CN218229851U - Finished product placing assembly for concrete preparation and maintenance - Google Patents

Finished product placing assembly for concrete preparation and maintenance Download PDF

Info

Publication number
CN218229851U
CN218229851U CN202222529838.2U CN202222529838U CN218229851U CN 218229851 U CN218229851 U CN 218229851U CN 202222529838 U CN202222529838 U CN 202222529838U CN 218229851 U CN218229851 U CN 218229851U
Authority
CN
China
Prior art keywords
rectangular
sleeve
sleeves
rectangle
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222529838.2U
Other languages
Chinese (zh)
Inventor
钱海波
陆海锋
童小龙
耿哲
董毓广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tonghe Construction Technology Co ltd
Original Assignee
Shanghai Tonghe Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tonghe Construction Technology Co ltd filed Critical Shanghai Tonghe Construction Technology Co ltd
Priority to CN202222529838.2U priority Critical patent/CN218229851U/en
Application granted granted Critical
Publication of CN218229851U publication Critical patent/CN218229851U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model belongs to the technical field of the concrete finished product placement equipment, a subassembly is placed to finished product of concrete preparation maintenance is disclosed, place the board including two, two equal fixedly connected with second rectangle sleeves in the relative side left and right sides of placing the board, two adjacent inside activities of second rectangle sleeves are pegged graft around have the second rectangle pole, first rectangle sleeve has been cup jointed in the outside activity of first rectangle pole, first rectangle sheathed tube outside screw thread is pegged graft and is had first fastening bolt, a plurality of first spacing circular slots have been seted up on the surface of first rectangle pole, two adjacent back of the body one end and first rectangle sleeve fixed connection of two fourth rectangle sleeves back on the back around, this application has solved two distances of placing between the board of prior art and has been fixed, can not adjust, and then make this application be not convenient for the problem of stacking the concrete electric pole of different length.

Description

Finished product placing assembly for concrete preparation and maintenance
Technical Field
The application relates to the technical field of concrete finished product placing equipment, in particular to a finished product placing assembly for concrete preparation and maintenance.
Background
The concrete preparation technology mainly comprises the steps of calculating the strength of concrete and stirring the concrete. Belong to an important link in the concrete engineering, the concrete pole is for the pole of making with concrete and reinforcing bar or steel wire, for a finished product of concrete preparation, the finished product of producing needs the watering to its maintenance sometimes, after concrete pole production was accomplished, need pile up the concrete pole and place together, can use and place the subassembly, the finished product of some concrete preparations that have now places the subassembly and still have some problems, just for example:
publication (announcement) number CN212373900U discloses a finished product storage device for concrete pole production, which comprises two placing plates, wherein the two placing plates are fixedly connected through a connecting rod; the adjustable blocking assemblies … … are fixedly mounted at the tops of the two placing plates, so that more concrete poles can be stacked, and the utilization rate of the space of a site is improved; but the distance between two placing plates of this application is fixed, and is not adjustable, and then makes this application be not convenient for piling up the concrete pole of different length.
In order to solve the problem, the application provides a subassembly is placed to finished product of concrete preparation maintenance.
SUMMERY OF THE UTILITY MODEL
The application provides the following technical scheme: the utility model provides a subassembly is placed to finished product of concrete preparation maintenance, includes two and places the board, two the equal fixedly connected with second rectangle sleeve pipe in the opposite side left and right sides of placing the board, adjacent two around the inside activity of second rectangle sleeve pipe is pegged graft and is had second rectangle pole, two the equal screw thread in the outside of second rectangle sleeve pipe is pegged graft and has been had second fastening bolt, a plurality of second spacing circular slots have been seted up to the surface symmetry of second rectangle pole, the top of second rectangle sleeve pipe and second rectangle pole is fixedly connected with third rectangle pole and fifth rectangle pole respectively, the outside activity of third rectangle pole has cup jointed the third rectangle sleeve pipe, the outside activity of fifth rectangle pole has cup jointed the fifth rectangle sleeve pipe, the top fixedly connected with fourth rectangle pole of fifth rectangle sleeve pipe, the top fixedly connected with fourth rectangle sleeve pipe of third rectangle, and the both ends of fourth rectangle pole all activity peg graft in the inside of fourth rectangle sleeve pipe, the equal fixedly connected with first rectangle pole in the top left and right sides of placing the board, the outside activity of first rectangle sleeve pipe has cup jointed the first rectangle sleeve pipe, first bolt fastening bolt is seted up with a plurality of adjacent first rectangle sleeve pipe around the first rectangle pole, the adjacent bolt connection of first rectangle pole.
Through above-mentioned technical scheme, it is fixed to have solved two distances of placing between the board of prior art, can not adjust, and then makes this application be not convenient for the problem of stacking the concrete pole of different length.
Further, the first fastening bolt extends to the inside of the first limiting circular groove, and the second fastening bolt extends to the inside of the second limiting circular groove.
Through the technical scheme, the first rectangular sleeve after adjustment is limited and fixed, and the second rectangular sleeve after adjustment is limited and fixed.
Furthermore, the third rectangular rod and the third rectangular sleeves are respectively provided with a plurality of rods, and the fifth rectangular sleeve is arranged between the two third rectangular sleeves.
Furthermore, the bottom end face of the second rectangular rod is fixedly connected with an anti-skid plate, and the bottom end face of the anti-skid plate is fixedly connected with a positioning rod.
Through above-mentioned technical scheme, the locating lever inserts to place below the ground, has played firm effect to the position of whole device.
Furthermore, the length of the second rectangular rod is equal to that of the fourth rectangular rod, and the length of the second rectangular sleeve is equal to that of the fourth rectangular sleeve.
Furthermore, the bottom end of the positioning rod is of a cone structure, and the horizontal section of the positioning rod is circular.
Through above-mentioned technical scheme, reduce the locating lever and insert the inside resistance in soil layer.
Furthermore, a second threaded hole communicated with the inner cavity of the second rectangular sleeve is formed in the outer surface of the second rectangular sleeve, the second fastening bolt is in threaded connection with the inner portion of the second threaded hole, a first threaded hole communicated with the inner cavity of the first rectangular sleeve is formed in the outer surface of the first rectangular sleeve, and the first fastening bolt is in threaded connection with the inner portion of the first threaded hole.
Through the technical scheme, the second fastening bolt is in threaded connection with the second rectangular sleeve, and the first fastening bolt is in threaded connection with the first rectangular sleeve.
To sum up, this application includes following beneficial technological effect:
1. the placing plate is pulled to move outwards or pushed inwards, the placing plate drives the second rectangular sleeve to move outside the second rectangular rod, the fourth rectangular sleeve moves outside the fourth rectangular rod, and the distance between the two placing plates can be adjusted, so that concrete electric poles with different lengths can be stacked conveniently; after the distance between two placing plates is adjusted, the second fastening bolt is rotated to be inserted into the second limiting circular groove, and the second rectangular sleeve after adjustment is limited and fixed.
2. Insert the locating lever to place subaerial, played firm effect to the position of whole device, antiskid ribbed tile and ground contact further promote the stability ability that whole device placed on ground simultaneously.
Drawings
FIG. 1 is a schematic structural diagram of the present application;
FIG. 2 is a schematic view of a first rectangular bushing and a first rectangular rod of the present application;
FIG. 3 is a schematic view of a second rectangular bushing and a second rectangular rod of the present application.
The numbering in the figures illustrates:
1. placing a plate; 2. a first rectangular sleeve; 3. a first rectangular bar; 4. a first fastening bolt; 5. a second rectangular sleeve; 6. a second fastening bolt; 7. positioning a rod; 8. a second rectangular bar; 9. a second limit circular groove; 10. a third rectangular bar; 11. a third rectangular sleeve; 12. a fourth rectangular bar; 13. a fourth rectangular sleeve; 14. a first limit circular groove; 15. a fifth rectangular sleeve; 16. a fifth rectangular bar.
Detailed Description
The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application; it is obvious that the described embodiments are only a part of the embodiments of the present application, and not all embodiments, and all other embodiments obtained by those of ordinary skill in the art without any inventive work based on the embodiments in the present application belong to the protection scope of the present application.
In the description of the present application, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present application. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present application, it should be noted that, unless otherwise explicitly stated or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like, are to be interpreted broadly, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present application can be understood in a specific case by those of ordinary skill in the art.
The first embodiment is as follows:
referring to fig. 1, 2 and 3, the embodiment of the present application discloses a finished product placement assembly for concrete preparation and maintenance, which includes two placement plates 1, wherein the left and right sides of the opposite side surfaces of the two placement plates 1 are fixedly connected with second rectangular sleeves 5, the inner parts of the two adjacent second rectangular sleeves 5 are movably inserted with second rectangular rods 8, the outer parts of the two second rectangular sleeves 5 are respectively and threadedly inserted with second fastening bolts 6, the surface of the second rectangular rod 8 is symmetrically provided with a plurality of second limiting circular grooves 9, the tops of the second rectangular sleeves 5 and the second rectangular rods 8 are respectively and fixedly connected with third rectangular rods 10 and fifth rectangular rods 16, the outer part of the third rectangular rod 10 is movably sleeved with a third rectangular sleeve 11, the outer part of the fifth rectangular rod 16 is movably sleeved with a fifth rectangular sleeve 15, the top of the fifth rectangular sleeve 15 is fixedly connected with a fourth rectangular rod 12, the third rectangular sleeve 11, the third rectangular rod 10, the fifth rectangular sleeve 15 and the fifth rectangular rod 16 is matched with a first rectangular sleeve 2 and a first sleeve 3, the top of the first sleeve 3 is fixedly connected with a fourth sleeve 12, the first sleeve 2 is fixedly connected with a fourth sleeve 13, the outer part of the first sleeve 3, the first sleeve 3 is fixedly connected with a fourth sleeve 13, the outer part of the second rectangular sleeve 3, the second sleeve 3 is fixedly connected with a second sleeve 13, the first sleeve 13, the second sleeve 3 is fixedly connected with a second sleeve 13, the second sleeve 13 is fixedly connected with a third rectangular sleeve 13, the fourth rectangular sleeve 13 moves outside the fourth rectangular rod 12, and further can adjust the distance between two placing plates 1, so as to facilitate stacking of concrete poles with different lengths, after the distance between two placing plates 1 is adjusted, the second fastening bolt 6 is rotated to be inserted into the second limiting circular groove 9, the second rectangular sleeve 5 after adjustment is limited and fixed, the fourth rectangular rod 12 is pulled to move upwards, so that the first rectangular sleeve 2 moves upwards outside the first rectangular rod 3, the third rectangular sleeve 11 moves upwards outside the third rectangular rod 10, the fifth rectangular sleeve 15 moves upwards outside the fifth rectangular rod 16, so as to adjust the position of the first rectangular sleeve 2 in the vertical direction, change the blocking range of the first rectangular sleeve 2, block concrete poles with different stacking heights, after the first rectangular sleeve 2 is adjusted, the first fastening bolt 4 is rotated to be inserted into the first limiting circular groove 14, and facilitate fixing and limiting of the first rectangular sleeve 2 after adjustment.
Referring to fig. 1 and 2, the first fastening bolt 4 extends into the first limiting circular groove 14 to limit and fix the adjusted first rectangular sleeve 2, and the second fastening bolt 6 extends into the second limiting circular groove 9 to limit and fix the adjusted second rectangular sleeve 5.
Referring to fig. 1, a plurality of third rectangular rods 10 and a plurality of third rectangular sleeves 11 are arranged, a fifth rectangular sleeve 15 is arranged between the two third rectangular sleeves 11, two ends of the fifth rectangular sleeve 15 and two ends of the third rectangular sleeves 11 are both open, and the lengths of the fifth rectangular rods 16 and the third rectangular rods 10 are both equal to the length of the first rectangular rod 3.
Referring to fig. 1, the length of the second rectangular bar 8 is equal to the length of the fourth rectangular bar 12, the length of the second rectangular sleeve 5 is equal to the length of the fourth rectangular sleeve 13, and the shape and structure of the fourth rectangular sleeve 13 are the same as those of the second rectangular sleeve 5.
Referring to fig. 1 and 2, a second threaded hole communicated with an inner cavity of the second rectangular sleeve 5 is formed in an outer surface of the second rectangular sleeve 5, a second fastening bolt 6 is inserted into the second threaded hole in a threaded manner, a first threaded hole communicated with the inner cavity of the first rectangular sleeve 2 is formed in an outer surface of the first rectangular sleeve 2, a first fastening bolt 4 is inserted into the first threaded hole in a threaded manner, the second fastening bolt 6 is connected with the second rectangular sleeve 5 in a threaded manner, and the first fastening bolt 4 is connected with the first rectangular sleeve 2 in a threaded manner.
Example two:
referring to fig. 1, the utility model also discloses a finished product placement component for concrete preparation and maintenance, which is different from the first embodiment in that: bottom face fixedly connected with antiskid ribbed tile of second rectangular rod 8, antiskid ribbed tile is direct and ground contact, increase the area of contact on whole device and ground, promote the steadiness ability that whole device placed on ground, the bottom face fixedly connected with locating lever 7 of antiskid ribbed tile, insert locating lever 7 to the place below ground, the effect of stabilizing has been played to the position of whole device, the bottom of locating lever 7 is the cone structure, reduce the resistance that inserts ground soil layer inside, and the horizontal cross-section of locating lever 7 is circularly.
The implementation principle of the application is as follows: the concrete electric poles with different stacking heights can be blocked by changing the blocking range of the first rectangular sleeve 2 by pulling one placing plate 1 to move outwards or push inwards, the placing plate 1 drives the second rectangular sleeve 5 to move outside the second rectangular pole 8, the fourth rectangular sleeve 13 moves outside the fourth rectangular pole 12 and can further adjust the distance between the two placing plates 1, so that concrete electric poles with different lengths can be stacked conveniently, after the distance between the two placing plates 1 is adjusted, the second fastening bolt 6 is rotated to be inserted into the second limiting circular groove 9 to limit and fix the second rectangular sleeve 5 after adjustment, the fourth rectangular pole 12 is pulled to move upwards, so that the first rectangular sleeve 2 moves upwards outside the first rectangular pole 3, the third rectangular sleeve 11 moves upwards outside the third rectangular pole 10, the fifth rectangular sleeve 15 moves upwards outside the fifth rectangular pole 16, so that the position of the first rectangular sleeve 2 in the vertical direction can be adjusted, the blocking range of the first rectangular sleeve 2 is changed, concrete electric poles with different stacking heights can be blocked, after the first rectangular sleeve 2 is fastened and adjusted, the first rectangular sleeve 4 is inserted into the first limiting circular groove 14, and then the limiting sleeve 2 is adjusted conveniently.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (7)

1. The utility model provides a subassembly is placed to finished product of concrete preparation maintenance, includes two and places board (1), its characterized in that: the left side and the right side of the opposite side surfaces of the two placing plates (1) are fixedly connected with second rectangular sleeves (5), the inner parts of the two second rectangular sleeves (5) which are adjacent in the front and back are movably inserted with second rectangular rods (8), the outer parts of the two second rectangular sleeves (5) are respectively and fixedly connected with a third rectangular rod (10) and a fifth rectangular rod (16) in a threaded insertion manner, the surface of the second rectangular rod (8) is symmetrically provided with a plurality of second limiting circular grooves (9), the outer parts of the second rectangular sleeves (5) and the second rectangular rods (8) are respectively and fixedly connected with a third rectangular sleeve (11), the outer parts of the fifth rectangular rods (16) are sleeved with a fifth rectangular sleeve (15), the top parts of the fifth rectangular sleeves (15) are fixedly connected with a fourth rectangular rod (12), the top parts of the third rectangular sleeves (11) are fixedly connected with a fourth sleeve (13), the two ends of the fourth rectangular rods (12) are movably sleeved on the inner parts of the first rectangular sleeves (3), the first rectangular sleeves (3) are fixedly connected with first rectangular sleeves (3), a plurality of first limiting circular grooves (14) are formed in the surface of the first rectangular rod (3), and the back ends of the front rectangular sleeve and the back rectangular sleeve (13) which are adjacent to each other are fixedly connected with the first rectangular sleeve (2).
2. A concrete preparation and curing product placement assembly as recited in claim 1, wherein: the first fastening bolt (4) extends to the inside of the first limiting circular groove (14), and the second fastening bolt (6) extends to the inside of the second limiting circular groove (9).
3. A concrete preparation and curing product placement assembly as recited in claim 1, wherein: the third rectangular rods (10) and the third rectangular sleeves (11) are respectively provided with a plurality of sleeves, and the fifth rectangular sleeve (15) is arranged between the two third rectangular sleeves (11).
4. A concrete preparation and curing product placement assembly as recited in claim 1, wherein: the bottom end face of the second rectangular rod (8) is fixedly connected with an anti-skid plate, and the bottom end face of the anti-skid plate is fixedly connected with a positioning rod (7).
5. A concrete preparation and curing product placement assembly as recited in claim 1, wherein: the length of the second rectangular rod (8) is equal to that of the fourth rectangular rod (12), and the length of the second rectangular sleeve (5) is equal to that of the fourth rectangular sleeve (13).
6. The finished product placement assembly for concrete preparation and curing of claim 4, wherein: the bottom end of the positioning rod (7) is of a cone structure, and the horizontal section of the positioning rod (7) is circular.
7. The finished product placement assembly for concrete preparation and curing of claim 1, wherein: the outer surface of the second rectangular sleeve (5) is provided with a second threaded hole communicated with the inner cavity of the second rectangular sleeve (5), the second fastening bolt (6) is in threaded connection inside the second threaded hole, the outer surface of the first rectangular sleeve (2) is provided with a first threaded hole communicated with the inner cavity of the first rectangular sleeve (2), and the first fastening bolt (4) is in threaded connection inside the first threaded hole.
CN202222529838.2U 2022-09-23 2022-09-23 Finished product placing assembly for concrete preparation and maintenance Active CN218229851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222529838.2U CN218229851U (en) 2022-09-23 2022-09-23 Finished product placing assembly for concrete preparation and maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222529838.2U CN218229851U (en) 2022-09-23 2022-09-23 Finished product placing assembly for concrete preparation and maintenance

Publications (1)

Publication Number Publication Date
CN218229851U true CN218229851U (en) 2023-01-06

Family

ID=84665408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222529838.2U Active CN218229851U (en) 2022-09-23 2022-09-23 Finished product placing assembly for concrete preparation and maintenance

Country Status (1)

Country Link
CN (1) CN218229851U (en)

Similar Documents

Publication Publication Date Title
CN218229851U (en) Finished product placing assembly for concrete preparation and maintenance
KR102148899B1 (en) Retaining wall structure
CN210887117U (en) Novel fragment of brick unit and river course side slope protection structure
CN211898331U (en) Building concrete pipe pile
CN213039054U (en) Afforestation isolated column convenient to equipment
CN215884763U (en) Modular prefabricated wallboard piling bin
CN112302038B (en) Collapsible loess slope protective structure
CN211922696U (en) Assembly building block and ecological retaining wall formed by same
CN212104006U (en) Pile foundation structure in soft soil area
CN213029290U (en) Green house bearing structure for agricultural facility
CN214853086U (en) Three-dimensional vegetation net integrated configuration of high stability that can splice
CN215500694U (en) Typhoon-resistant support frame for nuclear power station
CN211571754U (en) Ecological geogrid for slope protection
CN219822307U (en) Size-adjustable unit assembly type steel pipe storage rack
CN212052838U (en) Concrete and pile foundation connecting device
CN217812307U (en) Adjustable supporting device for plate buckle support
CN215759549U (en) Bar base of prefabricated building
CN214783642U (en) Ecological slope protection structure of hydraulic engineering
CN219808481U (en) Frame structure
CN216615956U (en) Flexibly assembled block brick for plant-growing retaining wall
CN214740177U (en) Connecting and fixing device for steel support
CN214695727U (en) Slope protection retaining wall building block
CN217523312U (en) But height-adjusting's environmental protection flowerpot flower case bracing piece
CN212611782U (en) Grass planting floor tile for urban afforestation
CN217518181U (en) Rotatory ramp template support system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant