CN218267639U - Supporting device for mounting hydraulic engineering pipeline - Google Patents

Supporting device for mounting hydraulic engineering pipeline Download PDF

Info

Publication number
CN218267639U
CN218267639U CN202222611936.0U CN202222611936U CN218267639U CN 218267639 U CN218267639 U CN 218267639U CN 202222611936 U CN202222611936 U CN 202222611936U CN 218267639 U CN218267639 U CN 218267639U
Authority
CN
China
Prior art keywords
arc
fixed mounting
pipeline
hydraulic engineering
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222611936.0U
Other languages
Chinese (zh)
Inventor
王明玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222611936.0U priority Critical patent/CN218267639U/en
Application granted granted Critical
Publication of CN218267639U publication Critical patent/CN218267639U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a strutting arrangement for hydraulic engineering piping erection, relate to hydraulic engineering piping erection technical field, specifically include the backup pad, the upper surface of backup pad begins to have the spout, the equal sliding connection of inside wall of spout has the loading board, twice equal fixed mounting of upper surface of loading board has the bearer post, a side surface top fixed mounting of bearer post is because the support column, the equal fixed mounting in one side of bearer post has the diaphragm is kept away from to the loading board, the rectangular channel has been seted up on a side surface of diaphragm, the interior bottom threaded connection of rectangular channel has the regulation pole, the top fixed mounting of regulation pole has rotatory handle, make through adjusting pole and rotatory handle and adjust the pole screw thread upwards, this is threaded connection's L shape fixed plate together upwards, and with the fixed column of kink joint with polygon card frame lifting, avoided the pipeline to leave ground or wall too closely lead to rivers through the vibration that produces to take place the condition that collides with pipeline and ground, strutting arrangement's practicality has been improved.

Description

Supporting device for mounting hydraulic engineering pipeline
Technical Field
The utility model relates to a hydraulic engineering piping erection technical field specifically is a strutting arrangement for be used for hydraulic engineering piping erection.
Background
The pipeline is a device which is connected by pipes, pipe connectors, valves and the like and used for conveying gas, liquid or fluid with solid particles, and the fluid is pressurized by a blower, a compressor, a pump, a boiler and the like, flows from a high-pressure part to a low-pressure part of the pipeline, and can also be conveyed by utilizing the pressure or gravity of the fluid.
Current hydraulic engineering pipeline strutting arrangement workman generally fills in the arc iron sheet with the pipeline in the installation to squeeze into the steel sheet and fix with the bolt through the coincidence of both sides iron sheet, this kind of structure cladding is peripheral at the pipeline completely, does not have the buffering space, pipeline rigidity vibration when rivers strike, cause the damage of junction very easily, and the vibrations that use rivers to produce for a long time can make the not hard up condition of bolt, thereby can lead to the water pipe to drop and cause the damage, influence water conservancy pipeline's normal use.
SUMMERY OF THE UTILITY MODEL
Solves the technical problem
The utility model is not enough to prior art, the utility model provides a strutting arrangement for hydraulic engineering piping erection, in order to solve current hydraulic engineering piping strutting arrangement in the installation workman generally fill in the arc iron sheet with the pipeline, and squeeze into the bolt in the steel sheet and fix through the coincidence of both sides iron sheet, the complete cladding of this kind of structure is peripheral at the pipeline, there is not buffer space, pipeline rigidity vibrates during rivers strike, cause the damage of junction very easily, and the vibrations that use rivers to produce for a long time can make the not hard up condition of bolt, thereby can lead to the water pipe to fall and cause the damage, influence the problem of the normal use of hydraulic pipeline.
Technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a strutting arrangement for be used for hydraulic engineering piping erection includes the backup pad, the upper surface of backup pad begins to have the spout, the equal sliding connection of inside wall of spout has the loading board, twice equal fixed mounting of upper surface of loading board has the bearer post, a side surface top fixed mounting of bearer post is because the support column, the equal fixed mounting in one side that the bearer post was kept away from to the loading board has the diaphragm, the rectangular channel has been seted up on a side surface of diaphragm, the interior bottom threaded connection of rectangular channel has the regulation pole, the top fixed mounting who adjusts the pole has rotatory handle.
Optionally, the extrados threaded connection of rotatory handle has L shape fixed plate, L shape fixed plate department of buckling joint has the fixed column, the quantity of fixed column is two, the one end fixed mounting of fixed column has polygon card frame, makes through adjusting pole and rotatory handle and adjusts the pole screw thread upwards, and this is threaded connection's L shape fixed plate together upwards to with the fixed column of kink joint with polygon card frame lifting, avoided the pipeline to leave the condition that pipeline and ground take place to collide with through the vibration that produces near too with rivers, improved strutting arrangement's practicality.
Optionally, fixed columns are mounted on two sides of the polygonal clamping frame, a limiting plate is fixedly mounted on one side of each fixed column, and a guide hole is formed in the polygonal clamping frame.
Optionally, movable grooves have been all seted up to the intrados both sides of guiding hole, the activity joint of the intrados of movable groove has universal ball, the equal fixed mounting of the interior roof of guiding hole has compression spring, there is the arc through support column through connection in the interior roof both sides of guiding hole, make the pipeline fix it along universal ball through universal ball, improved the crooked controllability of pipeline, increased the flexibility of direction.
Optionally, the quantity of arc is five to with annular array's form evenly distributed, the one end fixed mounting of universal ball is on one of them a set of arc, compression spring's one end fixed mounting is on another arc, spacing spring has been cup jointed to the one end of support column, the one end fixed mounting of support column is on one of them another set of arc, and compression spring and spacing spring receive self elastic influence to take place elastic deformation when making the pipeline insert through compression spring and spacing spring, will extrude the arc and let its and pipeline laminating avoid having its cladding in the peripheral condition that does not have buffer space of pipeline through the screw, receive the influence of spring deformation, slowed down rivers and brought the damage to pipeline junction vibration.
Optionally, the contained angle is 120 between bearing post and the loading board, the quantity of loading board is two, and equal sliding connection is in the spout, the intrados fixedly connected with pipeline of arc makes two loading boards pass through the spout through spout and loading board and can fix the different positions of pipeline, has avoided needing to twist off the screw and the condition of fixing again when a water conservation pipe appears damaging, has improved the flexibility of device, alleviates staff's burden.
Advantageous effects
The utility model provides a strutting arrangement for be used for hydraulic engineering piping erection possesses following beneficial effect:
1. when making the pipeline insert through compression spring and spacing spring, compression spring and spacing spring receive self elastic influence to take place elastic deformation, will extrude the arc and let its and pipeline laminating, avoid passing through the screw with its cladding the condition that does not have buffer space in the pipeline periphery, receive the influence of spring deformation, slowed down rivers and brought the damage to the vibration of pipe connection department, and make rotatory handle through adjusting pole and rotatory handle, it upwards to make the regulation pole screw thread, this is that threaded connection's L shape fixed plate together upwards, and with the fixed lifting of polygon card frame of kink joint, avoided the pipeline to leave ground or wall too closely lead to rivers to take place the condition of colliding with pipeline and ground through the vibration that produces, strutting arrangement's practicality has been improved.
2. The two bearing plates can be fixed at different positions of the pipeline through the sliding grooves and the bearing plates, the situation that a screw needs to be screwed off and fixed again when a water-saving pipe is damaged is avoided, the flexibility of the device is improved, and the burden of workers is lightened.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic plan view of the present invention;
FIG. 3 is a schematic view of the disassembled structure of the present invention;
fig. 4 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
In the figure: 1. a support plate; 2. a chute; 3. carrying a plate; 4. a load bearing column; 5. a support pillar; 6. a transverse plate; 7. a rectangular groove; 8. adjusting a rod; 9. rotating the handle; 10. an L-shaped fixing plate; 11. fixing a column; 12. a polygonal clamping frame; 13. a limiting plate; 14. a guide hole; 15. a universal ball; 16. a compression spring; 17. an arc-shaped plate; 18. a limiting spring; 19. a pipeline.
Detailed Description
The structure, ratio, size and the like shown in the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention has no technical essential significance, and any structure modification, ratio relationship change or size adjustment still falls within the range which can be covered by the technical content disclosed by the present invention without affecting the function and the achievable purpose of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides a strutting arrangement for hydraulic engineering piping erection, a strutting arrangement for hydraulic engineering piping erection includes backup pad 1, the upper surface of fixed column backup pad 1 begins to have spout 2, the equal sliding connection of inside wall of fixed column spout 2 has loading board 3, the equal fixed mounting of twice upper surface of fixed column loading board 3 has load post 4, a side surface top fixed mounting of fixed column load post 4 is because support column 5, the equal fixed mounting in one side of load post 4 has diaphragm 6 is kept away from to fixed column loading board 3, rectangular channel 7 has been seted up on a side surface of fixed column diaphragm 6, the interior bottom threaded connection of fixed column rectangular channel 7 has regulation pole 8, the top fixed mounting of fixed column regulation pole 8 has twist grip 9, the extrados threaded connection of fixed column twist grip 9 has L shape fixed plate 10, fixed column L shape fixed plate 10 buckle department joint has fixed column 11, the quantity of fixed column 11 is two, the one end fixed mounting of fixed column 11 has polygon card frame 12.
Make 8 screw threads of regulation pole upwards through adjusting 8 poles and rotatory handle 9, this is threaded connection's L shape fixed plate 10 together upwards to with the fixed column 11 of kink joint with the lifting of polygon card frame 12, avoided the pipeline to leave ground or the wall too near to lead to rivers to take place the condition of colliding with pipeline and ground through the vibration that produces, improved strutting arrangement's practicality.
Fixed column 11 is all installed to the both sides of fixed column polygon card frame 12, a limiting plate 13 is fixedly installed to one side end of fixed column 11, guiding hole 14 has been seted up to fixed column polygon card frame 12's inside, the activity groove has all been seted up to the intrados both sides of fixed column guiding hole 14, the intrados activity joint in fixed column activity groove has universal ball 15, the equal fixed mounting of interior roof of fixed column guiding hole 14 has compression spring 16, there is the arc 17 bottom wall through connection through support column 5 in the interior diapire both sides of fixed column guiding hole 14.
The pipeline 19 is fixed along the universal ball 15 through the universal ball 15, so that the controllability of the bending of the pipeline is improved, and the flexibility of guiding is increased.
The number of the fixed column arc-shaped plates 17 is five, the fixed column arc-shaped plates are evenly distributed in an annular array mode, one end of the fixed column universal ball 15 is fixedly installed on one group of arc-shaped plates 17, one end of the fixed column compression spring 16 is fixedly installed on the other group of arc-shaped plates 17, one end of the fixed column supporting column 5 is sleeved with the limiting spring 18, and one end of the fixed column supporting column 5 is fixedly installed on the other group of arc-shaped plates 17.
When making pipeline 19 insert through compression spring 16 and spacing spring 18, compression spring 16 and spacing spring 18 receive self elastic influence to take place elastic deformation, will extrude the arc 17 and let its and 19 laminating avoid through the screw with its cladding in the peripheral condition that does not have buffer space of pipeline, receive the influence of spring deformation, slowed down rivers and brought the damage to pipeline junction vibration.
The fixed column bears the contained angle between post 4 and the loading board 3 to be 120, and the quantity of fixed column loading board 3 is two, all slides the intercommunication and crosses spout 2 and loading board 3 and make two loading boards 3.
Can fix 19 different positions of pipeline through spout 2, avoid appearing damaging when a water conservation pipe the condition that need unscrew the screw and fix again, improved the flexibility of device, alleviate staff's burden and connect in spout 2, the intrados fixedly connected with pipeline 19 of fixed column arc 17.
The utility model discloses in, the device's working procedure as follows:
the pipeline 19 is inserted into the guide hole 14 by a worker, the size of the pipeline 19 starts to extrude the compression spring 16 by the originally loose arc-shaped plate 17 when the pipeline is just inserted, meanwhile, the arc-shaped plate 17 at the lower end of the guide hole 14 also starts to extrude the limiting spring 18, the arc-shaped plates 17 at two sides of the inner arc surface of the guide hole 14 are fixed along the pipeline 19 under the influence of the universal ball 15, when the pipeline is attached to the outer arc surface of the pipeline, the compression spring 16 and the limiting spring 18 are elastically deformed under the influence of the elasticity of the compression spring 16 and the limiting spring 18, the arc-shaped plates 17 are extruded to be attached to the pipeline 19, when the height needs to be increased, the handle 9 is rotated to enable the adjusting rod 8 to be upwards threaded, the L-shaped fixing plate 10 in threaded connection is upwards together, the fixing column 11 clamped at the bent part lifts the polygonal clamping frame 12, otherwise, the pipeline 19 is lowered, and the two bearing plates 3 can fix different positions of the pipeline 19 through the sliding chute 2, so that the hydraulic engineering pipeline installation supporting device is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a strutting arrangement for be used for hydraulic engineering piping erection, includes backup pad (1), its characterized in that: the upper surface of backup pad (1) begins to have spout (2), the equal sliding connection of inside wall of spout (2) has loading board (3), twice equal fixed mounting of upper surface of loading board (3) has bearing post (4), a side surface top fixed mounting of bearing post (4) is because support column (5), the equal fixed mounting in one side of bearing post (4) has diaphragm (6) is kept away from in loading board (3), rectangular channel (7) have been seted up on a side surface of diaphragm (6), the interior bottom threaded connection of rectangular channel (7) has regulation pole (8), the top fixed mounting of adjusting pole (8) has rotatory handle (9).
2. The supporting device for hydraulic engineering pipeline installation according to claim 1, characterized in that: the outer arc surface threaded connection of twist grip (9) has L shape fixed plate (10), L shape fixed plate (10) buckle department joint has fixed column (11), the quantity of fixed column (11) is two, the one end fixed mounting of fixed column (11) has polygon card frame (12).
3. The supporting device for hydraulic engineering pipeline installation according to claim 2, characterized in that: fixed columns (11) are mounted on two sides of the polygonal clamping frame (12), a limiting plate (13) is fixedly mounted on one side of each fixed column (11), and a guide hole (14) is formed in the polygonal clamping frame (12).
4. A support device for hydraulic engineering piping erection according to claim 3, characterized in that: the activity groove has all been seted up to the intrados both sides of guiding hole (14), the activity joint of the intrados in activity groove has universal ball (15), the equal fixed mounting of the interior roof of guiding hole (14) has compression spring (16), there is arc (17) through connection in the interior diapire both sides of guiding hole (14) through support column (5).
5. A supporting device for hydraulic engineering piping erection according to claim 4 characterized in that: the number of the arc-shaped plates (17) is five, the arc-shaped plates are evenly distributed in an annular array mode, one end of each universal ball (15) is fixedly installed on one group of the arc-shaped plates (17), one end of each compression spring (16) is fixedly installed on the other arc-shaped plate (17), one end of each supporting column (5) is sleeved with a limiting spring (18), and one end of each supporting column (5) is fixedly installed on the other group of the arc-shaped plates (17).
6. A supporting device for hydraulic engineering pipe installation according to claim 5, characterized in that: the included angle between bearing post (4) and bearing board (3) is 120, the quantity of bearing board (3) is two, equal sliding connection in spout (2), the intrados fixedly connected with pipeline (19) of arc (17).
CN202222611936.0U 2022-09-30 2022-09-30 Supporting device for mounting hydraulic engineering pipeline Active CN218267639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222611936.0U CN218267639U (en) 2022-09-30 2022-09-30 Supporting device for mounting hydraulic engineering pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222611936.0U CN218267639U (en) 2022-09-30 2022-09-30 Supporting device for mounting hydraulic engineering pipeline

Publications (1)

Publication Number Publication Date
CN218267639U true CN218267639U (en) 2023-01-10

Family

ID=84748108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222611936.0U Active CN218267639U (en) 2022-09-30 2022-09-30 Supporting device for mounting hydraulic engineering pipeline

Country Status (1)

Country Link
CN (1) CN218267639U (en)

Similar Documents

Publication Publication Date Title
CN206204995U (en) The tall and big side wall one side formwork erection of open trench tunnel agent structure
CN218267639U (en) Supporting device for mounting hydraulic engineering pipeline
CN209568564U (en) A kind of civil engineering anti-seismic structure
CN209622202U (en) A kind of lateral para-seismic support of air hose
CN206217502U (en) One kind support wheel assembly
CN108100636A (en) A kind of more stable elevating mechanism
CN207743587U (en) A kind of concrete embedded distribution box box shell inside eyelid retractor of main body
CN209818911U (en) But height-adjusting's antidetonation gallows
CN215484903U (en) Civil engineering construction support
CN208932847U (en) A kind of attachment device of tower crane being arranged on basement roof
CN209637224U (en) A kind of assembled wall
CN209099522U (en) A kind of support steel construction
CN202984517U (en) Reinforcing steel bar bender
CN202769052U (en) Pipeline movable cradle
CN213954684U (en) Anti-seismic large-span hoisting connecting piece
CN220910177U (en) Mining fixed wire nail
CN201635115U (en) Cable stayed bridge type pump station
CN209337924U (en) It is a kind of convenient for fixed base of traction machine
CN215669029U (en) Square entity pier reinforcing bar deviation correcting device
CN217734358U (en) Box column and high girder steel connection structure that varies
CN209977453U (en) Pipeline protection device for natural gas exploitation
CN210878249U (en) Steel pipe welding assembly platform
CN212897754U (en) Earthquake-resistant reinforcing structure for building support
CN208251317U (en) A kind of novel steel skeleton building structure
CN205118450U (en) Concrete pump pipe fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant