CN218362078U - Electric arc furnace unloading splash slag protector for fused brick production - Google Patents

Electric arc furnace unloading splash slag protector for fused brick production Download PDF

Info

Publication number
CN218362078U
CN218362078U CN202222243048.8U CN202222243048U CN218362078U CN 218362078 U CN218362078 U CN 218362078U CN 202222243048 U CN202222243048 U CN 202222243048U CN 218362078 U CN218362078 U CN 218362078U
Authority
CN
China
Prior art keywords
arc furnace
electric arc
heat insulation
insulation glass
electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222243048.8U
Other languages
Chinese (zh)
Inventor
龙沾卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Yuandong Refractory Co Ltd
Original Assignee
Zhengzhou Yuandong Refractory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Yuandong Refractory Co Ltd filed Critical Zhengzhou Yuandong Refractory Co Ltd
Priority to CN202222243048.8U priority Critical patent/CN218362078U/en
Application granted granted Critical
Publication of CN218362078U publication Critical patent/CN218362078U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses an electric arc furnace unloading splash slag protector for electric smelting brick production relates to electric smelting brick casting and splashes slag protection technical field, including unloading district and protection baffle, still include: the heat insulation glass is fixedly arranged on the protective partition plate; clean subassembly, clean subassembly is with right insulating glass is close to unloading district one side is cleaned, clean subassembly includes constant head tank, stopper and mounting bracket and scraper blade, the constant head tank is seted up in the protective barrier, stopper sliding connection be in the constant head tank, the beneficial effects of the utility model are that: the protection baffle sets up and is being close to electric arc furnace department for splash sediment and heat when keeping apart the meltwater casting, when insulating glass has the dust, can have the cleanness to the dust on insulating glass surface through the scraper blade that sets up on the mounting bracket, guarantee insulating glass's cleanness like this, in order to guarantee that operating personnel obtains sufficient clear operation field of vision.

Description

Electric arc furnace unloading splash slag protector for fused brick production
Technical Field
The utility model relates to an electric smelting brick casting splashes sediment protection technical field, specifically is an electric arc furnace unloading splashes sediment protector for electric smelting brick production.
Background
The meltwater of electric arc furnace is direct in casting to the sand mould from the material mouth, and the control of sand mould is removed and need be hoisted through the driving to guarantee that the sand mould aims at the material mouth, consequently driving operating personnel is very close to pouring the position, splashes sediment and high temperature and causes the injury to operating personnel when avoiding casting, need utilize protector to keep apart.
Present splash slag protector can effectively completely cut off splash slag and heat when using, separate splash slag through setting up the guard plate, the glass of handling the setting at the protection can observe the furnace mouth ejection of compact and the casting condition, in order to obtain better observation field of vision, protector sets up furnace mouth one side at the electric arc furnace, therefore it is very close to the electric arc furnace, the electric arc furnace is when heating at every turn, can release a large amount of smoke and dust when a large amount of ore raw materials heat-melting, these smoke and dust although can be collected, but still have some loss to all around, the smoke and dust of loss is attached to on protective glass, owing to be in the high temperature state, it is very inconvenient to clear up, the glass that leads to of dust is fuzzy, influence operating personnel and observe pouring the state.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an electric arc furnace unloading splash slag protector for production of fused brick can use under the high temperature condition, cleans the glass that is close to heat source one side, guarantees that glass is in clean state to obtain enough clear operation field of vision, with the above-mentioned weak point of solving among the prior art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an electric arc furnace unloading splash slag protector for production of electric smelting brick, includes unloading district and protection baffle, still includes:
the heat insulation glass is fixedly arranged on the protective partition plate;
the cleaning assembly is used for cleaning one side, close to the blanking area, of the heat insulation glass and comprises a positioning groove, a limiting block, a mounting frame and a scraper, the positioning groove is formed in the protective partition plate, the limiting block is connected into the positioning groove in a sliding mode, the mounting frame is fixedly mounted on the limiting block, the scraper is fixedly mounted on the mounting frame, and the scraper is attached to the heat insulation glass in a sliding mode;
and the driving mechanism is used for driving the scraper to perform reciprocating displacement along the heat insulation glass.
Preferably, the number of the protection clapboards is at least two, the protection clapboards are spliced with each other, and a cover plate is arranged at the top of each protection clapboard.
Preferably, the driving mechanism comprises an installation block and a screw rod, the screw rod is rotatably connected to the protective partition plate, the installation block is in threaded connection with the screw rod, and the installation block is fixedly connected to the installation frame.
Preferably, a motor is fixedly mounted on the cover plate, a transmission shaft is fixedly mounted on an output shaft of the motor, helical gears are fixedly mounted at one end of the transmission shaft and one end of the screw rod, and the helical gears are meshed with each other.
Preferably, the position of the protective partition plate is arranged on one side of the blanking area, and the heat insulation glass is arranged on the protective partition plate close to the blanking area.
Preferably, the heat insulating glass is mounted in a double-layer manner, and a light shielding film is adhered to the surface of the heat insulating glass.
Compared with the prior art, the beneficial effects of the utility model are that: this electric arc furnace unloading splashing slag protector for production of electrically fused brick: thermal-insulated glass is towards unloading district, when thermal-insulated glass has the dust, can drive the lead screw through the motor rotation and rotate, and then drive the mounting bracket by the lead screw and carry out the displacement, and the scraper blade that sets up on the mounting bracket can have the cleanness to the dust on thermal-insulated glass surface, guarantees thermal-insulated glass's cleanness like this to guarantee that operating personnel obtains enough clear operation view.
Drawings
Fig. 1 is a schematic view of an overall structure provided by an embodiment of the present invention;
fig. 2 is a schematic structural view of the whole body after turning over provided by the embodiment of the present invention;
FIG. 3 is a schematic view of a cleaning assembly and a driving mechanism provided in an embodiment of the present invention;
fig. 4 is a schematic structural view of a protective partition and its components according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of the mounting frame and the components thereof according to the embodiment of the present invention.
In the figure: 10. a blanking area; 11. a protective barrier; 111. a cover plate; 12. heat-insulating glass; 13. a cleaning assembly; 14. a drive mechanism; 15. positioning a groove; 16. a limiting block; 17. a mounting frame; 18. a squeegee; 19. mounting blocks; 20. a screw rod; 21. A drive shaft; 22. a helical gear; 23. an electric motor.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present disclosure more apparent, the technical solutions of the embodiments of the present disclosure will be clearly and completely described below with reference to the drawings of the embodiments of the present disclosure.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides an electric arc furnace unloading splash slag protector for production of electric smelting brick, includes unloading district 10 and protection baffle 11, operating personnel operates behind protection baffle 11, keeps apart the splash slag and the heat that produce in the electric arc furnace ejection of compact process through protection baffle 11, protects operating personnel, to still including:
the heat insulation glass 12, the heat insulation glass 12 is fixedly mounted on the protective baffle 11, the operator observes through the heat insulation glass 12, and the smooth proceeding of casting is ensured;
the cleaning assembly 13 is used for cleaning one side, close to the blanking area 10, of the heat insulation glass 12, the cleaning assembly 13 comprises a positioning groove 15, a limiting block 16, an installation frame 17 and a scraper 18, the positioning groove 15 is formed in the protective partition plate 11, the limiting block 16 is connected into the positioning groove 15 in a sliding mode, the installation frame 17 is fixedly installed on the limiting block 16, the scraper 18 is fixedly installed on the installation frame 17, the scraper 18 is attached to the heat insulation glass 12 in a sliding mode, the positioning groove 15 is formed in the protective partition plate 11, and the limiting block 16 can only move in the positioning groove 15, so that the position of the installation frame 17 can be guaranteed to be in a stable state by the aid of the limiting block 16 and can only move along the heat insulation glass 12, the scraper 18 fixed on the installation frame 17 can scrape the heat insulation glass 12, cleaning of the heat insulation glass 12 is achieved, the heat insulation glass 12 is guaranteed to be in a clean state, a sufficiently clear operation view field is obtained, and operation of an operator can be facilitated on the equipment;
and the driving mechanism 14 is used for driving the scraper 18 to perform reciprocating displacement along the heat insulation glass 12, and the driving mechanism 14 is used for driving the scraper 18 to perform reciprocating displacement so as to clean the heat insulation glass 12.
Referring to fig. 1, at least two protective partitions 11 are provided, the protective partitions 11 are spliced with each other, a cover plate 111 is provided on the top of each protective partition 11, and the at least two protective partitions 11 can protect at least two directions, and protect heat from the arc furnace and heat from the blanking area 10.
Referring to fig. 3, the driving mechanism 14 includes an installation block 19 and a screw rod 20, the screw rod 20 is rotatably connected to the protective partition 11, the installation block 19 is in threaded connection with the screw rod 20, the installation block 19 is fixedly connected to the installation frame 17, the screw rod 20 can only rotate but cannot perform displacement in other manners, when the screw rod 20 rotates, the installation block 19 is acted by a threaded force, so that the installation block 19 moves, the installation frame 17 is driven to displace, and the scraper 18 is driven.
Referring to fig. 3, a motor 23 is fixedly mounted on the cover plate 111, a transmission shaft 21 is fixedly mounted on an output shaft of the motor 23, helical gears 22 are fixedly mounted at one end of the transmission shaft 21 and one end of the screw rod 20, the two helical gears 22 are engaged with each other, the motor 23 rotates to drive the transmission shaft 21 to rotate, the transmission shaft 21 is driven by the two helical gears 22 when rotating, the screw rod 20 rotates synchronously, the motor 23 is arranged through the transmission shaft 21, the blanking area 10 can be kept away from, and the motor 23 is prevented from being damaged by high temperature.
Referring to fig. 1, the position of the protective partition 11 is set at one side of the blanking area 10, the heat insulation glass 12 is set on the protective partition 11 near the blanking area 10, the protective partition 11 is set at one side of the blanking area 10, and the casting state can be clearly observed through the arrangement of the heat insulation glass 12.
Referring to fig. 4, the insulating glass 12 is mounted in a double-layer manner, a light shielding film is adhered to the surface of the insulating glass 12, the insulating glass 12 with double layers improves the heat insulation effect, and the light shielding film prevents the glasses from being damaged by high brightness during casting.
The utility model discloses when concrete implementation: in order to obtain sufficient field of vision, protective barrier 11 sets up and is being close to electric arc furnace department, when the electric arc furnace carries out ore heating, a large amount of smoke and dust of production can the loss and attach to insulating glass 12, use and use, operating personnel stands in protective barrier 11 rear, the driving that is used for lifting by crane the sand mould is controlled here, before the operation, need open motor 23, motor 23 is used for driving lead screw 20 and rotates, when lead screw 20 rotates, installation piece 19 can receive the effect of screw force, installation piece 19 will move like this, drive mounting bracket 17 and carry out the displacement like this, fixed scraper blade 18 can scrape insulating glass 12 on the mounting bracket 17 like this, in order to realize the cleanness to insulating glass 12, guarantee insulating glass 12 is in clean state, in order to obtain sufficient clear operation field of vision, make things convenient for operating personnel to operate equipment.

Claims (6)

1. The utility model provides an electric arc furnace unloading splash slag protector for production of electric smelting brick, includes unloading district (10) and protection baffle (11), its characterized in that still includes:
the heat insulation glass (12), the said heat insulation glass (12) is fixedly mounted on the protective baffle (11);
the cleaning assembly (13) is used for cleaning one side, close to the blanking area (10), of the heat insulation glass (12), the cleaning assembly (13) comprises a positioning groove (15), a limiting block (16), a mounting frame (17) and a scraper (18), the positioning groove (15) is formed in the protective partition plate (11), the limiting block (16) is connected into the positioning groove (15) in a sliding mode, the mounting frame (17) is fixedly installed on the limiting block (16), the scraper (18) is fixedly installed on the mounting frame (17), and the scraper (18) is attached to the heat insulation glass (12) in a sliding mode;
a drive mechanism (14), the drive mechanism (14) being configured to drive the squeegee (18) for reciprocating displacement along the insulating glass (12).
2. The electric arc furnace unloading splash slag protector for electric smelting brick production according to claim 1, characterized in that: the number of the protection partition plates (11) is at least two, the protection partition plates (11) are spliced with each other, and a cover plate (111) is arranged at the top of each protection partition plate (11).
3. The electric arc furnace blanking slag splashing protection device for electric melting brick production according to claim 2, characterized in that: actuating mechanism (14) is including installation piece (19), lead screw (20) rotate to be connected on protection baffle (11), installation piece (19) with lead screw (20) threaded connection, installation piece (19) fixed connection be in on mounting bracket (17).
4. The electric arc furnace blanking slag splashing protection device for electric melting brick production according to claim 3, characterized in that: the motor (23) is fixedly mounted on the cover plate (111), the transmission shaft (21) is fixedly mounted on an output shaft of the motor (23), one end of the transmission shaft (21) and one end of the screw rod (20) are fixedly mounted with the bevel gears (22), and the bevel gears (22) are meshed with each other.
5. The electric arc furnace blanking slag splashing protection device for electric melting brick production according to claim 2, characterized in that: the position of the protective partition plate (11) is arranged on one side of the blanking area (10), and the heat insulation glass (12) is arranged on the protective partition plate (11) close to the blanking area (10).
6. The electric arc furnace blanking slag splashing protection device for electric melting brick production according to claim 5, characterized in that: the heat insulation glass (12) adopts a double-layer installation mode, and a shading film is pasted on the surface of the heat insulation glass (12).
CN202222243048.8U 2022-08-25 2022-08-25 Electric arc furnace unloading splash slag protector for fused brick production Active CN218362078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222243048.8U CN218362078U (en) 2022-08-25 2022-08-25 Electric arc furnace unloading splash slag protector for fused brick production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222243048.8U CN218362078U (en) 2022-08-25 2022-08-25 Electric arc furnace unloading splash slag protector for fused brick production

Publications (1)

Publication Number Publication Date
CN218362078U true CN218362078U (en) 2023-01-24

Family

ID=84968789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222243048.8U Active CN218362078U (en) 2022-08-25 2022-08-25 Electric arc furnace unloading splash slag protector for fused brick production

Country Status (1)

Country Link
CN (1) CN218362078U (en)

Similar Documents

Publication Publication Date Title
CN218362078U (en) Electric arc furnace unloading splash slag protector for fused brick production
CN212726437U (en) Automatic deicing machine for deicing of telegraph pole
CN219454679U (en) Slag removing device for molten aluminum
CN216745410U (en) Recovery smelting equipment for high-alloying aluminum alloy product
CN111702149A (en) Alloy rapid melting equipment and melting method thereof
CN216575510U (en) Automatic switch ladle cover with iron slag scraping function
CN207709854U (en) A kind of slab ingot casting dross fishing device
CN202658211U (en) Aluminum alloy solution online degassing device
CN214571489U (en) Uniform heating's infusion bottle glass founds device
CN214987648U (en) Asphalt concrete storage device
CN203429049U (en) Automatic slag remover
CN210936251U (en) Antistatic silica gel protection film dust collector
CN220541759U (en) Aluminum zinc alloy ingot refining device
CN110586882B (en) Silver ingot manufacturing equipment
CN209260177U (en) A kind of zinc residue produced in hot zinc plating strainer
CN217529205U (en) Simple slag removing device for hot-metal bottle
CN102303868B (en) Reusing and degumming process of polycrystalline or monocrystalline silicon waste material and special annealing furnace
CN217433287U (en) Intelligent brazing furnace
CN219156982U (en) Laser cladding equipment with safeguard function
CN219640677U (en) Melting furnace with protective structure
CN216409728U (en) Improved aluminum alloy melting furnace
CN208606580U (en) A kind of aluminium alloy melting furnace of easy scale removal
CN220250698U (en) Double-chamber furnace
CN218968927U (en) Airtight oil-water separator
CN202139059U (en) Annealing furnace special for recycling and degumming process of polycrystal or monocrystal silicon waste materials

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant