CN218231609U - Material storage rack for building engineering management - Google Patents

Material storage rack for building engineering management Download PDF

Info

Publication number
CN218231609U
CN218231609U CN202222666804.8U CN202222666804U CN218231609U CN 218231609 U CN218231609 U CN 218231609U CN 202222666804 U CN202222666804 U CN 202222666804U CN 218231609 U CN218231609 U CN 218231609U
Authority
CN
China
Prior art keywords
pulley
storage rack
hoisting
materials
goods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222666804.8U
Other languages
Chinese (zh)
Inventor
赵严峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222666804.8U priority Critical patent/CN218231609U/en
Application granted granted Critical
Publication of CN218231609U publication Critical patent/CN218231609U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Warehouses Or Storage Devices (AREA)

Abstract

The utility model discloses a goods and materials storage rack for building engineering management relates to building engineering technical field, comprising a main body, the upper end of main part is provided with hangs the device, bottom one side of main part is provided with the fixing device of being convenient for, the top of the fixing device of being convenient for is provided with the lift supporter, the upper end of main part is provided with weather enclosure, the inboard of main part is provided with the support frame, one side of support frame is provided with the auxiliary stay frame. The utility model discloses a hoisting motor, receive and release the pulley, the jack-up chain, horizontal pulley, vertical pulley, lifting hook's combined action is down, can hang and get heavier goods and materials to a take the altitude, make its storage rack can be light goods and materials from top to bottom more, through the draw-in groove, the spout, lift support piece, fixing bolt, under the combined action of lift supporter, can adjust the height of lift supporter according to the goods and materials high condition, improve the space utilization who stores the rack, through the character cut in bas-relief spout, the screw slide bar, the angle valve, sliding baffle's combined action is down, thereby can adjust goods and materials level activity space at will according to the goods and materials width and fix the goods and materials centre gripping, improve the stability of goods and materials on the storage rack.

Description

Material storage rack for building engineering management
Technical Field
The utility model relates to a building engineering technical field, concretely relates to material storage rack for building engineering management.
Background
In the material storage process for building engineering management, due to the limitation of capital conditions of construction enterprises, site storehouses and other conditions, all the required materials cannot be purchased in place at one time in construction, so that the material storage condition is that the materials are put in and out in time, the safety of the materials is ensured, and reasonable classification planning is required to be carried out on the materials. The following problems exist in the prior art:
1. the existing material storage rack for building engineering management does not have the function of lifting and taking, and sometimes the storage rack is inconvenient to be lifted and lowered due to heavier materials;
2. the existing material storage rack for building engineering management has the disadvantages that the storage space is seriously wasted and the space utilization rate is extremely poor due to the fixed internal structure;
3. the existing material storage rack for building engineering management has no fixing effect on materials placed on the storage rack, so that the stability of the materials on the storage rack is poor, and the materials are easy to fall off.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
a material storage rack for building engineering management comprises a main body, wherein a hoisting device is arranged at the upper end of the main body, a fixing device is arranged on one side of the bottom of the main body, a lifting storage rack is arranged above the fixing device, a rain-proof shed is arranged at the upper end of the main body, a support frame is arranged on the inner side of the main body, and an auxiliary support frame is arranged on one side of the support frame; the hoisting device comprises a hoisting motor, a retractable pulley, a hoisting chain, a transverse pulley, a vertical pulley and a hoisting hook, wherein the retractable pulley is positioned at one side of the hoisting motor, and the hoisting chain is positioned on the outer surface of the retractable pulley; one side of the hoisting motor is in transmission connection with one side of the retractable pulley, and one end of the hoisting chain is movably connected with the outer surface of the retractable pulley.
The utility model discloses technical scheme's further improvement lies in: the horizontal pulley is located one end of a hoisting chain, the vertical pulley is located in front of the horizontal pulley, and the hoisting hook is located below the vertical pulley.
The utility model discloses technical scheme's further improvement lies in: the outer surface of the transverse pulley is movably connected with the other end of the hoisting chain through a groove, and the lower end of the vertical pulley is fixedly connected with the upper end of the hoisting hook through the hoisting chain.
The utility model discloses technical scheme's further improvement lies in: the main part includes draw-in groove, spout, lift support piece, fixing bolt, the draw-in groove is located the upper end of spout, lift support piece is located the upper end surface of draw-in groove, fixing bolt is located one side of spout.
The utility model discloses technical scheme's further improvement lies in: the lower end of the lifting support piece is detachably connected with the outer surface of the upper end of the clamping groove, and one side of the sliding groove is movably connected with the fixing bolt.
The utility model discloses technical scheme's further improvement lies in: the fixing device convenient to use comprises a concave sliding groove, a thread sliding rod, an angle valve and a sliding baffle, wherein the angle valve is located on one side of the thread sliding rod, the thread sliding rod is located inside the concave sliding groove, and the sliding baffle is located at the upper end of the concave sliding groove.
The utility model discloses technical scheme's further improvement lies in: one side of the angle valve is fixedly connected with one end of the threaded sliding rod, the bottom of the sliding baffle is movably connected with the surface of the threaded sliding rod through a threaded groove, and the lower end of the sliding baffle is movably connected with the upper end of the concave sliding groove.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a goods and materials storage rack for building engineering management, through hoisting motor, receive and release the pulley, the jack-up chain, horizontal pulley, vertical pulley, hoisting hook's combined action is down, can hang and get heavier goods and materials to a take the altitude, make its storage rack can light goods and materials from top to bottom more, it rotates to receive and release the pulley to be driven by hoisting motor work, thereby make and fix the jack-up chain who receive and releases on the pulley around receiving and releasing the pulley and receive and release length, receive and release the direction with the jack-up chain through horizontal pulley and vertical pulley and fix that the perpendicular to stores up the frame anterior segment and receive and release, hook the goods and materials at the jack-up hook of jack-up chain below and just can realize easily hanging and get goods and materials storage rack from top to bottom.
2. The utility model provides a goods and materials store frame for building engineering management, under the combined action through draw-in groove, spout, lift support piece, fixing bolt, lift supporter, can adjust the height of lift supporter according to the goods and materials high condition, improve the space utilization who stores the frame, through the swing joint of fixing bolt on the spout, promote the required high back with the lift supporter, remove lift support piece and place the nearest annoying recess department in fixing bolt below draw-in groove to this supports the height of fixed lift supporter.
3. The utility model provides a goods and materials storage rack for building engineering management, through the font spout, the screw thread slide bar, the angle valve, sliding baffle's combined action is down, thereby can adjust goods and materials horizontal activity space at will according to the goods and materials width and fix the goods and materials centre gripping, improve the stability of goods and materials on storage rack, it is rotatory to drive the screw thread slide bar through the rotation angle valve, because of sliding baffle bottom through the surface swing joint with thread groove and screw thread slide bar, and sliding baffle's lower extreme and the upper end swing joint of spill spout, so sliding baffle only can be along screw thread slide bar direction horizontal migration, thereby realize adjusting sliding baffle's the purpose of the fixed goods and materials of position centre gripping according to the goods and materials width.
Drawings
Fig. 1 is a schematic structural view of a material storage rack for construction engineering management according to the present invention;
FIG. 2 is a schematic view of the lifting shelf of the present invention;
fig. 3 is a schematic structural view of the hoisting device of the present invention;
fig. 4 is a schematic structural view of the fixing device of the present invention.
In the figure: 1. a main body; 2. a hoisting device; 3. the device is convenient to fix; 4. a lifting shelf; 5. a rain-proof shed; 6. a support frame; 7. a secondary support frame; 11. a card slot; 12. a chute; 13. a lifting support; 14. fixing the bolt; 21. a hoisting motor; 22. retracting and releasing the pulley; 23. a hoisting chain; 24. a transverse pulley; 25. a vertical pulley; 26. a lifting hook; 31. a concave chute; 32. a threaded slide bar; 33. an angle valve; 34. a slide shutter.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a material storage rack for building engineering management, which comprises a main body 1, wherein a hoisting device 2 is arranged at the upper end of the main body 1, a fixing device 3 is arranged at one side of the bottom of the main body 1, a lifting storage rack 4 is arranged above the fixing device 3, a rain-proof shed 5 is arranged at the upper end of the main body 1, a support frame 6 is arranged at the inner side of the main body 1, and an auxiliary support frame 7 is arranged at one side of the support frame 6; the hoisting device 2 comprises a hoisting motor 21, a retractable pulley 22, a hoisting chain 23, a transverse pulley 24, a vertical pulley 25 and a hoisting hook 26, wherein the retractable pulley 22 is positioned at one side of the hoisting motor 21, and the hoisting chain 23 is positioned on the outer surface of the retractable pulley 22; one side of the hoisting motor 21 is in transmission connection with one side of the retractable pulley 22, one end of the hoisting chain 23 is movably connected with the outer surface of the retractable pulley 22, the transverse pulley 24 is positioned at one end of the hoisting chain 23, the vertical pulley 25 is positioned in front of the transverse pulley 24, the hoisting hook 26 is positioned below the vertical pulley 25, the outer surface of the transverse pulley 24 is movably connected with the other end of the hoisting chain 23 through a groove, and the lower end of the vertical pulley 25 is fixedly connected with the upper end of the hoisting hook 26 through the hoisting chain 23.
In this embodiment, the heavy materials can be hung to a certain height, so that the storage rack can easily load and unload the materials, the hoisting motor 21 drives the retractable pulley 22 to rotate, so that the hoisting chain 23 fixed on the retractable pulley 22 rotates around the retractable pulley 22 for retractable length, the retractable direction of the hoisting chain 23 is fixed at the front end of the storage rack through the transverse pulley 24 and the vertical pulley 25 for retractable, and the hoisting hook 26 fixed below the hoisting chain 23 hooks the materials, so that the object can be easily hung from the upper storage rack and the lower storage rack.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the main body 1 includes a clamping groove 11, a sliding groove 12, a lifting support member 13 and a fixing bolt 14, the clamping groove 11 is located at the upper end of the sliding groove 12, the lifting support member 13 is located at the outer surface of the upper end of the clamping groove 11, the fixing bolt 14 is located at one side of the sliding groove 12, the lower end of the lifting support member 13 is detachably connected with the outer surface of the upper end of the clamping groove 11, and one side of the sliding groove 12 is movably connected with the fixing bolt 14.
In this embodiment, can adjust the height of lift supporter 4 according to the high condition of goods and materials, improve the space utilization who stores the supporter, through the swing joint of fixing bolt 14 on spout 12, after lifting supporter 4 and promoting required height, remove lift support piece 13 and place to the nearest recess department of fixing bolt 14 below draw-in groove 11 to this supports the height of fixed lift supporter 4.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the fixing device 3 includes a concave chute 31, a threaded sliding rod 32, an angle valve 33, and a sliding baffle 34, the angle valve 33 is located at one side of the threaded sliding rod 32, the threaded sliding rod 32 is located inside the concave chute 31, the sliding baffle 34 is located at the upper end of the concave chute 31, one side of the angle valve 33 is fixedly connected with one end of the threaded sliding rod 32, the bottom of the sliding baffle 34 is movably connected with the surface of the threaded sliding rod 32 through a threaded groove, and the lower end of the sliding baffle 34 is movably connected with the upper end of the concave chute 31.
In this embodiment, thereby can adjust the horizontal activity space of goods and materials at will according to goods and materials width and fix the goods and materials centre gripping, improve the stability of goods and materials on the storage rack, it is rotatory to drive screw thread slide bar 32 through turning angle valve 33, because of the surperficial swing joint of sliding baffle 34 bottom through thread groove and screw thread slide bar 32, and the lower extreme of sliding baffle 34 and the upper end swing joint of spill spout 31, so sliding baffle 34 only can be along screw thread slide bar 32 direction horizontal migration, thereby realize adjusting the purpose of the fixed goods and materials of position centre gripping of sliding baffle 34 according to goods and materials width.
The working principle of the material storage rack for construction engineering management will be described in detail below.
As shown in fig. 1-4, when the material storage rack for building engineering management is in use, a heavy material can be hung and taken to a certain height through the hanging device 2, so that the storage rack can be used for loading and unloading the material more easily, the hoisting motor 21 works to drive the retractable pulley 22 to rotate, so that the hoisting chain 23 fixed on the retractable pulley 22 surrounds the retractable pulley 22 for retracting and releasing, the hoisting chain 23 is fixed at the front end of the storage rack in the retracting and releasing direction through the transverse pulley 24 and the vertical pulley 25, the hoisting hook 26 fixed below the hoisting chain 23 hooks the material to easily lift the upper and lower storage racks, the height of the lifting storage rack 4 can be adjusted according to the height of the material through the lifting support 13, the space utilization rate of the storage rack is improved, after the lifting storage rack 4 is lifted to a required height through the movable connection of the fixing bolt 14 on the chute 12, the lifting support 13 is moved to the nearest groove of the clamping groove 11 below the fixing bolt 14 to support and fix the height of the lifting storage rack 4, the fixing device 3 adjusts the width of the sliding rod according to the width of the movable space, so that the sliding rod can be horizontally connected with the sliding baffle plate 34, and the sliding baffle plate 34, so that the sliding rod can be horizontally moved, and the baffle plate can be connected with the sliding rod, and the sliding baffle plate 34, so that the baffle plate can be horizontally moved horizontally and the baffle plate can be connected with the baffle plate at the sliding rod.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (7)

1. The utility model provides a material storage rack for building engineering management, includes main part (1), its characterized in that: the upper end of the main body (1) is provided with a hoisting device (2), one side of the bottom of the main body (1) is provided with a fixing facilitating device (3), a lifting storage rack (4) is arranged above the fixing facilitating device (3), the upper end of the main body (1) is provided with a weather enclosure (5), the inner side of the main body (1) is provided with a support frame (6), and one side of the support frame (6) is provided with an auxiliary support frame (7);
the hoisting device (2) comprises a hoisting motor (21), a retractable pulley (22), a hoisting chain (23), a transverse pulley (24), a vertical pulley (25) and a hoisting hook (26), wherein the retractable pulley (22) is positioned on one side of the hoisting motor (21), and the hoisting chain (23) is positioned on the outer surface of the retractable pulley (22);
one side of the hoisting motor (21) is in transmission connection with one side of the retractable pulley (22), and one end of the hoisting chain (23) is movably connected with the outer surface of the retractable pulley (22).
2. The material storage rack for the construction engineering management as claimed in claim 1, wherein: the transverse pulley (24) is located at one end of the hoisting chain (23), the vertical pulley (25) is located in front of the transverse pulley (24), and the hoisting hook (26) is located below the vertical pulley (25).
3. The material storage rack for the construction engineering management as claimed in claim 2, wherein: the outer surface of the transverse pulley (24) is movably connected with the other end of the hoisting chain (23) through a groove, and the lower end of the vertical pulley (25) is fixedly connected with the upper end of a hoisting hook (26) through the hoisting chain (23).
4. The material storage rack for the construction engineering management as claimed in claim 1, wherein: the main part (1) comprises a clamping groove (11), a sliding groove (12), a lifting support piece (13) and a fixing bolt (14), the clamping groove (11) is located at the upper end of the sliding groove (12), the lifting support piece (13) is located on the outer surface of the upper end of the clamping groove (11), and the fixing bolt (14) is located on one side of the sliding groove (12).
5. The material storage rack for building engineering management according to claim 4, wherein: the lower end of the lifting support piece (13) is detachably connected with the outer surface of the upper end of the clamping groove (11), and one side of the sliding groove (12) is movably connected with the fixing bolt (14).
6. The material storage rack for building engineering management of claim 1, wherein: fixing device (3) of being convenient for includes spill spout (31), screw slide bar (32), angle valve (33), slide damper (34), angle valve (33) are located one side of screw slide bar (32), screw slide bar (32) are located the inside of spill spout (31), slide damper (34) are located the upper end of spill spout (31).
7. The material storage rack for building engineering management according to claim 6, wherein: one side of the angle valve (33) is fixedly connected with one end of the threaded sliding rod (32), the bottom of the sliding baffle (34) is movably connected with the surface of the threaded sliding rod (32) through a threaded groove, and the lower end of the sliding baffle (34) is movably connected with the upper end of the concave sliding groove (31).
CN202222666804.8U 2022-10-11 2022-10-11 Material storage rack for building engineering management Active CN218231609U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222666804.8U CN218231609U (en) 2022-10-11 2022-10-11 Material storage rack for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222666804.8U CN218231609U (en) 2022-10-11 2022-10-11 Material storage rack for building engineering management

Publications (1)

Publication Number Publication Date
CN218231609U true CN218231609U (en) 2023-01-06

Family

ID=84668299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222666804.8U Active CN218231609U (en) 2022-10-11 2022-10-11 Material storage rack for building engineering management

Country Status (1)

Country Link
CN (1) CN218231609U (en)

Similar Documents

Publication Publication Date Title
CN109761174A (en) The convenient boom hoisting of kiln well lid
CN220283308U (en) Block chain logistics hoisting machine
CN113911502B (en) Hoist transportation frame of reduction loss
CN218231609U (en) Material storage rack for building engineering management
CN113006726B (en) Adjustable lifting device for rapidly grabbing and dragging reinforcement cage in slurry hole
CN214494510U (en) Expansion structure is extended to lifting machine hopper
CN212802627U (en) Lifting device for building engineering
CN217674798U (en) Movable lifting type stacker for goods shelf
CN213231225U (en) Grab bucket bridge crane
CN213085198U (en) Balance hanging beam group lifting appliance
CN113697683A (en) Equipment part replacement lifting appliance
CN210884943U (en) Gantry crane portal
CN209872124U (en) Crane auxiliary device for avoiding deformation of roasting frame in transfer process
CN217866251U (en) Aluminum hole chamfering hook mobile device
CN217921101U (en) Full-automatic crane control system
CN217756517U (en) Metallurgical crane
CN210012551U (en) A frock of taking one's place for ensureing high-speed railway sunshade safe hoist and mount
CN221027198U (en) Hoisting sling structure of prefabricated part
CN220977211U (en) Hanger for electroplating processing of workpiece
CN211594694U (en) Automatic elevator
CN219669594U (en) Auxiliary electric hoist discharging device
CN215974658U (en) Energy-concerving and environment-protective type is hanger for construction
CN217173055U (en) Hoisting machine for building construction inside building body
CN214935503U (en) Lifting device for building engineering
CN210340071U (en) Portable bridge cable duct apron lifting device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant