fixing effect for wind power generation
CN211089011U (en) Temporary supporting device for electric power cable installation
CN215950605U (en) Fixing snap ring for water conservancy and hydropower embedded pipeline
CN220337620U (en) Pipeline supporting device for hydraulic engineering
CN219219278U (en) Pipe network slotting and pipe burying structure
CN220408555U (en) Auxiliary pipeline connecting equipment for water supply and drainage
CN219343016U (en) Side slope protective fence with good protective effect
CN220963939U (en) Electric connection structure of photovoltaic energy storage device cable
CN217842953U (en) Municipal administration pipe-line installation device
CN217583433U (en) Pipeline comprehensive support for basement pipeline layout
CN217502963U (en) Drainage pipe for municipal works
CN214466898U (en) Portable coupling mechanism of water conservancy pipeline
CN218405733U (en) Settlement-preventing construction auxiliary device for road construction underground pipeline
CN217130616U (en) Water supply and drainage pipeline connecting component for environmental engineering
CN218997595U (en) Spool installation fixing device
CN219062642U (en) Anti-jacking device of push bench for subway construction
CN213982299U (en) Fixing device is laid to building water conservancy pipeline
CN217639321U (en) Intelligent electronic product performance detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant