CN212101319U - Hydraulic engineering construction pipe laying pay-off - Google Patents
Hydraulic engineering construction pipe laying pay-off Download PDFInfo
- Publication number
- CN212101319U CN212101319U CN202020526013.3U CN202020526013U CN212101319U CN 212101319 U CN212101319 U CN 212101319U CN 202020526013 U CN202020526013 U CN 202020526013U CN 212101319 U CN212101319 U CN 212101319U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- rod
- plate
- hydraulic engineering
- engineering construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sewage (AREA)
Abstract
The utility model discloses a hydraulic engineering construction pipe laying and paying-off device, which comprises a base, the base upper end is fixedly connected with a supporting plate, one side of the supporting plate is fixedly connected with a fixed plate, the upper end of the fixed plate is fixedly provided with a motor, one end of the motor passes through the supporting plate and is fixedly connected with a rotating sleeve, the other side of the upper end of the supporting plate is fixedly connected with a mounting plate, the bottom end inside the mounting plate is fixedly connected with a first telescopic rod, the upper end of the first telescopic rod is fixedly connected with a sliding block, the inside of the sliding block is fixedly connected with a second telescopic rod, one end of the second telescopic rod is fixedly connected with a connecting plate, the inside of the sliding block is slidably connected with an inserting rod, the inside of the inserting rod is fixedly connected with a third telescopic rod, through the design of, convenient follow-up unwrapping wire facilitates the use operation.
Description
Technical Field
The utility model relates to a pay-off specifically is a hydraulic engineering construction pipe laying pay-off.
Background
The technical aspect of the hydraulic engineering field is greatly improved under the promotion of the development of the economic society in recent years, particularly, the development and application of the pay-off technology make great contribution to the development of the hydraulic engineering field, and pay-off devices are mostly adopted in the existing hydraulic engineering for pay-off.
The existing cable pipe has heavier weight, and a worker can hardly lift the wire roller, but the existing pay-off device can not lift the wire roller. Therefore, the utility model provides a hydraulic engineering construction pipe laying pay-off to solve the problem that proposes in the above-mentioned background art.
Disclosure of Invention
An object of the utility model is to provide a hydraulic engineering construction pipe laying pay-off to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
a pipe laying and paying-off device for hydraulic engineering construction comprises a base, wherein a supporting plate is fixedly connected to the upper end of the base, a fixing plate is fixedly connected to one side of the supporting plate, a motor is fixedly mounted at the upper end of the fixing plate, one end of the motor penetrates through the supporting plate and is fixedly connected with a rotating sleeve, a mounting plate is fixedly connected to the other side of the upper end of the supporting plate, a first telescopic rod is fixedly connected to the bottom end of the interior of the mounting plate, a sliding block is fixedly connected to the upper end of the first telescopic rod, a second telescopic rod is fixedly connected to the interior of the sliding block, a connecting plate is fixedly connected to one end of the second telescopic rod, an inserting rod is slidably connected to the interior of the sliding block, a third telescopic rod is fixedly connected to, the movable rod penetrates through the first fixed plate, a baffle is fixedly connected to one side of the first fixed plate, the front end of the movable rod is rotatably connected with a rotating rod, the rotating rod is located between the clamping rods, and the baffle is located between the rotating rods. The user moves the device to a construction site, a worker pushes a wire roller from an inclined plate to the position above a base, an external controller controls a first telescopic rod to lift, the telescopic rod drives a sliding block to move up and down, the sliding block moves up and down to enable an insertion rod to be aligned with the wire roller, a controller controls a second telescopic rod to shorten to enable the insertion rod to be inserted into the wire roller, the first telescopic rod is controlled to lift to enable the insertion rod to be aligned with a rotating sleeve, the controller controls the second telescopic rod to enable the insertion rod to be inserted into the rotating sleeve, the controller controls the third telescopic rod to extend, the third telescopic rod extends to push a movable rod to move right, the movable rod moves right to drive the rotating rod to move right, the two ends of the rotating rod are outwards opened due to the limitation of a baffle plate, the rotating rod pushes a clamping rod to extend out of the inner part of the insertion, the motor starts to drive the rotating sleeve to rotate, the rotating sleeve rotates to drive the inserting rod to rotate, and the inserting rod rotates to drive the wire roller to rotate for paying off.
As a further aspect of the present invention: the lower end of the base is fixedly connected with a plurality of universal wheels, and one side of the base is provided with an inclined plate.
As a further aspect of the present invention: a cross opening is formed in the inner portion of the rotating sleeve, a cross block is fixedly connected to one end of the inserting rod, and the cross block can be inserted into the cross opening.
As a further aspect of the present invention: the wire roller is placed on the upper end of the base and is located between the supporting plate and the mounting plate.
As a further aspect of the present invention: one end of the insertion rod is rotatably connected with the connecting plate.
As a further aspect of the present invention: the length of the insertion rod is longer than that of the wire roller.
Compared with the prior art, the beneficial effects of the utility model are that:
through the design have the insertion rod, inside inserting the line roller through the insertion rod, can break away from ground with the line roller through telescopic link one, avoid the manual operation, save the labour, fix the line roller through the inside joint pole of insertion rod simultaneously, convenient follow-up unwrapping wire facilitates the use operation.
Drawings
Fig. 1 is a schematic structural diagram of a pipe laying and paying-off device for hydraulic engineering construction.
Fig. 2 is a schematic structural diagram of an insertion rod in a pipe laying and paying-off device for hydraulic engineering construction.
Fig. 3 is an enlarged view of a part a in fig. 2 of a pipe laying and paying-off device for hydraulic engineering construction.
Fig. 4 is a perspective view of a rotating sleeve in a pipe laying and paying-off device for hydraulic engineering construction.
In the figure: 1. a base; 2. a universal wheel; 3. a sloping plate; 4. a support plate; 5. a fixing plate; 6. a motor; 7. rotating the sleeve; 701. a cross-shaped opening; 8. mounting a plate; 9. a first telescopic rod; 10. a slider; 11. a second telescopic rod; 12. a connecting plate; 13. an insertion rod; 1301. a third telescopic rod; 1302. a cross block; 1303. a movable rod; 1304. a clamping and connecting rod; 1305. a first fixing plate; 1306. rotating the rod; 1307. a spring; 1308. a baffle plate; 14. and (4) wire roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, in the embodiment of the present invention, a hydraulic engineering construction pipe laying and paying-off device comprises a base 1, a plurality of universal wheels 2 are fixedly connected to the lower end of the base 1, an inclined plate 3 is arranged on one side of the base 1, a supporting plate 4 is fixedly connected to the upper end of the base 1, a fixing plate 5 is fixedly connected to one side of the supporting plate 4, a motor 6 is fixedly mounted at the upper end of the fixing plate 5, one end of the motor 6 passes through the supporting plate 4 and is fixedly connected with a rotating sleeve 7, a mounting plate 8 is fixedly connected to the other side of the upper end of the supporting plate 4, a wire roller 14 is arranged at the upper end of the base 1, the wire roller 14 is arranged between the supporting plate 4 and the mounting plate 8, a first telescopic rod 9 is fixedly connected to the inner bottom end of the mounting plate 8, a sliding block, insert 13 one end and connecting plate 12 and rotate and be connected, the length of inserting 13 is good at the length of line roller 14, the cross mouth 701 has been seted up to the cover 7 inside of rotating, insert 13 one end fixedly connected with cross 1302, cross 1302 can insert inside the cross mouth 701, insert 13 inside fixedly connected with telescopic link three 1301 of pole, telescopic link three 1301 one end fixedly connected with movable rod 1303, it has a plurality of joint poles 1304 to insert the inside upper and lower sliding connection of pole 13, fixedly connected with spring 1307 between the joint pole 1304, insert the inside equal fixedly connected with fixed plate 1305 in joint pole 1304 one side of pole 1304 of 13, movable rod 1303 passes fixed plate 1305, fixed plate 1305 one side fixedly connected with baffle 1308, the movable rod front end rotates and is connected with the dwang 1306, the dwang 1306 is located between the joint pole 1304, baffle 1308 is located between the dwa. The user moves the device to a construction site, a worker pushes the wire roller 14 to the upper side of the base 1 from the inclined plate 3, the external controller controls the first telescopic rod 9 to ascend and descend, the first telescopic rod 9 drives the sliding block 10 to move up and down, the sliding block 10 moves up and down to enable the insertion rod 13 to be aligned with the wire roller 14, the controller controls the second telescopic rod 11 to shorten to enable the insertion rod to be inserted into the wire roller 14, the first telescopic rod 9 is controlled to ascend to enable the insertion rod 13 to be aligned with the rotating sleeve 7, the second telescopic rod 11 is controlled by the controller to enable the insertion rod 13 to be inserted into the rotating sleeve 7, the third telescopic rod 1301 is controlled by the controller to extend, the third telescopic rod 1301 extends to push the movable rod 1303 to move right, the movable rod 1303 moves right to drive the rotating rod 1306 to move right, the two ends of the rotating rod 1306 are outwards opened due to the limitation of the baffle 1308, the rotating rod 1306 pushes, the motor 6 is controlled to be started through the controller, the motor 6 is started to drive the rotating sleeve 7 to rotate, the rotating sleeve 7 rotates to drive the inserting rod 13 to rotate, and the inserting rod 13 rotates to drive the wire roller 14 to rotate for paying off.
The utility model discloses a theory of operation is:
when the device is used, a user moves the device to a construction site, a worker pushes a wire roller 14 to the upper side of a base 1 from an inclined plate 3, an external controller controls a first telescopic rod 9 to lift, the first telescopic rod 9 drives a sliding block 10 to move up and down, the sliding block 10 moves up and down to enable an insertion rod 13 to be aligned with the wire roller 14, a controller controls a second telescopic rod 11 to shorten to enable the insertion rod to be inserted into the wire roller 14, then the first telescopic rod 9 is controlled to lift to enable the insertion rod 13 to be aligned with a rotating sleeve 7, the second telescopic rod 11 is controlled by the controller to enable the insertion rod 13 to be inserted into the rotating sleeve 7, a third telescopic rod 1301 is controlled by the controller to extend to enable the third telescopic rod 1301 to extend to push a movable rod 1303 to move right, the movable rod 1303 moves right to drive the rotating rod 1306 to move right, the two ends of the rotating rod 1306 are outwards due to the limitation of a baffle 1308 of the rotating rod, the motor 6 is controlled to be started through the controller, the motor 6 is started to drive the rotating sleeve 7 to rotate, the rotating sleeve 7 rotates to drive the inserting rod 13 to rotate, and the inserting rod 13 rotates to drive the wire roller 14 to rotate for paying off.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. A pipe laying and paying-off device for hydraulic engineering construction comprises a base (1) and is characterized in that a supporting plate (4) is fixedly connected to the upper end of the base (1), a fixing plate (5) is fixedly connected to one side of the supporting plate (4), a motor (6) is fixedly mounted at the upper end of the fixing plate (5), one end of the motor (6) penetrates through the supporting plate (4) and is fixedly connected with a rotating sleeve (7), a mounting plate (8) is fixedly connected to the other side of the upper end of the supporting plate (4), a first telescopic rod (9) is fixedly connected to the bottom end inside the mounting plate (8), a sliding block (10) is fixedly connected to the upper end of the first telescopic rod (9), a second telescopic rod (11) is fixedly connected to the inside of the sliding block (10), a connecting plate (12) is fixedly connected to one end of the second, three (1301) one end fixedly connected with movable rod (1303) of telescopic link, sliding connection has a plurality of joint poles (1304) about inserting pole (13) is inside, fixedly connected with spring (1307) between joint pole (1304), insert pole (13) inside and be located joint pole (1304) one side equal fixedly connected with fixed plate (1305), fixed plate (1305) is passed in movable rod (1303), fixed plate (1305) one side fixedly connected with baffle (1308) of fixed plate (1305), movable rod (1303) front end rotates and is connected with dwang (1306), dwang (1306) are located between joint pole (1304), baffle (1308) are located between dwang (1306).
2. The hydraulic engineering construction pipe laying and paying-off device according to claim 1, wherein a plurality of universal wheels (2) are fixedly connected to the lower end of the base (1), and an inclined plate (3) is arranged on one side of the base (1).
3. The hydraulic engineering construction pipe burying and paying out device according to claim 1, wherein a cross opening (701) is formed in the rotating sleeve (7), a cross block (1302) is fixedly connected to one end of the inserting rod (13), and the cross block (1302) can be inserted into the cross opening (701).
4. The hydraulic engineering construction pipe laying and paying off device according to claim 1, wherein a wire roller (14) is placed at the upper end of the base (1), and the wire roller (14) is located between the supporting plate (4) and the mounting plate (8).
5. The hydraulic engineering construction pipe laying and paying out device according to claim 1, wherein one end of the insertion rod (13) is rotatably connected with the connecting plate (12).
6. A hydraulic engineering construction pipe laying and paying out device according to claim 1, wherein the length of the insertion rod (13) is longer than the length of the wire roller (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020526013.3U CN212101319U (en) | 2020-04-12 | 2020-04-12 | Hydraulic engineering construction pipe laying pay-off |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202020526013.3U CN212101319U (en) | 2020-04-12 | 2020-04-12 | Hydraulic engineering construction pipe laying pay-off |
Publications (1)
Publication Number | Publication Date |
---|---|
CN212101319U true CN212101319U (en) | 2020-12-08 |
Family
ID=73630289
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202020526013.3U Expired - Fee Related CN212101319U (en) | 2020-04-12 | 2020-04-12 | Hydraulic engineering construction pipe laying pay-off |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN212101319U (en) |
-
2020
- 2020-04-12 CN CN202020526013.3U patent/CN212101319U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105442932A (en) | Power grid pole burying device and construction method | |
CN205377168U (en) | Erect leap device of power transmission line | |
CN105421859A (en) | Electricity grid telegraph pole erecting device and construction method | |
CN105421860A (en) | Electricity grid telegraph pole erecting device and construction method | |
CN204152415U (en) | A kind of power transformation picture control probe ascend operation multifunction insulating ladder | |
CN210558505U (en) | Environment-friendly energy-saving type pay-off device for wireless communication technology | |
CN212101319U (en) | Hydraulic engineering construction pipe laying pay-off | |
CN205123121U (en) | Action bars is strideed across to electric wire | |
CN213171337U (en) | Material lifting equipment for high-altitude operation | |
CN109761160B (en) | Electric power screen cabinet migration device | |
CN205846663U (en) | A kind of height-adjustable overhead line structures | |
CN210326756U (en) | Automatic location over-and-under type electrical wiring special-purpose vehicle | |
CN214100134U (en) | Wiring disc for electric power engineering who facilitates use | |
CN205123133U (en) | Dismantled and assembled construction cable support | |
CN211018061U (en) | Multi-connected cable pulley block | |
CN105421861A (en) | Electricity grid telegraph pole erecting device and construction method | |
CN211004327U (en) | Portable pole wire lifter | |
CN205377170U (en) | Portable power transmission line handing equipment | |
CN209675819U (en) | A kind of optical cable hook manipulator | |
CN219620734U (en) | Safety lifting device for building construction | |
CN210264114U (en) | High-strength telegraph pole | |
CN110880716A (en) | High-voltage switch cabinet cable access device and construction method | |
CN211081224U (en) | Power transmission equipment installation device for electrical engineering | |
CN214462320U (en) | Cargo platform is used in hydraulic engineering construction | |
CN205595518U (en) | Automatic retrieve electrical power supply wire reel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201208 |