CN218292728U - Operating platform encorbelments - Google Patents

Operating platform encorbelments Download PDF

Info

Publication number
CN218292728U
CN218292728U CN202222392693.6U CN202222392693U CN218292728U CN 218292728 U CN218292728 U CN 218292728U CN 202222392693 U CN202222392693 U CN 202222392693U CN 218292728 U CN218292728 U CN 218292728U
Authority
CN
China
Prior art keywords
shelf
cantilever
platform
stand
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222392693.6U
Other languages
Chinese (zh)
Inventor
吴艳明
佟成龙
秦添
班少鹏
周孝武
张武刚
陈辈
王秀
何兴雄
闫双朋
王瑞杰
曾天祥
崔秀峰
陈昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Bureau Third Construction Co Ltd
Original Assignee
China Construction Fifth Bureau Third Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Bureau Third Construction Co Ltd filed Critical China Construction Fifth Bureau Third Construction Co Ltd
Priority to CN202222392693.6U priority Critical patent/CN218292728U/en
Application granted granted Critical
Publication of CN218292728U publication Critical patent/CN218292728U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to an overhanging operation platform, which comprises a base, a balancing weight, a vertical frame, an overhanging beam and a cantilever platform, wherein the balancing weight is arranged on the base, and the vertical frame is detachably connected on the base; the number of the cantilever beams is two, and the cantilever beams are detachably and horizontally connected to two opposite sides of the vertical frame; the platform of taking out includes shelf and shelf, and the shelf both sides joint respectively keep away from the one end of grudging post at two cantilever beams, and the shelf overlap joint is used for placement tool or constructor work platform who stands to use with the shelf formation on the shelf. The utility model discloses in constitute the operation platform that encorbelments's base, grudging post, cantilever beam, take out the platform and constitute and can dismantle the connection between the shelf and the shelf of taking out the platform, can very convenient make up, build, but the long-distance transport when long-distance transport is transported, can effectively solve the inconvenient problem of long-distance transport.

Description

Operating platform encorbelments
Technical Field
The utility model relates to a construction technical field especially relates to an operation platform encorbelments.
Background
When construction of a building wall, an elevator shaft, or the like is difficult, various temporary operation platforms or operation frames are often installed on a construction site to perform various operations such as masonry, decoration, painting, and the like, and generally, a framework type platform, which can be used for carrying materials or carrying construction workers and performing various operations therein within a certain period of time, is called an operation platform. The cantilever operation platform is used as one operation platform, the cost of repeated construction can be saved due to the movable characteristic of the cantilever operation platform, and the cantilever operation platform is widely applied to the field of building construction.
However, when the existing mobile cantilever platform is transported for a long distance, the existing mobile cantilever platform often has the problem of inconvenient transportation due to the fact that the existing mobile cantilever platform occupies too large space.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an operation platform encorbelments makes things convenient for the dismouting, can effectively improve the convenience of long-distance transportation.
To achieve the purpose, the utility model adopts the following technical proposal:
the cantilever operation platform comprises a base, a balancing weight, a vertical frame, a cantilever beam and a cantilever platform, wherein the balancing weight is arranged on the base, and the vertical frame is detachably connected to the base; the number of the cantilever beams is two, and the cantilever beams are detachably and horizontally connected to two opposite sides of the vertical frame; the cantilever platform comprises a shelf and a shelf, the shelf is a square frame, two opposite sides of the shelf are respectively clamped and connected with the cantilever beam far away from one end of the stand, the shelf is in lap joint with the shelf, and the shelf forms a working platform for placing tools or constructors to stand.
Optionally, the vertical frame includes four upright columns vertically arranged, the base is provided with first connecting cylinders corresponding to the upright columns one to one, and the upright columns are inserted into the first connecting cylinders.
Optionally, the stand further comprises a first connecting rod horizontally arranged, and the first connecting rod is connected with the stand column through a disc buckle.
Optionally, the cantilever beam is connected with the stand through a disc buckle.
Optionally, the shelf includes two first backup pads and two second backup pads, two are connected respectively at the both ends of second backup pad first backup pad, the both ends of first backup pad set up the connecting groove that the opening is decurrent, the connecting groove can the joint be in on the cantilever beam.
Optionally, baffles are arranged on two sides of the shelf in the length direction, and the inner sides of the baffles are respectively abutted to the opposite outer sides of the shelf.
Optionally, the picking platform further comprises four upright rods vertically arranged, second connecting cylinders corresponding to the upright rods one to one are arranged on the shelf, and the upright rods are inserted into the second connecting cylinders.
Optionally, the platform further comprises a second connecting rod horizontally arranged, and the second connecting rod is connected with the vertical rod through a disc buckle.
Optionally, the shelf can be overlapped on the second connecting rod.
Optionally, the stand further comprises a limiting assembly, the limiting assembly comprises a steel wire rope, a lock catch and a connecting ring, the connecting ring is sleeved on the stand, one end of the steel wire rope is connected with the connecting ring, and the other end of the steel wire rope is connected with the lock catch.
The beneficial effects of the utility model are that: constitute the grudging post of encorbelmenting operation platform, cantilever beam, a pedestal, can dismantle the connection between platform and the balancing weight, it is very convenient to assemble, and the platform of encorbelmenting simultaneously includes shelf and shelf, and the shelf can the joint on cantilever beam, and the shelf can overlap joint on the shelf, can form fast and be used for placement tool or constructor to stand the work platform who uses, can transport whole cantilever operation platform split when carrying out long-distance transport, has improved the convenience of encorbelmenting operation platform long-distance transport.
Drawings
Fig. 1 is a schematic structural diagram of an overhanging operation platform according to an embodiment of the present invention;
fig. 2 is a schematic view of a connection relationship between a stand and a base according to an embodiment of the present invention;
fig. 3 is a schematic structural diagram of a platform according to an embodiment of the present invention;
fig. 4 is a schematic structural diagram of a shelf according to an embodiment of the present invention.
In the figure: 1. a base; 2. a first connecting cylinder; 3. a column; 4. a balancing weight; 5. a connecting ring; 6. a wire rope; 7. locking; 8. a first connecting rod; 9. a cantilever beam; 10. a shelf; 11. connecting grooves; 12. a second connecting cylinder; 13. a shelf; 14. a baffle plate; 15. erecting a rod; 16. a second connecting rod; 17. a universal wheel.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not limiting of the invention. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures.
In the description of the present invention, unless otherwise explicitly specified or limited, the terms "connected", "connected" and "fixed" are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or may be connected through the use of two elements or the interaction of two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
In the present application, unless expressly stated or limited otherwise, the recitation of a first feature "on" or "under" a second feature may include the recitation of the first and second features being in direct contact, and may also include the recitation of the first and second features not being in direct contact, but being in contact with another feature between them. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
In the description of the present embodiment, the terms "upper", "lower", "left", "right", and the like are used based on the orientations and positional relationships shown in the drawings, and are only for convenience of description and simplification of operation, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used only for descriptive purposes and are not intended to have a special meaning.
This embodiment provides an operation platform encorbelments, mainly is applied to the field that needs high altitude construction, for example the construction field, adopts the components of a whole that can function independently structural grouping to form, can be very convenient dismouting, can transport with the form of components of a whole that can function independently with its dismantlement when long-distance transit.
Referring to fig. 1-4, the operation platform of encorbelmenting that this embodiment provided, including base 1, the grudging post, cantilever beam 9, pick up platform and balancing weight 4, balancing weight 4 is placed on base 1, increase the counter weight for whole operation platform of encorbelmenting, make the part of encorbelmenting safer, the grudging post can be dismantled and connect in base 1 upper surface, the quantity of cantilever beam 9 is two, can dismantle horizontally connect in the relative both sides of grudging post, it includes shelf 10 and shelf 13 to pick up the platform, shelf 10 is square, its both sides joint respectively is in two one end of encorbelmenting that cantilever beam 9 kept away from the grudging post, shelf 10 both can link together two cantilever beams 9, strengthen its stability, can also place shelf 13 simultaneously, shelf 13 overlap joint is on shelf 10, form the work platform that is used for placing tool or constructor the use of standing with shelf 10 jointly.
In this embodiment, whole operation platform of encorbelmenting is formed by base 1, grudging post, cantilever beam 9 and the shelf 10 and the shelf 13 equipment that constitute the platform of encorbelmenting, can be very convenient assemble and dismantle, has solved the current removal platform of encorbelmenting and has built inconvenient, the inconvenient problem of long-distance transportation.
It can be understood that the clump weight 4 can be arranged into a plurality of pieces to reduce the volume of the clump weight 4, and further improve the convenience of transportation.
The bottom of the base 1 is provided with a plurality of universal wheels 17, the universal wheels 17 are rotationally connected with the base 1, the whole cantilever operation platform can be conveniently moved through the universal wheels 17, after wheel locks on the universal wheels 17 are locked, the whole cantilever operation platform can be fixed,
referring to fig. 1, the grudging post includes four stands 3 of vertical setting, and galvanized steel pipe can be chooseed for use to stand 3, and base 1 upper surface is provided with the first connecting cylinder 2 with stand 3 one-to-one, and during the equipment, stand 3 pegs graft in first connecting cylinder 2, realizes the fast assembly of grudging post and base 1, for guaranteeing structural strength, first connecting cylinder 2 welds with base 1.
Referring to fig. 2, the vertical frame further includes a first connecting rod 8 horizontally disposed, the first connecting rods 8 are detachably connected between two adjacent vertical columns 3, and at the same height of the vertical columns 3, four first connecting rods 8 enclose to form a square frame, so as to improve the stability of the whole vertical frame structure. Specifically, head rod 8 is connected through the dish knot with stand 3, can realize the quick assembly disassembly of head rod 8 and stand 3, and a plurality of dish knots set up along the extending direction interval of stand 3, also the axial spaced of head rod 8 along stand 3 encloses synthetic a plurality of square framves promptly. In this embodiment, the plate buckle is a socket type plate buckle.
Similarly, cantilever beam 9 also can be connected with stand 3 through coiling the knot, and cantilever beam 9 is the vertical rectangular frame who sets up, and its upper and lower relative side is fixed respectively on two coils that set up along stand 3 axial are buckled, can make cantilever beam 9's the portion of encorbelmenting have better stability and security, and further, cantilever beam 9 and head rod 8 share and coil the knot.
Referring to fig. 3, the shelf 10 includes two first supporting plates and two second supporting plates, two ends of the second supporting plates are respectively connected with the two first supporting plates, two ends of the first supporting plates are provided with connecting grooves 11 with downward openings, and the connecting grooves are used for being connected to cantilever beams 9 in a clamping manner, more specifically, the second supporting plates are perpendicular to the first supporting plates, the first supporting plates are perpendicular to the cantilever beams 9, so that the consistency of specifications of shelves 13 lapped on the shelf 10 is guaranteed, the assembling difficulty is reduced, meanwhile, the second supporting plates are arranged close to the cantilever beams 9, gaps are prevented from being formed between the second supporting plates and the cantilever beams 9, and the risk that construction workers step on the hollow board to drop is reduced.
Referring to fig. 4, baffles 14 are disposed on two sides of the shelf 13 in the length direction, the baffles 14 are perpendicular to the shelf 13, and when the shelf 13 is overlapped on the shelf 10, the inner sides of the baffles 14 are respectively abutted against the opposite outer sides of the shelf 10, so as to prevent the shelf 13 from being displaced in the length direction. More specifically, the length direction of shelf 13 is unanimous with the length direction of first backup pad, and shelf 13 both ends overlap joint respectively in the second backup pad, for avoiding shelf 13 to drop from the length both ends of first backup pad, the frame construction that first backup pad and second backup pad are constituteed is H shape, and the quantity of shelf 13 can be selected as required, and generally speaking, distance between two first backup pads is the integral multiple relation with shelf 13 width, and it is full of shelf 13 to pave between two first backup pads to further reduce the risk that the construction workman stepped on the sky.
As shown in fig. 3, the platform further includes four upright posts 15, and the upright posts 15 limit the moving space of the constructor standing on the shelf 13 and prevent the constructor from falling off the shelf 13 as much as possible. The upright rod 15 is detachably connected with the shelf 10, in this embodiment, in order to improve the assembling effect, the upright rod 15 and the shelf 10 are connected in an inserting manner, correspondingly, the shelf 10 is provided with a second connecting cylinder 12 for inserting the upright rod 15, and the second connecting cylinder 12 is welded with the shelf 10.
Second connecting rod 16 level can be dismantled and connect between adjacent pole setting 15, not only can improve pole setting 15's structural strength, further restricts constructor's activity space, can also overlap joint shelf 13 on second connecting rod 16 simultaneously, and the platform or the second grade work platform as constructor placement tool use, and is specific, and second connecting rod 16 is connected between pole setting 15 through the dish knot equally, encloses jointly to close and forms rectangular frame.
Referring to fig. 1, the operation platform that encorbelments in this embodiment still includes spacing subassembly, and spacing subassembly can carry out spacingly with whole operation platform that encorbelments, makes it have better stability and security.
The limiting assembly comprises a steel wire rope 6, a lock catch 7 and a connecting ring 5, the connecting ring 5 can be sleeved on the stand column 3 or the first connecting rod 8 of the stand frame, in the embodiment, the connecting ring 5 is sleeved on the stand column 3 in a sliding mode, the range of the external environment where the whole limiting assembly can be connected can be improved, one end of the steel wire rope 6 is connected with the connecting ring 5, the other end of the steel wire rope is connected with the lock catch 7, the lock catch 7 can be fixed on a fixed structure of a building wall body or the ground according to specific construction site conditions and construction requirements, especially when the overhanging operation platform is arranged in a high altitude, the moving distance of the overhanging operation platform can be limited by the limiting assembly, and the whole moving overhanging platform is prevented from falling in the high altitude due to universal wheel 17 wheel lock failure or other external force factors.
Optionally, the limiting assemblies are provided with a plurality of groups, specifically four groups can be provided, wherein every two groups of limiting assemblies are sleeved at different heights of different stand columns 3, so that safety is further ensured. Compared with the complete limiting assembly (equivalent to a locking assembly) in other embodiments, the limiting assembly in the embodiment has certain flexibility, can expand the range of available building wall or ground fixing structures, and ensures the stability and safety of an operating platform.
It is obvious that the above embodiments of the present invention are only examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Numerous obvious variations, rearrangements and substitutions will now occur to those skilled in the art without departing from the scope of the invention. This need not be, nor should it be exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. Operation platform encorbelments, its characterized in that includes:
a base (1);
a weight block (4) disposed on the base (1),
the stand is detachably connected to the base (1);
the number of the cantilever beams (9) is two, and the cantilever beams (9) are detachably and horizontally connected to two opposite sides of the vertical frame;
the platform of choosing, including shelf (10) and shelf (13), shelf (10) are square, the joint is in two respectively in the relative both sides of shelf (10) cantilever beam (9) are kept away from the one end of grudging post, shelf (13) overlap joint is in on shelf (10), with shelf (10) form and are used for placement tool or constructor stand work platform who uses.
2. The cantilever operation platform according to claim 1, wherein the stand comprises four upright posts (3) vertically arranged, the base (1) is provided with first connecting cylinders (2) corresponding to the upright posts (3) one by one, and the upright posts (3) are inserted into the first connecting cylinders (2).
3. An overhanging working platform according to claim 2, characterized in that the stand further comprises a horizontally arranged first connecting rod (8), and the first connecting rod (8) is connected with the upright (3) by a disc buckle.
4. An overhanging working platform according to claim 1, characterized in that the cantilever beam (9) is connected with the stand by a disc buckle.
5. The cantilever operation platform according to claim 1, wherein the shelf (10) comprises two first supporting plates and two second supporting plates, two ends of the second supporting plates are respectively connected with the two first supporting plates, two ends of the first supporting plates are provided with connecting grooves (11) with downward openings, and the connecting grooves (11) can be clamped on the cantilever beam (9).
6. An overhanging working platform according to claim 1, characterized in that baffles (14) are arranged on both sides of the shelf (13) in the length direction, and the inner sides of the baffles (14) are respectively abutted against the opposite outer sides of the shelf (10).
7. The cantilever operation platform according to claim 1, wherein the cantilever platform further comprises four upright posts (15) vertically arranged, second connecting cylinders (12) corresponding to the upright posts (15) one by one are arranged on the shelf (10), and the upright posts (15) are inserted into the second connecting cylinders (12).
8. The overhanging operation platform of claim 7, wherein the cantilever further comprises a second connecting rod (16) horizontally arranged, and the second connecting rod (16) is connected with the vertical rod (15) through a disk buckle.
9. Cantilevered operating platform according to claim 8, wherein the shelf (13) can be overlapped on the second connecting rod (16).
10. The cantilever operation platform according to any one of claims 1 to 9, further comprising a limiting component, wherein the limiting component comprises a steel wire rope (6), a lock catch (7) and a connecting ring (5), the connecting ring (5) is sleeved on the stand, one end of the steel wire rope (6) is connected with the connecting ring (5), and the other end of the steel wire rope is connected with the lock catch (7).
CN202222392693.6U 2022-09-08 2022-09-08 Operating platform encorbelments Active CN218292728U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222392693.6U CN218292728U (en) 2022-09-08 2022-09-08 Operating platform encorbelments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222392693.6U CN218292728U (en) 2022-09-08 2022-09-08 Operating platform encorbelments

Publications (1)

Publication Number Publication Date
CN218292728U true CN218292728U (en) 2023-01-13

Family

ID=84812983

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222392693.6U Active CN218292728U (en) 2022-09-08 2022-09-08 Operating platform encorbelments

Country Status (1)

Country Link
CN (1) CN218292728U (en)

Similar Documents

Publication Publication Date Title
CA2805655A1 (en) Scaffold with scaffolding elements and methods for erection thereof
CN111136630A (en) Large-scale vertical PC component assembled self-locking bilateral storage rack
CN218292728U (en) Operating platform encorbelments
CN210105279U (en) Support node and support
CN115405081A (en) Cantilever operating platform
CN108118885B (en) vertical moving type protection platform and application thereof in steel structure column butt joint construction
CN208981741U (en) Scaffold system and its scaffold structure
CN212897455U (en) Prevent portable scaffold frame that topples
CN214329824U (en) Hanging cage for high-altitude operation
CN212744033U (en) Portal type support for shield launching
CN210002826U (en) detachable welding platform for steel column construction
CN112343320A (en) Combined working support
CN210152220U (en) Movable operating platform that encorbelments
CN210683047U (en) Loading and unloading vehicle device suitable for large-scale component
CN210195457U (en) Safety protective guard is used in civil engineering
CN206625532U (en) Elevating construction platform bedframe and base
CN219060823U (en) Operation platform
CN214695691U (en) Prefabricated vertical channel of caisson
CN211841940U (en) Large-scale vertical PC component assembled self-locking bilateral storage rack
CN219587275U (en) Support tool
CN219408926U (en) Quick dismantlement sled dress equipment frame
CN220293292U (en) Upright post assembling structure of goods shelf
CN221422604U (en) Movable maintenance platform
CN213979828U (en) Assembly type steel construction dismouting platform for building
CN217812226U (en) Construction scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant