CN218250017U - Accurate preparation device for thermal insulation gel for building construction - Google Patents

Accurate preparation device for thermal insulation gel for building construction Download PDF

Info

Publication number
CN218250017U
CN218250017U CN202220990196.3U CN202220990196U CN218250017U CN 218250017 U CN218250017 U CN 218250017U CN 202220990196 U CN202220990196 U CN 202220990196U CN 218250017 U CN218250017 U CN 218250017U
Authority
CN
China
Prior art keywords
filter
preparation
section
building construction
preparation device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220990196.3U
Other languages
Chinese (zh)
Inventor
梁志武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Guidesheng Building Materials Co ltd
Original Assignee
Guangxi Guidesheng Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Guidesheng Building Materials Co ltd filed Critical Guangxi Guidesheng Building Materials Co ltd
Priority to CN202220990196.3U priority Critical patent/CN218250017U/en
Application granted granted Critical
Publication of CN218250017U publication Critical patent/CN218250017U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cookers (AREA)

Abstract

The utility model discloses a preparation device for preparing heat insulation gel for accurate building construction, which comprises a bracket, wherein a preparation cylinder is arranged at the top of the bracket, a feeding pipe is arranged on the top end surface of the preparation cylinder, a filtering component is arranged in the feeding pipe, the filtering component comprises an installation frame, a first filtering plate and a second filtering plate are sequentially fixed on the inner side of the installation frame from top to bottom, a limiting bolt penetrates through the inner side of the top of the installation frame for installation and fixation, and a screw hole in threaded connection with the limiting bolt is formed in the inner wall of an opening of the feeding pipe; through the filter I and the filter II of design, can filter the material in the raw and other materials in throwing the material, avoid getting into and join in marriage the inside lower problem that causes the finished product quality of a section of thick bamboo, the installing frame of design can once only take out the clearance with filter I and filter two together, and it is very convenient to operate, and the spring of design can be in throwing the material, through the purpose of the quick unloading of vibration realization.

Description

Accurate preparation device for heat insulation gel for building construction
Technical Field
The utility model belongs to the technical field of thermal-insulated heat preservation gel preparation equipment, concretely relates to preparation device of thermal-insulated heat preservation gel preparation of accurate construction.
Background
With the development of heat insulation and heat preservation gel technology, the heat insulation and heat preservation gel technology is becoming mature day by day, and at present, it has become a technical trend to replace an external hanging type external wall heat preservation layer by painting heat insulation and heat preservation gel, and the heat insulation and heat preservation gel is widely used in the field of building construction, and in the preparation of the heat insulation and heat preservation gel, various raw materials need to be mixed and configured through a special configuration device to realize production.
The existing preparation device can not filter the raw materials in the feeding process, once the raw materials contain impurities, the quality of the finished products in the later period can be influenced, the existing treatment mode can only filter the raw materials before the raw materials are put into the preparation process, the cleanliness of the materials in the feeding process can not be ensured, and the existing device does not have any structure capable of being collected at the discharge port, so that the raw materials falling from the inner wall of the discharge port can fall to pollute the ground.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an accurate building construction's preparation device of thermal-insulated heat preservation gel preparation to feed inlet department who proposes does not carry out filterable structure in solving above-mentioned background art, and the problem of discharge outlet department not receiving the material structure.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an accurate preparation device of thermal-insulated heat preservation gel preparation of construction, includes the support, a preparation section of thick bamboo is installed at the top of support, be provided with the inlet pipe on the top face of a preparation section of thick bamboo, the inside of inlet pipe is provided with filtering component, and this filtering component includes the installing frame, the inboard of installing frame is fixed with filter one and filter two from top to bottom in proper order, spacing bolt has still been run through to the top inboard of installing frame for the installation is fixed, the screw with spacing bolt threaded connection is seted up to the opening inner wall of inlet pipe, filter one all is provided with the backup pad with the both ends bottom of filter two for the support, the inner wall welded fastening of backup pad and installing frame, every the top welding of backup pad has the spring, realizes the vibration through kick-backing, reaches quick unloading, and is a plurality of the spring is laminated with the bottom of filter one and filter two respectively.
Preferably, the width of installing frame is less than the inboard width of inlet pipe, filter one all is the slope form with filter two, promotes the unloading speed, and the longitudinal section between them is "eight" style of calligraphy down, the cross section of inlet pipe, filter one, filter two is the cuboid structure, and three's cross sectional area equals.
Preferably, the bottom of preparing a section of thick bamboo is provided with the discharging pipe, the surface of support has inserted the collection steamer tray, the lateral wall symmetry of collecting the steamer tray has seted up the side channel, and convenient slip the inside of collecting the steamer tray is provided with the scraper blade, the both ends of scraper blade are in the inside in side channel, the bottom of scraper blade and the seamless laminating of the inside bottom face of collecting the steamer tray.
Preferably, the longitudinal section of the rear surface of the collecting drawer is in a U-shaped structure, so that later cleaning is facilitated, residual materials are scraped out together, and the cross section of the collecting drawer is in a T-shaped structure.
Preferably, the discharge hole of the discharge pipe is located inside the collection drawer, and the discharge pipe is inclined.
Preferably, the motor is installed to the bottom inboard of support, provides power, and the output of motor passes through the belt and is connected with the input transmission of speed reducer, install the (mixing) shaft on the output of speed reducer, this (mixing) shaft is in the inside of preparation section of thick bamboo, the rear portion of support still is provided with the switch board, realizes accurate processing, the switch board is connected with the motor electricity.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the designed mounting frame can be used for taking out and cleaning the first filter plate and the second filter plate at one time, the operation is very convenient, and the designed spring can realize the purpose of quick blanking through vibration in the feeding process;
2. through the collection steamer tray of design, can collect the residual material that the discharging tube inner wall dropped, avoid causing the pollution to ground, the scraper blade of design, the residual material that will collect on the steamer tray that will collect that can be quick scrapes the clearance, and whole use is very convenient.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a sectional view showing the installation of the feeding pipe, the first filtering plate and the second filtering plate of the present invention;
FIG. 3 is an enlarged view of the area A of FIG. 2 according to the present invention;
fig. 4 is a top view connecting and cross-sectional view of the bracket and the collecting drawer of the present invention.
In the figure: 1. preparing a cylinder; 2. a feeding pipe; 3. a first filter plate; 4. a speed reducer; 5. a support; 6. a collection drawer; 7. a discharge pipe; 8. a limit bolt; 9. a second filter plate; 10. installing a frame; 11. a support plate; 12. A spring; 13. a side groove; 14. a squeegee; 15. a control cabinet.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides an accurate preparation device of thermal-insulated heat preservation gel preparation of construction, which comprises a bracket 5, a preparation section of thick bamboo 1 is installed at the top of support 5, be provided with inlet pipe 2 on the top face of a preparation section of thick bamboo 1, the inside of inlet pipe 2 is provided with filter assembly, this filter assembly includes installing frame 10, the installing frame 10 of design, can once only take out the clearance with filter 3 and filter two 9 together, it is very convenient to operate, the inboard of installing frame 10 is fixed with filter 3 and filter two 9 by from the top down in proper order, filter 3 and filter two 9 through the design, can be in throwing the material, filter the material in the raw and other materials, avoid getting into and joining in marriage the inside lower problem that causes the finished product quality of a section of thick bamboo 1, spacing bolt 8 has still been run through to the top inboard of installing frame 10, the screw with spacing bolt 8 threaded connection is seted up to the opening inner wall of inlet pipe 2, filter 3 and two 9's both ends bottom all is provided with backup pad 11, backup pad 11 and installing frame 10's inner wall welded, the top spring 12 of every backup pad 11, the spring 12 of design, can throw the material in the welding of realizing through the quick filter and the laminating of a plurality of filter two mesh of filter 9 and the unloading purpose of a plurality of vibration.
In this embodiment, preferably, the width of the mounting frame 10 is smaller than the inside width of the feeding pipe 2, the first filter plate 3 and the second filter plate 9 are both inclined, the longitudinal sections of the first filter plate 3 and the second filter plate 9 are inverted splayed, and the cross sections of the feeding pipe 2, the first filter plate 3 and the second filter plate 9 are all cuboid structures, so that the normal placement is realized, and the cross sectional areas of the three are equal.
In this embodiment, it is preferred, the bottom of a preparation section of thick bamboo 1 is provided with discharging pipe 7, be used for the ejection of compact, support 5's surface has inserted collection steamer tray 6, collection steamer tray 6 through the design, can collect the remaining material that discharging pipe 7 inner wall dropped, avoid causing the pollution to ground, side channel 13 has been seted up to the lateral wall symmetry of collecting steamer tray 6, inside at collection steamer tray 6 is provided with scraper blade 14, the scraper blade 14 of design, the clearance is scraped to the remaining material that will collect on the steamer tray 6 that can be quick, it is very convenient to wholly use, scraper blade 14's both ends are in side channel 13's inside, scraper blade 14's bottom and the seamless laminating of the inside bottom face of collecting steamer tray 6.
In this embodiment, preferably, the longitudinal section of the rear surface of the collecting drawer 6 is a "u" shaped structure, which facilitates later cleaning, and the cross section of the collecting drawer 6 is a "T" shaped structure.
In this embodiment, preferably, the discharge gate of discharging pipe 7 is in the inside of collecting drawer 6, conveniently collects the residual material that drops, and discharging pipe 7 is the slope form.
In this embodiment, preferably, a motor is installed on the inner side of the bottom of the support 5, an output end of the motor is in transmission connection with an input end of the speed reducer 4 through a belt, a stirring shaft is installed on an output end of the speed reducer 4 and used for stirring and preparing raw materials, the stirring shaft is located inside the preparation barrel 1, a control cabinet 15 is further arranged on the rear portion of the support 5, the rotating speed of the motor is controlled through the control cabinet 15, so that accurate processing is achieved, and the control cabinet 15 is electrically connected with the motor.
The utility model discloses a theory of operation and use flow: the utility model discloses before using, install the installing frame 10 at the inner wall of inlet pipe 2 through spacing bolt 8 earlier, raw and other materials that will prepare later pour into from inlet pipe 2, in the injection, raw and other materials can carry out the first filtration through filter one 3, and the impurity of filtering is blockked by filter one 3, the raw and other materials that drop to filter two 9 plays carry out the second filtration, get into preparation section of thick bamboo 1 at last, in throwing the material, the raw and other materials can strike filter one 3 and filter two 9, filter one 3 and filter two 9 can extrude spring 12 this moment, spring 12 produces the resilience, drive filter one 3 and filter two 9 up-and-down motion through the resilience and realize the purpose of vibration unloading, drive speed reducer 4 through the motor, speed reducer 4 drives the inside stirring of preparation section of thick bamboo 1 and prepares, the material after the preparation passes through discharging pipe 7 and discharges, in discharging, can be connected discharging pipe 7 with the external pipeline, after the work is finished, dismantle the external pipeline, the material that remains in discharging pipe 7 insides can drop to the inside of collection steamer tray 6, accomplish the collection with this; in later stage processing, can slide scraper blade 14 in the inside of collecting steamer tray 6, in sliding, the both ends of scraper blade 14 move at the inboard of side channel 13, and the bottom face of scraper blade 14 and the inside bottom face seamless laminating of collecting steamer tray 6 simultaneously to this completion is to the scraping of collecting steamer tray 6 bottom face, and discharge through the opening of collecting steamer tray 6 rear end, when clearing up filterable impurity, dismantle stop bolt 8, the inside of following inlet pipe 2 is taken out with filter 3 and filter 9 to rethread installing frame 10, with this completion clearance.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a preparation device of thermal-insulated heat preservation gel preparation of accurate construction, includes support (5), a preparation section of thick bamboo (1) is installed at the top of support (5), be provided with inlet pipe (2), its characterized in that on the top face of a preparation section of thick bamboo (1): the inside of inlet pipe (2) is provided with filtering component, and this filtering component includes installing frame (10), the inboard of installing frame (10) is fixed with filter (3) and filter two (9) by last from down in proper order, spacing bolt (8) have still been run through to the top inboard of installing frame (10), the screw with spacing bolt (8) threaded connection is seted up to the opening inner wall of inlet pipe (2), all be provided with backup pad (11) bottom the both ends of filter (3) and filter two (9), backup pad (11) and the inner wall welded fastening of installing frame (10), every the top welding of backup pad (11) has spring (12), and is a plurality of spring (12) laminate with the bottom of filter (3) and filter two (9) respectively.
2. The preparation device for the precise preparation of the heat insulation gel for building construction according to claim 1, is characterized in that: the width of installing frame (10) is less than the inboard width of inlet pipe (2), filter (3) all are the slope form with filter two (9), and longitudinal section between them is "eight" style of calligraphy of falling, the cross section of inlet pipe (2), filter (3), filter two (9) is the cuboid structure, and the cross sectional area of three equals.
3. The preparation device for the precise preparation of the heat insulation gel for building construction according to claim 1, is characterized in that: the bottom of preparing a section of thick bamboo (1) is provided with discharging pipe (7), the surface of support (5) has inserted collection steamer tray (6), side channel (13) have been seted up to the lateral wall symmetry of collecting steamer tray (6 the inside of collecting steamer tray (6) is provided with scraper blade (14), the both ends of scraper blade (14) are in the inside of side channel (13), the bottom of scraper blade (14) and the seamless laminating of inside bottom face of collecting steamer tray (6).
4. The preparation device for the precise preparation of the heat insulation gel for building construction according to claim 3, is characterized in that: the longitudinal section of the rear surface of the collecting drawer (6) is in a U-shaped structure, and the cross section of the collecting drawer (6) is in a T-shaped structure.
5. The precise preparation device for heat insulation gel for building construction according to claim 3, characterized in that: the discharge hole of the discharge pipe (7) is located inside the collection drawer (6), and the discharge pipe (7) is inclined.
6. The preparation device for the precise preparation of the heat insulation gel for building construction according to claim 1, is characterized in that: the motor is installed to the bottom inboard of support (5), and the output of motor passes through the belt and is connected with the input transmission of speed reducer (4), install the (mixing) shaft on the output of speed reducer (4), this (mixing) shaft is in the inside of a preparation section of thick bamboo (1), the rear portion of support (5) still is provided with switch board (15), switch board (15) are connected with the motor electricity.
CN202220990196.3U 2022-04-26 2022-04-26 Accurate preparation device for thermal insulation gel for building construction Active CN218250017U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220990196.3U CN218250017U (en) 2022-04-26 2022-04-26 Accurate preparation device for thermal insulation gel for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220990196.3U CN218250017U (en) 2022-04-26 2022-04-26 Accurate preparation device for thermal insulation gel for building construction

Publications (1)

Publication Number Publication Date
CN218250017U true CN218250017U (en) 2023-01-10

Family

ID=84755549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220990196.3U Active CN218250017U (en) 2022-04-26 2022-04-26 Accurate preparation device for thermal insulation gel for building construction

Country Status (1)

Country Link
CN (1) CN218250017U (en)

Similar Documents

Publication Publication Date Title
CN112279395B (en) Sewage treatment device capable of reducing sludge discharge
CN218421245U (en) Draw sediment liquid separator for heparin sodium
CN217661858U (en) Dirt separator is used in waste water separation
CN218250017U (en) Accurate preparation device for thermal insulation gel for building construction
CN116099270A (en) Filtering equipment and method for preparing raw materials of medicines
CN210057497U (en) Filter press
CN109046926A (en) A kind of rice cleaning device of secondary reuse of waste water
CN218660573U (en) A equipment for sesame squeezes
CN115925217A (en) Adjustable sludge filter press
CN114748899B (en) Modularized filter press
CN215352250U (en) Filter equipment is used in gear oil production
CN113231353A (en) Self-cleaning device for residues of cooked wheaten food on iron plate cooking table
CN210521885U (en) High-efficient type pressure filter
CN112957818A (en) Chemical production is with receipts oil multi-layer filter device
CN115300972B (en) Food processing wastewater treatment equipment
CN219055448U (en) Oil press convenient to clearance dregs of fat
CN220349117U (en) Squeezing device for tung oil processing
CN218740565U (en) Rosin processing is with dissolving liquid filter equipment
CN220185472U (en) Frequency conversion fire control smoke exhaust fan
CN219827053U (en) Anti-blocking slurry pump assembly
CN220676966U (en) Walnut oil impurity filter
CN218740469U (en) Inclined net type hydraulic screen
CN221014751U (en) Impurity separation device for glass sewage treatment
CN219333275U (en) Efficient screw press
CN219815513U (en) Steel industry waste residue processing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant