Pier stud template vertical degree adjusting device Download PDFInfo
- Publication number
- CN218345963U CN218345963U CN202222464974.8U CN202222464974U CN218345963U CN 218345963 U CN218345963 U CN 218345963U CN 202222464974 U CN202222464974 U CN 202222464974U CN 218345963 U CN218345963 U CN 218345963U
- Authority
- CN
- China
- Prior art keywords
- level
- assembly
- pier
- formwork
- verticality
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型提供一种墩柱模板竖直度调节装置,涉及桥梁墩柱施工设备的技术领域,包括水平尺组件、固定结构、刻度盘和线坠,水平尺组件与固定结构连接,水平尺组件用于通过固定结构与外接的墩柱模板连接;刻度盘和线坠均与水平尺组件连接,且线坠用于通过指在刻度盘上的位置展现出墩柱模板的倾斜程度。本实用新型缓解了现有技术中存在的在调整墩柱模板竖直度的时候无法准确判断墩柱模板在竖直方向上偏移的角度和方向的技术问题。
The utility model provides a device for adjusting the verticality of a pier column formwork, which relates to the technical field of bridge pier column construction equipment, including a level component, a fixed structure, a dial and a line pendant, the level component is connected with the fixed structure, and the level component It is used to connect with the external pier formwork through a fixed structure; both the dial and the line pendant are connected with the level gauge assembly, and the line pendant is used to show the inclination degree of the pier formwork through the position of the finger on the dial. The utility model alleviates the technical problem in the prior art that the angle and direction of the vertical offset of the pier column formwork cannot be accurately judged when the verticality of the pier column formwork is adjusted.
Description
技术领域technical field
本实用新型涉及桥梁墩柱施工设备的技术领域,尤其是涉及一种墩柱模板竖直度调节装置。The utility model relates to the technical field of construction equipment for bridge pier columns, in particular to a device for adjusting the verticality of a formwork for pier columns.
背景技术Background technique
桥梁墩柱实体质量中,墩柱竖直度为主要控制项,其直接影响墩柱受力传递。而在墩柱施工中,影响墩柱竖直度的主要因素为墩柱模板的安装。Among the solid quality of bridge piers, the verticality of pier columns is the main control item, which directly affects the force transfer of pier columns. In the construction of pier columns, the main factor affecting the verticality of pier columns is the installation of pier column formwork.
目前,墩柱模板安装时,其对中控制的方法为墩柱模板拼装完成后,在模板顶部挂设线垂至模板底,作业人员用钢尺测量上部和下部垂线至模板外缘的距离。若测量数值一致,说明模板竖直。若两者不一致,说明模板倾斜,并通过两个数值的差值判断出模板倾斜方向,之后通过调整模板四周缆风绳长度进行校正。通过不断重复量距和调整,直至上述上下两测距一致。该方向调整完毕后,选取垂直于该方向的另一缆风绳悬挂位置,重复上述操作步骤,直至模板在同一水平面上的前后左右四个方向上均处于竖直状态。At present, when the pier column formwork is installed, the centering control method is that after the pier column formwork is assembled, a line is hung from the top of the formwork to the bottom of the formwork, and the operator uses a steel ruler to measure the distance from the upper and lower perpendicular lines to the outer edge of the formwork . If the measured values are consistent, the template is vertical. If the two are not consistent, it means that the template is tilted, and the tilt direction of the template can be judged by the difference between the two values, and then corrected by adjusting the length of the wind rope around the template. Repeat the distance measurement and adjustment until the above-mentioned upper and lower distances are consistent. After the direction is adjusted, select another cable wind rope suspension position perpendicular to this direction, and repeat the above operation steps until the formwork is in a vertical state in the four directions of front, back, left, and right on the same horizontal plane.
然而此种实施方式也具有一定的缺陷:模板竖直度调整时,需在三处安排操作人员,即:模板顶挂线及测距人员、模板底测距人员、地面缆风绳调节人员,用工量较多;模板竖直度调节过程中,无任何指示依据,测距及缆风绳调节两个过程需重复进行,功效较低;如线坠设置于墩柱模板外侧,很容易受到外界风力影响,加大了实施难度及测量误差;如线坠设置于墩柱模板内侧,则底部测量人员处于有限空间内作业,安全风险较高。However, this implementation method also has certain defects: when adjusting the verticality of the formwork, operators need to be arranged in three places, namely: the line hanging and distance measuring personnel on the top of the formwork, the distance measuring personnel at the bottom of the formwork, and the adjustment personnel of the wind cable on the ground. A lot of labor is required; there is no indication basis during the vertical adjustment of the formwork, and the two processes of distance measurement and cable wind rope adjustment need to be repeated, and the efficiency is low; if the line pendant is set outside the pier formwork, it is easily affected by the outside The influence of wind increases the difficulty of implementation and measurement errors; if the line pendant is set inside the formwork of the pier column, the bottom surveyors will work in a limited space, and the safety risk is high.
实用新型内容Utility model content
本实用新型的目的在于提供一种墩柱模板竖直度调节装置,以缓解现有技术中存在的在调整墩柱模板竖直度的时候无法准确判断墩柱模板在竖直方向上偏移的角度和方向的技术问题。The purpose of the utility model is to provide a device for adjusting the verticality of the pier formwork, so as to alleviate the problem in the prior art that the verticality of the pier formwork cannot be accurately judged when the verticality of the pier formwork is adjusted. Technical issues of angle and direction.
为实现上述目的,本实用新型采用如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
第一方面,本实用新型提供一种墩柱模板竖直度调节装置,包括水平尺组件、固定结构、刻度盘和线坠,所述水平尺组件与所述固定结构连接,所述水平尺组件用于通过所述固定结构与外接的墩柱模板连接;In the first aspect, the utility model provides a device for adjusting the verticality of pier formwork, including a level assembly, a fixed structure, a dial and a line pendant, the level assembly is connected to the fixed structure, and the level assembly It is used to connect with the external pier formwork through the fixed structure;
所述刻度盘和所述线坠均与所述水平尺组件连接,且所述线坠用于通过指在所述刻度盘上的位置展现出所述墩柱模板的倾斜程度。Both the dial and the line pendant are connected to the level assembly, and the line pendant is used to display the inclination of the pier formwork through the position of the finger on the dial.
本实用新型可选的实施方式中,所述水平尺组件包括水平尺本体和连接件,所述水平尺本体与所述连接件连接;In an optional embodiment of the present utility model, the level assembly includes a level body and a connecting piece, and the level body is connected to the connecting piece;
所述水平尺本体与所述固定结构和所述刻度盘连接;The level body is connected with the fixed structure and the dial;
所述连接件与所述线坠连接。The connecting piece is connected with the wire sinker.
进一步地,墩柱模板竖直度调节装置还包括水准仪,所述水准仪与所述水平尺本体连接。Further, the device for adjusting the verticality of the pier formwork also includes a level, and the level is connected to the level body.
进一步地,所述水平尺本体开设有安装槽,所述安装槽用于安装所述水准仪。Further, the level body is provided with an installation groove, and the installation groove is used for installing the level.
进一步地,所述安装槽至少有两个,且两个所述安装槽对称开设于所述水平尺本体上。Further, there are at least two installation grooves, and the two installation grooves are symmetrically opened on the level body.
本实用新型可选的实施方式中,所述固定结构包括滑槽和固定组件,所述滑槽与所述水平尺组件连接;In an optional embodiment of the present utility model, the fixing structure includes a chute and a fixing assembly, and the chute is connected to the level assembly;
所述固定组件与所述滑槽滑动连接,且所述固定组件远离所述滑槽的一端用于与所述墩柱模板连接。The fixing component is slidably connected with the chute, and the end of the fixing component away from the chute is used for connecting with the pier formwork.
进一步地,所述固定组件包括螺杆和紧固螺母,所述螺杆的一端通过螺帽与所述滑槽滑动连接,且所述螺杆的另一端用于与所述墩柱模板连接;Further, the fixing assembly includes a screw and a fastening nut, one end of the screw is slidably connected with the chute through a nut, and the other end of the screw is used for connecting with the pier formwork;
所述紧固螺母与所述螺杆连接,所述紧固螺母用于通过旋紧抵接在所述滑槽上以使所述螺杆相对于所述滑槽固定。The fastening nut is connected with the screw rod, and the fastening nut is used to abut against the sliding groove by screwing so as to fix the screw rod relative to the sliding groove.
本实用新型可选的实施方式中,所述固定结构至少有两组,且两组所述固定结构与所述水平尺组件的两端对应连接。In an optional embodiment of the present invention, there are at least two groups of the fixing structures, and the two groups of the fixing structures are correspondingly connected to both ends of the level assembly.
本实用新型可选的实施方式中,墩柱模板竖直度调节装置还包括牵拉组件,所述牵拉组件的一端与所述水平尺组件连接,另一端用于与地面固定连接,所述牵拉组件用于拉动所述水平尺组件以使所述线坠指向所述刻度盘的竖直点位上。In an optional embodiment of the present invention, the device for adjusting the verticality of the pier formwork also includes a pulling assembly, one end of the pulling assembly is connected to the level ruler assembly, and the other end is used for fixed connection with the ground. The pulling assembly is used to pull the level assembly so that the line pendant points to the vertical point of the dial.
进一步地,所述牵拉组件包括缆风绳和地锚,所述缆风绳的一端与所述水平尺组件连接,且所述缆风绳的另一端与所述地锚连接;Further, the pulling assembly includes a cable wind rope and a ground anchor, one end of the cable wind rope is connected to the level assembly, and the other end of the cable wind rope is connected to the ground anchor;
所述地锚用于插入地下固定。The ground anchor is used for insertion into the ground for fixing.
本实用新型能够实现如下有益效果:The utility model can realize following beneficial effect:
第一方面,本实用新型提供一种墩柱模板竖直度调节装置,包括水平尺组件、固定结构、刻度盘和线坠,水平尺组件与固定结构连接,水平尺组件用于通过固定结构与外接的墩柱模板连接;刻度盘和线坠均与水平尺组件连接,且线坠用于通过指在刻度盘上的位置展现出墩柱模板的倾斜程度。In the first aspect, the utility model provides a device for adjusting the verticality of the pier formwork, including a level assembly, a fixed structure, a dial and a line pendant, the level assembly is connected to the fixed structure, and the level assembly is used to communicate with the fixed structure The external pier formwork is connected; both the dial and the line pendant are connected with the level gauge assembly, and the line pendant is used to show the inclination of the pier formwork through the position of the finger on the dial.
在本实用新型中,墩柱模板竖直度调节装置包括水平尺组件、固定结构、刻度盘和线坠,水平尺组件通过固定结构与墩柱模板连接,且优选的将水平尺组件设置在墩柱模板顶部位置,而后在将线坠放下,观察线坠指向刻度盘的什么位置,以判断墩柱模板的倾斜方向和倾斜程度,而后可以通过牵拉或推起的方式对墩柱模板进行纠正。In the utility model, the verticality adjustment device of the pier column formwork includes a level assembly, a fixed structure, a dial and a line pendant, the level assembly is connected with the pier formwork through the fixed structure, and preferably the level assembly is arranged on the pier The top position of the column formwork, and then put the line pendant down, and observe where the line pendant points to the dial to judge the inclination direction and degree of the pier formwork, and then the pier formwork can be corrected by pulling or pushing up .
与现有技术相比,本实用新型提供的墩柱模板竖直度调节装置,可以在对墩柱模板进行调整的过程中,对墩柱模板的倾斜程度进行实时观测,进而对墩柱模板扶正。Compared with the prior art, the verticality adjustment device of the pier column formwork provided by the utility model can observe the inclination degree of the pier column formwork in real time during the adjustment process of the pier column formwork, and then straighten the pier column formwork .
综上,本实用新型至少缓解了现有技术中存在的在调整墩柱模板竖直度的时候无法准确判断墩柱模板在竖直方向上偏移的角度和方向的技术问题。In summary, the utility model at least alleviates the technical problem in the prior art that the angle and direction of the vertical offset of the pier formwork cannot be accurately judged when adjusting the verticality of the pier formwork.
附图说明Description of drawings
为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific implementation of the utility model or the technical solutions in the prior art, the accompanying drawings that need to be used in the description of the specific implementation or the prior art will be briefly introduced below. Obviously, the following descriptions The accompanying drawings are some implementations of the utility model, and those skilled in the art can also obtain other drawings according to these drawings without any creative work.
图1为本实用新型实施例提供的墩柱模板竖直度调节装置主体部分的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the main part of the pier formwork verticality adjustment device provided by the utility model embodiment;
图2为本实用新型实施例提供的墩柱模板竖直度调节装置主体部分的主视结构示意图;Fig. 2 is a front structural schematic diagram of the main part of the pier formwork verticality adjustment device provided by the embodiment of the present invention;
图3为本实用新型实施例提供的墩柱模板竖直度调节装置主体部分的俯视结构示意图;Fig. 3 is a top view structural schematic diagram of the main part of the pier formwork verticality adjustment device provided by the embodiment of the present invention;
图4为本实用新型实施例提供的墩柱模板竖直度调节装置使用状态下的主视结构示意图。Fig. 4 is a schematic diagram of the front view of the pier formwork verticality adjustment device provided by the embodiment of the present invention under the use state.
图标:1-水平尺组件;11-水平尺本体;111-安装槽;12-连接件;2-水准仪;3-固定结构;31-滑槽;32-固定组件;321-螺杆;322-紧固螺母;4-刻度盘;5-线坠;6-牵拉组件;61-缆风绳;62-地锚;7-墩柱模板;8-承台。Icons: 1-level component; 11-level body; 111-installation slot; 12-connector; 2-level; 3-fixed structure; 31-chute; 32-fixed component; 321-screw; 322-tight Fixing nut; 4-dial; 5-line pendant; 6-pulling component; 61-cable wind rope; 62-ground anchor; 7-pier formwork; 8-cap.
具体实施方式Detailed ways
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本实用新型实施例的组件可以各种不同的配置来布置和设计。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations.
因此,以下对在附图中提供的本实用新型的实施例的详细描述并非旨在限制要求保护的本实用新型的范围,而是仅仅表示本实用新型的选定实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that like numerals and letters denote similar items in the following figures, therefore, once an item is defined in one figure, it does not require further definition and explanation in subsequent figures.
在本实用新型的描述中,需要说明的是,术语“上”、“下”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该实用新型产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。此外,术语“第一”、“第二”、“第三”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of the present utility model, it should be noted that the orientations or positional relationships indicated by the terms "upper", "lower", "vertical", "horizontal", "inner" and "outer" are based on the drawings. The orientation or positional relationship shown, or the orientation or positional relationship that the utility model product is usually placed in use, is only for the convenience of describing the utility model and simplifying the description, rather than indicating or implying that the referred device or element must have a specific Orientation, construction and operation in a specific orientation, and therefore should not be construed as limiting the utility model. In addition, the terms "first", "second", "third", etc. are only used for distinguishing descriptions, and should not be construed as indicating or implying relative importance.
此外,术语“水平”、“竖直”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。Furthermore, the terms "horizontal", "vertical" and the like do not imply that a component is absolutely level or overhanging, but may be slightly inclined. For example, "horizontal" only means that its direction is more horizontal than "vertical", and it does not mean that the structure must be completely horizontal, but can be slightly inclined.
在本实用新型的描述中,还需要说明的是,除非另有明确的规定和限定,术语“设置”、“安装”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should also be noted that, unless otherwise clearly stipulated and limited, the terms "setting", "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a A detachable connection, or an integral connection; it may be a mechanical connection or an electrical connection; it may be a direct connection or an indirect connection through an intermediary, and it may be an internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
下面结合附图,对本实用新型的一些实施方式作详细说明。在不冲突的情况下,下述的实施例及实施例中的特征可以相互组合。Below in conjunction with the accompanying drawings, some embodiments of the present utility model will be described in detail. In the case of no conflict, the following embodiments and features in the embodiments can be combined with each other.
实施例一Embodiment one
本实施例提供一种墩柱模板竖直度调节装置,参照图1或图4,该墩柱模板竖直度调节装置包括水平尺组件1、固定结构3、刻度盘4和线坠5,水平尺组件1与固定结构3连接,水平尺组件1用于通过固定结构3与外接的墩柱模板7连接;刻度盘4和线坠5均与水平尺组件1连接,且线坠5用于通过指在刻度盘4上的位置展现出墩柱模板7的倾斜程度。The present embodiment provides a device for adjusting the verticality of the pier formwork. Referring to FIG. 1 or FIG. The
本实用新型实施例至少缓解了现有技术中存在的在调整墩柱模板7竖直度的时候无法准确判断墩柱模板7在竖直方向上偏移的角度和方向的技术问题。The embodiment of the utility model at least alleviates the technical problem in the prior art that the angle and direction of the vertical offset of the pier formwork 7 cannot be accurately judged when adjusting the verticality of the pier formwork 7 .
在本实用新型实施例中,墩柱模板竖直度调节装置包括水平尺组件1、固定结构3、刻度盘4和线坠5,水平尺组件1通过固定结构3与墩柱模板7连接,且优选的将水平尺组件1设置在墩柱模板7顶部位置,而后在将线坠5放下,观察线坠5指向刻度盘4的什么位置,以判断墩柱模板7的倾斜方向和倾斜程度,而后可以通过牵拉或推起的方式对墩柱模板7进行纠正。In the embodiment of the utility model, the device for adjusting the verticality of the pier column formwork includes a
与现有技术相比,本实用新型实施例提供的墩柱模板竖直度调节装置,可以在对墩柱模板7进行调整的过程中,对墩柱模板7的倾斜程度进行实时观测,进而对墩柱模板7扶正。Compared with the prior art, the pier column formwork verticality adjustment device provided by the embodiment of the utility model can observe the inclination degree of the pier column formwork 7 in real time during the process of adjusting the pier column formwork 7, and then adjust the The pier formwork 7 is righted.
本实施例可选的实施方式中,参照图2,水平尺组件1包括水平尺本体11和连接件12,水平尺本体11与连接件12连接;水平尺本体11与固定结构3和刻度盘4连接;连接件12与线坠5连接。In an optional implementation of this embodiment, referring to FIG. 2 , the
具体的:水平尺本体11与连接件12连接,优选的,水平尺本体11为长条形结构,且水平尺本体11水平放置,连接件12连接在水平尺本体11的底部中心处;刻度盘4与水平尺本体11底部连接,且刻度盘4上设有0刻度位置,此0刻度位置位于水平尺本体11底面的中心处;水平尺本体11通过固定结构3与墩柱模板7的顶部可拆卸连接。Concrete: the
进一步地,参照图1或图2,墩柱模板竖直度调节装置还包括水准仪2,水准仪2与水平尺本体11连接。Further, referring to FIG. 1 or FIG. 2 , the device for adjusting the verticality of the pier formwork further includes a
具体的:水准仪2与水平尺本体11连接,水准仪2为水准气泡结构,通过观察起泡的位置,判断水平尺本体11是否水平。Specifically: the
进一步地,参照图1,水平尺本体11开设有安装槽111,安装槽111用于安装水准仪2。Further, referring to FIG. 1 , the
具体的:水平尺本体11开设有安装槽111,安装槽111用于容置水准仪2,以使得水准仪2相对于水平尺本体11固定。Specifically: the
进一步地,参照图3,安装槽111至少有两个,且两个安装槽111对称开设于水平尺本体11上。Further, referring to FIG. 3 , there are at least two
具体的:两个安装槽111对称开设于水平尺本体11上,且两个安装槽111内均设有水准仪2。Specifically: two
本实施例可选的实施方式中,参照图2,固定结构3包括滑槽31和固定组件32,滑槽31与水平尺组件1连接;固定组件32与滑槽31滑动连接,且固定组件32远离滑槽31的一端用于与墩柱模板7连接。In an optional implementation of this embodiment, referring to FIG. 2 , the fixed
具体的:滑槽31与水平尺组件1连接,且滑槽31优选为限位滑槽,固定组件32与滑槽31滑动连接,即固定组件32的一端在滑槽31内,另一端悬空设置;在使用过程中,固定组件32远离滑槽31的一端用于与墩柱模板7连接。Specifically: the
进一步地,参照图2,固定组件32包括螺杆321和紧固螺母322,螺杆321的一端通过螺帽与滑槽31滑动连接,且螺杆321的另一端用于与墩柱模板7连接;紧固螺母322与螺杆321连接,紧固螺母322用于通过旋紧抵接在滑槽31上以使螺杆321相对于滑槽31固定。Further, referring to FIG. 2 , the fixing
具体的:螺杆321的一端通过螺帽与滑槽31滑动连接,且螺杆321的另一端用于与墩柱模板7连接,优选的,螺杆321远离滑槽31的一端可通过连接件与墩柱模板7连接;紧固螺母322旋紧在滑槽31上,通过螺杆321的螺帽与紧固螺母322夹紧连接,使得螺杆321相对于滑槽31固定。Specifically: one end of the
本实施例可选的实施方式中,固定结构3至少有两组,且两组固定结构3与水平尺组件1的两端对应连接。In an optional implementation of this embodiment, there are at least two sets of fixing
具体的:两组固定结构3与水平尺组件1的两端对应连接,且两组固定结构3分别与墩柱模板7端部两边缘连接,以使得水平尺组件1与墩柱模板7连接更稳固。Specifically: two sets of fixed
本实施例可选的实施方式中,参照图4,墩柱模板竖直度调节装置还包括牵拉组件6,牵拉组件6的一端与水平尺组件1连接,另一端用于与地面固定连接,牵拉组件6用于拉动水平尺组件1以使线坠5指向刻度盘4的竖直点位上。In an optional implementation of this embodiment, referring to Figure 4, the pier formwork verticality adjustment device also includes a pulling
具体的:牵拉组件6的一端与水平尺组件1连接,另一端用于与地面固定连接,优选的,牵拉组件6至少有两组,且两组的牵拉组件6相对位于墩柱模板7的两侧。Specifically: one end of the pulling
进一步地,牵拉组件6包括缆风绳61和地锚62,缆风绳61的一端与水平尺组件1连接,且缆风绳61的另一端与地锚62连接;地锚62用于插入地下固定。Further, the pulling
具体的:墩柱模板7底部设置在承台8上,缆风绳61的一端与水平尺组件1连接,且缆风绳61的另一端与地锚62连接,地锚62用于插入地下固定;当线坠5指向刻度盘4的0刻度的一侧时,两侧的操作人员通过缆风绳61的松紧程度,以使得线坠5指向刻度盘4的0刻度上,以对墩柱模板7调直。Specifically: the bottom of the pier formwork 7 is set on the
最后应说明的是:本说明书中的各个实施例均采用递进的方式描述,每个实施例重点说明的都是与其它实施例的不同之处,各个实施例之间相同相似的部分相互参见即可;本说明书中的以上各实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述各实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的范围。Finally, it should be noted that each embodiment in this specification is described in a progressive manner, each embodiment focuses on the differences from other embodiments, and the same and similar parts of each embodiment refer to each other That is to say; the above embodiments in this description are only used to illustrate the technical solutions of the utility model, rather than to limit it; although the utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should Understanding: It is still possible to modify the technical solutions recorded in the foregoing embodiments, or to perform equivalent replacements for some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the various implementations of the present utility model. The scope of technical solutions.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222464974.8U CN218345963U (en) | 2022-09-16 | 2022-09-16 | Pier stud template vertical degree adjusting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222464974.8U CN218345963U (en) | 2022-09-16 | 2022-09-16 | Pier stud template vertical degree adjusting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218345963U true CN218345963U (en) | 2023-01-20 |
Family
ID=84893090
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222464974.8U Active CN218345963U (en) | 2022-09-16 | 2022-09-16 | Pier stud template vertical degree adjusting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218345963U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| USD1068509S1 (en) | 2024-05-24 | 2025-04-01 | Roger D. Collins | Leveling and spacing device |
| US12416496B1 (en) | 2024-03-29 | 2025-09-16 | Roger D. Collins | Leveling and spacing device |
-
2022
- 2022-09-16 CN CN202222464974.8U patent/CN218345963U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12416496B1 (en) | 2024-03-29 | 2025-09-16 | Roger D. Collins | Leveling and spacing device |
| USD1068509S1 (en) | 2024-05-24 | 2025-04-01 | Roger D. Collins | Leveling and spacing device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN218345963U (en) | Pier stud template vertical degree adjusting device | |
| CN112923915B (en) | Checking device and checking method for pier column template deviation and verticality control | |
| CN105043343A (en) | Method for automated measurement of tunnel vault settlement based on laser displacement sensor | |
| CN114088050B (en) | A steel tower installation measurement method | |
| CN209541760U (en) | A kind of inclination monitoring device based on sash weight method | |
| CN210067488U (en) | Outdoor curtain wall unwrapping wire appurtenance | |
| CN116592838A (en) | Underground component lowering installation verticality measuring and monitoring method | |
| CN215572994U (en) | An inclinometer calibration device | |
| CN211904126U (en) | Long-distance cast point measurement system and its above-ground and underground control point measurement device | |
| CN218092140U (en) | Curtain wall vertical keel mounting and positioning device | |
| CN211203563U (en) | An adjustable mounting bracket for positioning the base of a wall-mounted electrical equipment | |
| CN208606762U (en) | A kind of building engineering construction testing apparatus for verticality | |
| CN205209408U (en) | Bridge crane wiping line installation NULL utensil | |
| CN208998789U (en) | Total station survey auxiliary device and total station measuring system | |
| CN106441231A (en) | Universal inclinometer | |
| CN115342782A (en) | Large portal crane support leg perpendicularity detection device and assembly and inspection method thereof | |
| CN106767904B (en) | Calibrating device of vertical plumb line measurement system | |
| CN108645376B (en) | Telescopic leveling device and detection method thereof | |
| CN204388839U (en) | Settlement observation servicing unit | |
| CN109323689A (en) | Total Station Survey Auxiliary Device and Total Station Survey System | |
| CN206113928U (en) | Special detection instrument of template | |
| CN221725214U (en) | Debugging level gauge for installation of building doors and windows | |
| CN107462230B (en) | Tower ruler righting device and using method thereof | |
| CN215596979U (en) | Wall-attached type verticality measuring base | |
| CN217504585U (en) | Beam template detection tool |