CN218376579U - Kilometer drill site early warning centralized control device system - Google Patents
Kilometer drill site early warning centralized control device system Download PDFInfo
- Publication number
- CN218376579U CN218376579U CN202222606599.6U CN202222606599U CN218376579U CN 218376579 U CN218376579 U CN 218376579U CN 202222606599 U CN202222606599 U CN 202222606599U CN 218376579 U CN218376579 U CN 218376579U
- Authority
- CN
- China
- Prior art keywords
- probe
- early warning
- centralized control
- control device
- kilometer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model belongs to the technical field of the drill site early warning, specifically a kilometer drill site early warning centralized control device system. The early warning centralized control problem of the kilometer drilling site is solved, and the early warning centralized control problem comprises an upwind side probe arranged on an upwind side coal slope, a downwind side probe arranged on a downwind side coal slope, a leeward angle probe arranged at a leeward angle, a drilling machine and a water tank arranged in the drilling site, wherein an operation table, a probe integrated display and a valve control assembly are arranged beside the drilling machine, a slag discharge port probe is arranged at a slag discharge port of the water tank, and the upwind side probe, the downwind side probe, the slag discharge port probe and the leeward angle probe are in signal connection with the probe integrated display; the water discharge valve of the water tank is controlled by a valve control assembly.
Description
Technical Field
The utility model belongs to the technical field of the drill site early warning, specifically a kilometer drill site early warning centralized control device system.
Background
The underground coal mine drilling site comprises a water exploration and drainage drilling site, a gas drainage drilling site and the like, and in short, the underground coal mine drilling site is used for drilling. A drilling site for placing a kilometer drilling machine is called a kilometer drilling site, and in the process that the kilometer drilling machine in the kilometer drilling site performs drilling on the coal side, the risk of gas leakage exists, so that early warning needs to be performed on gas leakage, and the safety of workers can be guaranteed.
Meanwhile, the number of negative pressure pipelines of a kilometer drilling site is large, field personnel are inconvenient to operate, and in the using process, due to the limitation of conditions such as geographical positions, machine moving of drilling machines, large gas of the drilling site and the like, personnel need to frequently run to the side of the negative pressure pipelines to control the negative pressure valves or special people need to control the negative pressure valves. Therefore, the control mechanism in the kilometer drilling field needs to be designed and controlled.
Disclosure of Invention
The utility model discloses a solve the problem of kilometer drill site early warning centralized control, provide a kilometer drill site early warning centralized control device system.
The utility model adopts the following technical proposal: a kilometer drill site early warning centralized control device system comprises an upwind side probe arranged on an upwind side coal wall, a downwind side probe arranged on a downwind side coal wall, a leeward angle probe arranged at a leeward angle, a drilling machine and a water tank arranged in a drill site, wherein an operation table, a probe integrated display and a valve control assembly are arranged beside the drilling machine, a slag discharge port probe is arranged at a slag discharge port of the water tank, and the upwind side probe, the downwind side probe, the slag discharge port probe and the leeward angle probe are in signal connection with the probe integrated display; the water discharge valve of the water tank is controlled by a valve control assembly.
In some embodiments, the discharge valve is pneumatically controlled.
In some embodiments, the probe integrated display and valve control assembly are integrated on an operator console.
In some embodiments, the upwind, downwind, and leeward angle probes are gas sensors.
In some embodiments, the slag notch probe is a pipeline negative pressure gauge.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. kilometer drill site negative pressure pipeline is more, and the field personnel operation is inconvenient, in the use, because geographical position, rig move the machine, drill site gas limit such as big, the utility model discloses an at operation panel pneumatic control valve, when downthehole orifice appears, the accessible operation panel is opened fast, reduces orifice gas transfinite risk.
2. The gas monitoring and water drainage control of the kilometer drilling site are centralized to an operation table. The gas monitoring and water discharging work is completed by one owner.
Drawings
FIG. 1 is a layout diagram of the present invention;
in the figure, 1-windward coal side, 2-downwind coal side, 3-windward probe, 4-downwind probe, 5-water tank, 6-slag discharge port probe, 7-leeward angle probe, 8-probe integrated display, 9-drilling machine, 10-operation table and 11-valve control assembly.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention; based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
A kilometer drill site early warning centralized control device system comprises an upwind side probe 3 arranged on an upwind side coal wall 1, a downwind side probe 4 arranged on a downwind side coal wall 2, a leeward angle probe 7 arranged at a leeward angle, a drilling machine 9 and a water tank 5 arranged in a drill site, wherein an operation table 10, a probe integrated display 8 and a valve control assembly 11 are arranged beside the drilling machine 9, a slag discharge port probe 6 is arranged at a slag discharge port of the water tank 5, and the upwind side probe 3, the downwind side probe 4, the slag discharge port probe 6 and the leeward angle probe 7 are in signal connection with the probe integrated display 8; the upwind side probe 3, the downwind side probe 4 and the leeward angle probe 7 are gas sensors. The slag discharge port probe 6 is a pipeline negative pressure meter. The water discharge valve of the water tank 5 is controlled by the valve control component 11, and the water discharge valve is pneumatically controlled.
The probe integrated display 8 and valve control assembly 11 are integrated on the console 10.
The integrated control of the operation table can accurately adjust the negative pressure remote control and the gas value display, form a practical and effective integrated control system, realize the reduction and the improvement of the efficiency and provide powerful guarantee for the technical development of the kilometer drilling machine.
The structure, ratio, size and the like shown in the drawings attached to the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention does not have the substantial significance in the technology, and any structure modification, ratio relationship change or size adjustment should still fall within the scope which can be covered by the technical content disclosed by the present invention without affecting the efficacy which can be produced by the present invention and the purpose which can be achieved by the present invention. Meanwhile, the terms such as "upper", "lower", "left", "right", "middle" and "one" used in the present specification are for convenience of description, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof may be made without substantial technical changes, and the present invention is also regarded as the scope of the present invention.
Finally, it should be noted that: the above embodiments are only used to illustrate the technical solution of the present invention, and not to limit the same; although the present invention has been described in detail with reference to the foregoing embodiments, it should be understood by those skilled in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some or all of the technical features may be equivalently replaced; such modifications and substitutions do not depart from the spirit and scope of the present invention.
Claims (5)
1. The utility model provides a kilometer drill site early warning centralized control device system which characterized in that: comprises an upwind side probe (3) arranged on an upwind side coal wall (1), a downwind side probe (4) arranged on a downwind side coal wall (2), a leeward angle probe (7) arranged at a leeward angle, a drilling machine (9) arranged in a drilling field and a water tank (5), an operation table (10), a probe integrated display (8) and a valve control assembly (11) are arranged beside a drilling machine (9), a slag discharge port probe (6) is arranged at a slag discharge port of the water tank (5), and the upstream side probe (3), the downstream side probe (4), the slag discharge port probe (6) and the leeward angle probe (7) are in signal connection with the probe integrated display (8); the water discharge valve of the water tank (5) is controlled by a valve control assembly (11).
2. The kilometer drill site early warning centralized control device system as recited in claim 1, wherein: the water drain valve is pneumatically controlled.
3. The kilometer drill site early warning centralized control device system as recited in claim 1, wherein: the probe integrated display (8) and the valve control assembly (11) are integrated on the operating table (10).
4. The kilometer drill site early warning centralized control device system as recited in claim 1, wherein: the upwind side probe (3), the downwind side probe (4) and the leeward angle probe (7) are gas sensors.
5. The kilometer drill site early warning centralized control device system as recited in claim 1, wherein: the slag discharge port probe (6) is a pipeline negative pressure meter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222606599.6U CN218376579U (en) | 2022-09-30 | 2022-09-30 | Kilometer drill site early warning centralized control device system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222606599.6U CN218376579U (en) | 2022-09-30 | 2022-09-30 | Kilometer drill site early warning centralized control device system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218376579U true CN218376579U (en) | 2023-01-24 |
Family
ID=84927236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222606599.6U Active CN218376579U (en) | 2022-09-30 | 2022-09-30 | Kilometer drill site early warning centralized control device system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218376579U (en) |
-
2022
- 2022-09-30 CN CN202222606599.6U patent/CN218376579U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204638022U (en) | One joins ammonia device automatically | |
CN218376579U (en) | Kilometer drill site early warning centralized control device system | |
CN206943821U (en) | Bi-layered device based on natural gas line | |
CN206248269U (en) | A kind of anti-blocking sampling pressure-measuring device of flue | |
CN202994400U (en) | Box gas leakage detector | |
CN203500858U (en) | Device for detecting coal gas pressure and flow and preventing blockage | |
CN205247226U (en) | Liquid -level monitoring device | |
CN208383516U (en) | A kind of burner hearth connecting pipe anti-clogging automatic blowing system | |
CN106918421A (en) | Adjustable superhigh pressure water jet pressure measxurement experimental provision | |
CN206945662U (en) | A kind of concentration detection apparatus of gas | |
CN205896335U (en) | High -pressure gas control flap | |
CN202339219U (en) | Underground cave depot liquid level measurement device | |
CN211317391U (en) | Device for measuring garbage layer differential pressure and thickness in garbage incinerator | |
CN203573172U (en) | Intelligent cooperative control system device of pneumatic shield-shaped gate | |
CN204518719U (en) | A kind of novel agricultural environmental monitoring controls field irrigation rig automatically | |
CN201152760Y (en) | Integrated intelligent inner cone type flow meter | |
CN204510167U (en) | A kind of control system of movable dam | |
CN207019720U (en) | Integrated measuring piecing devices for water-tight equipment | |
CN208688716U (en) | Slurry delivery pipe line is along stroke pressure synchronized measurement system and pressure sensor apparatus | |
CN221646989U (en) | Gas early warning centralized control system for kilometer drilling sites | |
CN207813872U (en) | A kind of energy-saving air compressor control system | |
CN218760369U (en) | Remote control device for pneumatic diaphragm pump | |
CN201884050U (en) | Flow rate gap bridge device for gas drainage pipeline | |
CN209908684U (en) | Full-automatic control device of concentric pipe jet pump of coal bed gas cluster well | |
CN214407872U (en) | Condenser vacuum measuring device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |