CN218213911U - Temperature control device for mass concrete construction - Google Patents

Temperature control device for mass concrete construction Download PDF

Info

Publication number
CN218213911U
CN218213911U CN202222807208.7U CN202222807208U CN218213911U CN 218213911 U CN218213911 U CN 218213911U CN 202222807208 U CN202222807208 U CN 202222807208U CN 218213911 U CN218213911 U CN 218213911U
Authority
CN
China
Prior art keywords
water tank
temperature
concrete construction
control device
temperature control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222807208.7U
Other languages
Chinese (zh)
Inventor
王磊
王笑天
郑志强
李伟
毛宝江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Bureau Development and Construction Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
China Construction Eighth Bureau Development and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd, China Construction Eighth Bureau Development and Construction Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202222807208.7U priority Critical patent/CN218213911U/en
Application granted granted Critical
Publication of CN218213911U publication Critical patent/CN218213911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measuring Temperature Or Quantity Of Heat (AREA)

Abstract

The utility model provides a bulky concrete construction temperature control device, include: a device that can be moved automatically; the water tank is fixedly arranged at the top of the automatic moving device; the control cabinet is fixedly arranged on the right side of the top of the automatic movable device, and a first temperature detection device is fixedly arranged on the top of the control cabinet; and a second temperature detection device. The utility model provides a pair of bulky concrete construction temperature control device can carry out the detection achievement to the temperature of its concrete, and water according to the structure that detects, make the volume of the water of watering carry out the state of cooling to its concrete directly proportional, and the temperature status after watering through second temperature-detecting device detects, both contrast around, thereby can judge the state around the temperature of here, thereby can not influence the time and the user state that each position of concrete later stage solidifies.

Description

Temperature control device for mass concrete construction
Technical Field
The utility model relates to a construction field especially relates to a bulky concrete construction temperature control device.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place.
With the continuous progress of urbanization, high-rise buildings of various buildings are built, concrete is required to be used when the buildings are built, and when the concrete is used, the concrete in a large-area horizontal state is particularly used, so that the phenomenon of dry cracking is avoided when the concrete is solidified and formed, and the temperature control is required to be used.
The mode of current temperature control adopts the manual work to carry out untimely watering to it and makes it remain moist state solidification slowly all the time, and waters through artificial mode to it is inhomogeneous to appear watering easily, and makes the moist state of concrete differ, thereby influences the concrete setting time easily, thereby influences the state that later stage concrete setting used easily.
Therefore, it is necessary to provide a mass concrete construction temperature control device to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a bulky concrete construction temperature control device has solved the control temperature that waters through artificial mode to it is inhomogeneous to appear watering easily, and makes the moist state of concrete difficult, thereby influences the concrete setting time easily, thereby influences the problem of the state that later stage concrete setting used easily.
In order to solve the technical problem, the utility model provides a pair of bulky concrete construction temperature control device, include: a device that can be moved automatically;
the water tank is fixedly arranged at the top of the automatic moving device;
the control cabinet is fixedly arranged on the right side of the top of the automatic movable device, and a first temperature detection device is fixedly arranged on the top of the control cabinet;
the second temperature detection device is fixedly arranged on the left side of the water tank;
the connecting block, connecting block fixed mounting in but the front and the back at automatic moving device top, the inboard fixed mounting of connecting block has fixed pipe, the bottom of fixed pipe is provided with the shower nozzle, the top intercommunication of fixed pipe has the connecting pipe, the top of connecting pipe in the bottom intercommunication of water tank, the solenoid valve has been seted up on the surface of connecting pipe.
Preferably, a heating pipe is fixedly mounted at the bottom inside the water tank, and a filter pipe is fixedly mounted inside the water tank and outside the top of the connecting pipe.
Preferably, the two sides inside the water tank are fixedly provided with slide bars, and the surfaces of the slide bars are connected with floating plates in a sliding manner.
Preferably, the communicating holes are formed in two sides of the top of the inside of the water tank, the connecting frame is arranged inside the communicating holes, and the bottom of the connecting frame is fixedly installed on the top of the floating plate.
Preferably, an alarm switch is fixedly mounted on the left side of the top of the water tank, and a temperature detection device control switch is fixedly mounted on the right side of the top of the water tank.
Preferably, a pressing plate is fixedly mounted at the top of the interior of the connecting frame.
Preferably, an alarm is fixedly mounted on the back of the top of the water tank.
Compared with the prior art, the utility model provides a pair of bulky concrete construction temperature control device has following beneficial effect:
the utility model provides a bulky concrete construction temperature control device, but through automatic moving device, the water tank, the control cabinet, first temperature-detecting device, second temperature-detecting device, the connecting block, fixed pipe, the shower nozzle, the connecting pipe, thereby mutually supporting between the solenoid valve isotructure can carry out detection achievement to the temperature of its concrete, and water according to the structure that detects, make the volume of the water of watering carry out the state of cooling to its concrete directly proportional, and the temperature status after watering through second temperature-detecting device detects, both contrast around, thereby can judge the state around the temperature of here, thereby can not influence the time and the user state that each position of concrete later stage solidifies.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of a large-volume concrete construction temperature control device provided by the present invention;
FIG. 2 is a schematic structural view of a front cross section of the water tank shown in FIG. 1;
FIG. 3 is a schematic side sectional view of the water tank shown in FIG. 1;
fig. 4 is a schematic structural diagram of a second embodiment of a large-volume concrete construction temperature control device provided by the present invention;
FIG. 5 is a schematic structural view of the top of the floating plate shown in FIG. 4;
fig. 6 is a schematic view of the structure of the top of the water tank shown in fig. 4.
Reference numbers in the figures: 1. but automatic mobile device, 2, water tank, 3, control cabinet, 4, first temperature-detecting device, 5, second temperature-detecting device, 6, connecting block, 7, fixed pipe, 8, shower nozzle, 9, connecting pipe, 10, solenoid valve, 11, heating pipe, 12, chimney filter, 13, slide bar, 14, kickboard, 15, intercommunicating pore, 16, link, 17, alarm switch, 18, according to the board, 19, temperature-detecting device control switch, 20, siren.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
First embodiment
Please refer to fig. 1, fig. 2 and fig. 3, wherein fig. 1 is a schematic structural diagram of a first embodiment of a temperature control device for mass concrete construction according to the present invention; FIG. 2 is a schematic structural view of a front cross section of the water tank shown in FIG. 1; fig. 3 is a schematic structural view of a side section of the water tank shown in fig. 1. A mass concrete construction temperature control device comprising: an automatically movable device 1;
the water tank 2 is fixedly arranged at the top of the automatic movable device 1;
the control cabinet 3 is fixedly arranged on the right side of the top of the automatic movable device 1, and the top of the control cabinet 3 is fixedly provided with a first temperature detection device 4;
the second temperature detection device 5 is fixedly arranged on the left side of the water tank 2;
thereby state around can cooling it contrasts through mutually supporting between first temperature-detecting device 4 and the second temperature-detecting device 5 to can make things convenient for the later stage staff to observe its state.
Connecting block 6, connecting block 6 fixed mounting in but the front and the back at automatic moving device 1 top, the inboard fixed mounting of connecting block 6 has fixed pipe 7, the bottom of fixed pipe 7 is provided with shower nozzle 8, the top intercommunication of fixed pipe 7 has connecting pipe 9, the top of connecting pipe 9 in the bottom intercommunication of water tank 2, solenoid valve 10 has been seted up on the surface of connecting pipe 9.
The water pump and other structures which are not used in the water tank 2 automatically flow downwards under the action of gravity, so that the impact force generated when water is sprayed can be prevented from influencing the surface of concrete.
The inside bottom fixed mounting of water tank 2 has heating pipe 11, the outside fixed mounting that just is located the connecting pipe 9 top in the inside of water tank 2 has filter tube 12.
The utility model provides a pair of bulky concrete construction temperature control device's theory of operation as follows:
through the inside with water filling intake box 2, but rethread control machine case 3 starts automatic movement device 1 and removes to can make overall structure remove, and start first temperature-detecting device 4 and second temperature-detecting device 5 simultaneously and carry out work.
Thereby the rethread first temperature-detecting device 4's start carries out temperature detection work to its concrete surface, and with how much water just can cool down to suitable state of watering that needs of its data message transmission to analysis current temperature in control box 3, and start solenoid valve 10, start through solenoid valve 10, thereby make connecting pipe 9 be in the state of being opened, thereby because the effect of gravity can make the water in the water tank 2 enter into connecting pipe 9 and fixed pipe 7 and from the position of shower nozzle 8 outwards blowout can, and this moment can automatic mobile device 1's the moving speed match the speed of water spray can.
And the concrete after watering is subjected to temperature detection work through the second temperature detection device 5, and data information of the concrete is transmitted to the control cabinet 3, so that the data information after cooling can be recorded and compared.
The water in the water tank 2 is filtered when entering the connecting pipe 9 through the filter pipe 12, so that the blockage of the spray head 8 caused by the impurities in the water entering the spray head 8 is avoided; and overall structure when using winter, the accessible starts heating pipe 11, heats the work through heating pipe 11 to the water in its water tank 2 to overall structure's practicality can be improved.
Compared with the prior art, the utility model provides a pair of bulky concrete construction temperature control device has following beneficial effect:
through but automatic moving device 1, water tank 2, control cabinet 3, first temperature-detecting device 4, second temperature-detecting device 5, connecting block 6, fixed pipe 7, shower nozzle 8, connecting pipe 9, thereby the temperature of solenoid valve 10 isotructure between mutually supporting can be to its concrete detects the work, and water according to the structure that detects, make the volume of the water of watering carry out the state direct ratio of cooling to its concrete, and the temperature state after watering through second temperature-detecting device 5 detects, both contrast around, thereby can judge the state around the temperature of here, thereby can not influence the time and the user state that each position of concrete later stage solidifies.
Second embodiment
Referring to fig. 4, 5 and 6, a second embodiment of the present application provides another temperature control device for mass concrete construction based on a temperature control device for mass concrete construction provided by a first embodiment of the present application. The second embodiment is only the preferred mode of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
Specifically, the difference of the large-volume concrete construction temperature control device provided by the second embodiment of the present application lies in that, the two sides inside the water tank 2 are both fixedly mounted with a slide bar 13, and the surface of the slide bar 13 is slidably connected with a floating plate 14.
Both sides of the top inside the water tank 2 are provided with communicating holes 15, connecting frames 16 are arranged inside the communicating holes 15, and the bottoms of the connecting frames 16 are fixedly installed on the top of the floating plate 14.
The surface of the connecting frame 16 is provided with a scale bar, so that the staff can conveniently observe the residual quantity in the water outlet tank 2.
The left side fixed mounting at the top of water tank 2 has alarm switch 17, the right side fixed mounting at the top of water tank 2 has temperature-detecting device control switch 19.
The switch 19 is controlled to be closed by the temperature detection device, so that the temperature detection device is still in a working state when the temperature detection device cannot perform watering and cooling under the condition that no water exists in the water tank 2.
A pressing plate 18 is fixedly mounted on the top of the inside of the connecting frame 16.
An alarm 20 is fixedly mounted on the back of the top of the water tank 2.
The utility model provides a pair of bulky concrete construction temperature control device's theory of operation as follows:
along with the gradual reduction of the water in the water tank 2, when the water level gradually drops, the floating plate 14 moves downwards on the surface of the sliding rod 13 along with the drop of the water level, then the connecting frame 16 is driven to move downwards through the downward movement of the floating plate 14, at the moment, the connecting frame 16 moves downwards in the communicating hole 15, then the connecting frame 16 moves downwards through the downward movement of the connecting frame 16, the pressing plate 18 is simultaneously driven to move downwards until the pressing plate 18 is in contact with the alarm switch 17 and the temperature detection device control switch 19, the alarm switch 17 and the temperature detection device control switch 19 are pressed downwards, so that the alarm switch 17 is turned on, the alarm 20 is started to give an alarm, the floating plate 14 is positioned at the bottom inside the water tank 2 and is in contact with the inner wall at the bottom of the water tank 2, and the temperature detection device control switch 19 stops being in a working state when being pressed downwards.
Compared with the prior art, the utility model provides a pair of bulky concrete construction temperature control device has following beneficial effect:
the water level state in the water tank 2 can be detected through the mutual matching of the structures such as the sliding rod 13, the floating plate 14, the communication hole 15, the connecting frame 16, the alarm switch 17, the pressing plate 18, the temperature detection device control switch 19, the alarm 20 and the like, so that the problem that the efficiency of later work is influenced after the staff cannot find the water in the water tank 2 is avoided.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (7)

1. A bulky concrete construction temperature control device, its characterized in that includes: a device that can be moved automatically;
the water tank is fixedly arranged at the top of the automatic moving device;
the control cabinet is fixedly arranged on the right side of the top of the automatic movable device, and a first temperature detection device is fixedly arranged on the top of the control cabinet;
the second temperature detection device is fixedly arranged on the left side of the water tank;
the connecting block, connecting block fixed mounting in but the front and the back at automatic moving device top, the inboard fixed mounting of connecting block has fixed pipe, the bottom of fixed pipe is provided with the shower nozzle, the top intercommunication of fixed pipe has the connecting pipe, the top of connecting pipe in the bottom intercommunication of water tank, the solenoid valve has been seted up on the surface of connecting pipe.
2. The temperature control device for mass concrete construction according to claim 1, wherein a heating pipe is fixedly installed at the bottom of the inside of the water tank, and a filter pipe is fixedly installed inside the water tank and outside the top of the connecting pipe.
3. The mass concrete construction temperature control device according to claim 1, wherein slide bars are fixedly mounted on both sides of the inside of the water tank, and floating plates are slidably connected to the surfaces of the slide bars.
4. The temperature control device for mass concrete construction according to claim 3, wherein communication holes are formed in both sides of the top of the inside of the water tank, a connecting frame is arranged inside the communication holes, and the bottom of the connecting frame is fixedly mounted with the top of the floating plate.
5. The temperature control device for mass concrete construction according to claim 4, wherein an alarm switch is fixedly installed at the left side of the top of the water tank, and a temperature detection device control switch is fixedly installed at the right side of the top of the water tank.
6. The mass concrete construction temperature control device according to claim 5, wherein a pressing plate is fixedly installed at the top of the inside of the connection frame.
7. The temperature control device for mass concrete construction according to claim 6, wherein an alarm is fixedly installed on the back of the top of the water tank.
CN202222807208.7U 2022-10-24 2022-10-24 Temperature control device for mass concrete construction Active CN218213911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222807208.7U CN218213911U (en) 2022-10-24 2022-10-24 Temperature control device for mass concrete construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222807208.7U CN218213911U (en) 2022-10-24 2022-10-24 Temperature control device for mass concrete construction

Publications (1)

Publication Number Publication Date
CN218213911U true CN218213911U (en) 2023-01-03

Family

ID=84643863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222807208.7U Active CN218213911U (en) 2022-10-24 2022-10-24 Temperature control device for mass concrete construction

Country Status (1)

Country Link
CN (1) CN218213911U (en)

Similar Documents

Publication Publication Date Title
CN201979046U (en) Jet nozzle cleaning mechanism
CN218213911U (en) Temperature control device for mass concrete construction
CN210657151U (en) Screw wire rod pickling device
CN201871698U (en) Mould releasing agent spraying device for non-ferrous metal continuous casting machine
CN213592105U (en) Air conditioner copper pipe cooling device
CN211659323U (en) Oil removing groove with ultrasonic cleaning function
CN210046739U (en) Cutting device is used in mould processing with dust removal function
CN212116331U (en) Drought-resistant vegetable cultivation device
CN219114435U (en) Building red brick cutting equipment with dust removal function
CN213382530U (en) Developing, etching and film removing equipment
CN214557323U (en) Cooling device with telescopic spray head for casting
CN220846350U (en) Wool cleaning device is used in production of sheep wool trousers
CN116871491B (en) Die casting die shedder
CN208105069U (en) A kind of sandbox of the dismounting convenient for bridge door opening bracket
CN219210840U (en) Magnesium alloy surface cleaning device
CN220730700U (en) Bulky concrete temperature control device
CN109500985A (en) A kind of interlocking segment parting agent special spray equipment
CN219596804U (en) Broken device of recycling of concrete test block
CN219466483U (en) Cleaning device for concrete pipe pile die
CN111281257A (en) High-rise building window lateral surface belt cleaning device
CN216865210U (en) Foundation ditch drainage device of construction
CN215217157U (en) Integral prefabricating and forming device for molten pool of metal melting heat-preserving industrial furnace
CN219710008U (en) Watering device for concrete curing
CN210334249U (en) Wax mould casting wax melting system
CN215868240U (en) Irrigation technology training device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant