CN213449554U - Discharging platform for high-rise building construction - Google Patents

Discharging platform for high-rise building construction Download PDF

Info

Publication number
CN213449554U
CN213449554U CN202022245914.8U CN202022245914U CN213449554U CN 213449554 U CN213449554 U CN 213449554U CN 202022245914 U CN202022245914 U CN 202022245914U CN 213449554 U CN213449554 U CN 213449554U
Authority
CN
China
Prior art keywords
plate
block
base
building construction
rise building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022245914.8U
Other languages
Chinese (zh)
Inventor
周成涌
姜勇
余玉林
孙祥明
郑春飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guohai Construction Co ltd
Original Assignee
Guohai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guohai Construction Co ltd filed Critical Guohai Construction Co ltd
Priority to CN202022245914.8U priority Critical patent/CN213449554U/en
Application granted granted Critical
Publication of CN213449554U publication Critical patent/CN213449554U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a high-rise building construction is with platform of unloading belongs to the building construction field, including base and building main part, the base upper surface is fixed with the roof through the pillar, the welding of base lower surface one side symmetry has the locating plate, the mount is installed to one side of roof lower surface, install the pneumatic cylinder on the mount, the one end of pneumatic cylinder runs through the roof and is connected with the locating piece, the upper surface of base is fixed with the guard plate, the guard plate is U style of calligraphy structure, the mounting bracket is installed to one side symmetry of guard plate, the baffle is installed in the rotation between two mounting brackets, the one side that the guard plate was kept away from to the baffle is provided with the inclined plane, the inclined plane department has seted up the; the utility model relates to a novelty, the structure is ingenious, has improved the stability and the security of the platform of unloading, makes things convenient for material loading and unloading, and easy operation is worth promoting.

Description

Discharging platform for high-rise building construction
Technical Field
The utility model belongs to the technical field of the construction, concretely relates to high-rise building construction is with platform of unloading.
Background
At present, with the rapid development of the economy in China, the scale of urban construction is continuously enlarged, as is well known, after the construction of a certain layer of structure of a high-rise building is completed, materials and equipment such as templates, steel pipes and the like of a concrete structure of a construction floor need to be lifted to the outside of the construction floor, the materials and the equipment cannot be transported away in the building, and an unloading platform needs to be erected so as to be lifted to the unloading platform by a tower crane and then transported to a construction site.
However, the existing discharging platform is not flexible enough in use and poor in stability, and has no protection structure, so that the material can fall off, and the danger of falling objects from high altitude can be caused.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high-rise building construction is with platform of unloading to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the discharging platform for the high-rise building construction comprises a base and a building main body, wherein a top plate is fixed on the upper surface of the base through a support column, positioning plates are symmetrically welded on one side of the lower surface of the base, a fixing frame is installed on one side of the lower surface of the top plate, a hydraulic cylinder is installed on the fixing frame, one end of the hydraulic cylinder penetrates through the top plate and is connected with a positioning block, a protection plate is fixed on the upper surface of the base and is of a U-shaped structure, mounting frames are symmetrically installed on one side of the protection plate, a baffle is rotatably installed between the two mounting frames, an inclined plane is arranged on one side, away from the protection plate, of the baffle, a limiting groove is formed in the inclined plane, mounting rods are symmetrically welded on one side of the top of the protection plate, through holes are formed in the mounting rods, the limiting block is welded with an inserting block.
As a preferred embodiment, four supporting columns are arranged, and the four supporting columns are symmetrically distributed between the base and the top plate, and a hanging ring is installed in the middle of the upper surface of the top plate.
In a preferred embodiment, the positioning block is in a U-shaped structure, and the positioning block is located right above the positioning plate.
As a preferred embodiment, the longitudinal section of the stopper is a fan-shaped structure, and the longitudinal section of the limiting block is a triangular structure.
In a preferred embodiment, the insertion block is matched with the size of the limiting groove.
Compared with the prior art, the beneficial effects of the utility model are that:
the discharging platform for high-rise building construction can fix the whole device on a building main body by arranging the structures such as the base, the positioning plate, the hydraulic cylinder, the positioning block, the fixing frame and the like, does not damage the building main body, and improves the use stability;
this high-rise building construction is with platform of unloading is through setting up guard plate, baffle, installation pole, movable rod, dog, stopper and inserted block isotructure, and the baffle can rotate, makes things convenient for material loading and unloading, and the guard plate that cooperates simultaneously has fine guard action, avoids removing in-process material and drops, improves the security.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural view of the guard plate and the baffle of the present invention;
FIG. 3 is a top view of the base and guard plate of the present invention;
FIG. 4 is a schematic structural view of the baffle and the limiting groove of the present invention;
fig. 5 is the structure diagram of the stopper and the limiting block in the present invention.
In the figure: 1. a base; 2. a building body; 3. a pillar; 4. a top plate; 5. a hoisting ring; 6. positioning a plate; 7. a fixed mount; 8. a hydraulic cylinder; 9. positioning blocks; 10. a mounting frame; 11. a baffle plate; 12. a limiting groove; 13. a protection plate; 14. mounting a rod; 15. a movable rod; 16. pulling the block; 17. mounting a plate; 18. a spring; 19. a stopper; 20. a limiting block; 21. and (5) inserting the blocks.
Detailed Description
The present invention will be further described with reference to the following examples.
The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention. The condition in the embodiment can be further adjusted according to concrete condition the utility model discloses a it is right under the design prerequisite the utility model discloses a simple improvement of method all belongs to the utility model discloses the scope of claiming.
Referring to fig. 1-5, the utility model provides a high-rise building construction is with platform of unloading, including base 1 and building main part 2, the top surface of base 1 is fixed with roof 4 through pillar 3, and pillar 3 is provided with four, and four 3 symmetric distributions of pillar are between base 1 and roof 4, and rings 5 are installed to the intermediate position of roof 4 upper surface.
Positioning plates 6 are symmetrically welded on one side of the lower surface of the base 1, a fixing frame 7 is installed on one side of the lower surface of the top plate 4, a hydraulic cylinder 8 is installed on the fixing frame 7, one end of the hydraulic cylinder 8 penetrates through the top plate 4 and is connected with a positioning block 9, the positioning block 9 is of a U-shaped structure, and the positioning block 9 is located right above the positioning plates 6.
Base 1's last fixed surface has guard plate 13, guard plate 13 is U style of calligraphy structure, mounting bracket 10 is installed to one side symmetry of guard plate 13, rotate between two mounting bracket 10 and install baffle 11, one side that guard plate 13 was kept away from to baffle 11 is provided with the inclined plane, spacing groove 12 has been seted up to inclined plane department, one side symmetry welding at guard plate 13 top has installation pole 14, the through-hole has been seted up on installation pole 14, the through-hole internalization is provided with movable rod 15, the top of movable rod 15 is fixed with draws piece 16, the bottom mounting of movable rod 15 has mounting panel 17, the cover is equipped with spring 18 on the movable rod 15, mounting panel 17's lower skin has dog 19 and stopper 20, the longitudinal section of dog 19 is fan-shaped structure, stopper 20's longitudinal.
The limiting block 20 is welded with an inserting block 21, and the size of the inserting block 21 is matched with that of the limiting groove 12.
When the device is used, firstly, the tower crane is connected with the hoisting ring 5, the whole device is hoisted to a required floor, then the positioning plate 6 is fixed on the building main body 2, then the hydraulic cylinder 8 is opened to push the positioning block 9 to rise, so that the positioning block 9 is also fixed on the building main body 2, the top and the bottom of the device are both fixed, the stability is good, then the pull block 16 is pulled upwards to separate the limiting block 20 and the jack 21 from the limiting groove 12, the baffle 11 can be placed, the baffle 11 is placed on the ground of the building main body 2 in an inclined state, various materials are conveniently placed on the base 1, after the placement is completed, the baffle 11 is directly rotated to reset, the baffle 11 firstly contacts the stop block 19, so that the movable rod 15 and the mounting plate 17 are pushed to move upwards, when the baffle 11 is in a vertical state, the limiting block 20 and the insertion block 21 move downwards under the action of the, the jack 21 inserts the spacing groove 12 in, can fix a position baffle 11, and cooperation guard plate 13 surrounds the material on the base 1, reduces the possibility that the in-process material that removes dropped, improves the security, and convenient operation is worth promoting.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. High-rise building construction is with platform of unloading, including base (1) and building main part (2), its characterized in that: the upper surface of the base (1) is fixed with a top plate (4) through a support column (3), one side of the lower surface of the base (1) is symmetrically welded with a positioning plate (6), one side of the lower surface of the top plate (4) is provided with a fixing frame (7), the fixing frame (7) is provided with a hydraulic cylinder (8), one end of the hydraulic cylinder (8) penetrates through the top plate (4) and is connected with a positioning block (9), the upper surface of the base (1) is fixed with a protection plate (13), the protection plate (13) is of a U-shaped structure, one side of the protection plate (13) is symmetrically provided with mounting frames (10), a baffle plate (11) is rotatably arranged between the two mounting frames (10), one side of the baffle plate (11) far away from the protection plate (13) is provided with an inclined plane, a limit groove (12) is formed in, a movable rod (15) is movably arranged in the through hole, a pull block (16) is fixed at the top end of the movable rod (15), a mounting plate (17) is fixed at the bottom end of the movable rod (15), a spring (18) is sleeved on the movable rod (15), a stop block (19) and a limiting block (20) are welded on the lower surface of the mounting plate (17), and an insertion block (21) is welded on the limiting block (20).
2. The discharging platform for high-rise building construction according to claim 1, wherein: the supporting columns (3) are four, the four supporting columns (3) are symmetrically distributed between the base (1) and the top plate (4), and the middle position of the upper surface of the top plate (4) is provided with a hanging ring (5).
3. The discharging platform for high-rise building construction according to claim 1, wherein: the positioning block (9) is of a U-shaped structure, and the positioning block (9) is located right above the positioning plate (6).
4. The discharging platform for high-rise building construction according to claim 1, wherein: the longitudinal section of the stop block (19) is of a fan-shaped structure, and the longitudinal section of the limiting block (20) is of a triangular structure.
5. The discharging platform for high-rise building construction according to claim 1, wherein: the size of the insert block (21) is matched with that of the limit groove (12).
CN202022245914.8U 2020-10-10 2020-10-10 Discharging platform for high-rise building construction Active CN213449554U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022245914.8U CN213449554U (en) 2020-10-10 2020-10-10 Discharging platform for high-rise building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022245914.8U CN213449554U (en) 2020-10-10 2020-10-10 Discharging platform for high-rise building construction

Publications (1)

Publication Number Publication Date
CN213449554U true CN213449554U (en) 2021-06-15

Family

ID=76288347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022245914.8U Active CN213449554U (en) 2020-10-10 2020-10-10 Discharging platform for high-rise building construction

Country Status (1)

Country Link
CN (1) CN213449554U (en)

Similar Documents

Publication Publication Date Title
CN108867647B (en) Multifunctional steel pipe column verticality adjusting machine for pile and column integrated construction
CN213449554U (en) Discharging platform for high-rise building construction
CN111827648A (en) Construction device and method for down-supporting type overhanging scaffold
CN209038882U (en) A kind of moveable suspended bracket for lifting pipeline in piping lane
CN216954805U (en) Weighing device used at collecting device
CN203361170U (en) Supporting upright column pile for building foundation pit support
CN205976699U (en) Fluid pressure type pole setting device
CN215254379U (en) Overhanging type moving operation frame
CN215108957U (en) A automatic storage device of top anchor net for roadway support
CN201339311Y (en) Turning plate device of hanging rack
CN204754950U (en) It puts force piece to combine to adopt to combine
CN211421883U (en) Prestressed tensioning jack lifting device
CN206352299U (en) A kind of cage car device constructed for water seepage mechanism
CN106121353B (en) Hydraulic vertical lever apparatus
CN216504864U (en) Sliding surface replacing device of elastic sliding plate support
CN219261687U (en) Building construction frame
CN220867997U (en) Bridge basin type support installation auxiliary device
CN218346154U (en) Reinforcing cage burial depth adjusting frame
CN214464281U (en) Mining scalable flexible net support
CN218061453U (en) Socket type supporting base for supporting frame body of multi-layer top plate formwork
CN215717037U (en) Bearing frame for building construction
CN221094926U (en) Portable construction warning sign
CN218234595U (en) Concrete pouring construction protection device
CN219175812U (en) Beam side rear embedded part construction operation platform
CN219031642U (en) Vertical conveying device for hole pile construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant