CN218373781U - Convenient fixed building concrete tubular pile extension ware - Google Patents

Convenient fixed building concrete tubular pile extension ware Download PDF

Info

Publication number
CN218373781U
CN218373781U CN202121950915.0U CN202121950915U CN218373781U CN 218373781 U CN218373781 U CN 218373781U CN 202121950915 U CN202121950915 U CN 202121950915U CN 218373781 U CN218373781 U CN 218373781U
Authority
CN
China
Prior art keywords
pile
hoop
connecting plate
outer side
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202121950915.0U
Other languages
Chinese (zh)
Inventor
魏来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Zhongting Construction Development Co ltd
Original Assignee
Fujian Zhongting Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Zhongting Construction Development Co ltd filed Critical Fujian Zhongting Construction Development Co ltd
Priority to CN202121950915.0U priority Critical patent/CN218373781U/en
Application granted granted Critical
Publication of CN218373781U publication Critical patent/CN218373781U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a convenient fixed building concrete tubular pile extension ware, this convenient fixed building concrete tubular pile extension ware aim at solving prior art down need splice each staple bolt, and it is comparatively inconvenient to install, can not carry out the technical problem of quick installation. The pile extension device for the building concrete pipe pile comprises a first pile hoop, three groups of second pile hoops which are uniformly distributed on the outer side of the first pile hoop, and a rotating module arranged on the outer side of the first pile hoop; the adjusting module is fixedly mounted on the outer side of the first pile hoop, the connecting module is arranged on the outer side of the first pile hoop, and the limiting module is arranged on the outer side of the first pile hoop. This convenient fixed building concrete tubular pile extension ware only needs to adjust inside tubular pile through adjusting module, carries out spacing processing to inside through spacing module, has realized carrying out quick fixed processing to tubular pile extension ware, and it is more convenient to use.

Description

Convenient fixed building concrete tubular pile extension ware
Technical Field
The utility model belongs to the technical field of the architectural equipment, concretely relates to convenient fixed building concrete tubular pile extension ware.
Background
Nowadays, high-rise buildings are scaled to one another, and concrete columns are often used in the construction of the high-rise buildings, and when concrete columns are poured, pipe pile connecting devices are often used to pour concrete pipes.
At present, the utility model patent with the patent number of CN202011321945.5 discloses a concrete pipe pile extension device, belongs to concrete pipe pile extension device technical field, and the invention includes first pile extension staple bolt, second pile extension staple bolt, third pile extension staple bolt and fourth pile extension staple bolt, and the both sides of first pile extension staple bolt, second pile extension staple bolt, third pile extension staple bolt and fourth pile extension staple bolt all are fixed with fixed lug. The concrete pipe pile protecting device is provided with a protecting sleeve, a sliding groove and a sealing washer, after a first pile splicing hoop, a second pile splicing hoop, a third pile splicing hoop and a fourth pile splicing hoop are connected through fixing bolts and a concrete pipe pile is fixed through a reinforcing screw rod, a worker can install the protecting sleeve around a fixing lug through the sliding groove so as to protect the fixing bolts, and the worker can rotate the sealing washer to the joint of the reinforcing screw rod and the first pile splicing hoop, the second pile splicing hoop, the third pile splicing hoop and the fourth pile splicing hoop through threads so as to play a role in protection. What its adopted is to fix between the staple bolt through the screw, but this tubular pile connects a ware and is installing the room, need splice each staple bolt, and it is comparatively inconvenient to install, can not install fast.
Therefore, in order to solve the problem that the conventional building concrete pipe pile extension device which is convenient to fix in daily life is inconvenient to install in use, the practical applicability of the device needs to be improved.
SUMMERY OF THE UTILITY MODEL
(1) Technical problem to be solved
Not enough to prior art, the utility model aims to provide a convenient fixed building concrete tubular pile extension ware, this convenient fixed building concrete tubular pile extension ware aim at solving prior art down need splice each staple bolt, and it is comparatively inconvenient to install, can not carry out the technical problem of quick installation.
(2) Technical scheme
In order to solve the technical problem, the utility model provides a convenient-to-fix building concrete pipe pile extension device, which comprises a first pile hoop, three groups of second pile hoops which are uniformly distributed outside the first pile hoop, and a rotating module arranged outside the first pile hoop; the utility model discloses a pile anchor ear, including first stake staple bolt, the outside fixed mounting of first stake staple bolt has adjusting module, the outside of first stake staple bolt is provided with linking module, the outside of first stake staple bolt is provided with spacing module, spacing module symmetric distribution in adjusting module's upper and lower both sides.
When the convenient fixed building concrete pipe pile extension device of the technical scheme is used, the three second pile hoops are rotated to the tail end of the second pile hoop and the head end of the first pile hoop along the first pile hoop, the first pile hoop and the second pile hoop are rotated by the rotating module to be limited, the internal pipe pile is adjusted by the adjusting module, the limiting processing is performed on the internal part by the limiting module, the pipe pile extension device is quickly fixed and processed, and the use is more convenient.
Preferably, the inside of rotation module is including first fishplate bar and second fishplate bar, first fishplate bar with first staple bolt fixed connection, the second fishplate bar with second staple bolt fixed connection, the inboard rotation of first fishplate bar is connected with the pivot, first fishplate bar passes through the pivot with the second fishplate bar rotates to be connected, and rotation through pivot to first fishplate bar and second fishplate bar carries out spacingly, is connected through rotation of second fishplate bar and first fishplate bar and rotates first staple bolt and second staple bolt and handle.
Preferably, adjusting module's inside is including the baffle, the inboard of first stake staple bolt is provided with interior hoop plate, the thread groove has been seted up in the outside of first stake staple bolt, the inboard lead screw of thread groove is connected with the threaded rod, the threaded rod with baffle fixed connection, the threaded rod with interior hoop plate rotates to be connected, is connected with the lead screw of threaded rod through the thread groove and drives interior hoop plate and remove, is convenient for rotate the regulation through the baffle to the threaded rod and handles.
Further, the outside of threaded rod is provided with the nut, the threaded rod with nut threaded connection fixes the processing through the threaded connection of threaded rod and nut to the position of threaded rod, prevents that the threaded rod from skidding appearing.
Still further, the inside of spacing module includes the spacing groove, the spacing groove set up in the outside of first stake staple bolt, the inboard sliding connection of spacing groove has the gag lever post, the gag lever post with interior hoop plate fixed connection carries out spacing processing to the interior hoop plate through the sliding connection of spacing groove and gag lever post.
Preferably, the outer side of the first pile hoop is fixedly provided with a third connecting plate, the outer side of the second pile hoop is fixedly provided with a fourth connecting plate, the third connecting plate is connected with the fourth connecting plate in a clamping manner, and the first pile hoop and the second pile hoop are connected in a limiting manner through the clamping connection of the third connecting plate and the fourth connecting plate.
Further, the inboard of third fishplate bar is provided with the bolt, the fourth fishplate bar with the bolt block is connected, the screw has been seted up in the outside of third fishplate bar, the inboard of screw is provided with the bolt, the screw with bolt threaded connection through the threaded connection of bolt and screw, fixes the bolt position of inside, carries out spacing processing through the bolt to the position of third fishplate bar and fourth fishplate bar.
(3) Advantageous effects
Compared with the prior art, the beneficial effects of the utility model reside in that: the utility model discloses a convenient fixed building concrete tubular pile extension ware utilizes and carries out spacing processing with three second staple bolt along the rotation of first staple bolt to second staple bolt end and first staple bolt head end interconnect to second staple bolt, rotate first staple bolt and second staple bolt through rotating the module, insert the bolt along fourth fishplate bar and third fishplate bar, stabilize the connection to third fishplate bar and fourth fishplate bar, twist the bolt along the screw is rotatory, fix the position of bolt, rotate the threaded rod, it moves inwards to connect the drive inner hoop board through the lead screw of threaded rod and thread groove, sliding connection through spacing groove and gag lever post carries out spacing processing to inner tubular pile, adjust inner tubular pile, realized tubular pile extension ware and carried out quick fixed processing, it is more convenient to use.
Drawings
In order to clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the embodiments or the technical solutions in the prior art will be briefly described below, it is obvious that the drawings in the following description are only one embodiment of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a schematic three-dimensional structure of an embodiment of the present invention;
FIG. 2 is a schematic top view of an embodiment of the present invention;
FIG. 3 is a schematic top view of an embodiment of the present invention;
the labels in the figures are: 1. a first pile hoop; 2. a second pile hoop; 3. rotating the module; 4. an adjustment module; 5. a connection module; 6. a limiting module; 7. a first receiving plate; 8. a second receiving plate; 9. a rotating shaft; 10. a baffle plate; 11. an inner hoop plate; 12. a thread groove; 13. a threaded rod; 14. a nut; 15. a limiting groove; 16. a limiting rod; 17. a third connecting plate; 18. a fourth receiving plate; 19. a bolt; 20. a screw hole; 21. and (4) bolts.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the technical solution in the embodiments of the present invention is clearly and completely described below to further explain the present invention.
Example 1
The concrete embodiment is a building concrete pipe pile extension device for convenient fixation, the three-dimensional structure of which is schematically shown in fig. 1, and the top view structure of which is schematically shown in fig. 2, and the building concrete pipe pile extension device comprises a first pile hoop 1, three groups of second pile hoops 2 which are uniformly distributed outside the first pile hoop 1, and a rotating module 3 which is arranged outside the first pile hoop 1; the outside fixed mounting of first stake staple bolt 1 has adjusting module 4, and the outside of first stake staple bolt 1 is provided with linking module 5, and the first outside of staple bolt 1 is provided with spacing module 6, and spacing module 6 symmetric distribution is in adjusting module 4's upper and lower both sides.
For the specific embodiment, the material of the first anchor ear 1 and the second anchor ear 2 is set according to the practical application, for example, the first anchor ear 1 and the second anchor ear 2 can be made of metal or wood, the connection mode of the rotating module 3 is limited according to the practical application, for example, the rotating module 3 can be hinged.
Wherein, the inside of rotation module 3 is including first fishplate bar 7 and second fishplate bar 8, first fishplate bar 7 and first stake staple bolt 1 fixed connection, second fishplate bar 8 and second stake staple bolt 2 fixed connection, the inboard rotation of first fishplate bar 7 is connected with pivot 9, first fishplate bar 7 rotates with second fishplate bar 8 through pivot 9 and is connected, it is spacing to the rotation of first fishplate bar 7 with second fishplate bar 8 through pivot 9, it handles to rotate first staple bolt 1 and second stake staple bolt 2 to be connected through the rotation of second fishplate bar 8 with first fishplate bar 7, the inside of adjusting module 4 is including baffle 10, the inboard of first staple bolt 1 is provided with interior hoop plate 11, thread groove 12 has been seted up in the outside of first staple bolt 1, the inboard of thread groove 12 is connected with threaded rod 13, threaded rod 13 and baffle 10 fixed connection, threaded rod 13 is connected with interior hoop plate 11 rotatably, it moves to drive threaded rod interior hoop plate 11 through the connection of thread groove 12 with threaded rod 13, be convenient for adjusting threaded rod 13 through baffle 10, threaded rod 13 is provided with the threaded rod 13 outside screw nut and screw nut 13, screw nut connection that 14 screw nut connection handles the threaded rod 13 and screw nut 14 the screw nut that screw nut appears skidding.
The concrete embodiment is a building concrete pipe pile extension device convenient for fixing, a schematic view of a overlooking unfolding structure of the construction concrete pipe pile extension device is shown in fig. 3, the limiting module 6 comprises a limiting groove 15, the limiting groove 15 is arranged on the outer side of a first pile hoop 1, the inner side of the limiting groove 15 is connected with a limiting rod 16 in a sliding manner, the limiting rod 16 is fixedly connected with an inner hoop plate 11, the inner hoop plate 11 is limited through the sliding connection of the limiting groove 15 and the limiting rod 16, a third connecting plate 17 is fixedly arranged on the outer side of the first pile hoop 1, a fourth connecting plate 18 is fixedly arranged on the outer side of a second pile hoop 2, the third connecting plate 17 is connected with the fourth connecting plate 18 in a clamping manner, and the connection of the first pile hoop 1 and the second pile hoop 2 is limited through the clamping connection of the third connecting plate 17 and the fourth connecting plate 18.
Meanwhile, a bolt 19 is arranged on the inner side of the third connecting plate 17, the fourth connecting plate 18 is connected with the bolt 19 in a clamping manner, a screw hole 20 is formed in the outer side of the third connecting plate 17, a bolt 21 is arranged on the inner side of the screw hole 20, the screw hole 20 is connected with the bolt 21 in a threaded manner, the bolt 19 in the inner part is fixed through the threaded connection of the bolt 21 and the screw hole 20, and the position of the third connecting plate 17 and the position of the fourth connecting plate 18 are limited through the bolt 19.
When the convenient fixed building concrete pipe pile extension device of the technical scheme is used, three second pile hoops 2 are rotated to the tail end of the second pile hoop 2 and the head end of the first pile hoop 1 to be connected with each other along the first pile hoop 1, the first pile hoop 1 and the second pile hoop 2 are rotated to be limited by the rotating module 3, the bolt 19 is inserted into the fourth connecting plate 18 and the third connecting plate 17 along the fourth connecting plate 18, the third connecting plate 17 and the fourth connecting plate 18 are stably connected, the bolt 21 is screwed in along the rotation of the screw hole 20, the position of the bolt 19 is fixed, the threaded rod 13 is rotated, the threaded rod 13 is connected with the screw rod of the threaded groove 12 through the threaded rod to drive the inner hoop plate 11 to move inwards, the inner hoop plate 11 is limited by the sliding connection of the limiting groove 15 and the limiting rod 16, the internal pipe pile is adjusted, the quick fixing treatment of the pipe pile extension device is realized, and the use is more convenient.
Having thus described the principal technical features and basic principles of the invention, and the advantages thereof, it will be apparent to those skilled in the art that the present invention is not limited to the details of the foregoing exemplary embodiments, but is capable of other embodiments without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description describes embodiments, not every embodiment includes only a single embodiment, and such descriptions are provided for clarity only, and those skilled in the art will recognize that the embodiments described herein may be combined as a whole to form other embodiments as would be understood by those skilled in the art.

Claims (7)

1. A conveniently fixed building concrete pipe pile extension device comprises a first pile hoop, three groups of second pile hoops and a rotating module, wherein the three groups of second pile hoops are uniformly distributed on the outer side of the first pile hoop; the pile anchor ear fixing device is characterized in that an adjusting module is fixedly mounted on the outer side of the first pile anchor ear, a connecting module is arranged on the outer side of the first pile anchor ear, a limiting module is arranged on the outer side of the first pile anchor ear, and the limiting module is symmetrically distributed on the upper side and the lower side of the adjusting module.
2. The conveniently fixed building concrete pipe pile extension device according to claim 1, wherein the inside of the rotating module comprises a first connecting plate and a second connecting plate, the first connecting plate is fixedly connected with the first pile hoop, the second connecting plate is fixedly connected with the second pile hoop, the inner side of the first connecting plate is rotatably connected with a rotating shaft, and the first connecting plate is rotatably connected with the second connecting plate through the rotating shaft.
3. The conveniently-fixed building concrete pipe pile extension device according to claim 1, wherein a baffle is included inside the adjusting module, an inner hoop plate is arranged inside the first pile hoop, a thread groove is formed in the outer side of the first pile hoop, an inner lead screw of the thread groove is connected with a threaded rod, the threaded rod is fixedly connected with the baffle, and the threaded rod is rotatably connected with the inner hoop plate.
4. A convenient fixed building concrete pipe pile extension tool according to claim 3, wherein a nut is provided on the outside of the threaded rod, and the threaded rod is in threaded connection with the nut.
5. The conveniently fixed building concrete pipe pile extension device according to claim 3, wherein the limiting module comprises a limiting groove inside, the limiting groove is formed in the outer side of the first pile hoop, a limiting rod is connected to the inner side of the limiting groove in a sliding mode, and the limiting rod is fixedly connected with the inner hoop plate.
6. The conveniently fixed building concrete pipe pile extension device according to claim 1, wherein a third connecting plate is fixedly mounted on the outer side of the first pile hoop, a fourth connecting plate is fixedly mounted on the outer side of the second pile hoop, and the third connecting plate and the fourth connecting plate are connected in a clamping manner.
7. The conveniently-fixed building concrete pipe pile extension device according to claim 6, wherein a bolt is arranged on the inner side of the third connecting plate, the fourth connecting plate is connected with the bolt in a clamping mode, a screw hole is formed in the outer side of the third connecting plate, a bolt is arranged on the inner side of the screw hole, and the screw hole is in threaded connection with the bolt.
CN202121950915.0U 2021-08-19 2021-08-19 Convenient fixed building concrete tubular pile extension ware Withdrawn - After Issue CN218373781U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121950915.0U CN218373781U (en) 2021-08-19 2021-08-19 Convenient fixed building concrete tubular pile extension ware

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121950915.0U CN218373781U (en) 2021-08-19 2021-08-19 Convenient fixed building concrete tubular pile extension ware

Publications (1)

Publication Number Publication Date
CN218373781U true CN218373781U (en) 2023-01-24

Family

ID=84950391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121950915.0U Withdrawn - After Issue CN218373781U (en) 2021-08-19 2021-08-19 Convenient fixed building concrete tubular pile extension ware

Country Status (1)

Country Link
CN (1) CN218373781U (en)

Similar Documents

Publication Publication Date Title
CN108643456B (en) Mounting fixture of main rib of flanging die
CN218373781U (en) Convenient fixed building concrete tubular pile extension ware
CN205534609U (en) Distribution rack business turn over line cable sleeve fixing device
CN210359152U (en) Sand box fixing and clamping device
CN215055903U (en) Power transmission tower reinforcing device
CN204482557U (en) A kind of bracing wire turnbuckle
CN213279069U (en) Fixing device for cable on building wall
CN213683296U (en) Preformed hole plugging device
CN207572846U (en) A kind of double catenary clamping devices for erecting cable
CN215906994U (en) Large-span assembled space steel network building structure
CN216598880U (en) Fixing device for network comprehensive wiring
CN210894392U (en) Steerable wind speed sensor mounting device
CN215212270U (en) Scaffold connecting mechanism for building engineering
CN217997907U (en) Guardrail net convenient to install
CN208830694U (en) A kind of installing and connecting apparatus of construction safety protective net
CN220855300U (en) Down-lead wire clamp convenient to install
CN219241298U (en) Auxiliary device for mounting upright rod of steel pipe scaffold
CN220401339U (en) Cable bridge with adjustable angle
CN220510730U (en) Electric power fitting convenient to adjust
CN217951484U (en) Building drain pipe mounting structure
CN212695680U (en) Be applied to overhead line's electric power fitting
CN216143275U (en) Barring adapter
CN218757526U (en) Adjustable steel shotcrete of deep basal pit quick detach
CN218668182U (en) Crossbeam pushes up structure to one side
CN216598914U (en) Multi-azimuth wire outlet hanging ring for building roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20230124

Effective date of abandoning: 20230213

AV01 Patent right actively abandoned

Granted publication date: 20230124

Effective date of abandoning: 20230213