CN218176875U - Municipal administration drainage is with enclosing fender convenient to stabilize - Google Patents

Municipal administration drainage is with enclosing fender convenient to stabilize Download PDF

Info

Publication number
CN218176875U
CN218176875U CN202222161652.6U CN202222161652U CN218176875U CN 218176875 U CN218176875 U CN 218176875U CN 202222161652 U CN202222161652 U CN 202222161652U CN 218176875 U CN218176875 U CN 218176875U
Authority
CN
China
Prior art keywords
rail
fixed
screw rod
horizontal pole
base platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222161652.6U
Other languages
Chinese (zh)
Inventor
陈映标
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Chuangran Construction Co ltd
Original Assignee
Guangdong Chuangran Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Chuangran Construction Co ltd filed Critical Guangdong Chuangran Construction Co ltd
Priority to CN202222161652.6U priority Critical patent/CN218176875U/en
Application granted granted Critical
Publication of CN218176875U publication Critical patent/CN218176875U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a municipal drainage is with being convenient for firm fender that encloses relates to municipal administration technical field. The utility model discloses a stump, first rail, second rail, ground nail and screw rod, the stump includes the base station, base station upper end symmetry is fixed with the loop bar, the lower part of loop bar is fixed with the spacing ring, the lower extreme of base station is fixed with the stand, it has the ground nail to peg graft in the base station, the cover is equipped with first rail on the loop bar, it has the screw rod to peg graft between first rail and the second rail, and screw rod lower part outer peripheral face has connect the nut soon, and the structure of first rail and second rail is the same. The utility model discloses a set up stake, ground nail, put first rail, second rail, solved municipal drainage construction and enclosed that keep off inconvenient connection, place firm inadequately and enclose the fender and can't center on according to specific area of construction, lead to enclosing the problem on too much unnecessary ground.

Description

Municipal administration drainage is with enclosing fender that is convenient for stabilize
Technical Field
The utility model belongs to the technical field of the municipal administration, especially, relate to a municipal drainage is with being convenient for firm fender that encloses.
Background
Municipal administration refers to various administrative works of a city. Also referred to as market trading transactions; and (5) city management work. Including industrial and commercial, traffic, public security, cultural and educational, environmental, sanitary, infrastructure, etc. Municipal drainage is one of them important engineering, and in municipal drainage engineering's the construction process, it encloses the fender and surrounds the construction area to need to utilize usually, avoids external pedestrian etc. to get into, avoids leading to construction potential safety hazard, ensures inside and outside personnel's safety, but it still has following drawback in the in-service use:
1. the existing municipal drainage construction enclosure is generally rigid, is independent and is inconvenient to connect with each other, is not stable enough after being placed and is easy to topple;
2. the current municipal drainage construction encloses and keeps off unable according to specific construction area and centers on too much unnecessary area usually, leads to external traffic to produce the influence.
Therefore, the existing municipal drainage fence cannot meet the requirements in practical use, so that an improved technology is urgently needed in the market to solve the problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a municipal drainage is with being convenient for firm fender that encloses through setting up stake, ground nail, putting first rail, second rail, has solved municipal drainage construction and has enclosed that the fender is inconvenient to be connected, place firm inadequately and enclose the fender and can't center on according to concrete construction area, leads to enclosing the too much problem on unnecessary ground.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a municipal administration drainage is with being convenient for firm fender that encloses, including stake, first rail, second rail, ground nail and screw rod, the stake includes the base station, base station upper end symmetry is fixed with the loop bar, the lower part of loop bar is fixed with the spacing ring, the lower extreme of base station is fixed with the stand, it has the ground nail to peg graft in the base station, the cover is equipped with first rail on the loop bar, it has the screw rod to peg graft between first rail and the second rail, and screw rod lower part outer peripheral face has connect the nut soon, and the structure of first rail and second rail is the same.
Further, first rail includes first horizontal pole and second horizontal pole, the both ends of first horizontal pole and second horizontal pole all are fixed with the lantern ring, the loop bar outside is located through the lantern ring cover to the one end of first horizontal pole and second horizontal pole, and it has the screw rod to peg graft in the lantern ring of the first horizontal pole and the second horizontal pole other end.
Furthermore, a vertical bar is fixed between the first cross bar and the second cross bar, a vertical bar is fixed at the bottom of the second cross bar, and a bottom plate is fixed at the bottom end of the vertical bar.
Further, a support is fixed to the bottom of the stand column, a through groove is formed in the center of the upper end of the base platform and penetrates through the base platform, the stand column and the support, the ground nail is inserted into the through groove, and the through groove is located between the two loop bars.
Furthermore, four lantern rings close to each other in the first rail and the second rail are positioned on the same vertical central line and are vertically penetrated through by a screw rod.
The utility model discloses following beneficial effect has:
1. the utility model discloses a set up stake, ground nail, solved municipal drainage construction and enclosed the inconvenient connection of fender, place firm problem inadequately, through the stake stable place in subaerial, ground nail is gone into in the cooperation, realizes stable the placing, avoids simple touching to topple over, secondly sets up the loop bar on the base station in the stake, can be convenient be connected with the rail, simple cover is established and can be accomplished the equipment, also can not connect insecurely, can remain stable under the action of gravity of rail self.
2. The utility model discloses a set up first rail, the second rail, it can't center on according to specific construction area to have solved municipal drainage construction and enclosed the fender, lead to enclosing the problem on too much unnecessary ground, adopt the screw rod to peg graft between first rail and the second rail, use the screw rod earlier between first rail and the second rail as the center rotation, around the construction region, form anomalous centering, recycle nut and screw rod locking are injectd, the completion centers on, the connection of avoiding the deadlock between the rail leads to the too much problem of centering on the region.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an exploded view of the present invention;
fig. 3 is a structural diagram of the first rail of the present invention.
In the drawings, the reference numbers indicate the following list of parts:
1. erecting a pile; 101. a base station; 102. a column; 103. a loop bar; 104. a limiting ring; 105. a support; 106. a through groove; 2. a first fence; 201. a first cross bar; 202. a second cross bar; 203. a vertical bar; 204. a collar; 205. a vertical rod; 206. a base plate; 3. a second fence; 4. a ground nail; 5. a screw; 6. and a nut.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention.
Please refer to fig. 1-3, the utility model relates to a municipal drainage is with enclosing fender convenient to stabilize, including founding stake 1, first rail 2, second rail 3, ground nail 4 and screw rod 5, founding stake 1 includes base station 101, base station 101 upper end symmetry is fixed with loop bar 103, the lower part of loop bar 103 is fixed with spacing ring 104, the lower extreme of base station 101 is fixed with stand 102, it has ground nail 4 to peg graft in the base station 101, the cover is equipped with first rail 2 on the loop bar 103, peg graft between first rail 2 and the second rail 3 and have screw rod 5, and screw rod 5 lower part outer peripheral face has connect soon nut 6, first rail 2 is the same with second rail 3's structure, found stake 1 vertical placing subaerial, utilize ground nail 4 to pass its inside nailing ground, in order to keep the stability of structure, can not empty easily, and establish first rail 2 through loop bar 103 cover on the base station 101 in founding stake 1, second rail 3 utilizes screw rod 5 to rotate with first rail 2 and is connected, conveniently adjust the angle between the two, cooperate rail 6 to lock the topography, thereby it prescribes to select to open according to construct with the second angle, be convenient to carry out.
As shown in fig. 1-3, the first rail 2 includes a first cross bar 201 and a second cross bar 202, two ends of the first cross bar 201 and the second cross bar 202 are both fixed with a collar 204, one end of the first cross bar 201 and one end of the second cross bar 202 are sleeved outside the collar 103 through the collar 204, and a screw 5 is inserted in the collar 204 at the other end of the first cross bar 201 and the second cross bar 202;
four lantern rings 204 close to each other in the first fence 2 and the second fence 3 are positioned on the same vertical middle line and are vertically penetrated by a screw 5;
when the first rail 2 and the second rail 3 are assembled, firstly, two lantern rings 204 at one end of the first rail 2 are sleeved on the sleeve rod 103, the other end of the first rail 2 is matched with one end of the second rail 3, the four lantern rings 204 which are close to each other are arranged on the same vertical line, then, the screw 5 penetrates through the lantern rings 204, the angles of the first rail 2 and the second rail 3 are adjusted according to the terrain to be surrounded, after the determination, the nut 6 is screwed in from the bottom end of the screw 5 until the screw is in contact with the second cross bar 202, the positions of the first rail 2 and the second rail 3 can be limited by screwing, the other end of the second rail 3 can be connected with a new vertical pile 1, and can also be connected with a group of first rails 2, and the connection modes are consistent as above.
A vertical bar 203 is fixed between the first cross bar 201 and the second cross bar 202, a vertical bar 205 is fixed at the bottom of the second cross bar 202, and a bottom plate 206 is fixed at the bottom end of the vertical bar 205;
a plurality of vertical bars 203 are connected between the first cross bar 201 and the second cross bar 202 to form an upper structure of the fence, and a plurality of vertical bars 205 are connected below the second cross bar 202 to form a lower structure of the fence by utilizing a bottom plate 206 to back cover.
As shown in fig. 1-2, a support 105 is fixed at the bottom of the upright post 102, a through groove 106 is formed in the center of the upper end of the base 101, the through groove 106 penetrates through the base 101, the upright post 102 and the support 105, the ground nail 4 is inserted into the through groove 106, and the through groove 106 is located between the two loop bars 103;
steadily place subaerially through support 105, after confirming the position, insert logical groove 106 with ground nail 4, nail into ground to confirm the position of stake 1, the structure is comparatively firm.
The above is only the preferred embodiment of the present invention, and the present invention is not limited thereto, and any modifications to the technical solutions recorded in the foregoing embodiments, and equivalent replacements to some of the technical features thereof, and any modifications, equivalent replacements, and improvements made belong to the protection scope of the present invention.

Claims (5)

1. The utility model provides a municipal administration drainage is with enclosing fender convenient to stabilize, includes stake (1), first rail (2), second rail (3), ground nail (4) and screw rod (5), its characterized in that: the vertical pile (1) comprises a base platform (101), sleeve rods (103) are symmetrically fixed to the upper end of the base platform (101), a limiting ring (104) is fixed to the lower portion of each sleeve rod (103), a stand column (102) is fixed to the lower end of the base platform (101), ground nails (4) are inserted into the base platform (101), a first rail (2) is sleeved on each sleeve rod (103), a screw rod (5) is inserted between the first rail (2) and the second rail (3), a nut (6) is screwed on the outer peripheral face of the lower portion of each screw rod (5), and the first rail (2) and the second rail (3) are identical in structure.
2. The municipal drainage stable surrounding baffle as claimed in claim 1, wherein: first rail (2) include first horizontal pole (201) and second horizontal pole (202), the both ends of first horizontal pole (201) and second horizontal pole (202) all are fixed with lantern ring (204), loop bar (103) outside is located through lantern ring (204) cover to the one end of first horizontal pole (201) and second horizontal pole (202), and it has screw rod (5) to peg graft in lantern ring (204) of first horizontal pole (201) and second horizontal pole (202) other end.
3. The municipal drainage stable surrounding baffle as claimed in claim 2, wherein: vertical bars (203) are fixed between the first cross bar (201) and the second cross bar (202), vertical bars (205) are fixed at the bottom of the second cross bar (202), and bottom plates (206) are fixed at the bottom ends of the vertical bars (205).
4. The municipal drainage stable surrounding baffle as claimed in claim 1, wherein: the bottom of the upright post (102) is fixed with a support (105), the center of the upper end of the base platform (101) is provided with a through groove (106), the through groove (106) penetrates through the base platform (101), the upright post (102) and the support (105), the ground nail (4) is inserted into the through groove (106), and the through groove (106) is located between the two loop bars (103).
5. The convenient-to-stabilize fence for municipal drainage according to claim 2, characterized in that: four lantern rings (204) which are close to each other in the first fence (2) and the second fence (3) are positioned on the same vertical middle line and are vertically penetrated through by a screw rod (5).
CN202222161652.6U 2022-08-16 2022-08-16 Municipal administration drainage is with enclosing fender convenient to stabilize Active CN218176875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222161652.6U CN218176875U (en) 2022-08-16 2022-08-16 Municipal administration drainage is with enclosing fender convenient to stabilize

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222161652.6U CN218176875U (en) 2022-08-16 2022-08-16 Municipal administration drainage is with enclosing fender convenient to stabilize

Publications (1)

Publication Number Publication Date
CN218176875U true CN218176875U (en) 2022-12-30

Family

ID=84619696

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222161652.6U Active CN218176875U (en) 2022-08-16 2022-08-16 Municipal administration drainage is with enclosing fender convenient to stabilize

Country Status (1)

Country Link
CN (1) CN218176875U (en)

Similar Documents

Publication Publication Date Title
CN218176875U (en) Municipal administration drainage is with enclosing fender convenient to stabilize
CN210289329U (en) Embedded part for installing street lamp pole
CN208673679U (en) Facilities Construction safety warning-panel in a kind of factory
CN210173529U (en) Fixing device is deposited to reinforcing bar for construction
CN209816893U (en) Ground pile bearing platform
CN210459920U (en) Construction frame
CN203654880U (en) Safety fence
CN210031550U (en) Concrete pouring steel formwork for highway bridge
CN220847234U (en) Electric power safety warning device
CN206616923U (en) A kind of concurrent
CN207812355U (en) A kind of urban road and traffic engineering protective fence
CN214786616U (en) Peach-shaped upright column base installation part
FR2343198A1 (en) Temporary traffic sign post with cruciform base - has members which pivot into line via lifting rotation and lowering between retaining lugs
CN221024858U (en) Combined spliced water storage equipment
CN212927331U (en) Be used for side slope enclosure construction protector
CN214463823U (en) Anti-tilting safety ladder
CN210396370U (en) Interim rail is used in protection of environmental protection engineering building site foundation ditch
CN219138621U (en) Portable protective structure of municipal works's foundation ditch
CN216553316U (en) Urban and rural planning land reclamation device
CN219344302U (en) Modularized highway construction guardrail
CN215104946U (en) Detachable guardrail assembly for municipal public works
CN204608792U (en) A kind of chassis stone installing rack
CN219034308U (en) Safety fence for road construction
CN218091902U (en) Support connection structure for civil engineering
CN210827839U (en) Double-circulation garage fixed upright post structure device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant