CN205123133U - Dismantled and assembled construction cable support - Google Patents
Dismantled and assembled construction cable support Download PDFInfo
- Publication number
- CN205123133U CN205123133U CN201520968322.5U CN201520968322U CN205123133U CN 205123133 U CN205123133 U CN 205123133U CN 201520968322 U CN201520968322 U CN 201520968322U CN 205123133 U CN205123133 U CN 205123133U
- Authority
- CN
- China
- Prior art keywords
- hook
- vertical rod
- stringing
- base
- dismantled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 230000005611 electricity Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000004804 winding Methods 0.000 abstract 6
- 238000000034 method Methods 0.000 description 4
- 238000009413 insulation Methods 0.000 description 3
- 238000000151 deposition Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
A detachable construction cable support comprises a support body, wherein the support body comprises a base, a vertical rod, an upper winding hook, a lower winding hook, a stringing hook and a handle, and is made of residual steel bars on a construction site; the base is connected with the vertical rod, at least two winding hooks are arranged at the upper part and the lower part, the hook opening of the upper winding hook faces upwards, the hook opening of the lower winding hook faces downwards, and the two winding hooks are symmetrical and connected to the vertical rod at the same side; the stringing hook is connected to the top of the upright rod, and the opening of the stringing hook is upward; the handle is connected to the vertical rod. The utility model has the characteristics of with low costs, simple manufacture, practicality are strong, on-the-spot stringing is clean and tidy orderly, carry and convenient to use etc, make things convenient for job site's use, can prevent effectively that the electric shock occurence of failure from just meeting safe civilized construction requirements. The route of the overhead line can be flexibly adjusted along with the change of the construction electricity utilization part, and the electric shock of personnel caused by the damage of a cable grounding wire sheath is prevented.
Description
Technical field
The utility model relates to construction implement field, particularly relates to a kind of dismantled and assembled and can around the insulated cable support depositing superfluous cable.
Background technology
At construction site, cable mops floor because supporting nowhere and there are major safety risks, avoids cable to mop floor rationally and effectively very important to safety in production, greatly can reduce the occurrence probability of security incident.Invent a kind of rationally effective cable bearer for temporary electricity use very necessary for this reason.
Utility model content
The purpose of this utility model is to provide a kind of dismantled and assembled and around the insulated cable support depositing superfluous cable, can will solve the problem that cable mops floor, fixed bracket very flexible, cost are high, wire-excessive is placed nowhere.
For achieving the above object, the utility model adopts following technical scheme: a kind of dismantled and assembled construction cable support, comprise support body, described support body comprises base, vertical rod, upper coiling hook, lower coiling hook, stringing hook and handle, is manufactured by the residue reinforcing bar on building site to form; Described base is connected with vertical rod, and described coiling hook has upper and lower two at least, and upward, down, two coiling hooks are symmetrical and homonymy is connected in vertical rod for the mouth of hook of lower coiling hook for the mouth of hook of upper coiling hook; Described stringing hook connecting is connected on vertical rod top, opening upwards; Described handle is connected in vertical rod.
Preferably, there is a through hole at described base center, and vertical rod penetrates through hole and is connected with base.
Preferably, described stringing hook is L shape or U-shaped.
Preferably, described handle is laterally or is vertically connected to the middle part of vertical rod.
Compared with prior art the utility model has following characteristics and beneficial effect: the utility model has taken into full account the factor such as operating environment, safety utilization of electric power of construction site, have cost low, make simple, practical, field stringing clean and tidy in order, carry and the feature such as easy to use, the use at convenient construction scene, can prevent electric shock accidents from occurring and meeting safety construction requirement effectively.It can adjust the path of overhead transmission line flexibly along with the variation at power supply for construction position, prevent the cable line skin breakage personnel that cause that mop floor from getting an electric shock.The utility model can be widely used in the various job sites needing temporary support cable such as architectural engineering, subway engineering, Tunnel Engineering.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Reference numeral: coiling hook 5-stringing hook under 1-base, the upper coiling hook of 2-vertical rod, 3-, 4-,
6-handle.
Embodiment
Shown in Figure 1, this dismantled and assembled construction cable support, comprises support body, and described support body comprises base 1, vertical rod 2, upper coiling hook 3, lower coiling hook 4, stringing hook 5 and handle 6, is manufactured by the residue reinforcing bar on building site to form; Described base 1 is connected with vertical rod 2, and described coiling hook has upper and lower two at least, and upward, down, two coiling hooks are symmetrical and homonymy is connected in vertical rod for the mouth of hook of lower coiling hook 4 for the mouth of hook of upper coiling hook 3; Described stringing hook 5 is connected to vertical rod top, opening upwards; Described handle 6 is connected in vertical rod.
Shown in Figure 1, in the utility model, there is a through hole at base 1 center, and vertical rod 2 penetrates through hole and is connected with base 1.
Shown in Figure 1, in the utility model, stringing hook 5 is L shape or U-shaped.
Shown in Figure 1, in the utility model, handle 6 is laterally or is vertically connected to the middle part of vertical rod.
In specific embodiment shown in Figure 1, base 1 is rounded dome concrete product, and adopt job site discarded concrete material to build and form, when building, a steel sleeve pipe is placed at base center, build shaping after, recoverable stand-by; Vertical rod 2 and the socket connection of base central through hole, height can be determined voluntarily according to the width of the working face at scene, ceiling height or construction level high condition; Upper coiling extension 3 and lower coiling are linked up with 4 hooks and are all fixed on position, vertical rod middle and lower part, and superfluous cable is wrapped on coiling hook by visual on-site cable length surplus, avoid wire-excessive that the unnecessary phenomenon that mops floor occurs; Stringing links up with 5 visual stringing distances, and cable is done insulation with it fixing, thus improve sag height between support, ensures that pedestrian is convenient; Handle 6 can hand-held after insulation processing, can ensure the personal safety of operating personnel, can increase again the degree of safety in use procedure.
In specific embodiment shown in Figure 1, base 1 diameter is
600mm, vertical rod 2 diameter is not less than
15mm, hook diameter is
6mm.
In the utility model, steel part all adopts and is welded to connect, and weld should meet corresponding welding requirements.
In the utility model, insulation processing is all done by handle 6 and hook place.
In the utility model, for aesthetic and corrosion-resisting function, steel part can do zinc-plated process.
Of the present utility modelly install and use process: first, base 1 is positioned over each point correct position on stringing path, levelling leveling, cable and stringing are linked up with 5 fix, hand-held vertical rod 2 by bottom of upright rod inserted base, then, residue cable is wrapped on coiling hook, completes the process of installing and using.After having constructed, vertical rod 2 is extracted, remove each point and fix, move to other positions and reuse.
Claims (4)
1. a dismantled and assembled construction cable support, comprise support body, it is characterized in that: described support body comprises base (1), vertical rod (2), upper coiling hook (3), lower coiling hook (4), stringing hook (5) and handle (6), is manufactured by the residue reinforcing bar on building site to form; Described base (1) is connected with vertical rod (2), and described coiling hook has upper and lower two at least, and upward, down, two coiling hooks are symmetrical and homonymy is connected in vertical rod for the mouth of hook of lower coiling hook (4) for the mouth of hook of upper coiling hook (3); Described stringing hook (5) is connected to vertical rod top, opening upwards; Described handle (6) is connected in vertical rod.
2. the dismantled and assembled construction cable support of one according to claim 1, is characterized in that: there is a through hole at described base (1) center, vertical rod (2) penetrates through hole and is connected with base (1).
3. the dismantled and assembled construction cable support of one according to claim 1 and 2, is characterized in that: described stringing hook (5) is L shape or U-shaped.
4. the dismantled and assembled construction cable support of one according to claim 3, is characterized in that: described handle (6) is laterally or is vertically connected to the middle part of vertical rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520968322.5U CN205123133U (en) | 2015-11-30 | 2015-11-30 | Dismantled and assembled construction cable support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520968322.5U CN205123133U (en) | 2015-11-30 | 2015-11-30 | Dismantled and assembled construction cable support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205123133U true CN205123133U (en) | 2016-03-30 |
Family
ID=55578709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520968322.5U Expired - Fee Related CN205123133U (en) | 2015-11-30 | 2015-11-30 | Dismantled and assembled construction cable support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205123133U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109787172A (en) * | 2019-01-29 | 2019-05-21 | 江南造船(集团)有限责任公司 | A kind of cable for ship hanging device |
CN110752562A (en) * | 2018-07-24 | 2020-02-04 | 五冶集团上海有限公司 | Steel bar welding cable support |
-
2015
- 2015-11-30 CN CN201520968322.5U patent/CN205123133U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110752562A (en) * | 2018-07-24 | 2020-02-04 | 五冶集团上海有限公司 | Steel bar welding cable support |
CN109787172A (en) * | 2019-01-29 | 2019-05-21 | 江南造船(集团)有限责任公司 | A kind of cable for ship hanging device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205123133U (en) | Dismantled and assembled construction cable support | |
CN205123121U (en) | Action bars is strideed across to electric wire | |
CN206712345U (en) | A kind of construction cable clip | |
CN202090629U (en) | "Inverted-U-shaped" truss structure of main variable ingoing line used for 750 kV transformer station in Riyue Mountain | |
CN201812946U (en) | Portable grounding wire for power line maintenance | |
CN203617651U (en) | Steady and reliable abacus connector | |
CN104600655A (en) | Strengthening structure for lightning rod device | |
CN205846663U (en) | A kind of height-adjustable overhead line structures | |
CN202488041U (en) | 500 kilovolt hot-line work electric-field-entering ladder | |
CN205090084U (en) | Adjustable electric block cable support | |
CN205151012U (en) | Ground wire auxiliary apparatus | |
CN202872257U (en) | Opening type slide cable hook | |
CN102312599A (en) | Multi-prism steel pipe pole of power transmission line | |
CN202872255U (en) | Spanning support for traction cable | |
CN203113867U (en) | Straight-line cable T-jointing steel tube rod tower | |
CN201247925Y (en) | Safety hanging stair for maintaining cable terminal | |
CN102312600B (en) | Multi-prism plug-in type steel pipe pole of power transmission line | |
CN200967424Y (en) | Inclined bracing wire | |
CN205172411U (en) | Portable novel tub of tower cat ladder | |
CN204782201U (en) | Steel pipe pole is with steel pipe cross arm of eight arris variable cross sections | |
CN203497843U (en) | High-voltage ground wire coiler | |
CN203367919U (en) | Wire clamp body of ground-potential-working non-bearing connecting wire clamp | |
CN103457213A (en) | Wire clamp body of ground potential operation non-bearing connection wire clamp | |
CN204371368U (en) | A kind of down-hole permanent support holder net | |
CN208782378U (en) | Move electrical equipment cable wire routing overcast in construction site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 Termination date: 20211130 |
|