CN218331124U CN202221773993.2U CN202221773993U CN218331124U CN 218331124 U CN218331124 U CN 218331124U CN 202221773993 U CN202221773993 U CN 202221773993U CN 218331124 U CN218331124 U CN 218331124U
Authority
CN
China
Prior art keywords
rod
gear
plate
backup pad
water pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221773993.2U
Other languages
Chinese (zh)
Inventor
陈建国
曹俊辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221773993.2U priority Critical patent/CN218331124U/en
Application granted granted Critical
Publication of CN218331124U publication Critical patent/CN218331124U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The utility model discloses a building outer wall infiltration testing arrangement for building engineering management, terminal surface four corners department is equipped with from locking-type universal wheel under the bottom plate, bottom plate up end center is equipped with the bracing piece, the bracing piece upper end is equipped with the mounting panel, the mounting panel up end left and right sides is equipped with backup pad one and backup pad two respectively, be equipped with the water pipe between backup pad one and the backup pad two, evenly be equipped with the shower nozzle on the water pipe, both ends are equipped with inlet tube and pivot respectively about the water pipe, inlet tube and pivot rotate with backup pad one and backup pad two respectively, the pivot right-hand member is equipped with gear one, two upper ends of backup pad are equipped with the diaphragm, diaphragm right-hand member sliding connection has the transfer line, the transfer line lower extreme is equipped with the rack, rack and gear one meshing, the transfer line upper end is equipped with the driving plate, be equipped with the spring between driving plate and the diaphragm, the diaphragm up end is equipped with the motor, be equipped with the cam on the output of motor. The advantages are that: adjustable spraying angle, large spraying area, low failure rate and long service life.

Description

Building outer wall infiltration testing arrangement for building engineering management
Technical Field
The utility model relates to a testing arrangement technical field specifically indicates a building outer wall infiltration testing arrangement for building engineering management.
Background
After the construction of the building is completed, an engineering supervision is needed to check and accept the building, performance tests of multiple buildings need to be expanded in the checking and accepting process, water seepage tests of the wall surface and the window edge of the building are included in the multiple performance tests, if the water seepage tests of the wall surface and the window edge of the building are not carried out, water seepage can possibly occur to the interior of a room due to quality reasons of the wall surface in heavy rainfall weather, property loss of an owner is caused, and therefore the water seepage tests of the wall surface are needed.
Current infiltration testing arrangement, its water spray angle is fixed, and the area of water spray is less, and some infiltration testing arrangements can adjust spraying the angle, but all are through the frequent positive and negative rotation of motor, drive the water pipe and make a round trip to rotate, realize the adjustment of spraying the angle, enlarge and spray the area, but the frequent positive and negative rotation of motor can lead to the fact adverse effect to its life, breaks down easily.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is, to the above-mentioned problem, a building outer wall infiltration testing arrangement for building engineering management of 2 is provided.
In order to solve the technical problem, the utility model provides a technical scheme does: the utility model provides a building outer wall infiltration testing arrangement for building engineering management, includes bottom plate and water pipe, terminal surface four corners department is equipped with from the locking-type universal wheel under the bottom plate, bottom plate up end center is equipped with the bracing piece, upper end of the support bar is equipped with the mounting panel, the mounting panel up end left and right sides is equipped with backup pad one and backup pad two respectively, be equipped with the water pipe between backup pad one and the backup pad two, evenly be equipped with the shower nozzle on the water pipe, both ends are equipped with inlet tube and pivot respectively about the water pipe, inlet tube and pivot rotate with backup pad one and backup pad two respectively, the pivot right-hand member is equipped with gear one, two upper ends of backup pad are equipped with the diaphragm, diaphragm right-hand member sliding connection has the transfer line, the transfer line lower extreme is equipped with the rack, rack and gear one meshing, the transfer line upper end is equipped with the driving plate, be equipped with the spring between driving plate and the diaphragm, the diaphragm up end is equipped with the motor, be equipped with the cam on the output of motor, the cam is laminated with the driving plate.
Compared with the prior art, the utility model the advantage lie in: this building outer wall infiltration testing arrangement for building engineering management, the motor rotates, it rotates to drive the cam, the cam drives through driving plate downstream, the driving plate resets under the spring action, the driving plate passes through transfer line and spring drive rack motion up-and-down motion, adjust the spraying angle of shower nozzle on the water pipe, the motor only needs to rotate always, can realize that the water pipe makes a round trip to rotate, when satisfying spraying angular adjustment and spraying the area, the fault rate has effectively been reduced, service life has been guaranteed.
As the improvement, the cam includes fixed block and movable block, the fixed block is connected with the output of motor, the fixed block rotates on the one side relative with the movable block and is connected with regulation pole one, adjust pole one and movable block threaded connection, it is equipped with the gag lever post to adjust pole one both sides on the fixed block, gag lever post and movable block sliding connection. The first adjusting rod is rotated to adjust the distance between the fixed block and the movable block, so that the length of the cam is adjusted, the movement distance of the rack is adjusted, and the amplitude of the rotation angle of the water pipe is flexible and adjustable.
As an improvement, the bracing piece includes dead lever and movable rod, movable rod and dead lever up end sliding connection, the dead lever lower extreme is connected with the bottom plate, the movable rod upper end is connected with the mounting panel, the dead lever internal rotation is connected with the threaded rod, terminal surface threaded connection under threaded rod and the movable rod, the threaded rod lower extreme is equipped with gear two, the dead lever side rotates and is connected with regulation pole two, be equipped with gear three on the regulation pole two, gear three and the meshing of gear two. And a second adjusting rod is rotated, a third gear is meshed with the second gear to drive the threaded rod to rotate, and the threaded rod drives the movable rod to slide in the fixed rod, so that the total length of the supporting rod is adjusted, and the height of the water feeding pipe of the mounting plate is adjusted.
As an improvement, the spring is sleeved on the transmission rod. The drive rod guides the extension direction of the spring.
As an improvement, a guide rod is arranged at the right end of the upper end face of the mounting plate, and the rack is connected with the guide rod in a sliding mode. The guide rod guides the moving direction of the rack.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a schematic structural view of the cam of the present invention.
Reference numerals are as follows: 1. the water pipe type automatic water supply device comprises a bottom plate, 2, a water pipe, 3, a self-locking universal wheel, 4, a mounting plate, 5, a first support plate, 6, a second support plate, 7, a spray head, 8, a water inlet pipe, 9, a rotating shaft, 10, a first gear, 11, a transverse plate, 12, a transmission rod, 13, a rack, 14, a transmission plate, 15, a spring, 16, a motor, 17, a fixed block, 18, a movable block, 19, a first adjusting rod, 20, a limiting rod, 21, a fixed rod, 22, a movable rod, 23, a threaded rod, 24, a second gear, 25, a second adjusting rod, 26, a third gear, 27 and a guide rod.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Combine accompanying figure 1, the 4 up end left and right sides of mounting panel are equipped with backup pad one 5 and backup pad two 6 respectively, be equipped with water pipe 2 between backup pad one 5 and the backup pad two 6, evenly be equipped with shower nozzle 7 on the water pipe 2, both ends are equipped with inlet tube 8 and pivot 9 respectively about water pipe 2, inlet tube 8 and pivot 9 rotate with backup pad one 5 and backup pad two 6 respectively, pivot 9 right-hand member is equipped with gear one 10, 6 upper ends in backup pad are equipped with diaphragm 11, 11 right-hand members sliding connection of diaphragm has transfer line 12, the transfer line 12 lower extreme is equipped with rack 13, rack 13 meshes with gear one 10, 12 upper ends of transfer line are equipped with driving plate 14, be equipped with spring 15 between driving plate 14 and the diaphragm 11, 11 up end is equipped with motor 16, be equipped with the cam on 16's the output, the cam is laminated with driving plate 14.
Motor 16 rotates, it rotates to drive the cam, the cam drives through driving plate 14 downstream, driving plate 14 resets under the effect of spring 15, driving plate 14 drives rack 13 motion up-and-down motion through transfer line 12 and spring 15, spray the angle of shower nozzle 7 on water pipe 2 and adjust, motor 16 only need rotate always, can realize that water pipe 2 makes a round trip to rotate, when satisfying the spray angular adjustment and spraying the area, the fault rate has effectively been reduced, service life has been guaranteed.
With reference to fig. 2, the cam comprises a fixed block 17 and a movable block 18, the fixed block 17 is connected with the output end of a motor 16, one surface of the fixed block 17, which is opposite to the movable block 18, is rotatably connected with a first adjusting rod 19, the first adjusting rod 19 is in threaded connection with the movable block 18, limiting rods 20 are arranged on two sides of the first adjusting rod 19 on the fixed block 17, and the limiting rods 20 are slidably connected with the movable block 18.
And rotating the first adjusting rod 19 to adjust the distance between the fixed block 17 and the movable block 18, thereby adjusting the length of the cam, further adjusting the movement distance of the rack 13, and enabling the amplitude of the rotation angle of the water pipe 2 to be flexibly adjustable.
Combine figure 1, the bracing piece includes dead lever 21 and movable rod 22, movable rod 22 and dead lever 21 up end sliding connection, dead lever 21 lower extreme is connected with bottom plate 1, the upper end of movable rod 21 is connected with mounting panel 4, the internal rotation of dead lever 21 is connected with threaded rod 23, terminal surface threaded connection under threaded rod 23 and the movable rod 22, threaded rod 23 lower extreme is equipped with gear two 24, dead lever 21 side is rotated and is connected with regulation pole two 25, be equipped with gear three 26 on the regulation pole two 25, gear three 26 and the meshing of gear two 24.
Rotate and adjust pole two 25, through the meshing of three 26 of gears and two 24 of gears, drive threaded rod 23 and rotate, threaded rod 23 drives movable rod 22 and slides in dead lever 21 to the overall length of adjustment bracing piece, and then the height of adjustment mounting panel 4 water-supply pipe 2.
The present invention has been described in connection with the embodiments thereof, and the description is not intended to be limiting, and the embodiments shown in the drawings are only one of the embodiments of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should understand that they should not be limited to the embodiments described above, and that they can design the similar structure and embodiments without departing from the spirit of the invention.

Claims (5)

1. The utility model provides a building outer wall infiltration testing arrangement for building engineering management, includes bottom plate (1) and water pipe (2), its characterized in that: the automatic water-saving water dispenser is characterized in that four corners of the lower end face of the bottom plate (1) are provided with self-locking universal wheels (3), the center of the upper end face of the bottom plate (1) is provided with a supporting rod, the upper end of the supporting rod is provided with a mounting plate (4), the left side and the right side of the upper end face of the mounting plate (4) are respectively provided with a first supporting plate (5) and a second supporting plate (6), a water pipe (2) is arranged between the first supporting plate (5) and the second supporting plate (6), the water pipe (2) is uniformly provided with a spray head (7), the left side and the right side of the water pipe (2) are respectively provided with a water inlet pipe (8) and a rotating shaft (9), the water inlet pipe (8) and the rotating shaft (9) are respectively rotated with the first supporting plate (5) and the second supporting plate (6), the right end of the rotating shaft (9) is provided with a first gear (10), the upper end of the second supporting plate (6) is provided with a transverse plate (11), the right end of the transverse plate (11) is slidably connected with a transmission rod (12), the lower end of the transmission rod (12) is provided with a rack (13), the rack (13) meshed with a first gear (10), the upper end of the transmission rod (12), the transmission plate (14), a spring (15) is arranged between the transverse plate (11), and an output end of a motor (16) is arranged on the motor (16), the cam is attached to the transmission plate (14).
2. The building outer wall water seepage testing device for the building engineering management according to claim 1, characterized in that: the cam includes fixed block (17) and movable block (18), fixed block (17) are connected with the output of motor (16), fixed block (17) rotate in the one side relative with movable block (18) and are connected with regulation pole (19), adjust pole (19) and movable block (18) threaded connection, it is equipped with gag lever post (20) to adjust pole (19) both sides on fixed block (17), gag lever post (20) and movable block (18) sliding connection.
3. The building outer wall water seepage testing device for the building engineering management according to claim 1, characterized in that: the bracing piece includes dead lever (21) and movable rod (22), movable rod (22) and dead lever (21) up end sliding connection, dead lever (21) lower extreme is connected with bottom plate (1), movable rod (22) upper end is connected with mounting panel (4), dead lever (21) internal rotation is connected with threaded rod (23), terminal surface threaded connection under threaded rod (23) and movable rod (22), threaded rod (23) lower extreme is equipped with gear two (24), dead lever (21) side rotates and is connected with regulation pole two (25), be equipped with gear three (26) on regulation pole two (25), gear three (26) and gear two (24) meshing.
4. The building outer wall water seepage testing device for the building engineering management according to claim 1, characterized in that: the spring (15) is sleeved on the transmission rod (12).
5. The building engineering management is with building outer wall infiltration testing arrangement of claim 1, characterized in that: the right end of the upper end face of the mounting plate (4) is provided with a guide rod (27), and the rack (13) is connected with the guide rod (27) in a sliding mode.
CN202221773993.2U 2022-07-11 2022-07-11 Building outer wall infiltration testing arrangement for building engineering management Active CN218331124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221773993.2U CN218331124U (en) 2022-07-11 2022-07-11 Building outer wall infiltration testing arrangement for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221773993.2U CN218331124U (en) 2022-07-11 2022-07-11 Building outer wall infiltration testing arrangement for building engineering management

Publications (1)

Publication Number Publication Date
CN218331124U true CN218331124U (en) 2023-01-17

Family

ID=84870835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221773993.2U Active CN218331124U (en) 2022-07-11 2022-07-11 Building outer wall infiltration testing arrangement for building engineering management

Country Status (1)

Country Link
CN (1) CN218331124U (en)

Similar Documents

Publication Publication Date Title
CN110440350A (en) A kind of mounting device of multi-connected machine construction
CN208353283U (en) A kind of solar bracket plate cleaning plant
CN111953275A (en) Solar photovoltaic panel supporting and fixing device
CN107740566B (en) Building wall mortar strickle robot
CN112589549A (en) Pipeline anticorrosive treatment equipment
CN218331124U (en) Building outer wall infiltration testing arrangement for building engineering management
CN217886611U (en) Epidemic prevention and control early warning disinfection device
CN210382137U (en) Solar energy power generation formula irrigation device
CN208230334U (en) The double insulator charged washers of brush of parallel synchronous
CN113136841A (en) Prevent accumulational water sluicegate of debris
CN221015180U (en) Dust removal spray set
CN219899720U (en) Dust screen leveling equipment
CN216195872U (en) Reinforced steel structure house support column
CN219960509U (en) Photovoltaic board belt cleaning device
CN214972748U (en) High-efficient dust collector of building civil engineering
CN221231298U (en) Purging device of cold rolling mill
CN116938096B (en) Extensive assembled photovoltaic module of adaptability
CN213978779U (en) High pressure is washed automobile-used sprinkler
CN218392878U (en) Property job site dust collecting equipment
CN219442094U (en) Spraying device
CN218265061U (en) Concrete maintenance device
CN216356625U (en) Solar power station maintains with overhauing device
CN212956443U (en) Novel hydraulic dam
CN220457362U (en) Photovoltaic support capable of being cleaned
CN218236886U (en) Video cloud networking camera energy-saving control system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant