CN218319909U - Circuit pay-off of electric power engineering construction - Google Patents

Circuit pay-off of electric power engineering construction Download PDF

Info

Publication number
CN218319909U
CN218319909U CN202221705802.9U CN202221705802U CN218319909U CN 218319909 U CN218319909 U CN 218319909U CN 202221705802 U CN202221705802 U CN 202221705802U CN 218319909 U CN218319909 U CN 218319909U
Authority
CN
China
Prior art keywords
fixedly connected
main part
engineering construction
power
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221705802.9U
Other languages
Chinese (zh)
Inventor
张涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Juqiang Power Engineering Co ltd
Original Assignee
Anhui Juqiang Power Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Juqiang Power Engineering Co ltd filed Critical Anhui Juqiang Power Engineering Co ltd
Priority to CN202221705802.9U priority Critical patent/CN218319909U/en
Application granted granted Critical
Publication of CN218319909U publication Critical patent/CN218319909U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a circuit pay-off of electric power engineering construction, comprising a main body, main part upper end middle part fixedly connected with unwrapping wire ware and fixture block, open fixture block front end upper portion has the draw-in groove, the unwrapping wire ware passes through draw-in groove and fixture block joint, main part upper end left part fixedly connected with pull rod, the equal fixedly connected with locating rack of main part upper end right part and right-hand member, two the locating rack position corresponds, the equal interactive connection in main part front end right part and rear end right part has the auxiliary wheel, main part lower extreme fixedly connected with power unit and obstacle clearing mechanism, power unit and obstacle clearing mechanism contactless, main part front end left part and rear end left part all are provided with the power wheel, two the power wheel all with power unit fixed connection and with the main part all contactless. A circuit pay-off of electric power engineering construction, through being provided with clearance sacrifice mechanism, clearance sacrifice mechanism can push away the debris in the wire casing of digging, makes the circuit shop put more evenly.

Description

Line pay-off of electric power engineering construction
Technical Field
The utility model relates to an electric power engineering construction technical field, in particular to circuit pay-off of electric power engineering construction.
Background
Along with the development of electric power in China, electric power equipment communication equipment is widely constructed and applied, cables or communication line winding and unwinding are required to be arranged at construction sections in the process of electric power equipment construction and maintenance, the construction sections not only comprise urban roads and expressways which are easy to construct, but also comprise complex road section construction such as mountain areas with backward traffic facilities and the like, and the existing electric power engineering construction line unwinding device has at least the following defects: 1. the existing line pay-off device for electric power engineering construction is inconvenient to move, can move only by pulling equipment by manpower, and is laborious to move; 2. the existing line pay-off device for electric power engineering construction does not have a barrier clearing function, sundries are prone to falling into an excavated line groove, and a placed line is uneven, so that a novel line pay-off device for electric power engineering construction is provided.
SUMMERY OF THE UTILITY MODEL
A primary object of the utility model is to provide a circuit pay-off of electric power engineering construction can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a circuit pay-off of electric power engineering construction, includes the main part, main part upper end middle part fixedly connected with unwrapping wire ware and fixture block, open fixture block front end upper portion has the draw-in groove, the unwrapping wire ware passes through draw-in groove and fixture block joint, main part upper end left part fixedly connected with pull rod, the equal fixedly connected with locating rack of main part upper end right part and right-hand member, two the locating rack position corresponds, the equal interactive connection in main part front end right part and rear end right part has the auxiliary wheel, main part lower extreme fixedly connected with power unit and clearance obstacle mechanism, power unit and clearance obstacle mechanism contactless, main part front end left part and rear end left part all are provided with the power wheel, two the power wheel all with power unit fixed connection and all contactless with the main part.
Preferably, the power mechanism comprises a power box and a transmission rod, and bevel gears are fixedly connected to the output end of the power box and the outer surface of the transmission rod.
Preferably, the two bevel gears are meshed with each other and are not in contact with the main body, the power box is fixedly connected with the main body, and the transmission rod is movably connected with the main body in an inserting mode and is fixedly connected with the two power wheels together.
Preferably, the obstacle removing mechanism comprises an obstacle removing block and two electric lifting rods, and the lower ends of the two electric lifting rods are fixedly connected with fixing seats.
Preferably, the two electric lifting rods are fixedly connected with the main body, the two fixing seats are fixedly connected with the obstacle clearing block, and the two electric lifting rods are not in contact with each other.
Preferably, the paying-off device comprises a fixing block, a movable block is movably connected to the upper end of the fixing block, a motor is fixedly connected to the front end of the movable block, the output end of the motor penetrates through a bearing rod fixedly connected with the movable block, the bearing rod is connected with the clamping groove in a clamped mode, and the fixing block is fixedly connected with the main body.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. in the utility model, the power mechanism is arranged at the lower end of the main body and drives the power wheels connected with the two ends of the transmission rod through the bevel gear, so that the device can move without large tension, and a lot of force is saved for constructors;
2. the utility model discloses in, through being provided with clearance barrier mechanism in main part lower extreme left part, when equipment carries out the unwrapping wire and removes, clearance barrier mechanism can push away the debris in the unwrapping wire inslot that dig, makes the circuit shop put more evenly, and the unwrapping wire effect is better.
Drawings
Fig. 1 is a schematic view of the overall structure of a line pay-off device for power engineering construction according to the present invention;
fig. 2 is a schematic view of the overall structure of the power mechanism of the line pay-off device for power engineering construction of the present invention;
FIG. 3 is a schematic view of the overall structure of the obstacle clearing mechanism of the line pay-off device for power engineering construction of the present invention;
fig. 4 is the utility model relates to a circuit pay-off device's of electric power engineering construction unwrapping wire ware overall structure schematic diagram.
In the figure: 1. a main body; 2. a paying-off device; 3. a clamping block; 4. a card slot; 5. a pull rod; 6. a positioning frame; 7. an auxiliary wheel; 8. a power mechanism; 9. an obstacle removing mechanism; 10. a power wheel; 81. a power box; 82. a transmission rod; 83. a bevel gear; 91. removing obstacles; 92. an electric lifting rod; 93. a fixed seat; 21. a fixed block; 22. a movable block; 23. a motor; 24. a carrier bar.
Detailed Description
In order to make the utility model realize, the technical means, the creation characteristics, the achievement purpose and the efficacy are easy to understand and understand, the utility model is further explained by combining the specific implementation mode.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a circuit pay-off of electric power engineering construction, including main part 1, 1 upper end middle part fixedly connected with unwrapping wire ware 2 of main part and fixture block 3, open at 3 front end upper portions of fixture block has draw-in groove 4, unwrapping wire ware 2 passes through draw-in groove 4 and 3 joints of fixture block, 1 upper end left part fixedly connected with pull rod 5 of main part, 1 upper end right part of main part and the equal fixedly connected with locating rack 6 of right-hand member, two locating rack 6 positions correspond, 1 front end right part of main part and the equal interactive connection in rear end right part have auxiliary wheel 7, 1 lower extreme fixedly connected with power unit 8 of main part and obstacle clearing mechanism 9, power unit 8 and obstacle clearing mechanism 9 contactless, 1 front end left part of main part and rear end left part all are provided with power wheel 10, two power wheel 10 all with 8 fixed connection in power unit and all contactless with main part 1.
In this embodiment, the power mechanism 8 includes a power box 81 and a transmission rod 82, bevel gears 83 are fixedly connected to the output end of the power box 81 and the outer surface of the transmission rod 82, the two bevel gears 83 are meshed with each other and are not in contact with the main body 1, the power box 81 is fixedly connected with the main body 1, the transmission rod 82 is movably connected with the main body 1 in an inserting manner and is fixedly connected with the two power wheels 10 together, the power mechanism 8 is arranged at the lower end of the main body 1, the power mechanism 8 drives the power wheels 10 connected to the two ends of the transmission rod 82 through the bevel gears 83, so that the device can move without large pulling force, and a lot of force is saved for constructors.
In this embodiment, the obstacle clearing mechanism 9 includes an obstacle clearing block 91 and two electric lifting rods 92, two equal fixedly connected with fixing seats 93 of the lower ends of the electric lifting rods 92, two equal fixedly connected with main body 1 of the electric lifting rods 92, two equal fixedly connected with obstacle clearing block 91 of the fixing seats 93, two non-contact electric lifting rods 92, the paying out device 2 includes a fixing block 21, the upper end of the fixing block 21 is movably connected with a movable block 22, the front end of the movable block 22 is fixedly connected with a motor 23, the output end of the motor 23 runs through the movable block 22 and is fixedly connected with a bearing rod 24, the bearing rod 24 is connected with a clamping groove 4, the fixing block 21 is fixedly connected with the main body 1, the obstacle clearing mechanism 9 is arranged at the left part of the lower end of the main body 1, when the device carries out paying off and moves, the obstacle clearing mechanism 9 can lay out sundries in the dug paying-off grooves, so that the lines are more flat, and the paying-off effect is better.
It should be noted that, the utility model relates to a circuit pay-off of electric power engineering construction, in the use, at first with the movable block 22 upset in unwrapping wire ware 2, make carrier bar 24 upwards, cup joint the coil of wire at carrier bar 24 surface, reset movable block 22 again, make carrier bar 24 card go into in the draw-in groove 4 of fixture block 3 front end, put down the piece 91 of removing obstacles and laminate the wire casing of digging through two electric lift poles 92 in the mechanism 9 of control obstacle removal, headstock 81 in the rethread control power unit 8, headstock 81 makes transfer line 82 take two power wheels 10 to rotate through bevel gear 83, carry out directional control through hand pull rod 5, can carry out the unwrapping wire, during the unwrapping wire, two locating racks 6 that the circuit can set up through main part 1 upper end right part and right-hand member can ensure the circuit and can steadily put at the wire casing inslot, whole device is simple to use, and labor-saving, and is suitable for the unwrapping wire use.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a circuit pay-off of electric power engineering construction, includes main part (1), its characterized in that: main part (1) upper end middle part fixedly connected with unwrapping wire ware (2) and fixture block (3), fixture block (3) front end upper portion is opened there are draw-in groove (4), unwrapping wire ware (2) are through draw-in groove (4) and fixture block (3) joint, main part (1) upper end left part fixedly connected with pull rod (5), main part (1) upper end right part and the equal fixedly connected with locating rack (6) of right-hand member, two locating rack (6) position corresponds, main part (1) front end right part and the equal interactive connection of rear end right part have auxiliary wheel (7), main part (1) lower extreme fixedly connected with power unit (8) and obstacle clearance mechanism (9), power unit (8) and obstacle clearance mechanism (9) contactless, main part (1) front end left part and rear end left part all are provided with power wheel (10), two power wheel (10) all with power unit (8) fixed connection and all contactless with main part (1).
2. The line pay-off device for electric power engineering construction as claimed in claim 1, wherein: the power mechanism (8) comprises a power box (81) and a transmission rod (82), wherein the output end of the power box (81) and the outer surface of the transmission rod (82) are fixedly connected with bevel gears (83).
3. The line pay-off device for electric power engineering construction as claimed in claim 2, wherein: the two bevel gears (83) are meshed with each other and are not in contact with the main body (1), the power box (81) is fixedly connected with the main body (1), and the transmission rod (82) is movably connected with the main body (1) in a penetrating mode and is fixedly connected with the two power wheels (10) together.
4. The line pay-off device for electric power engineering construction as claimed in claim 1, wherein: the obstacle removing mechanism (9) comprises an obstacle removing block (91) and two electric lifting rods (92), and fixing seats (93) are fixedly connected to the lower ends of the two electric lifting rods (92).
5. The line pay-off device for electric power engineering construction as claimed in claim 4, wherein: two electric lift pole (92) all with main part (1) fixed connection, two fixing base (93) all with clearance piece (91) fixed connection, two electric lift pole (92) contactless.
6. The line pay-off device for electric power engineering construction as claimed in claim 1, wherein: unwrapping wire ware (2) are including fixed block (21), fixed block (21) upper end swing joint has movable block (22), movable block (22) front end fixedly connected with motor (23), motor (23) output runs through movable block (22) fixedly connected with carrier bar (24), carrier bar (24) and draw-in groove (4) joint, fixed block (21) and main part (1) fixed connection.
CN202221705802.9U 2022-07-04 2022-07-04 Circuit pay-off of electric power engineering construction Active CN218319909U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221705802.9U CN218319909U (en) 2022-07-04 2022-07-04 Circuit pay-off of electric power engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221705802.9U CN218319909U (en) 2022-07-04 2022-07-04 Circuit pay-off of electric power engineering construction

Publications (1)

Publication Number Publication Date
CN218319909U true CN218319909U (en) 2023-01-17

Family

ID=84868276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221705802.9U Active CN218319909U (en) 2022-07-04 2022-07-04 Circuit pay-off of electric power engineering construction

Country Status (1)

Country Link
CN (1) CN218319909U (en)

Similar Documents

Publication Publication Date Title
CN109346999A (en) Omnipotent bracing wire vehicle and cable-drawing construction method
CN110061447A (en) A kind of power transmission lines overhauling is with can obstacle detouring electric aerodyne
CN218319909U (en) Circuit pay-off of electric power engineering construction
CN111900668A (en) Erect cable installation auxiliary assembly
CN210608312U (en) Ground lead device for track traffic
CN204230761U (en) A kind of fluid pressure type cable winding apparatus
CN113964942B (en) Automatic inspection equipment for power cable
CN114314157B (en) Cable paying-off traction device
CN211874391U (en) Novel road drilling machine for traffic engineering
CN212151115U (en) Cable arrangement device for communication engineering
CN107508241B (en) High altitude multiconductor cable snow removing device
CN208398862U (en) A kind of Portable dip auxiliary device
CN110120649A (en) A kind of spool of embedded cable and the construction method of embedded cable
CN219791961U (en) Cable traction equipment convenient to use
CN214652571U (en) Cable construction is with removing pay-off
CN215889910U (en) Drilling device for vertical grounding electrode
CN216105405U (en) Cable coiling mechanism is used in town road water and electricity installation
CN216129124U (en) Cable winding equipment for building water and electricity installation
CN212978365U (en) Convenient high-voltage line electric power inspection robot
CN219123818U (en) Power cable line laying device of transformer substation
CN215060788U (en) Building engineering quality safety information acquisition device
CN219567154U (en) Threading construction device
CN212101319U (en) Hydraulic engineering construction pipe laying pay-off
CN210380015U (en) Green-cutting and barrier-sweeping auxiliary tool for electric power construction
CN220284742U (en) Hydropower station door machine anchoring structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant