CN218323890U - Building cylindrical frame post aluminum mould system - Google Patents

Building cylindrical frame post aluminum mould system Download PDF

Info

Publication number
CN218323890U
CN218323890U CN202221982696.9U CN202221982696U CN218323890U CN 218323890 U CN218323890 U CN 218323890U CN 202221982696 U CN202221982696 U CN 202221982696U CN 218323890 U CN218323890 U CN 218323890U
Authority
CN
China
Prior art keywords
main part
cylindrical frame
stupefied
panel
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221982696.9U
Other languages
Chinese (zh)
Inventor
姜淦清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhaoqing Chuangfu New Materials Technology Co.,Ltd.
Original Assignee
Zhaoqing Chuangfu New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhaoqing Chuangfu New Material Technology Co ltd filed Critical Zhaoqing Chuangfu New Material Technology Co ltd
Priority to CN202221982696.9U priority Critical patent/CN218323890U/en
Application granted granted Critical
Publication of CN218323890U publication Critical patent/CN218323890U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a building cylindrical frame post aluminum mould system relates to frame post aluminum mould field, including the stupefied main part of the back of the body and template main part, the both ends of the stupefied main part of the back of the body all are provided with the installation foot, and the installation foot can be used to adjacent two sets of stupefied main parts of the back of the body and carry out fastening connection, be provided with the panel in the template main part, the panel is the arc setting, and its outside is provided with the end rib, all be provided with several groups mounting hole on the end rib. The utility model discloses an effect of mounting hole can splice into cylindrical frame with multiunit template main part, realizes carrying out fast assembly to it, simultaneously through the effect of screw rod and nut, will carry on one's back stupefied main part and template main part fastening together, guarantees the compact type of connecting between it, prevents that the phenomenon of deep-fry mould from taking place, and the later stage of being convenient for when its rapid prototyping just guarantees its shaping quality is dismantled with higher speed, and reduces its staff's work burden.

Description

Building cylindrical frame post aluminum mould system
Technical Field
The utility model relates to a frame post aluminium mould field specifically is a building cylindrical frame post aluminium mould system.
Background
Along with the development of the building industry technology, the building construction process tends to flow and modular operation more and more, so that the building construction speed can be continuously increased, the building construction accuracy can also be improved, the modular operation is adopted in the construction process, and the model is built on site by adopting a template according to a designed drawing and then is directly poured to form the building.
The cylindrical frame column formwork construction in the existing building construction generally adopts corrugated pipes with corresponding diameters on the market as structural formworks, then wraps the installed column reinforcing steel bars, and then carries out corresponding reinforcement treatment on the column reinforcing steel bars.
Because the process of the structure in installation and subsequent disassembly is too complicated, the workload of workers is increased, a large amount of time is consumed, the overall installation speed is reduced, and the progress of the engineering progress cannot be ensured.
SUMMERY OF THE UTILITY MODEL
Based on this, the utility model aims at providing a building cylindrical frame post aluminium mould system to solve because above-mentioned structure is too loaded down with trivial details at the process of installation with follow-up dismantlement, increase staff's work burden, and consumed a large amount of time and reduced holistic installation rate, the technical problem of the process of unable assurance engineering progress.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building cylindrical frame post aluminum mould system, is including the stupefied main part of the back of the body and template main part, the both ends of the stupefied main part of the back of the body all are provided with the installation foot, and the installation foot can be used to adjacent two sets of stupefied main parts of the back of the body and carry out the fastening connection, be provided with the panel in the template main part, the panel is the arc setting, and its outside is provided with the end rib, all be provided with several groups mounting hole on the end rib.
Through adopting above-mentioned technical scheme, can splice into cylindrical frame with the multiunit template main part through the effect of mounting hole, realize carrying out fast assembly to it, simultaneously through the effect of screw rod and nut, will carry on one's back stupefied main part and template main part fastening together, guarantee the inseparable type of connecting between it, prevent that the phenomenon of deep-fry mould from taking place, the later stage of being convenient for is dismantled when accelerating its rapid prototyping and guaranteeing its shaping quality, and reduces its staff's work burden.
The utility model discloses further set up to, run through on the installation foot and be provided with the screw rod, and the both ends that are located the screw rod all are provided with rather than complex nut.
Through adopting above-mentioned technical scheme, can fasten the stupefied main part of back in the outside of template body fast through the cooperation of screw rod and nut.
The utility model discloses further set up to, the inboard that lies in the panel in the template main part is provided with a plurality of stiffening ribs.
Through adopting above-mentioned technical scheme, through the effect of stiffening rib, improve the anti deformability of template body, prevent that the condition of account mould from taking place among its assembling process.
The utility model discloses further set up to, there are first connecting square pipe, second connecting square pipe and enhancement side's nest of tubes to constitute in the stupefied main part of the back of the body, enhancement side's nest of tubes parallel weld and between the two.
Through adopting above-mentioned technical scheme, the cooperation is managed with strengthening square to two sets of connecting square, and the area of contact of increase and template main part prevents that its outer wall from leading to it to take place to deform because of pressure.
The utility model discloses further set up to, form a set of recess that supplies the bolt assembly installation between end rib and the panel.
Through adopting above-mentioned technical scheme, the staff of being convenient for carries out quick concatenation equipment to it for its work efficiency.
To sum up, the utility model discloses mainly have following beneficial effect:
the utility model discloses a be provided with several groups mounting hole on the end rib of template main part, effect through the mounting hole can splice into cylindrical frame with multiunit template main part, realize carrying out fast assembly to it, simultaneously through the effect of screw rod and nut, with the stupefied main part of the back of the body and template main part fastening together, guarantee the inseparable type of connecting between it, the phenomenon that prevents to explode the mould takes place, the later stage of being convenient for is dismantled when its rapid prototyping just guarantees its shaping quality with higher speed, and reduce its staff's work burden.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a perspective view of the template body of the present invention;
fig. 3 is a front view of the back ridge main body of the present invention;
fig. 4 is the local structure schematic diagram of the back arris main body of the utility model.
In the figure: 1. a back arris main body; 2. a template body; 3. a screw; 4. a nut; 5. a gasket; 6. mounting holes; 7. a panel; 8. reinforcing ribs; 9. an end rib; 10. mounting a foot; 11. a first connecting square tube; 12. a second connecting square tube; 13. and (4) reinforcing the square pipe.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
Next, an embodiment of the present invention will be described with reference to the overall structure thereof.
The utility model provides a building cylindrical frame post aluminum mould system, as shown in fig. 1-4, including the stupefied main part 1 of the back of the body and template main part 2, the both ends of the stupefied main part 1 of the back of the body all are provided with installation foot 10, it is provided with screw rod 3 to run through on the installation foot 10, and the both ends that are located screw rod 3 all are provided with nut 4 rather than the complex, through the mating reaction of screw rod 3 and nut 4, can assemble two sets of stupefied main parts 1 of the back of the body, make it hug closely the outer wall of template main part 2, simultaneously gasket 5 can prevent that nut 4 from droing off from screw rod 3, be provided with panel 7 on the template main part 2, panel 7 is the arc setting, be convenient for assemble it into cylindrical frame post, and its outside is provided with end rib 9, all be provided with a plurality of groups of mounting holes 6 on the end rib 9, through the cooperation of bolt assembly and mounting hole, be convenient for carry out the zonulae occludens between it, prevent the phenomenon that its junction from taking place to leak, form a set of recess that supplies the bolt assembly to install between end rib 9 and the panel 7, give the equipment space of bolt assembly.
Referring to fig. 2, a plurality of reinforcing ribs 8 are disposed on the inner side of the panel 7 of the formwork main body 2, and the reinforcing ribs 8 can increase the deformation resistance of the formwork main body 2 and prevent the formwork from being damaged when concrete is poured.
Referring to fig. 4, the back-ridge main body 1 is formed by a first connecting square tube 11, a second connecting square tube 12 and a reinforcing square tube 13, and the reinforcing square tube 13 is welded in parallel to the back-ridge main body and the reinforcing square tube, so as to increase the contact area between the back-ridge main body 1 and the template main body 2 and prevent the deformation of the outer side of the template main body 2 caused by an excessive internal impact force.
The utility model discloses a theory of operation does: during the use, can assemble into cylindrical frame with it fast through mounting hole 6 on the template main part 2, the staff later stage of being convenient for simultaneously dismantles it, treat that 2 equipment of template main part are accomplished the back through carrying out the joint with two sets of stupefied main parts 1 of the back of the body, fasten its outer wall at template main part 2 through the effect of screw rod 3 and nut 4, guarantee its inside concrete and stereotype, prevent its fried mould simultaneously, guarantee its shaping quality, mainly dismantle screw rod 3 and nut 4 can accomplish holistic dismantlement during the later stage is dismantled, in the time of its dismantlement efficiency, reduce its staff's working strength.
Although embodiments of the present invention have been shown and described, it is intended that the present embodiments be illustrative only and not limiting to the invention, and that the particular features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples, and that modifications, substitutions, variations, and the like, which are not inventive in light of the above teachings, may be made to the embodiments by those skilled in the art without departing from the principles and spirit of the present invention, but are to be construed as broadly as the following claims.

Claims (5)

1. The utility model provides a building cylindrical frame post aluminum mould system, includes stupefied main part of the back of the body (1) and template main part (2), its characterized in that: the stupefied main part of the back of the body (1) both ends all are provided with installation foot (10), and install foot (10) and can be used to adjacent two sets of stupefied main parts of the back of the body (1) and carry out fastening connection, be provided with panel (7) on template main part (2), panel (7) are the arc setting, and its outside is provided with end rib (9), all be provided with array mounting hole (6) on end rib (9).
2. The aluminum formwork system for building cylindrical frame columns according to claim 1, wherein: the mounting feet (10) are provided with screw rods (3) in a penetrating manner, and nuts (4) matched with the screw rods (3) are arranged at two ends of the screw rods (3).
3. The aluminum formwork system for building cylindrical frame columns according to claim 1, wherein: a plurality of reinforcing ribs (8) are arranged on the inner side of the panel (7) on the template main body (2).
4. The aluminum formwork system for building cylindrical frame columns according to claim 1, wherein: the stupefied main part of the back of the body (1) is last to have first connecting square pipe (11), second connecting square pipe (12) and strengthen square pipe (13) and constitute, strengthen square pipe (13) parallel weld and between the two.
5. The aluminum formwork system for building cylindrical frame columns according to claim 1, wherein: and a group of grooves for mounting the bolt assembly are formed between the end ribs (9) and the panel (7).
CN202221982696.9U 2022-07-29 2022-07-29 Building cylindrical frame post aluminum mould system Active CN218323890U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221982696.9U CN218323890U (en) 2022-07-29 2022-07-29 Building cylindrical frame post aluminum mould system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221982696.9U CN218323890U (en) 2022-07-29 2022-07-29 Building cylindrical frame post aluminum mould system

Publications (1)

Publication Number Publication Date
CN218323890U true CN218323890U (en) 2023-01-17

Family

ID=84873335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221982696.9U Active CN218323890U (en) 2022-07-29 2022-07-29 Building cylindrical frame post aluminum mould system

Country Status (1)

Country Link
CN (1) CN218323890U (en)

Similar Documents

Publication Publication Date Title
US10851537B2 (en) Assemblable structural column joint connection using fiber-reinforced concrete filled round double steel tubes and mounting method thereof
CN216616236U (en) Anti-seismic type building steel structure of high-rise building
CN211622556U (en) Scaffold wall connecting piece device
CN218323890U (en) Building cylindrical frame post aluminum mould system
CN101538913A (en) Hidden-buckle overhand ribbed cold-bending thin-wall steel pipe concrete and preparation method thereof
CN106978861A (en) A kind of truss-like combined steel plate wall
CN209741827U (en) Triangular brace device can be dismantled to pile foundation steel reinforcement cage
CN108222371B (en) Assembled steel pipe concrete composite column and splicing method
CN205036077U (en) Shear force wall formwork support suitable for narrow and small space usage
CN214940390U (en) Template for pouring full-package concrete of pipeline
CN214995980U (en) Template device for synchronous construction of double columns at expansion joint part of frame structure factory building
CN218149804U (en) Article font template reinforcing apparatus
CN219195986U (en) Assembled steel supporting structure
CN215802764U (en) Spiral ramp
CN220954645U (en) Adjustable and reusable hole template reinforcing assembly
CN220117750U (en) Building construction template consolidates to drawing device
CN218204533U (en) Supporting device for retaining wall construction
CN214738816U (en) Assembled steel construction beam column node
CN216518054U (en) Combined tunnel bearing structure
CN219993083U (en) Building construction engineering scaffold
CN218970637U (en) Three-tube back ridge cable-stayed reinforcing combined structure of aluminum alloy square column template for building
CN219118776U (en) Z-shaped reinforced full-wrapping back edge of aluminum alloy template wallboard for building
CN216766529U (en) Take screw-thread steel core concrete column of stiffening rib
CN218117230U (en) Concrete wall body sets up entrance to a cave aluminum mould board combination system
CN118407508B (en) Steel pipe column concrete frame beam and connecting method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 526200 No. 11, Huiyuan Avenue, Longfu Town, Sihui City, Zhaoqing City, Guangdong Province

Patentee after: Zhaoqing Chuangfu New Materials Technology Co.,Ltd.

Address before: 526200 No. 11, Huiyuan Avenue, Longfu Town, Sihui City, Zhaoqing City, Guangdong Province

Patentee before: Zhaoqing Chuangfu New Material Technology Co.,Ltd.

CP01 Change in the name or title of a patent holder