A overhaul fortune dimension platform for surface of water photovoltaic power plant Download PDFInfo
- Publication number
- CN218368204U CN218368204U CN202222425767.1U CN202222425767U CN218368204U CN 218368204 U CN218368204 U CN 218368204U CN 202222425767 U CN202222425767 U CN 202222425767U CN 218368204 U CN218368204 U CN 218368204U
- Authority
- CN
- China
- Prior art keywords
- lifting platform
- photovoltaic power
- platform
- fixed
- horizontal bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses an overhaul, operation and maintenance platform for a water surface photovoltaic power station, which relates to the technical field of the water surface photovoltaic power station and comprises a ship body, wherein a lifting platform is arranged at the top of the ship body through a lifting frame, a horizontal bar is arranged above the lifting platform, the lower surface of the horizontal bar is fixed at the top of the lifting platform through a plurality of spaced vertical bars, and a rain shielding plate is slidably arranged at the top of the horizontal bar; the lifting platform is characterized by also comprising a hanging basket, wherein the hanging basket is arranged on one side of the lifting platform and is lifted; the utility model discloses when the rainy day is maintained to the photovoltaic power plant on the surface of water, the dash board can be fine shelters from the rainwater, has improved workman's operational environment, improves maintenance efficiency, and the effect is better, and when fine day, can also carry out the sunshade by the dash board, the slip of the dash board of deuterogamying for the use of dash board is more nimble.
Description
Technical Field
The utility model relates to a surface of water photovoltaic power plant technical field specifically is an overhaul fortune dimension platform for surface of water photovoltaic power plant.
Background
Nowadays, with the development of photovoltaic power stations, the forms of photovoltaic power generation gradually show diversity, and the photovoltaic power generation is not only limited to be installed on the ground, but also widely applied to reservoirs, ponds and mudflats.
Photovoltaic power plant on the surface of water needs the workman to maintain in practical application, if breaks down, and current maintenance fortune dimension platform includes including the hull, installs lift platform at the top of hull through the crane, and the crane is prior art, and the hull transports staff to needs maintenance department, then the staff stands and maintains photovoltaic power plant on the surface of water on lift platform.
However, when the photovoltaic power station breaks down in a rainy day, workers can fall out of the rain for maintenance, firstly, the maintenance efficiency is reduced, secondly, the physical health of the workers can be affected, secondly, after the workers stand on the lifting platform, if the workers find that the left tools are not brought to the lifting platform, at the moment, the workers need to scare the ship body and take the needed tools, the trouble is caused, the maintenance process is delayed, and therefore improvement is needed.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides an overhaul fortune dimension platform for surface of water photovoltaic power plant has solved current lift platform when rainy day uses, influences the maintenance efficiency problem to photovoltaic power plant.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes:
an overhauling, operation and maintenance platform for a water surface photovoltaic power station comprises a ship body, wherein a lifting platform is installed at the top of the ship body through a lifting frame, the lifting frame is in the prior art, workers are conveyed to a position needing to be maintained by the ship body, and then the workers stand on the lifting platform to maintain the photovoltaic power station on the water surface;
a cross bar is arranged above the lifting platform, the lower surface of the cross bar is fixed at the top of the lifting platform through a plurality of spaced vertical bars, a rain shielding plate is slidably mounted at the top of the cross bar, and the rain shielding plate shields rainwater in rainy days, so that a photovoltaic power station on the water surface can be maintained in rainy days;
still include the hanging flower basket, the hanging flower basket is established in lift platform one side and goes up and down, when the staff forgot the instrument, can use on lifting platform with required instrument mention through the hanging flower basket.
Compared with the prior art, the utility model possess following beneficial effect:
1. the utility model discloses when the rainy day is to the maintenance of the photovoltaic power plant on the surface of water, the flashing can be fine shelters from the rainwater, has improved workman's operational environment, improves maintenance efficiency, and the effect is better.
2. The utility model discloses when fine, can hide the flashing and can also carry out the sunshade, the slip of the flashing of deuterogamying for the use of flashing is more nimble.
3. The utility model discloses rotating and changeing the handle, can driving the hanging flower basket and go up and down, when workman's maintenance, when taking place to forget the instrument, like this, just can place required instrument on the hanging flower basket, rotate and change the handle, drive the hanging flower basket and shift up, after the hanging flower basket rises to the highest point, will change again locking on the fixed plate can, the workman required instrument of taking, it is very convenient.
Drawings
Fig. 1 is a front view of the present invention;
FIG. 2 is a partial perspective view of the present invention;
fig. 3 is a partial perspective view of the lifting platform of the present invention;
FIG. 4 is a partial perspective view of the roller of the present invention;
fig. 5 is a partial cross-sectional view of a side view of the flashing of the present invention.
Reference numerals are as follows: 1. a hull; 2. a lifting frame; 3. a lifting platform; 4. a rail; 5. erecting a fence; 6. a flashing; 7. a hanging basket; 8. a chute; 9. a slider; 10. a sloping plate; 11. rotating the roller; 12. a chain; 13. turning a handle; 14. a fixing plate; 15. and a locking member.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention.
As shown in fig. 1, the utility model provides an overhaul fortune dimension platform for surface of water photovoltaic power plant, including hull 1, install lift platform 3 at the top of hull 1 through crane 2, crane 2 how drives lift platform 3 and removes, how to maintain photovoltaic power plant on the surface of water, is prior art, can refer to chinese patent CN202011535028.7, so the utility model discloses in no longer give unnecessary details, hull 1 transports the staff and needs maintenance department, then the staff stands and maintains photovoltaic power plant on the surface of water on lift platform 3.
As shown in fig. 2, a cross bar 4 is arranged above a lifting platform 3, the lower surface of the cross bar 4 is fixed at the top of the lifting platform 3 through a plurality of spaced vertical bars 5, a rain shielding plate 6 is slidably mounted at the top of the cross bar 4, when a photovoltaic power station on the water surface is maintained in rainy days, the rain shielding plate 6 can well shield rainwater, the acknowledged working environment is improved, the maintenance efficiency is improved, the effect is better, and in fine days, the rain shielding plate 6 can also shield the sunlight and is matched with the sliding of the rain shielding plate 6, so that the rain shielding plate 6 is more flexibly used;
as shown in fig. 2 and 3, the tool lifting device further comprises a hanging basket 7, wherein the hanging basket 7 is arranged on one side of the lifting platform 3 and is lifted, and when workers forget tools, the required tools can be lifted to the lifting platform 3 through the hanging basket 7 for use.
As shown in fig. 5, spout 8 has been seted up at the top of horizontal bar 4, and 8 both ends of spout are the closed setting, all are fixed with slider 9 in the bottom that flashing 6 is close to its both sides, and slider 9 is located flashing 6 length direction's middle part, and slider 9 and 8 sliding fit of spout are the dovetail, places hull 1 when the removal or flashing 6 slides, and flashing 6 breaks away from horizontal bar 4, guarantees flashing 6's stability.
As shown in fig. 3, the top of the lifting platform 3 near both sides thereof is fixed with inclined plates 10, a rotating roller 11 is rotatably installed between the two inclined plates 10, a chain 12 is fixed between the rotating roller 11 and the top of the hanging basket 7, an annular rotating handle 13 is fixed in the middle of the rotating roller 11, the chain 12 is wound or unwound on the rotating roller 11, a locking component for locking the rotating handle 13 is arranged on the lifting platform 3, the rotating handle 13 is rotated to drive the hanging basket 7 to go up and down, when a worker forgets tools during maintenance, the required tools can be placed on the hanging basket 7, the rotating handle 13 is rotated to drive the hanging basket 7 to go up, after the hanging basket 7 goes up to the highest position, the rotating handle 13 is locked on a fixing plate 14, and the worker can take the required tools, which is very convenient.
As shown in fig. 4, the locking assembly includes two fixing plates 14 fixed on the top of the lifting platform 3, the two fixing plates 14 are disposed on two sides of the rotating handle 13, the rotating handle 13 is locked between the two fixing plates 14 through a locking member 15, here, the locking member 15 can be a bolt, screw holes are disposed on the two fixing plates 14, a plurality of screw holes are disposed on the ring surface of the rotating handle 13, the bolt is screwed from the screw hole on one fixing plate 14, the screw hole on the rotating handle 13 is screwed into the screw hole on the other fixing plate 14, so as to lock the rotating handle 13, the locking member 15 can be a positioning pin, pin holes are disposed on the two fixing plates 14, a plurality of pin holes are disposed on the ring surface of the rotating handle 13, the bolt is inserted from the pin hole on one fixing plate 14, and the pin hole on the rotating handle 13 is screwed into the pin hole on the other fixing plate 14, so as to lock the rotating handle 13.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides an overhaul fortune dimension platform for surface of water photovoltaic power plant, includes the hull, installs lift platform, its characterized in that at the top of hull through the crane:
a horizontal bar is arranged above the lifting platform, the lower surface of the horizontal bar is fixed at the top of the lifting platform through a plurality of spaced vertical bars, and a rain shielding plate is slidably arranged at the top of the horizontal bar;
the lifting platform is characterized by further comprising a hanging basket, wherein the hanging basket is arranged on one side of the lifting platform and is lifted.
2. The service, operation and maintenance platform for the water surface photovoltaic power station as claimed in claim 1, wherein: the horizontal bar top has been seted up the spout, and the spout both ends are and seal the setting, all are fixed with the slider in the bottom that the flashing is close to its both sides, and the slider is located flashing length direction's middle part, slider and spout sliding fit.
3. The overhaul operation and maintenance platform for the water surface photovoltaic power station as claimed in claim 2, characterized in that: the sliding groove is a dovetail groove.
4. The service, operation and maintenance platform for the water surface photovoltaic power station as claimed in claim 1, wherein: inclined plates are fixed at the top of the lifting platform close to the two sides of the lifting platform, a rotating roller is rotatably arranged between the two inclined plates, and a chain is fixed between the rotating roller and the top of the hanging basket;
an annular rotating handle is fixed in the middle of the rotating roller, and a locking assembly for locking the rotating handle is arranged on the lifting platform.
5. The overhaul operation and maintenance platform for the water surface photovoltaic power station as claimed in claim 4, wherein: the locking assembly comprises two fixing plates fixed at the top of the lifting platform, the two fixing plates are arranged on two sides of a rotating handle, and the rotating handle is locked between the two fixing plates through a locking part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222425767.1U CN218368204U (en) | 2022-09-14 | 2022-09-14 | A overhaul fortune dimension platform for surface of water photovoltaic power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222425767.1U CN218368204U (en) | 2022-09-14 | 2022-09-14 | A overhaul fortune dimension platform for surface of water photovoltaic power plant |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218368204U true CN218368204U (en) | 2023-01-24 |
Family
ID=84974338
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222425767.1U Active CN218368204U (en) | 2022-09-14 | 2022-09-14 | A overhaul fortune dimension platform for surface of water photovoltaic power plant |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218368204U (en) |
-
2022
- 2022-09-14 CN CN202222425767.1U patent/CN218368204U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101307979B1 (en) | The safe stacker for sub-precise equipment and distribution | |
CN105006775A (en) | Automatic electric pole climbing operating platform | |
CN210598069U (en) | Scaffold with material lifting device | |
CN218368204U (en) | A overhaul fortune dimension platform for surface of water photovoltaic power plant | |
CN210977528U (en) | Device for removing duct piece in shield tunnel | |
CN213512947U (en) | Solar monitoring all-in-one machine | |
CN109519122A (en) | A kind of electric pole cultivation bar device of digging a hole | |
CN213979825U (en) | A lift for in aspect of building have protective structure | |
CN211056661U (en) | Liftable formula work platform | |
CN220723499U (en) | Hanging basket for installing power equipment | |
CN212799548U (en) | Scaffold for maintaining road lamps | |
CN106829789B (en) | Tree trimming Special lifting ladder | |
CN204267073U (en) | Rolling type Dust collecting net device | |
CN205998933U (en) | A kind of building multifunctional lifting platform | |
CN212890047U (en) | A nursery stock locomotive for forestry | |
CN213391156U (en) | Double hanging basket for high-altitude operation | |
CN220401823U (en) | Wisdom campus security protection equipment | |
CN217921160U (en) | Lifting device for water sump pump | |
CN220317224U (en) | Through-flow rotor lifting tool | |
CN220745301U (en) | Lifting device for maintenance | |
CN212956987U (en) | Steel structure box room | |
CN214401500U (en) | Mining area railway driving safety warning device | |
CN212577185U (en) | Safer steel wire drawing machine | |
CN211945987U (en) | Instrument hoisting device is used in road and bridge construction | |
CN219552416U (en) | Environment monitoring equipment capable of improving monitoring accuracy for mine geology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |