CN218320635U - Synchronous operation platform for mining - Google Patents

Synchronous operation platform for mining Download PDF

Info

Publication number
CN218320635U
CN218320635U CN202221420763.8U CN202221420763U CN218320635U CN 218320635 U CN218320635 U CN 218320635U CN 202221420763 U CN202221420763 U CN 202221420763U CN 218320635 U CN218320635 U CN 218320635U
Authority
CN
China
Prior art keywords
operating platform
operation platform
fixed
platform
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221420763.8U
Other languages
Chinese (zh)
Inventor
黄勇勤
黄景兴
黄平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Jiedeng Mining Machinery Co ltd
Original Assignee
Jiangxi Jiedeng Mining Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Jiedeng Mining Machinery Co ltd filed Critical Jiangxi Jiedeng Mining Machinery Co ltd
Priority to CN202221420763.8U priority Critical patent/CN218320635U/en
Application granted granted Critical
Publication of CN218320635U publication Critical patent/CN218320635U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The utility model provides a synchronous operation platform of mining, include: the wind speed detection device comprises an operating platform, a wind speed detector, an upper plate, a fixed protective guard, a movable protective guard device, a tool storage box, a lower bottom pulley device and a fixed pulley device, wherein a plurality of bottom pulleys are installed below the operating platform, the movable protective guard device is arranged on one side above the operating platform, the fixed protective guard is arranged on the other three sides of the operating platform, the top end of the fixed protective guard is connected with the upper plate, and the tool storage box is arranged on the fixed protective guard. The utility model discloses a synchronous operation platform of mining has and is overcoming a series of advantages such as environmental change, high altitude wind-force alarm, exploitation transportation synchronization and simple and practical.

Description

Synchronous operation platform for mining
Technical Field
The utility model relates to a mining equipment technical field specifically is a mining synchronous operation platform.
Background
In recent years, the scientific technology of our country is more advanced, so that the degree of mechanical automation is more and more common in various industries. The mining equipment is more generally used in the technical field of mining equipment, but the mechanical equipment in the industry at present cannot meet the requirements of high productivity and high efficiency, particularly, when workers mine, the mining position is limited, the working environment cannot be changed along with the change of the mining position, a large amount of manpower is wasted, the efficiency is low, and the mining equipment runs counter to the requirement of the high-efficiency era. Simultaneously in the exploitation mine, by the exploitation back often free fall, drop from the high altitude and easily cause personnel injured's risk, and the ore that drops often can pass through regrinding, easily causes the ore extravagant, should not retrieve simultaneously, has the inefficiency problem in the time of retrieving. When the operation platform works at high altitude, due to the special nature of the environment, some air openings exist, workers easily drop at high altitude due to overlarge wind, and the workers at high altitude can hardly determine whether to continue working or not through self-feeling.
In view of the above, it is determined that there is still much room for improvement in the field of mining equipment technology. The existing structure and the deficiency are researched and improved, and a synchronous operation platform for mining is provided, so that the aim of higher practical value is fulfilled.
SUMMERY OF THE UTILITY MODEL
In order to solve the problem, the utility model provides a synchronous operation platform of mining, include: the wind speed detection device comprises an operation platform, a wind speed detector, an upper plate, a fixed protective guard, a movable protective guard device, a tool storage box, a lower bottom pulley device and a fixed pulley device, wherein a plurality of bottom pulleys are installed below the operation platform, the movable protective guard device is arranged on one side above the operation platform, the fixed protective guard is arranged on the other three sides of the operation platform, the top end of the fixed protective guard is connected with the upper plate, and the tool storage box is arranged on the fixed protective guard.
Preferably, the upper surface of the operating platform is provided with a plurality of uniformly distributed convex points, and two side surfaces of the operating platform are respectively provided with a plurality of hooks.
Preferably, no guard rail is arranged above one side of the fixed guard rail facing the work.
Preferably, the two upper plates are connected together through two upper plate contraction rods in the middle, and the upper surface of each upper plate is provided with a wind speed detector.
Preferably, the movable guard rail device is composed of a movable guard rail, a sliding chute and guard rail pulleys (16), wherein the two movable guard rails are distributed above the sliding chute on the operating platform, and the middle of the two movable guard rails is moved through the guard rail pulleys respectively.
Preferably, the lower bottom pulley device is composed of a bottom pulley and a plug pin, the bottom pulley and the plug pin are distributed on the lower surface of the operating platform, and the diameter of the plug pin is matched with the size of the bottom pulley.
Preferably, the fixed pulley device is composed of a supporting piece, a motor and a fixed pulley, the fixed pulley is arranged on the bottom surface of the upper plate, the supporting piece is arranged on the side surface of the operating platform in the same vertical direction, and the motor is arranged on one side, close to the supporting piece, of the operating platform.
Preferably, a cavity is arranged in the operating platform, two operating platform shrinkage rods are arranged in the cavity, and the operating platform shrinkage rods can be used for placing an auxiliary storage plate matched with the rod in size.
Advantageous effects
1. When the working personnel face the change of the environment, the limitation of the environment can be got rid of to a certain extent, and the high efficiency of the work is further kept.
2. When operation platform is located the high latitude, can utilize and take out the shrink pole at operation platform shrink pole, place the supplementary storage board with pole size looks adaptation, store the ore of a certain amount, when the quality of ore reaches operation platform's the biggest bearing capacity, can utilize fixed pulley device and rope to transport the ore steadily on the plane, and then avoid dropping easily to cause personnel's injured risk from the high altitude, and the ore that drops often can pass through regrinding, easily cause the ore extravagant, should not retrieve simultaneously, there is a series of problems such as inefficiency in the time of retrieving.
3. When the working environment with overlarge wind power is met, the wind speed detector on the upper plate can detect the wind power of the current environment in real time, then the current wind power is fed back to the working personnel, whether the working personnel continue or stop the current work is reminded, and the life safety of the working personnel is guaranteed.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic view of the whole structure of the utility model.
Fig. 3 is a side view schematic diagram of the present invention.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
the method comprises the following steps of 1-operating platform, 2-wind speed detector, 3-upper plate, 4-fixed guard rail, 5-supporting piece, 6-motor, 7-upper plate contraction rod, 8-bottom pulley, 9-bolt, 10-operating platform contraction rod, 11-hook, 12-tool storage box, 13-movable guard rail, 14-fixed pulley, 15-chute and 16-guard rail pulley.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the drawings and examples. The following examples are provided to illustrate the invention but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Example (b):
this embodiment provides a synchronous operation platform of mining, includes: operation platform 1, wind speed detector 2, upper plate 3, fixed rail guard 4, portable rail guard device, instrument storage box 12, lower bottom pulley device, fixed pulley device, its characterized in that: a plurality of bottom pulleys 8 are arranged below the operating platform 1, a movable guard rail device is arranged on one side above the operating platform 1, fixed guard rails 4 are arranged on the other three sides, the top ends of the fixed guard rails 4 are connected with the upper plate 3, and a tool storage box 12 is arranged on the fixed guard rails 4; the upper surface of the operating platform 1 is provided with a plurality of uniformly distributed convex points, so that the friction force under feet of workers can be increased, which is very important for the workers in high altitude, the two side surfaces of the operating platform 1 are respectively provided with a plurality of hooks 11, and unnecessary storage barrels can be hung as required, so that the capacity of the operating platform is increased; any guardrail is not arranged above one side, facing the work, of the fixed protective guard 4, so that a plurality of workers can work conveniently and simultaneously, and the working efficiency is improved; the two upper plates 3 are connected together through the two upper plate contraction rods 7 in the middle, when a severe environment is met, the two upper plates 3 are connected, if a little environment is needed, the upper plates 3 can be folded and placed on two sides, the upper surfaces of the upper plates 3 are provided with the wind speed detectors 2, when the working environment with overlarge wind power is met, the wind speed detectors on the upper plates can detect the wind power of the current environment in real time, and then the current wind power is fed back to workers, so that whether the workers continue or stop the current work is reminded, and the life safety of the workers is guaranteed; the movable protective guard device is composed of movable protective guards 13, sliding grooves 15 and protective guard pulleys 16, the two movable protective guards 13 are distributed above the sliding grooves 15 on the operating platform 1, and the middle of each movable protective guard is moved through the protective guard pulleys 16, so that the personal safety of workers is guaranteed, and the movable protective guard device is convenient, simple and very practical; the lower bottom pulley device consists of a bottom pulley 8 and a plug pin 9, the bottom pulley 8 and the plug pin 9 are distributed on the lower surface of the operating platform 1, the diameter of the plug pin 9 is matched with the size of the bottom pulley 8, the plug pin can freely move when the plug pin works in a non-high altitude environment, and labor is saved; the fixed pulley device is composed of a supporting piece 5, a motor 6 and a fixed pulley 14, the fixed pulley 14 is arranged on the bottom surface of the upper plate 3, the supporting piece 5 is arranged on the side surface of the operating platform 1 in the same vertical direction, the motor 6 is arranged on one side of the operating platform 1 close to the supporting piece 5, a rope connected to the fixed pulley 14 is lifted by the rotation of the motor, and meanwhile, the supporting piece 5 is used for achieving the supporting point effect of force so that the rope can stably operate; there is a cavity operating platform 1 inside, is equipped with two operating platform shrink poles 10 in the cavity, and operating platform shrink pole 10 can place the supplementary storage board with pole size looks adaptation, when operating platform is located the high latitude, can utilize and take out the shrink pole at operating platform shrink pole, places the supplementary storage board with pole size looks adaptation, stores the ore of a certain amount.

Claims (8)

1. A synchronous mining operation platform comprising: operation platform (1), wind speed detector (2), upper plate (3), fixed rail guard (4), portable rail guard device, instrument storage box (12), pulley gear, the fixed pulley device of going to the bottom, operation platform (1) below installation a plurality of bottom pulley (8), its characterized in that: one side above the operating platform (1) is provided with a movable guard rail device, the other three sides are provided with fixed guard rails (4), the top ends of the fixed guard rails (4) are connected with the upper plate (3), and the tool storage box (12) is arranged on the fixed guard rails (4).
2. The mining synchronous operation platform of claim 1, wherein: the upper surface of the operating platform (1) is provided with a plurality of uniformly distributed convex points, and two side surfaces of the operating platform (1) are respectively provided with a plurality of hooks (11).
3. The synchronous mining operation platform of claim 1, wherein: and no guardrail is arranged above one working side of the fixed guardrail (4).
4. The mining synchronous operation platform of claim 1, wherein: the two upper plates (3) are connected together through two upper plate contraction rods (7) in the middle, and the upper surface of each upper plate (3) is provided with a wind speed detector (2).
5. The synchronous mining operation platform of claim 1, wherein: the movable guard rail device is composed of movable guard rails (13), sliding grooves (15) and guard rail pulleys (16), wherein the two movable guard rails (13) are distributed above the sliding grooves (15) on the operating platform (1), and the middle of each movable guard rail is moved through the guard rail pulleys (16).
6. The synchronous mining operation platform of claim 1, wherein: the lower bottom pulley device is composed of a bottom pulley (8) and a plug pin (9), the plug pin (9) is distributed on the lower surface of the operating platform (1), and the diameter of the plug pin (9) is matched with the size of the bottom pulley (8).
7. The synchronous mining operation platform of claim 1, wherein: the fixed pulley device comprises a supporting piece (5), a motor (6) and a fixed pulley (14), wherein the fixed pulley (14) is arranged on the bottom surface of the upper plate (3), the supporting piece (5) is arranged on the side surface of the operating platform (1) in the same vertical direction, and the motor (6) is arranged on one side, close to the supporting piece (5), of the operating platform (1).
8. The synchronous mining operation platform of claim 1, wherein: a cavity is arranged inside the operating platform (1), two operating platform shrinkage rods (10) are arranged in the cavity, and the operating platform shrinkage rods (10) can be used for placing an auxiliary storage plate matched with the rod size.
CN202221420763.8U 2022-06-09 2022-06-09 Synchronous operation platform for mining Active CN218320635U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221420763.8U CN218320635U (en) 2022-06-09 2022-06-09 Synchronous operation platform for mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221420763.8U CN218320635U (en) 2022-06-09 2022-06-09 Synchronous operation platform for mining

Publications (1)

Publication Number Publication Date
CN218320635U true CN218320635U (en) 2023-01-17

Family

ID=84867352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221420763.8U Active CN218320635U (en) 2022-06-09 2022-06-09 Synchronous operation platform for mining

Country Status (1)

Country Link
CN (1) CN218320635U (en)

Similar Documents

Publication Publication Date Title
CN109048913B (en) Ring shooting camera for track inspection robot
CN218320635U (en) Synchronous operation platform for mining
CN102263806A (en) Long-distance monitoring system of communication tower
CN103439178A (en) Load device for electric power fitting abrasion test machine
CN115000874B (en) Operation and maintenance equipment for high-voltage transmission line
CN205184728U (en) Multi -function tool box
CN213989855U (en) Multifunctional substation operation inspection device
CN207763917U (en) A kind of pendulum stand
CN208176363U (en) A kind of large size file management cabinet
CN210047954U (en) Automatic stereoscopic warehouse and control system thereof
CN210285536U (en) Mining stock anchor rope tray rack
CN207878197U (en) A kind of rail smooth degree automatic detection device
CN207518737U (en) A kind of liftable life outdoor videos monitoring device based on Internet of Things
CN214621260U (en) Power plant thermal control instrument calibrating device
CN206609206U (en) Freezer shelf and freezer shelf scale
CN201830463U (en) Communication tower remote monitoring system
CN211590066U (en) Tool storage box for overhaul of gas gathering station
CN105245854A (en) Elevation type automatic patrolling temperature image monitoring system
CN218619982U (en) Novel anti-collision detection device of crane
CN214277114U (en) Early warning of construction temporary bridge river course water level, fast monitoring devices of water yield water
CN216067423U (en) Unattended management and control device for electric power safety tool storeroom
CN213689246U (en) Electric cabinet shell resistance to compression detection device
CN212969848U (en) Video monitoring device for cell
CN215548509U (en) Safety protection structure for power distribution station inspection
CN219159096U (en) Offshore wind power energy recovery device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant