CN211007951U - Protector is used in municipal works construction - Google Patents

Protector is used in municipal works construction Download PDF

Info

Publication number
CN211007951U
CN211007951U CN201921919769.8U CN201921919769U CN211007951U CN 211007951 U CN211007951 U CN 211007951U CN 201921919769 U CN201921919769 U CN 201921919769U CN 211007951 U CN211007951 U CN 211007951U
Authority
CN
China
Prior art keywords
support frame
fixing sleeve
frame
protection
supporting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921919769.8U
Other languages
Chinese (zh)
Inventor
布占峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201921919769.8U priority Critical patent/CN211007951U/en
Application granted granted Critical
Publication of CN211007951U publication Critical patent/CN211007951U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a protector is used in municipal works construction belongs to the municipal works field. A protective device for municipal engineering construction comprises a base, wherein a first fixing sleeve and a second fixing sleeve are arranged on the base, a first supporting frame and a second supporting frame are respectively arranged on the first fixing sleeve and the second fixing sleeve, a plurality of protection plates are arranged on the side surfaces of the first supporting frame and the second supporting frame, a reinforcing member is arranged on the side surface of the first supporting frame, a mounting hole is arranged on the reinforcing member, a limiting frame is arranged in the middle of the first supporting frame, a connecting plate and a nut are arranged on the limiting frame, a mounting frame is arranged at the bottom of the second supporting frame, when a single protection plate is damaged, the worker can disassemble and replace the protective plate, the maintenance is convenient for the worker, and through the detachable protective plate, after the protection work is finished, the protection plate can be detached, the repeated utilization rate of the protection plate is improved, and the use cost of the protection device is further reduced.

Description

Protector is used in municipal works construction
Technical Field
The utility model relates to a municipal works technical field especially relates to a protector is used in municipal works construction.
Background
The municipal engineering refers to municipal facility construction engineering, and in China, municipal facilities refer to various buildings, structures, equipment and the like which are arranged in urban areas and town planning construction ranges and provide paid or unpaid public products and services for residents based on government responsibilities and obligations. Various public infrastructure construction matched with urban life belongs to the municipal engineering category, such as common urban roads, bridges and subways.
The protection device can be established near the construction site to current municipal works when the construction, and what the protection device that common cost is lower adopted is that the metal sheet protects, because the metal sheet matter is softer, after using a period, the strong wind probably scrapes the deformation with the metal sheet, leads to the metal sheet impaired, and the reuse rate of metal sheet is low, leads to the protection device use cost to improve, therefore we make the improvement, provide a protection device for the municipal works construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art municipal works protector reuse rate low, cause the problem that use cost is high, and the protector is used in municipal works construction that provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a protector is used in municipal works construction, includes the base, be provided with the fixed cover of first fixed cover and second on the base, first fixed cover with be provided with first support frame and second support frame on the fixed cover of second respectively, first support frame with the side of second support frame is provided with a plurality of guard plate, the side of first support frame is provided with the reinforcement, be provided with the mounting hole on the reinforcement, the middle part of first support frame is provided with spacing, be provided with connecting plate and nut on the spacing, the bottom of second support frame is provided with the mounting bracket, the middle part of mounting bracket is passed the mounting hole, a plurality of recess has been seted up on the surface at first support frame middle part, a plurality of has seted up on the surface of guard plate and has perforated.
Preferably, the first fixing sleeve and the second fixing sleeve are a plurality of first fixing sleeves and a plurality of second fixing sleeves which are arranged alternately at equal intervals.
Preferably, the mounting hole is matched with the mounting frame, and the second support frame is located between the two first support frames.
Preferably, the groove and the through hole are matched with the limiting frame, and the limiting frame is of a U-shaped structure.
Preferably, the surface of the first fixing sleeve and the surface of the second fixing sleeve are both provided with a plurality of connecting rods.
Preferably, the first fixing sleeve is fixedly connected with the first support frame through bolts, and the first support frame is inserted into the first fixing sleeve.
Compared with the prior art, the utility model provides a protector is used in municipal works construction possesses following beneficial effect:
1. this protector is used in municipal works construction, can support the fixed cover of first fixed cover and second through the base, can support first support frame and second support frame through the fixed cover of first fixed cover and second, can support the guard plate through first support frame and second support frame, when single guard plate takes place to damage, the staff can dismantle and change it, make things convenient for the staff to maintain, through the detachable guard plate, after the guard work is accomplished, the guard plate can be pulled down, the reuse rate of guard plate has been improved, and then the use cost of this protector has been reduced.
2. This protector is used in municipal works construction can be so that the mounting bracket on the second support frame passes the mounting hole through reinforcement and mounting hole, passes the mounting hole when the mounting bracket, and the mounting bracket just can link together the reinforcement on two adjacent first support frames, and connected mode is simple, and makes things convenient for staff to dismantle and used repeatedly, when the part takes place to damage, also can change, has improved the device's result of use, has reduced this protector's use cost.
3. This protector is used in municipal works construction can be so that spacing and first support frame are more stable when being connected through the recess, can make spacing pass the guard plate through the perforation.
The part that does not relate to in the device all is the same with prior art or can adopt prior art to realize, the utility model discloses a first support frame, second support frame, guard plate, spacing, connecting plate and the mounting bracket that can dismantle can make the device convenient repair when damaging, and can conveniently dismantle after the engineering finishes, used repeatedly has reduced this protector's use cost.
Drawings
FIG. 1 is a schematic structural view of a protection device for municipal engineering construction according to the present invention;
FIG. 2 is a schematic structural view of a second support frame part of the protection device for municipal engineering construction, which is provided by the utility model;
FIG. 3 is a schematic structural view of a protective plate part of the protective device for municipal engineering construction according to the present invention;
FIG. 4 is a schematic structural view of a limiting frame part of a protective device for municipal engineering construction according to the present invention;
FIG. 5 is a schematic structural view of a first fixing sleeve part of the protection device for municipal engineering construction according to the present invention;
fig. 6 is the utility model provides a municipal works construction is with first fixed cover of protector section part's schematic structure view.
In the figure: 1. a base; 2. a first fixing sleeve; 3. a second fixing sleeve; 4. a first support frame; 5. a second support frame; 6. a protection plate; 7. a reinforcement; 8. mounting holes; 9. a limiting frame; 10. a connecting plate; 11. a mounting frame; 12. a groove; 13. and (6) perforating.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Referring to fig. 1-6, a protection device for municipal engineering construction, comprising a base 1, wherein a first fixing sleeve 2 and a second fixing sleeve 3 are arranged on the base 1, a first support frame 4 and a second support frame 5 are respectively arranged on the first fixing sleeve 2 and the second fixing sleeve 3, a plurality of protection plates 6 are arranged on the side surfaces of the first support frame 4 and the second support frame 5, the first fixing sleeve 2 and the second fixing sleeve 3 can be supported by the base 1, the first support frame 4 and the second support frame 5 can be supported by the first fixing sleeve 2 and the second fixing sleeve 3, the protection plates 6 can be supported by the first support frame 4 and the second support frame 5, when a single protection plate 6 is damaged, a worker can detach and replace the protection plate 6, the maintenance of the worker is facilitated, through the detachable protection plate 6, after the protection work is completed, the protection plate 6 can be detached, the repeated utilization rate of the protection plate 6 is improved, the use cost of the protection device is further reduced, the reinforcing member 7 is arranged on the side face of the first support frame 4, the mounting hole 8 is formed in the reinforcing member 7, the limiting frame 9 is arranged in the middle of the first support frame 4, the connecting plate 10 and the nut are arranged on the limiting frame 9, the mounting frame 11 is arranged at the bottom of the second support frame 5, the middle of the mounting frame 11 penetrates through the mounting hole 8, the mounting frame 11 on the second support frame 5 can penetrate through the mounting hole 8 through the reinforcing member 7 and the mounting hole 8, when the mounting frame 11 penetrates through the mounting hole 8, the mounting frame 11 can connect the reinforcing members 7 on two adjacent first support frames 4 together, the connection mode is simple, the parts can be conveniently detached and repeatedly used by workers, when the parts are damaged, the parts can be replaced, the use effect of the protection device is improved, and the use cost, a plurality of recess 12 has been seted up on the surface at first support frame 4 middle part, and a plurality of is seted up on the surface of guard plate 6 and is perforated 13, and is more stable when can making spacing 9 be connected with first support frame 4 through recess 12, can make spacing 9 pass guard plate 6 through perforation 13.
First fixed cover 2 and the fixed cover 3 of second are a plurality of, the fixed cover 3 equidistance of the first fixed cover 2 of a plurality of and a plurality of second sets up in turn, the fixed cover 3 of the first fixed cover 2 and the second that sets up through the equidistance in turn can make grafting adjacent each other at first fixed cover 2 and first support frame 4 and the second support frame 5 of grafting on the fixed cover 3 of second, easy to assemble and dismantlement, and can make first support frame 4 and second support frame 5 more stable.
The mounting hole 8 and the mounting frame 11 are matched, the second support frame 5 is located between the two first support frames 4, the two adjacent first support frames 4 can be connected through the second support frame 5, and the overall stability of the protection device is improved.
Recess 12 and perforation 13 all set up with spacing 9 phase-matches, and spacing 9 is U type structure, can pass perforation 13 through spacing 9 that is U type structure, through the middle part of spacing 9 that is U type structure can with recess 12 contact card with to hang guard plate 6 on the surface of first support frame 4, realize fixed effect.
The surface of the first fixed cover 2 and the surface of the second fixed cover 3 are both provided with a plurality of connecting rods, so that the first fixed cover 2 and the second fixed cover 3 are more stable to be connected with the base 1 through the connecting rods.
Set up between first fixed cover 2 and the first support frame 4 and pass through bolt fixed connection, and first support frame 4 pegs graft in the inside of first fixed cover 2, can improve the effect that first support frame 4 anti-wind pressed through first support frame 4 and the first fixed cover 2 of pegging graft, prolong the support stability of first support frame 4.
In the utility model, the first fixing sleeve 2 and the second fixing sleeve 3 can be supported by the base 1, the first support frame 4 and the second support frame 5 can be supported by the first fixing sleeve 2 and the second fixing sleeve 3, the protection plate 6 can be supported by the first support frame 4 and the second support frame 5, when a single protection plate 6 is damaged, the protection plate 6 can be disassembled and replaced by a worker, the maintenance of the worker is convenient, the protection plate 6 can be disassembled by the detachable protection plate 6 after the protection work is finished, the repeated utilization rate of the protection plate 6 is improved, the use cost of the protection device is further reduced, the mounting frame 11 on the second support frame 5 can pass through the mounting hole 8 by the reinforcing piece 7 and the mounting hole 8, when the mounting frame 11 passes through the mounting hole 8, the mounting frame 11 can connect the reinforcing pieces 7 on two adjacent first support frames 4 together, the connected mode is simple, and make things convenient for staff to dismantle and used repeatedly, when the part takes place to damage, also can change, the device's result of use has been improved, the use cost of this protector has been reduced, can make spacing 9 more stable when being connected with first support frame 4 through recess 12, can make spacing 9 pass guard plate 6 through perforation 13, first fixed cover 2 and the fixed cover 3 of second through the equidistance setting up in turn can make grafting adjacent each other at first fixed cover 2 and first support frame 4 and the second support frame 5 of pegging graft on the fixed cover 3 of second, easy to assemble and dismantlement, and can make first support frame 4 and second support frame 5 more stable.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The protection device for municipal engineering construction comprises a base (1) and is characterized in that a first fixing sleeve (2) and a second fixing sleeve (3) are arranged on the base (1), a first support frame (4) and a second support frame (5) are respectively arranged on the first fixing sleeve (2) and the second fixing sleeve (3), a plurality of protection plates (6) are arranged on the side faces of the first support frame (4) and the second support frame (5), a reinforcing member (7) is arranged on the side face of the first support frame (4), a mounting hole (8) is formed in the reinforcing member (7), a limiting frame (9) is arranged in the middle of the first support frame (4), a connecting plate (10) and a nut are arranged on the limiting frame (9), a mounting frame (11) is arranged at the bottom of the second support frame (5), and the mounting hole (8) is penetrated through the middle of the mounting frame (11), the surface of the middle part of the first support frame (4) is provided with a plurality of grooves (12), and the surface of the protection plate (6) is provided with a plurality of through holes (13).
2. The protection device for municipal engineering construction according to claim 1, wherein each of the first and second fixing sleeves (2, 3) is provided with a plurality of first fixing sleeves (2) and a plurality of second fixing sleeves (3) alternately arranged at equal intervals.
3. The protection device for municipal engineering construction according to claim 1, wherein the mounting hole (8) is matched with the mounting rack (11), and the second support frame (5) is located between the two first support frames (4).
4. The protection device for municipal engineering construction according to claim 1, wherein the groove (12) and the through hole (13) are both matched with the limiting frame (9), and the limiting frame (9) is of a U-shaped structure.
5. The protection device for municipal engineering construction according to claim 1, characterized in that the surfaces of the first and second sleeves (2, 3) are provided with a plurality of connecting rods.
6. The protection device for municipal engineering construction according to claim 1, wherein the first fixing sleeve (2) is fixedly connected with the first support frame (4) through bolts, and the first support frame (4) is inserted into the first fixing sleeve (2).
CN201921919769.8U 2019-11-08 2019-11-08 Protector is used in municipal works construction Expired - Fee Related CN211007951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921919769.8U CN211007951U (en) 2019-11-08 2019-11-08 Protector is used in municipal works construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921919769.8U CN211007951U (en) 2019-11-08 2019-11-08 Protector is used in municipal works construction

Publications (1)

Publication Number Publication Date
CN211007951U true CN211007951U (en) 2020-07-14

Family

ID=71473352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921919769.8U Expired - Fee Related CN211007951U (en) 2019-11-08 2019-11-08 Protector is used in municipal works construction

Country Status (1)

Country Link
CN (1) CN211007951U (en)

Similar Documents

Publication Publication Date Title
CN217651988U (en) Steel structure beam column connection structure of prefabricated building
CN211007951U (en) Protector is used in municipal works construction
CN214739106U (en) Curtain wall steel frame node
CN211285306U (en) Preceding operation platform of bridge hanging basket
CN213742434U (en) Railing unit and template combination
CN209799003U (en) house steel structure supporting structure
CN203034914U (en) Demountable rail structure
CN110748003A (en) Steel structure support frame
CN215562075U (en) Traffic sign pole convenient to remove
CN213806524U (en) Protective net frame for scaffold
CN205646736U (en) Optimalarc cable support
CN216866222U (en) Water conservancy rail guard convenient to maintenance is changed
CN217151259U (en) Steel pipe supporting structure at building door opening
CN212541835U (en) Advertisement signboard of easy equipment
CN214939361U (en) Adjustable cantilever operation platform
CN214786006U (en) Building template for energy conservation with regulatory function
CN209923801U (en) Wind-proof device for municipal works
CN217537328U (en) Unit type box building
CN219451411U (en) Frame device is chosen in construction
CN221143380U (en) Stone material unit plate mounting structure of steel truss
CN217461389U (en) Scaffold frame supporting platform is used in construction of hole edge
CN211974234U (en) Civil engineering construction support
CN220580041U (en) Open caisson formwork platform
CN219931859U (en) Recyclable steel member
CN209874455U (en) Scaffold G-shaped quick lock

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200714