CN218234595U - Concrete pouring construction protection device - Google Patents
Concrete pouring construction protection device Download PDFInfo
- Publication number
- CN218234595U CN218234595U CN202221677494.3U CN202221677494U CN218234595U CN 218234595 U CN218234595 U CN 218234595U CN 202221677494 U CN202221677494 U CN 202221677494U CN 218234595 U CN218234595 U CN 218234595U
- Authority
- CN
- China
- Prior art keywords
- limiting
- support
- strut
- box
- concrete pouring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 19
- 239000010959 steel Substances 0.000 claims abstract description 19
- 230000001681 protective effect Effects 0.000 claims abstract description 16
- 238000004804 winding Methods 0.000 claims description 5
- 241001233242 Lontra Species 0.000 claims description 3
- 230000001012 protector Effects 0.000 claims description 3
- 238000005266 casting Methods 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 9
- 238000009435 building construction Methods 0.000 abstract description 2
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses a concrete pouring construction protection device, which comprises a stretching bracket, a first limit pillar, a second limit pillar, a protection screen plate and a take-up box, wherein the first limit pillar is connected with the second limit pillar through the stretching bracket, and the upper part of the stretching bracket is provided with a telescopic rod; a third limiting support is arranged on one side of the second limiting support, a wire collecting box is arranged on the third limiting support, and a steel wire rope in the wire collecting box is connected with a limiting clamping groove in the fourth limiting support through a limiting block; another steel wire rope on the fourth limiting strut is connected with other limiting struts to form a rectangular protective structure; the steel wire rope is provided with a plurality of protective net plates. The utility model is used for solve the complicated installation of being not convenient for of current building construction protective apparatus structure, and the unable problem that removes.
Description
Technical Field
The utility model relates to a green building technical field, concretely relates to concrete pouring construction protector.
Background
When peripheral side post concrete formwork construction is carried out in the construction process at present, generally adopt steel pipe fastener to set up interim simple and easy facing the limit protection, perhaps adopt protection scaffold frame totally enclosed construction, its structure is comparatively loaded down with trivial details, need a large amount of steel pipe materials when setting up steel pipe protection frame, set up the in-process and need a large amount of manpower resources, and the protection frame after setting up removes and inconvenience, therefore, a structure is comparatively simple, and the construction protection equipment that can be convenient for install and remove is one of the direction that technical staff in the field studied always.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a concrete pouring construction protector solves the complicated installation of being not convenient for of current building construction protective apparatus structure, and the unable problem that removes.
In order to solve the technical problem, the utility model adopts the following technical scheme:
a concrete pouring construction protection device comprises a stretching bracket, a first limit pillar, a second limit pillar, a protection screen plate and a take-up box, wherein the first limit pillar is connected with the second limit pillar through the stretching bracket, and the upper part of the stretching bracket is provided with a telescopic rod; a third limiting supporting column is arranged on one side of the second limiting supporting column, a wire collecting box is arranged on the third limiting supporting column, and a steel wire rope in the wire collecting box is connected with a limiting clamping groove in the fourth limiting supporting column through a limiting block; another steel wire rope on the fourth limiting strut is connected with other limiting struts to form a rectangular protective structure; the steel wire rope is provided with a plurality of protective net plates.
Furthermore, first spacing pillar includes bracing piece, lifter, first spacing hole and place the board, and the bracing piece sets up on placing the board, and bracing piece upper portion activity is provided with the lifter, be provided with on the lifter with the first spacing hole of bracing piece second spacing hole assorted.
Furthermore, the inside pivot that is provided with of collection line case, and be provided with the winding roller in the pivot, the one end of pivot is connected with the rotation handle through the connector.
Furthermore, a discharge port is formed in one end of the take-up box, fixing plates are arranged at two ends of the discharge port, a sliding groove is formed in the lower portion of each fixing plate, a connecting seat is arranged in each sliding groove in a sliding mode, and a wire guide wheel is arranged on a fixing lug of each connecting seat; the inside pressure spring that is provided with of spout.
Furthermore, the internal structures of the second limiting strut, the third limiting strut and the fourth limiting strut are consistent with the internal structure of the first limiting strut; and the bottom parts of the second limiting support column and the fourth limiting support column are provided with rotating wheels.
Furthermore, the limiting clamping grooves on the fourth limiting supporting column are uniformly distributed on the pipe surface.
Furthermore, a ratchet check valve is arranged on a rotating shaft of the take-up box.
Compared with the prior art, the utility model discloses can realize following one of beneficial effect:
1. first spacing pillar, first protective structure is constituteed to spacing pillar of second and tensile support, the wire rope on cooperation third spacing pillar and the spacing pillar of fourth forms rectangle protective structure, surround the construction site, installation protection otter board forms protective structure promptly on wire rope, only need fix spacing pillar through inflation screw and ground fixed when the installation, other spacing pillars open as required and can accomplish the installation, not only be convenient for install, and can remove as required.
2. Can contract as required at tensile support, realize opening, when personnel or vehicle need get into, can contract it through the spacing pillar of second, the operation of being convenient for.
3. Wire rope accomodates through the collection line case, can receive and release fast when needs are dismantled, improve equipment's practicality.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Figure 2 position the utility model discloses take-up box inner structure schematic diagram.
In the figure: 1-supporting rod, 2-lifting rod, 3-first limiting strut, 4-first limiting hole, 5-telescopic rod, 6-stretching bracket, 7-second limiting strut, 8-third limiting strut, 9-take-up box, 10-steel wire rope, 11-protective screen plate, 12-fourth limiting strut, 13-limiting block, 14-limiting clamping groove, 15-winding roller, 16-rotating shaft, 17-rotating handle, 18-fixing plate, 19-sliding groove, 20-pressure spring, 21-connecting seat and 22-guide wheel.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
Fig. 1 and 2 show a concrete pouring construction protection device, which comprises a stretching bracket 6, a first limit pillar 3, a second limit pillar 7, a protection screen 11 and a take-up box 9, wherein the first limit pillar 3 is connected with the second limit pillar 7 through the stretching bracket 6, and the upper part of the stretching bracket 6 is provided with a telescopic rod 5; a third limiting strut 8 is arranged on one side of the second limiting strut 7, a wire collection box 9 is arranged on the third limiting strut 8, and a steel wire rope 10 in the wire collection box 9 is connected with a limiting clamping groove 14 on a fourth limiting strut 12 through a limiting block 13; the other steel wire rope on the fourth limiting strut 12 is connected with other limiting struts to form a rectangular protective structure; a plurality of protective net plates 11 are arranged on the steel wire rope 10; in the above scheme, first limit post, first protective structure is constituteed to second limit post and tensile support, the wire rope on cooperation third limit post and the fourth limit post forms rectangle protective structure, surround the construction site, installation protection otter board forms protective structure promptly on wire rope, the installation wait only need will fix limit post and fix through expansion screw and ground, other limit post opens as required and can accomplish the installation, not only the installation of being convenient for, and can remove as required.
Example 2
In this embodiment, a first limiting pillar 3 is further described on the basis of the existing embodiment 1, where the first limiting pillar 3 includes a support rod 1, a lifting rod 2, a first limiting hole 4 and a mounting plate, the support rod 1 is disposed on the mounting plate, the lifting rod 2 is movably disposed on the upper portion of the support rod 1, and the lifting rod 2 is provided with a first limiting hole 4 matched with a second limiting hole of the support rod 1; the lifter can be adjusted on the bracing piece as required to spacing processing is carried out through spacing hole and the spacing round pin axle on upper portion, can adjust as required.
Example 3
In this embodiment, the wire rewinding box 9 is further described on the basis of the existing embodiment 1, a rotating shaft 16 is arranged inside the wire rewinding box 9, a wire winding roller 15 is arranged on the rotating shaft 16, and one end of the rotating shaft 15 is connected with a rotating handle 17 through a connector; a discharge hole is formed in one end of the take-up box 9, fixing plates 18 are arranged at two ends of the discharge hole, a sliding groove 19 is formed in the lower portion of each fixing plate 18, a connecting seat 21 is arranged in each sliding groove 19 in a sliding mode, and a wire guide wheel 22 is arranged on a fixing lug of each connecting seat 21; a pressure spring 20 is arranged in the chute 19; wire rope accomodates through the collection line case, can receive and release fast when needs are dismantled, improve equipment's practicality.
Example 4
In this embodiment, the second limiting strut 7 is further described on the basis of the existing embodiment 1, and the internal structures of the second limiting strut 7, the third limiting strut 8 and the fourth limiting strut 12 are all consistent with the internal structure of the first limiting strut 3; the bottom parts of the second limiting strut 7 and the fourth limiting strut 12 are provided with rotating wheels 15; the limiting clamping grooves 14 on the fourth limiting support 12 are uniformly distributed on the pipe surface; the take-up box 9 is provided with a ratchet check valve; the bottom of the second limiting support 7 and the bottom of the fourth limiting support 12 are provided with a rotating wheel 15 which can be moved and carried as required, the rotating wheel is matched with a steel wire rope for use, the ratchet check valve on the take-up box 9 can be used for limiting the steel wire rope and limiting after pulling down a proper position, and the limiting clamping grooves 14 on the fourth limiting support 12 are uniformly distributed on the pipe surface and can clamp the steel wire rope in multiple directions.
Although the invention has been described herein with reference to a number of illustrative embodiments thereof, it should be understood that numerous other modifications and embodiments can be devised by those skilled in the art that will fall within the spirit and scope of the principles of this invention. More specifically, various variations and modifications are possible in the component parts and/or arrangements of the subject combination arrangement within the scope of the disclosure, the drawings and the appended claims. In addition to variations and modifications in the component parts and/or arrangements, other uses will also be apparent to those skilled in the art.
Claims (6)
1. The utility model provides a concrete pouring construction protector, includes tensile support (6), first spacing pillar (3), the spacing pillar of second (7), protection otter board (11) and take-up box (9), its characterized in that: the first limiting strut (3) is connected with the second limiting strut (7) through a stretching bracket (6), and the upper part of the stretching bracket (6) is provided with a telescopic rod (5); a third limiting support (8) is arranged on one side of the second limiting support (7), a wire collection box (9) is arranged on the third limiting support (8), and a steel wire rope (10) in the wire collection box (9) is connected with a limiting clamping groove (14) in a fourth limiting support (12) through a limiting block (13); another steel wire rope on the fourth limiting strut (12) is connected with other limiting struts to form a rectangular protective structure; a plurality of protective net plates (11) are arranged on the steel wire rope (10); the first limiting support column (3) comprises a support rod (1), a lifting rod (2), a first limiting hole (4) and a placing plate, the support rod (1) is arranged on the placing plate, the lifting rod (2) is movably arranged on the upper portion of the support rod (1), and the lifting rod (2) is provided with the first limiting hole (4) matched with the second limiting hole of the support rod (1).
2. A concrete pouring construction guard according to claim 1, wherein: the winding box (9) is internally provided with a rotating shaft (16), the rotating shaft (16) is provided with a winding roller (15), and one end of the rotating shaft (15) is connected with a rotating handle (17) through a connector.
3. A concrete casting construction protecting device according to claim 2, characterized in that: a discharge hole is formed in one end of the take-up box (9), fixing plates (18) are arranged at two ends of the discharge hole, a sliding groove (19) is formed in the lower portion of each fixing plate (18), a connecting seat (21) is arranged in each sliding groove (19) in a sliding mode, and a wire guide wheel (22) is arranged on a fixing lug of each connecting seat (21); a pressure spring (20) is arranged in the sliding groove (19).
4. A concrete pouring construction guard according to claim 1, wherein: the inner structures of the second limiting strut (7), the third limiting strut (8) and the fourth limiting strut (12) are consistent with the inner structure of the first limiting strut (3); the bottoms of the second limiting support column (7) and the fourth limiting support column (12) are provided with rotating wheels (15).
5. A concrete pouring construction guard according to claim 1, wherein: and the limiting clamping grooves (14) on the fourth limiting supporting columns (12) are uniformly distributed on the pipe surface.
6. A concrete pouring construction guard according to claim 1, wherein: the take-up box (9) is provided with a ratchet check valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221677494.3U CN218234595U (en) | 2022-07-01 | 2022-07-01 | Concrete pouring construction protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221677494.3U CN218234595U (en) | 2022-07-01 | 2022-07-01 | Concrete pouring construction protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218234595U true CN218234595U (en) | 2023-01-06 |
Family
ID=84673692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221677494.3U Active CN218234595U (en) | 2022-07-01 | 2022-07-01 | Concrete pouring construction protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218234595U (en) |
-
2022
- 2022-07-01 CN CN202221677494.3U patent/CN218234595U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218234595U (en) | Concrete pouring construction protection device | |
CN107069533B (en) | A kind of super UHV Overhead Transmission Line tangent tower ground wire lifting tool | |
CN210342704U (en) | A concrete placement workstation for building in room | |
CN109209779B (en) | Temporary supporting device for wind power generation | |
CN209308543U (en) | The interim shielding device of substation's combined type | |
CN212646035U (en) | Safety net impact resistance test device | |
CN211421883U (en) | Prestressed tensioning jack lifting device | |
CN206313117U (en) | A kind of manual pulley support | |
CN207995295U (en) | A kind of Mobile distribution Network Communication screen cabinet with lightning function | |
CN219990967U (en) | Turnover device for large vertical pump of nuclear power plant | |
CN213449554U (en) | Discharging platform for high-rise building construction | |
CN212027199U (en) | Chemical fiber safety vertical net easy to install and fix | |
CN213806693U (en) | Edge protection structure is faced in assembly type building construction | |
CN221607588U (en) | Anti-drop device of crane | |
CN210032523U (en) | Building support | |
CN215407579U (en) | Wall building structure reinforcing apparatus | |
CN212801418U (en) | Water conservancy slope protection construction is with stone cage ware of drawing limit | |
CN221070924U (en) | Inspection shaft lid erection equipment | |
CN215928949U (en) | Hydraulic engineering ground detects uses protector | |
CN216468548U (en) | Traffic road condition information acquisition equipment | |
CN221350991U (en) | Building qualification rate check out test set | |
CN210013562U (en) | Protection device is used in road and bridge construction | |
CN219753921U (en) | Novel plate supporting mechanism for attached lifting scaffold | |
CN111745611B (en) | Outdoor cable terminal manufacturing platform | |
CN210798351U (en) | Building faces limit structure post construction protection frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 650000 No. 704, zone a, building 9, Dingyi Tiancheng, Xinfa village, high tech Zone, Kunming, Yunnan Patentee after: Kunzhou Construction Group Co.,Ltd. Country or region after: China Address before: 650000 No. 704, zone a, building 9, Dingyi Tiancheng, Xinfa village, high tech Zone, Kunming, Yunnan Patentee before: Yunnan kunzhou Construction Engineering Group Co.,Ltd. Country or region before: China |
|
CP03 | Change of name, title or address |