CN218375206U - Assembled pier stud template - Google Patents

Assembled pier stud template Download PDF

Info

Publication number
CN218375206U
CN218375206U CN202222426582.2U CN202222426582U CN218375206U CN 218375206 U CN218375206 U CN 218375206U CN 202222426582 U CN202222426582 U CN 202222426582U CN 218375206 U CN218375206 U CN 218375206U
Authority
CN
China
Prior art keywords
pier stud
template
semicircle ring
fastening bolt
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222426582.2U
Other languages
Chinese (zh)
Inventor
杨江波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Hongjia Bridge Formwork Co ltd
Original Assignee
Henan Hongjia Bridge Formwork Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Hongjia Bridge Formwork Co ltd filed Critical Henan Hongjia Bridge Formwork Co ltd
Priority to CN202222426582.2U priority Critical patent/CN218375206U/en
Application granted granted Critical
Publication of CN218375206U publication Critical patent/CN218375206U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses an assembled pier stud template, including the pier stud master template, still include pier stud assistant template and fastening device, the stave department of pier stud master template all is connected with fastening device with the stave department of pier stud assistant template, fastening device comprises semicircle ring A, semicircle ring B, through-hole, fastening bolt and nut combination, the through-hole has all been seted up at semicircle ring A's both ends and semicircle ring B's both ends, semicircle ring A passes through fastening bolt fixed connection with semicircle ring B, and fastening bolt runs through the through-hole, fastening bolt's thread groove department threaded connection has the nut, pier stud master template and pier stud assistant template are located between semicircle ring A and semicircle ring B. Conveniently fix the pier stud template through fastening device to and the convenience is dismantled the pier stud template, and it is consuming time to reduce personnel.

Description

Assembled pier stud template
Technical Field
The utility model relates to a pier stud template technical field, in particular to assembled pier stud template.
Background
Pier stud, be used for bearing the weight of the lower part of superstructure thing among the civil engineering promptly, the pier stud is mostly the assembled structure, current circular pier stud template is two semicircular templates usually, the compound die, need the manual work to use one of spanner to screw up or loosen multiseriate nut and the bolt of its two vertical tip of two semicircular templates during the form removal, the operation is wasted time and energy, low efficiency, delay the construction, and when concreting to the pier stud template for a long time, pier stud template side receives the extrusion of concrete external force, make the riser take place easily that deformation influences the side bolt of pier stud template and the dismantlement of nut. To this end, we propose an assembled pier stud template.
SUMMERY OF THE UTILITY MODEL
The utility model discloses a main aim at provides an assembled pier stud template is fixed the pier stud template through fastening device convenience to and the convenience is dismantled the pier stud template, and it is consuming time to reduce personnel, can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an assembled pier stud template, includes the pier stud master template, still includes pier stud side template and fastening device, the bulkhead department of pier stud master template all is connected with fastening device with the bulkhead department of pier stud side template, fastening device comprises semicircle ring A, semicircle ring B, through-hole, fastening bolt and nut combination, the through-hole has all been seted up at semicircle ring A's both ends and semicircle ring B's both ends, semicircle ring A passes through fastening bolt fixed connection with semicircle ring B, and fastening bolt runs through the through-hole, fastening bolt's thread groove department threaded connection has the nut, pier stud master template and pier stud side template are located between semicircle ring A and semicircle ring B.
Furthermore, threaded holes are formed in the two ends of the pier stud main template and the two ends of the pier stud auxiliary template, so that the pier stud main template and the pier stud auxiliary template can be conveniently lengthened.
Furthermore, threaded rods are connected to the plate wall of the pier stud main template and the plate wall of the pier stud auxiliary template in a threaded mode, and therefore the pier stud main template and the pier stud auxiliary template can be conveniently detached.
Furthermore, the other end welding of threaded rod has the commentaries on classics, makes things convenient for personnel to rotate.
Furthermore, the outer diameter of the pier column main template and the inner diameter of the outer mirror of the pier column auxiliary template are the same as the inner diameter of the semicircular ring A and the inner diameter of the semicircular ring B, so that the pier column main template and the pier column auxiliary template can be conveniently fixed.
Compared with the prior art, the utility model discloses following beneficial effect has: when the pier stud template is installed and used, the pier stud main template and the pier stud auxiliary template are symmetrically placed, the pier stud main template and the pier stud auxiliary template are located between the semicircular ring A and the semicircular ring B, the fastening bolt penetrates through the through hole, the nut is connected with the fastening bolt, the semicircular ring A and the semicircular ring B are connected, the pier stud main template and the pier stud auxiliary template are clamped and fixed through the semicircular ring A and the semicircular ring B, when concrete is poured between the pier stud main template and the pier stud auxiliary template, the rotating head is rotated by a person to enable the other end of the threaded rod to be flush with the inner wall of the semicircular ring A, so that pouring is conducted, after the concrete is solidified, the semicircular ring A and the semicircular ring B are separated after the nut is separated from the fastening bolt, the rotating head is twisted by the person to enable the threaded rod to rotate at the pier stud main template, so that the solidified concrete is extruded by the threaded rod, the pier stud main template is conveniently separated from the concrete, and the person can rapidly disassemble the pier stud main template and the pier stud auxiliary template.
Drawings
Fig. 1 is the utility model relates to an overall structure schematic diagram of assembled pier stud template.
Fig. 2 is the utility model relates to a fastening device structure sketch map of assembled pier stud template.
In the figure: 1. pier stud master templates; 2. a pier stud auxiliary template; 3. a fastening mechanism; 301. a semicircular ring A; 302. a semicircular ring B; 303. a through hole; 304. fastening a bolt; 305. a nut; 4. a threaded hole; 5. a threaded rod; 6. and (5) turning the head.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-2, an assembled pier stud template comprises a pier stud main template 1, and further comprises a pier stud auxiliary template 2 and a fastening mechanism 3, the panel wall of the pier stud main template 1 and the panel wall of the pier stud auxiliary template 2 are both connected with the fastening mechanism 3, the fastening mechanism 3 is formed by combining a semicircular ring a301, a semicircular ring B302, through holes 303, fastening bolts 304 and nuts 305, the through holes 303 are respectively formed at the two ends of the semicircular ring a301 and the two ends of the semicircular ring B302, the semicircular ring a301 and the semicircular ring B302 are fixedly connected through the fastening bolts 304, the fastening bolts 304 penetrate through the through holes 303, the screw thread groove of the fastening bolts 304 is in threaded connection with the nuts 305, and the pier stud main template 1 and the pier stud auxiliary template 2 are located between the semicircular ring a301 and the semicircular ring B302.
Threaded holes 4 are formed in the two ends of the pier stud main template 1 and the two ends of the pier stud auxiliary template 2, and the pier stud main template 1 and the pier stud auxiliary template 2 are conveniently lengthened.
Wherein, equal threaded connection in stave department of pier stud master template 1 and the stave department of pier stud assistant template 2 has threaded rod 5, the other end welding of threaded rod 5 has turn round 6, conveniently dismantles pier stud master template 1 and pier stud assistant template 2.
The outer diameter of the pier stud main template 1 and the outer mirror of the pier stud auxiliary template 2 are the same as the inner diameter of the semicircular ring A301 and the inner diameter of the semicircular ring B302, so that the pier stud main template 1 and the pier stud auxiliary template 2 can be conveniently fixed.
It should be noted that, the utility model relates to an assembled pier stud template, in operation, when installing the pier stud template and using, after pier stud master template 1 and pier stud assistant template 2 carry out the symmetry and put, make pier stud master template 1 and pier stud assistant template 2 be located behind semicircle ring A301 and semicircle ring B302, run through-hole 303 with fastening bolt 304, make nut 305 be connected with fastening bolt 304, thereby be connected semicircle ring A301 and semicircle ring B302, make semicircle ring A301 and semicircle ring B302 press from both sides tight fixed pier stud master template 1 and pier stud assistant template 2, when pouring concrete between pier stud master template 1 and pier stud assistant template 2, personnel rotate swivel 6 and make the other end of threaded rod 5 flush with semicircle ring A301's inner wall, thereby pour, after the concrete sets, after separating nut 305 and fastening bolt 304, separate semicircle ring A301 and semicircle ring B302, personnel twist swivel 6, make threaded rod 5 locate to rotate at the master template, thereby the threaded rod 5, thereby make the post 1 of extrusion master template 1 and the pier stud dismantle with the pier stud fast, the auxiliary template can 1 and dismantle with the pier stud 2 after the pier stud.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (5)

1. The utility model provides an assembled pier stud template, includes pier stud master template (1), its characterized in that still includes pier stud assistant template (2) and fastening device (3), the bulkhead department of pier stud master template (1) all is connected with fastening device (3) with the bulkhead department of pier stud assistant template (2), fastening device (3) comprise semicircle ring A (301), semicircle ring B (302), through-hole (303), fastening bolt (304) and nut (305) combination, through-hole (303) have all been seted up with the both ends of semicircle ring B (302) to the both ends of semicircle ring A (301), semicircle ring A (301) and semicircle ring B (302) are through fastening bolt (304) fixed connection, and fastening bolt (304) run through-hole (303), the thread groove department threaded connection of fastening bolt (304) has nut (305), master template (1) and pier stud assistant template (2) are located between semicircle ring A (301) and semicircle ring B (302).
2. The assembled pier stud formwork of claim 1, wherein: threaded holes (4) are formed in the two ends of the pier stud main template (1) and the two ends of the pier stud auxiliary template (2).
3. The assembled pier stud formwork of claim 1, wherein: threaded rods (5) are in threaded connection with the walls of the pier stud main template (1) and the pier stud auxiliary template (2).
4. The assembled pier stud formwork of claim 3, wherein: the other end of the threaded rod (5) is welded with a rotating head (6).
5. The assembled pier stud formwork of claim 1, wherein: the outer diameter of the pier stud main template (1) and the outer mirror of the pier stud auxiliary template (2) are the same as the inner diameter of the semicircular ring A (301) and the inner diameter of the semicircular ring B (302).
CN202222426582.2U 2022-09-14 2022-09-14 Assembled pier stud template Active CN218375206U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222426582.2U CN218375206U (en) 2022-09-14 2022-09-14 Assembled pier stud template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222426582.2U CN218375206U (en) 2022-09-14 2022-09-14 Assembled pier stud template

Publications (1)

Publication Number Publication Date
CN218375206U true CN218375206U (en) 2023-01-24

Family

ID=84973597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222426582.2U Active CN218375206U (en) 2022-09-14 2022-09-14 Assembled pier stud template

Country Status (1)

Country Link
CN (1) CN218375206U (en)

Similar Documents

Publication Publication Date Title
CN101538939B (en) Construction method for preset nut type steel-reinforced concrete compound pier template fixing device
CN211257823U (en) Building engineering construction template fastener
CN218375206U (en) Assembled pier stud template
CN201401010Y (en) Fixing device for preset nut type steel reinforced concrete combined column template
CN204590589U (en) Precast facade level connection joint ater-casting steel template
CN203654710U (en) Instrumental connecting tube for external wall scaffold shearing wall portion
CN201162349Y (en) Tension rod tapered joint head of steel form plate
CN206987144U (en) A kind of dismountable steel bar truss floor support plate of bed die
CN202745353U (en) Tool-type overhanging scaffold
CN201250516Y (en) Single-side wall mould holder strengthening device
CN210194478U (en) Novel traffic safety infrastructure structure convenient to installation
CN201162350Y (en) Water stop screw in underground shearing force wall
CN113183310A (en) Be used for prefabricated building PC wall conversion layer to reserve joint bar positioner
CN209874490U (en) Bracing structure of aluminum template
CN210117931U (en) Multifunctional integrated mountain-shaped clamp
CN207905351U (en) The bracing means of construction template
CN220704743U (en) Self-locking circular steel tube concrete column joint
CN105317191A (en) Temporary fixing method of prefabricated external wall panel and temporary fixing structure of prefabricated external wall panel
CN217897267U (en) Aluminum template system
CN202969933U (en) Waterproof bolt used for concrete wall body pouring
CN214401449U (en) Be convenient for bridge construction is with combination support of turning
CN220705151U (en) Novel aluminum template reinforcing and combining device for reverse bank and low wall of building
CN210563392U (en) Reusable cantilever formwork upper pull rod fixing device
CN214945594U (en) Double-hexagon bolt head bolt
CN220521954U (en) Wall form reinforcing member for double shear wall part at deformation joint

Legal Events

Date Code Title Description
GR01 Patent grant