CN218324295U - Safety protective guard for civil construction - Google Patents

Safety protective guard for civil construction Download PDF

Info

Publication number
CN218324295U
CN218324295U CN202222035315.2U CN202222035315U CN218324295U CN 218324295 U CN218324295 U CN 218324295U CN 202222035315 U CN202222035315 U CN 202222035315U CN 218324295 U CN218324295 U CN 218324295U
Authority
CN
China
Prior art keywords
frame
warning
fixed
bearing plate
locating lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222035315.2U
Other languages
Chinese (zh)
Inventor
王强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Institute of Engineering
Original Assignee
Chongqing Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Institute of Engineering filed Critical Chongqing Institute of Engineering
Priority to CN202222035315.2U priority Critical patent/CN218324295U/en
Application granted granted Critical
Publication of CN218324295U publication Critical patent/CN218324295U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a construction rail guard technical field just discloses a building construction safety rail guard, including the guardrail, the guardrail bottom surface is provided with the base, the guardrail side is provided with the locating lever. This civil construction safety protective guard, the utility model discloses a fix the locating lever on subaerial at present, the workman can fix the one end of fixed frame earlier on fixing the locating lever on subaerial, later fix the side at fixed frame with the locating lever again, thereby install the job site according to this order, and the installation method is simple, the problem of needing to spend a large amount of manpowers to carry out the dismouting when dismantling has been solved, it has the warning sign to paste through the front of guardrail, thereby it is the safety of paying attention to be the peripheral pedestrian of construction ground to be convenient for remind, and at the back of warning frame, survey in the warning frame and be provided with bearing plate and fixing base, when the workman need have a rest, but bearing plate and fixing base outwards rotate from the warning frame inboard, the workman sits at the rest of bearing plate top surface.

Description

Safety protective guard for civil construction
Technical Field
The utility model relates to a construction rail guard technical field specifically is a building construction safety rail guard.
Background
The aim of civil engineering is to create spaces and passages that are required for human production or life, that function well and that are comfortable and aesthetically pleasing. It is both a matter-wise requirement and a mental-wise requirement. With the development of society, the engineering structure is increasingly large and complex, super high-rise buildings, super large bridges, huge dams and complex subway systems continuously emerge, the living requirements of people are met, and meanwhile, the method also develops into a sign of social strength. The basic problem to be solved in civil engineering is engineering safety, so that the structure can resist various natural or artificial acting forces;
the existing safety protective guard is usually used for expanding the body type of the protective guard in order to increase the stability between protective frames in the installation process, and the installation mode is too complicated, so that a large amount of manpower is required for dismounting and mounting when dismounting, and the existing safety protective guard is not convenient to dismount and store.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a building construction safety protective guard possesses and fixes the locating lever on ground through present, and the workman can fix the one end of fixed frame earlier on will fixing the locating lever on ground, later fixes the side at fixed frame with the locating lever again to install the job site according to this order, and the mounting method is simple, has solved and has spent advantages such as the problem that a large amount of manpowers carried out the dismouting when dismantling, has solved above-mentioned technical problem.
Technical scheme
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a building construction safety rail guard, includes the guardrail, the guardrail bottom surface is provided with the base, the guardrail side is provided with the locating lever, be provided with fixed frame between the locating lever, fixed frame openly is provided with the warning frame, warning frame back both ends are provided with U type frame, be provided with the limiting plate between the U type frame, be provided with the bearing plate between the warning frame, the bearing plate bottom surface is provided with the fixing base, be connected the hinge between bearing plate and the warning frame, fixed frame both ends are provided with the fixture block.
Preferably, the base is fixedly installed on the bottom surface of the top rod, the fixing frame is embedded into the side end of the positioning rod, the front surface of the fixing frame is pasted with a warning board, and the back surface of the warning frame is provided with an object placing groove.
Through above-mentioned technical scheme, empty slot and the draw-in groove embedding through aiming at the guardrail side respectively with the fixture block at fixed frame both ends are entered, make fixed frame fix between the locating lever, and with fixed frame and locating lever between fixed, fix the base on ground earlier, drive fixed awl and rotate together when rotating the handle to can drive the locating lever and fix on ground.
Preferably, warning frame fixed mounting is in fixed frame intermediate position, warning frame top surface and bottom surface fixed connection U type frame, insert the limiting plate between the U type frame is positive, and the limiting plate is located the warning frame outside.
Through above-mentioned technical scheme, through fixing the locating lever on ground now, the workman can fix the one end of fixed frame on the locating lever that will fix on ground earlier, later fixes the locating lever at the side of fixed frame to install the job site according to this order, and the mounting method is simple, has solved and has spent the problem that a large amount of manpowers carry out the dismouting when dismantling.
Preferably, it is inboard that the warning frame is embedded to the bearing plate side, bearing plate bottom surface fixed connection fixing base, bearing plate and fixing base movable mounting are inboard in the warning frame, fixture block fixed mounting is at fixed frame both ends.
Through above-mentioned technical scheme, after installing completely according to the scope of job site, the warning sign has been pasted in the front of guardrail to be convenient for remind be the peripheral pedestrian of construction ground and notice safety, and at the back of warning frame, survey in the job site, survey in the warning frame and be provided with bearing plate and fixing base, when the workman need have a rest, but bearing plate and fixing base rotate from warning frame inboard outwards, thereby make the fixing base support on the bottom surface top, the workman can sit at the bearing plate top surface and have a rest.
Preferably, the base is provided with fixed awl all around, fixed awl both ends top surface is provided with the handle, the locating lever side is provided with the dead slot, the dead slot inboard is provided with the draw-in groove.
Through above-mentioned technical scheme, when not using the bearing plate to make, drive fixed seat with the bearing plate and rotate to warning frame inboard, later fix the bearing plate with the limiting plate embedding between U type frame.
Preferably, the fixed awl of detachable installation all around of locating lever, fixed awl top surface fixed mounting handle, fixture block embedding draw-in groove is inboard, and fixed frame embedding dead slot is inboard.
Through above-mentioned technical scheme, the workman rotates through holding the handle to drive fixed awl and rotate downwards, fix the base, thereby increase the steadiness of guardrail.
Compared with the prior art, the utility model provides a building construction safety protective guard possesses following beneficial effect:
1. the utility model discloses a fixing the locating lever on above-ground now, the workman can fix the one end of fixed frame earlier on will fixing the locating lever on above-ground, later fix the side at fixed frame with the locating lever again to install the job site according to this order, and the mounting method is simple, has solved and has spent a large amount of manpowers when dismantling and has carried out the problem of dismouting.
2. The utility model discloses a warning sign is pasted in the front of guardrail to be convenient for remind to the peripheral pedestrian of construction ground notices safety, and at the back of warning frame, survey in the construction site, survey in the warning frame and be provided with bearing plate and fixing base, when the workman need have a rest, can outwards rotate from warning frame inboard by bearing plate and fixing base, thereby make the fixing base support on the bottom surface top, the workman can sit and have a rest at the bearing plate top surface.
Drawings
FIG. 1 is a schematic view of the three-dimensional structure of the guardrail of the present invention;
FIG. 2 is a schematic view of the three-dimensional structure of the warning frame of the present invention;
FIG. 3 is a schematic view of a three-dimensional structure of a bearing plate of the present invention;
fig. 4 is a schematic view of the three-dimensional structure of the base of the present invention.
Wherein: 1. a guardrail; 2. a base; 3. positioning a rod; 4. a fixing frame; 5. a warning frame; 6. a U-shaped frame; 7. a limiting plate; 8. a bearing plate; 9. a fixed seat; 10. a hinge; 11. a clamping block; 201. a fixed cone; 202. a handle; 203. an empty groove; 204. a clamping groove.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The first embodiment is as follows:
referring to fig. 1-2, a safety guard rail for civil construction comprises a guard rail 1, wherein a base 2 is arranged on the bottom surface of the guard rail 1, positioning rods 3 are arranged on the side surfaces of the guard rail 1, a fixing frame 4 is arranged between the positioning rods 3, a warning frame 5 is arranged on the front surface of the fixing frame 4, U-shaped frames 6 are arranged at two ends of the back surface of the warning frame 5, a limiting plate 7 is arranged between the U-shaped frames 6, a bearing plate 8 is arranged between the warning frames 5, a fixing seat 9 is arranged on the bottom surface of the bearing plate 8, a hinge 10 is connected between the bearing plate 8 and the warning frame 5, and clamping blocks 11 are arranged at two ends of the fixing frame 4.
Preferably, base 2 fixed mounting is in 3 bottom surfaces of locating lever, and 3 sides of fixed frame 4 embedding locating lever, and fixed frame 4 openly is pasted and is had the warning sign, and 5 backs of warning frame are provided with puts the thing groove.
Through the technical scheme, the clamping blocks 11 at the two ends of the fixing frame 4 are respectively aligned with the empty grooves 203 and the clamping grooves 204 on the side surfaces of the guardrails 1 and are embedded into the empty grooves 203 and the clamping grooves 204, so that the fixing frame 4 is fixed between the positioning rods 3, the fixing frame 4 and the positioning rods 3 are fixed, the base 2 is fixed on the ground, the fixing cone 201 is driven to rotate when the handle 202 is rotated, and the positioning rods 3 can be driven to be fixed on the ground.
Preferably, the warning frame 5 is fixedly installed in the middle of the fixing frame 4, the top surface and the bottom surface of the warning frame 5 are fixedly connected with the U-shaped frame 6, the limiting plate 7 is inserted between the front surfaces of the U-shaped frame 6, and the limiting plate 7 is located on the outer side of the warning frame 5.
Through the technical scheme, the positioning rod 3 is fixed on the ground, a worker can fix one end of the fixing frame 4 on the positioning rod 3 fixed on the ground, and then fix the positioning rod 3 on the side end of the fixing frame 4, so that the construction site is installed according to the sequence, the installation method is simple, and the problem that a large amount of manpower is needed to disassemble and assemble when the disassembly is carried out is solved.
Preferably, 8 side embedding warning frames 5 inboards of bearing plate, 8 bottom surfaces fixed connection fixing base 9 of bearing plate, bearing plate 8 and fixing base 9 movable mounting are in warning 5 inboards of frame, and 11 fixed mounting of fixture block are in 4 both ends of fixed frame.
Through the technical scheme, after installing completely according to job site's scope, the warning sign has been pasted in guardrail 1's front, thereby be convenient for remind that the peripheral pedestrian of construction site notices safety, and at the back of warning frame 5, survey in the job site, it is provided with bearing plate 8 and fixing base 9 to survey in the warning frame 5, when the workman needs the rest, but bearing plate 8 and fixing base 9 outwards rotate from warning frame 5 inboard, thereby make fixing base 9 support on the bottom surface top, the workman can sit and take a rest at bearing plate 8 top surfaces.
Preferably, the base 2 is provided with fixed awl 201 all around, and the top surface of fixed awl 201 both ends is provided with handle 202, and the locating lever 3 side is provided with dead slot 203, and the dead slot 203 inboard is provided with draw-in groove 204.
Through above-mentioned technical scheme, when not using bearing plate 8 to make, drive fixing base 9 with bearing plate 8 and rotate 5 inboards to warning frame, later fix bearing plate 8 with limiting plate 7 embedding between U type frame 6.
The second embodiment:
referring to fig. 3-4, as an improvement of the previous embodiment, a fixing cone 201 is detachably mounted around the positioning rod 3, a handle 202 is fixedly mounted on the top surface of the fixing cone 201, the latch 11 is inserted into the inside of the slot 204, and the fixing frame 4 is inserted into the inside of the empty slot 203. The advantage is, the workman rotates through holding handle 202 to drive fixed awl 201 and rotate downwards, fix base 2, thereby increase the steadiness of guardrail.
When using, the utility model discloses a fix locating lever 3 on ground now, the workman can fix the one end of fixed frame 4 earlier on fixing locating lever 3 on ground, later fix locating lever 3 at the side of fixed frame 4 again, thereby install the job site according to this order, and the installation method is simple, the problem of needing to spend a large amount of manpowers to carry out the dismouting when dismantling has been solved, paste the warning sign through the front of guardrail 1, thereby be convenient for remind peripheral pedestrian's safety of being under construction, and at the back of warning frame 5, survey in the job site, it is provided with bearing plate 8 and fixing base 9 to survey in warning frame 5, when the workman needs the rest, can bearing plate 8 and fixing base 9 outwards rotate from warning frame 5 inboards, thereby make fixing base 9 support on the bottom surface top, the workman can sit and take a rest at bearing plate 8 top surfaces.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building construction safety protective guard, includes the guardrail, the guardrail bottom surface is provided with the base, the guardrail side is provided with the locating lever, be provided with fixed frame between the locating lever, fixed frame openly is provided with warning frame, its characterized in that: the warning frame back both ends are provided with the U shaped frame, be provided with the limiting plate between the U shaped frame, be provided with the bearing plate between the warning frame, the bearing plate bottom surface is provided with the fixing base, be connected the hinge between bearing plate and the warning frame, fixed frame both ends are provided with the fixture block.
2. The civil construction safety guard rail of claim 1, wherein: the base is fixedly installed on the bottom surface of the top positioning rod, the fixing frame is embedded into the side end of the positioning rod, the front surface of the fixing frame is pasted with a warning board, and the back surface of the warning frame is provided with an object placing groove.
3. The civil construction safety guard rail of claim 1, wherein: the warning frame is fixedly installed in the middle of the fixing frame, the top surface and the bottom surface of the warning frame are fixedly connected with the U-shaped frame, the limiting plate is inserted between the front surfaces of the U-shaped frame, and the limiting plate is located on the outer side of the warning frame.
4. The civil construction safety guard rail of claim 1, wherein: the warning frame is inboard in the embedding of bearing plate side, bearing plate bottom surface fixed connection fixing base, bearing plate and fixing base movable mounting are inboard in the warning frame, fixture block fixed mounting is at fixed frame both ends.
5. The civil construction safety guard rail of claim 1, wherein: the base is provided with fixed awl all around, fixed awl both ends top surface is provided with the handle, the locating lever side is provided with the dead slot, the dead slot inboard is provided with the draw-in groove.
6. The civil construction safety guard rail of claim 1, wherein: the locating lever is fixed awl of detachable installation all around, fixed awl top surface fixed mounting handle, fixture block embedding draw-in groove is inboard, and fixed frame embedding dead slot is inboard.
CN202222035315.2U 2022-08-03 2022-08-03 Safety protective guard for civil construction Active CN218324295U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222035315.2U CN218324295U (en) 2022-08-03 2022-08-03 Safety protective guard for civil construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222035315.2U CN218324295U (en) 2022-08-03 2022-08-03 Safety protective guard for civil construction

Publications (1)

Publication Number Publication Date
CN218324295U true CN218324295U (en) 2023-01-17

Family

ID=84875022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222035315.2U Active CN218324295U (en) 2022-08-03 2022-08-03 Safety protective guard for civil construction

Country Status (1)

Country Link
CN (1) CN218324295U (en)

Similar Documents

Publication Publication Date Title
CN218324295U (en) Safety protective guard for civil construction
CN112502428A (en) Green's building templates
CN211151465U (en) Line support for municipal road engineering
CN209478133U (en) A kind of civil engineering exterior-wall heat insulation board mounting assembly
CN211207909U (en) Landscape decoration device for municipal water conservancy bridge
CN210530504U (en) Multifunctional protective railing for construction site
CN113217013A (en) Protective structure is used in construction of simple and easy assembled abrupt slope tunnel entrance to a cave
CN217557920U (en) Guardrail for construction worker
CN111364789A (en) Combined suspension and protection device for deep foundation pit operation
CN211007951U (en) Protector is used in municipal works construction
CN214576203U (en) Novel municipal works are with supplementary protection guardrail
CN214658179U (en) Special suspended ceiling aluminum veneer for subway engineering
CN216740967U (en) Fence for building construction management
CN213144092U (en) Building engineering safety control rail
CN211369784U (en) Reusable building economic guardrail structure
CN216810293U (en) Permanent-temporary combined embedded part suitable for roof
CN214835005U (en) Safety protective guard for construction site
CN216157001U (en) But reutilization and remove convenient architectural decoration guardrail
CN214996651U (en) Diagonal bracing guardrail
CN218147928U (en) Sign for construction with stable structure
CN211714286U (en) Building curtain wall convenient to installation and dismantlement
CN210421105U (en) Town road foundation ditch safety device
CN217518381U (en) A foundation ditch faces limit protector for town road engineering job site
CN211973255U (en) Make things convenient for road guardrail of dismouting
CN215369138U (en) Protective net for building engineering safety

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant