CN218203773U - Crack filling device for highway maintenance - Google Patents
Crack filling device for highway maintenance Download PDFInfo
- Publication number
- CN218203773U CN218203773U CN202221066194.1U CN202221066194U CN218203773U CN 218203773 U CN218203773 U CN 218203773U CN 202221066194 U CN202221066194 U CN 202221066194U CN 218203773 U CN218203773 U CN 218203773U
- Authority
- CN
- China
- Prior art keywords
- water
- pipe
- filling device
- highway maintenance
- aperture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 20
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 89
- 238000003756 stirring Methods 0.000 claims description 13
- 238000010276 construction Methods 0.000 description 9
- 239000004568 cement Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 3
- 238000010521 absorption reaction Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 206010066054 Dysmorphism Diseases 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The utility model discloses a crack filling device for highway maintenance relates to highway maintenance technical field, specifically is a crack filling device for highway maintenance, including the base, its characterized in that: the upper surface of base fixedly connected with agitator tank, the A aperture has been seted up to the upper surface of agitator tank, the inside grafting of A aperture has agitator motor, the B aperture has been seted up to one side of agitator tank, the inside grafting of B aperture has A water pipe. This crack filling device for highway maintenance through the setting of outlet pipe, spacing ring, fixed block, triangle lead block dish and blank pipe for in the use, the staff can be through the filling position that removes the fixed outlet pipe of triangle lead block dish, and triangle lead block dish quality is great, and the position of fixed spacing ring that can be comparatively firm has guaranteed that the outlet pipe can not appear filling inhomogeneous condition because of the position change when the operation.
Description
Technical Field
The utility model relates to a highway curing means technical field specifically is a crack filling device is used in highway maintenance.
Background
The method is characterized in that the highway has long service time or is specialized in geographical position or is weak in foundation or has cracks due to other reasons, the cracks need to be filled and reinforced, the cracks cannot continue to crack, and the problem to be solved is how to control the cracks not to crack and fill and reinforce the cracks.
The existing device has the problems that the filling is not uniform due to the fact that the existing device cannot be limited, the water outlet pipe cannot be protected, the problem that cement cannot be mixed with water in time often occurs in the construction process, the quality and the progress of construction are affected by the problems, and therefore improvement is needed.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a crack filling device for highway maintenance has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a crack filling device for highway maintenance, includes the base, the last fixed surface of base is connected with the agitator tank, the A aperture has been seted up to the upper surface of agitator tank, agitator motor has been pegged graft to the inside of A aperture, the B aperture has been seted up to one side of agitator tank, the inside of B aperture is pegged graft and is had the A water pipe, the water absorption pump has been cup jointed on the surface of the other end of A water pipe, the other end of water absorption pump is pegged graft and is had the B water pipe, the outlet pipe has been cup jointed on the surface of the other end of B water pipe, the spacing ring has been cup jointed on the surface of outlet pipe, the surface of spacing ring is through fixed block fixedly connected with triangle lead block dish.
Optionally, a small hole C is formed in the bottom of the limiting ring, and a hollow pipe for protecting the water outlet pipe is fixedly connected inside the small hole C.
Optionally, the other end of the water outlet pipe is inserted into the hollow pipe, so that the water outlet pipe can be well protected after being inserted into the hollow pipe, and the upper surface of the base is fixedly connected with a water tank and a water pump for storing water.
Optionally, a D small hole is formed in one side of the water tank, a C water pipe is inserted into the D small hole, the surface of the other end of the C water pipe is sleeved at one end of the water pump, and a D water pipe is inserted at the other end of the water pump.
Optionally, the upper surface of the stirring box is provided with a small hole E, and the other end of the water pipe D is inserted into the upper surface of the stirring box.
Optionally, the upper surface of the base is fixedly connected with a high-pressure water gun placing sleeve, the lower surface of the base is fixedly connected with a universal wheel, so that after the pushing equipment is pushed to the existing position, a person can step on the brake pad to enable the universal wheel to be in a limiting state, and the upper surface of the base is fixedly connected with a shell.
(III) advantageous effects
The utility model provides a crack filling device for highway maintenance possesses following beneficial effect:
1. this crack filling device is used in highway maintenance, through the outlet pipe, the spacing ring, the fixed block, the setting of triangle lead block dish and air traffic control, make in the use, the staff can be through the filling position who removes the fixed outlet pipe of triangle lead block dish, triangle lead block dish quality is great, the position of fixed spacing ring that can be comparatively firm, guaranteed that the outlet pipe can not appear filling inhomogeneous condition because of the position changes when the operation, the quality of construction has been guaranteed, the air traffic control has also better protection the outlet pipe simultaneously, prevent that the outlet pipe damage from influencing the construction progress.
2. This crack filling device for highway maintenance, through water pump, D water pipe, agitator tank, C water pipe, water tank and agitator motor's setting for in the use, water in the water tank passes through C water pipe, water tank, water pump and D water pipe inflow agitator tank, mixes with the cement in the agitator tank, rethread agitator motor's stirring, and the muddy water stirring that cement can be timely when having realized the construction is and use, has practiced thrift the resource and has still guaranteed the quality of cement.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the structure of the water pump of the present invention;
fig. 3 is a schematic view of the structure of the triangular lead block tray of the present invention.
In the figure: 1. a base; 2. a stirring box; 3. a stirring motor; 4. a, a water pipe; 5. a water suction pump; 6. a water pipe B; 7. a water outlet pipe; 8. a limiting ring; 9. a fixed block; 10. a triangular lead block disc; 11. empty pipe; 12. a water tank; 13. a water pump; 14. c, a water pipe; 15. d, a water pipe; 16. a high-pressure water gun placing sleeve; 17. a universal wheel; 18. a housing.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
Referring to fig. 1 to 3, the present invention provides a technical solution: a crack filling device for highway maintenance comprises a base 1, wherein the upper surface of the base 1 is fixedly connected with a stirring box 2, the upper surface of the stirring box 2 is provided with a small hole A, a stirring motor 3 is inserted into the small hole A, one side of the stirring box 2 is provided with a small hole B, the surface of the other end of a water pipe 4,A inserted into the small hole B is sleeved with a water suction pump 5, the surface of the other end of a water pipe 6,B inserted into the water pipe 5 is sleeved with a water outlet pipe 7, the surface of the water outlet pipe 7 is sleeved with a limiting ring 8, the surface of the limiting ring 8 is fixedly connected with a triangular lead block disc 10 through a fixing block 9, and the position of the limiting ring 8 can be firmly fixed through the arrangement of the water outlet pipe 7, the limiting ring 8, the fixing block 9, the filling position of the triangular lead block disc 10 and the hollow pipe 11, so that in the use process, an operator can fix the filling position of the limiting ring 8 firmly, the water outlet pipe 7 cannot occur due to position change in operation, the case of the filling device, the hollow pipe 7 is guaranteed, construction, the construction progress of the hollow pipe 7 is well protected, and the construction progress of the hollow pipe 7 is prevented from being damaged;
the C aperture has been seted up to the bottom of spacing ring 8, the inside fixedly connected with in C aperture is used for protecting the blank pipe 11 of outlet pipe 7, the other end of outlet pipe 7 is pegged graft in the inside of blank pipe 11, make outlet pipe 7 can obtain better protection after inserting blank pipe 11, the last fixed surface of base 1 is connected with water tank 12 and the water pump 13 that is used for storing water, the D aperture has been seted up to one side of water tank 12, C water pipe 14 has been pegged graft to the inside in D aperture, the surface of the other end of C water pipe 14 cup joints the one end of water pump 13, the other end of water pump 13 has been pegged graft D water pipe 15, the E aperture has been seted up to the upper surface of agitator tank 2, the other end of D water pipe 15 is pegged graft in the upper surface of agitator tank 2, the cover 16 is placed to the upper surface fixedly connected with high-pressure squirt of base 1, the lower fixed surface of base 1 is connected with universal wheel 17, make personnel after pushing equipment to the existing location, it can make universal wheel 17 be in the restriction state to step on the brake block down, the upper surface fixedly connected with shell 18 of base 1.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
In conclusion, this crack filling device is used in highway maintenance, in the use, through water pump 13, D water pipe 15, agitator tank 2, C water pipe 14, water tank 12 and agitator motor 3's setting, make in the use, 12, water in the water tank 15 passes through C water pipe 14, water tank 12, water pump 13 and D water pipe 15 inflow agitator tank 2, mix with the cement in agitator tank 2, rethread agitator motor 3's stirring, the muddy water stirring that cement can be timely when having realized the construction is and use, the quality of cement has still been guaranteed to the resources of having practiced thrift.
In the description of the present application, the terms "connect", "install", "fix", "set", "provided", etc. are used in a broad sense, for example, the term "connect" may be a fixed connection or an indirect connection through an intermediate component without affecting the relationship between components and the technical effect, or may be an integral connection or a partial connection, and as the case may be, for a person of ordinary skill in the art, the specific meaning of the above terms in the present invention or the present invention can be understood according to specific situations, and the directions or positional relationships indicated by the terms "inside", "outside", "on", etc. are based on the directions or positional relationships shown in the drawings, or the directions or positional relationships that the products of the present invention are usually placed when in use, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the devices or elements referred to must have specific directions, be constructed and operated in specific directions, and therefore, cannot be understood as a limitation to the present invention.
The utility model discloses the standard part that uses all can purchase from the market, dysmorphism piece all can be customized according to the description with the record of attached drawing in the specification, the concrete connection mode of each part all adopts conventional means such as ripe bolt, rivet, welding among the prior art, machinery, part and equipment all adopt among the prior art, conventional model, including the conventional connection mode among the circuit connection adoption prior art, no detailed description here again, and the part that technical staff in the field knows, its structure and principle all can learn or learn through conventional experimental approach for this technical staff's accessible technical manual.
Claims (6)
1. The utility model provides a crack filling device for highway maintenance, includes base (1), its characterized in that: the last fixed surface of base (1) is connected with agitator tank (2), the A aperture has been seted up to the upper surface of agitator tank (2), stirring motor (3) have been pegged graft to the inside of A aperture, the B aperture has been seted up to one side of agitator tank (2), the inside of B aperture is pegged graft and is had A water pipe (4), suction pump (5) have been cup jointed on the surface of the other end of A water pipe (4), the other end of suction pump (5) is pegged graft and is had B water pipe (6), outlet pipe (7) have been cup jointed on the surface of the other end of B water pipe (6), spacing ring (8) have been cup jointed on the surface of outlet pipe (7), fixed block (9) fixedly connected with triangle lead plate (10) are passed through on the surface of spacing ring (8).
2. The crack filling device for highway maintenance according to claim 1, wherein: the bottom of the limiting ring (8) is provided with a small hole C, and a hollow pipe (11) used for protecting the water outlet pipe (7) is fixedly connected inside the small hole C.
3. The crack filling device for highway maintenance according to claim 1, wherein: the other end of the water outlet pipe (7) is inserted into the hollow pipe (11), and the upper surface of the base (1) is fixedly connected with a water tank (12) and a water pump (13) for storing water.
4. The crack filling device for highway maintenance according to claim 3, wherein: a D small hole is formed in one side of the water tank (12), a C water pipe (14) is inserted into the D small hole, the surface of the other end of the C water pipe (14) is sleeved at one end of the water pump (13), and a D water pipe (15) is inserted into the other end of the water pump (13).
5. The crack filling device for highway maintenance according to claim 4, wherein: the upper surface of agitator tank (2) is seted up E aperture, the other end of D water pipe (15) is pegged graft in the upper surface of agitator tank (2).
6. The crack filling device for highway maintenance according to claim 1, wherein: the upper surface fixed connection of base (1) places cover (16) with the high-pressure squirt, the lower fixed surface of base (1) is connected with universal wheel (17), the upper surface fixed connection of base (1) has shell (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221066194.1U CN218203773U (en) | 2022-05-06 | 2022-05-06 | Crack filling device for highway maintenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221066194.1U CN218203773U (en) | 2022-05-06 | 2022-05-06 | Crack filling device for highway maintenance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218203773U true CN218203773U (en) | 2023-01-03 |
Family
ID=84645267
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221066194.1U Expired - Fee Related CN218203773U (en) | 2022-05-06 | 2022-05-06 | Crack filling device for highway maintenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218203773U (en) |
-
2022
- 2022-05-06 CN CN202221066194.1U patent/CN218203773U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204800848U (en) | Construction concrete mixing bucket | |
CN218203773U (en) | Crack filling device for highway maintenance | |
CN204800844U (en) | High altitude concrete secondary agitator for building | |
CN206404687U (en) | A kind of rotating material blender | |
CN204575366U (en) | A kind of concrete real time sample device | |
CN110969809A (en) | Portable geological disaster monitoring device | |
CN110106882A (en) | A kind of gas lift reverse circulation device for cast-in-situ bored pile | |
CN206233673U (en) | A kind of herringbone holding pole standing device | |
CN204800849U (en) | Concrete mixing bucket for building site high altitude construction | |
CN107620314A (en) | The construction method and concrete column leg structure of a kind of concrete suspension column | |
CN207788821U (en) | Nuclear reactor vessel flange bolt adapter hollow pins remover | |
CN210563268U (en) | Ground filling tool for house building engineering | |
CN108589761A (en) | A kind of prefabricated assembled concrete basis | |
CN207331733U (en) | A kind of concrete column leg structure | |
CN205875747U (en) | Concrete flat -topped ridge formula vibrator | |
CN205674356U (en) | Cement mortar processing system | |
CN205917725U (en) | Communication tower | |
CN205799867U (en) | Concrete batch turning system | |
CN105826589A (en) | Method for glue pouring of battery box of electric vehicle | |
CN208963599U (en) | A kind of engineering construction concrete bucket | |
CN209686595U (en) | A kind of pre-buried structure | |
CN211548824U (en) | Concrete vibrating equipment | |
CN218060246U (en) | Engineering is managed with road surface basic unit sampling device | |
CN209129374U (en) | A kind of floor processing hole to be provided template component | |
CN216551937U (en) | Structure system for pre-embedding and breaking pile head by utilizing carbon dioxide |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230103 |