CN218815630U - Municipal works construction safety control rail - Google Patents
Municipal works construction safety control rail Download PDFInfo
- Publication number
- CN218815630U CN218815630U CN202221329150.3U CN202221329150U CN218815630U CN 218815630 U CN218815630 U CN 218815630U CN 202221329150 U CN202221329150 U CN 202221329150U CN 218815630 U CN218815630 U CN 218815630U
- Authority
- CN
- China
- Prior art keywords
- block
- fixed
- fence
- connecting block
- construction safety
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Fencing (AREA)
Abstract
本实用新型公开了一种市政工程施工安全管理围栏,包括若干支撑柱,支撑柱底部固定设有配重块,其中每两个支撑柱之间匹配设有围栏框,围栏框匹配固定设有若干围栏杆,围栏框侧面匹配设有告示板,围栏框下端两侧对称固定设有两个下连接块,支撑柱侧面固定设有与下连接块匹配的下固定块,围栏框上端两侧对称固定设有两个上连接块,支撑柱侧面固定设有与上连接块匹配的上固定块,上固定块与上连接块之间通过紧固螺栓固定连接。本实用新型可用于市政工程施工安全管理围栏,具有便于运输和设置的效果,同时可进行多角度变换,并可在变换后进行稳定固定。
The utility model discloses a municipal engineering construction safety management fence, which comprises a plurality of support columns, and the bottom of the support columns is fixed with counterweight blocks, wherein a fence frame is matched and fixed between every two support columns, and a number of fence frames are matched and fixed. The fence pole, the side of the fence frame is matched with a notice board, the lower end of the fence frame is symmetrically fixed on both sides with two lower connecting blocks, the side of the supporting column is fixed with a lower fixing block matching the lower connecting block, and the upper end of the fence frame is fixed symmetrically on both sides There are two upper connecting blocks, and an upper fixing block matching the upper connecting block is fixed on the side of the support column, and the upper fixing block and the upper connecting block are fixedly connected by fastening bolts. The utility model can be used for the safety management fence of the municipal engineering construction, has the effect of being convenient for transportation and installation, can perform multi-angle transformation at the same time, and can be stably fixed after transformation.
Description
技术领域technical field
本实用新型涉及市政工程施工安全管理装置技术领域,尤其涉及一种市政工程施工安全管理围栏。The utility model relates to the technical field of municipal engineering construction safety management devices, in particular to a municipal engineering construction safety management fence.
背景技术Background technique
市政工程是指城市道路、桥梁、给排水、污水处理、城市防洪、园林、道路绿化、路灯、环境卫生等城市公用事业工程,市政工程一般是属于国家的基础建设,是城市生存和发展必不可少的物质基础,是提高人民生活水平和对外开放的基本条件,市政工程施工时,会在施工地外围设置安全管理围栏,用于提醒路过的行人和车辆,确保施工的安全。Municipal engineering refers to urban public utility projects such as urban roads, bridges, water supply and drainage, sewage treatment, urban flood control, gardens, road greening, street lights, and environmental sanitation. Municipal engineering generally belongs to the country's infrastructure and is essential for urban survival and development. A small material base is the basic condition for improving people's living standards and opening up to the outside world. During the construction of municipal projects, safety management fences will be set up around the construction site to remind passing pedestrians and vehicles to ensure the safety of construction.
市政工程施工中,一些工程需要在短时间内完成,以减少对人们生活的影响,例如路面裂缝的修补,因此设置的围栏需要具有便捷设置的特性,以方便临时快速的施工,但是现有的市政工程施工安全管理围栏多数在设置时,围栏相互之间的连接,只能进行平行对接,在需要进行包围操作时,围栏之间只能进行直角对接,因此围护设置时,只能够设置矩形的包围圈,整体设置不够灵活,且占地面积较大,而现有的可灵活对接的围栏,缺少在对接后的固定机构,存在不稳定性。In the construction of municipal engineering, some projects need to be completed in a short time to reduce the impact on people's lives, such as the repair of cracks on the road surface, so the fences set up need to have the characteristics of convenient setting to facilitate temporary and rapid construction, but the existing Most of the construction safety management fences of municipal engineering are set up. The connection between the fences can only be connected in parallel. When the encirclement operation is required, the fences can only be connected at right angles. The overall setting of the encircling circle is not flexible enough, and the floor area is relatively large, while the existing fence that can be flexibly docked lacks a fixing mechanism after docking, so there is instability.
如中国专利:CN215056036U公开了一种建筑施工安全管理用围栏,还具体公开了:包括第一围栏框架,所述第一围栏框架的左侧设置有第二围栏框架,所述第二围栏框架的左后侧设置有拼接围栏框架,所述第一围栏框架、第二围栏框架和拼接围栏框架上安装有定位支撑组件。Such as Chinese patent: CN215056036U discloses a fence for building construction safety management, and also specifically discloses: comprising a first fence frame, a second fence frame is provided on the left side of the first fence frame, and a second fence frame is provided on the left side of the second fence frame A spliced fence frame is arranged on the left rear side, and positioning support components are installed on the first fence frame, the second fence frame and the spliced fence frame.
该实用新型存在一些不足之处:其设置的第一围栏框架、第二围栏框架、拼接围栏框架在进行拼接设置时,为直角拼接固定,在需要进行包围操作时,围栏之间只能够设置矩形的包围圈,整体设置不够灵活,占地面积较大。There are some deficiencies in this utility model: the first fence frame, the second fence frame, and the splicing fence frame are spliced and fixed at right angles when splicing. When encircling operations are required, only rectangles can be set between the fences. The encirclement circle, the overall setting is not flexible enough, and occupies a large area.
为此,我们提出一种市政工程施工安全管理围栏来解决上述问题。To this end, we propose a municipal engineering construction safety management fence to solve the above problems.
实用新型内容Utility model content
本实用新型的目的是为了解决现有技术中存在的缺点,而提出的一种市政工程施工安全管理围栏。The purpose of the utility model is to solve the shortcomings in the prior art, and propose a municipal engineering construction safety management fence.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种市政工程施工安全管理围栏,包括若干支撑柱,所述支撑柱底部固定设有配重块,其中每两个所述支撑柱之间匹配设有围栏框,所述围栏框匹配固定设有若干围栏杆,所述围栏框侧面匹配设有告示板,所述围栏框下端两侧对称固定设有两个下连接块,所述支撑柱侧面固定设有与下连接块匹配的下固定块,所述围栏框上端两侧对称固定设有两个上连接块,所述支撑柱侧面固定设有与上连接块匹配的上固定块,所述上固定块与上连接块之间通过紧固螺栓固定连接。A municipal engineering construction safety management fence, comprising several support columns, the bottom of the support columns is fixed with a counterweight, wherein a fence frame is matched between every two support columns, and the fence frame is matched and fixed with a A number of fence poles, the side of the fence frame is matched with a notice board, two lower connecting blocks are fixed symmetrically on both sides of the lower end of the fence frame, and the side of the support column is fixed with a lower fixing block matching the lower connecting block, Two upper connecting blocks are symmetrically fixed on both sides of the upper end of the fence frame, and an upper fixing block matching the upper connecting block is fixed on the side of the support column, and the upper fixing block and the upper connecting block are fixed by fastening bolts Fixed connection.
优选地,若干所述围栏杆呈竖直设置,且均匀设置在围栏框中部,若干所述围栏杆与围栏框高度匹配。Preferably, several of the fence bars are vertically arranged and evenly arranged in the middle of the fence frame, and the height of the several of the fence bars matches the fence frame.
优选地,所述告示板形状呈矩形,所述告示板四个边角处均固定设有连接卡块,四个所述连接卡块分别与两个围栏杆位置对应,且与围栏杆卡接匹配。Preferably, the shape of the notice board is rectangular, and the four corners of the notice board are fixed with connecting blocks, and the four connecting blocks respectively correspond to the positions of the two fence poles, and are clamped with the fence poles match.
优选地,所述下固定块上侧竖直固定设有竖直圆杆,所述下连接块设有与竖直圆杆匹配的圆孔。Preferably, the upper side of the lower fixing block is vertically fixed with a vertical round bar, and the lower connecting block is provided with a round hole matching the vertical round bar.
优选地,所述上固定块上侧固竖直固定设有圆柱块,所述上连接块设有与圆柱块匹配的通孔,所述圆柱块与竖直圆杆同轴对应。Preferably, the upper side of the upper fixing block is vertically fixed with a cylindrical block, the upper connecting block is provided with a through hole matching the cylindrical block, and the cylindrical block is coaxially corresponding to the vertical round rod.
优选地,所述圆柱块内部竖直设有与紧固螺栓匹配的螺纹孔,所述紧固螺栓上端转动设有环状块,所述环状块内部直径与圆柱块直径匹配,所述环状块侧面固定设有限位块,所述限位块呈折弯状,且上连接块上侧设有与限位块下端匹配的凹槽。Preferably, the inside of the cylindrical block is vertically provided with threaded holes matching the fastening bolts, and the upper end of the fastening bolts is rotated to form an annular block, the inner diameter of the annular block matches the diameter of the cylindrical block, and the ring A limit block is fixed on the side of the shaped block, and the limit block is bent, and a groove matching the lower end of the limit block is provided on the upper side of the upper connecting block.
与现有技术相比,本实用新型的有益效果为:Compared with the prior art, the beneficial effects of the utility model are:
本实用新型通过设置若干支撑柱,并在若干支撑柱之间设置围栏框和对应的围栏杆,从而实现围栏的效果,且通过设置对应的下连接块和下固定块,以及上固定块和上连接块,使得整体装置具有可拆卸的效果,进而使得整体装置具有便于运输和设置的效果,同时围栏框与支撑柱之间可进行多角度变换,不局限于直角对接,设置更加灵活,可有效减小围护时占用的面积,且通过在上固定块与上连接块之间设置紧固螺栓,从而实现对角度调节后的支撑柱和围栏框的固定,具有稳定固定的效果。The utility model realizes the effect of the fence by arranging several support columns, and setting fence frames and corresponding fence bars between several support columns, and by setting corresponding lower connecting blocks and lower fixing blocks, as well as upper fixing blocks and upper The connection block makes the overall device detachable, which in turn makes the overall device easy to transport and install. At the same time, multi-angle transformations can be performed between the fence frame and the support column, not limited to right-angle docking. The setting is more flexible and can be effectively The area occupied during enclosure is reduced, and by setting fastening bolts between the upper fixing block and the upper connecting block, the angle-adjusted support column and the fence frame can be fixed, which has a stable and fixed effect.
附图说明Description of drawings
图1为本实用新型提出的一种市政工程施工安全管理围栏的结构示意图;Fig. 1 is the structural representation of a kind of municipal engineering construction safety management fence that the utility model proposes;
图2为本实用新型提出的一种市政工程施工安全管理围栏中的围栏框的结构示意图;Fig. 2 is the structural representation of the fence frame in a kind of municipal engineering construction safety management fence that the utility model proposes;
图3为本实用新型提出的一种市政工程施工安全管理围栏中的紧固螺栓的结构示意图。Fig. 3 is a structural schematic diagram of fastening bolts in a municipal engineering construction safety management fence proposed by the utility model.
图中:1支撑柱、2围栏框、3围栏杆、4告示板、5下连接块、6下固定块、7上连接块、8上固定块、9紧固螺栓、10配重块、11连接卡块、12竖直圆杆、13圆柱块、14环状块、15限位块。In the figure: 1 supporting column, 2 fence frame, 3 fence pole, 4 bulletin board, 5 lower connecting block, 6 lower fixing block, 7 upper connecting block, 8 upper fixing block, 9 fastening bolt, 10 counterweight, 11 Connect block, 12 vertical round rods, 13 cylindrical blocks, 14 annular blocks, 15 limit blocks.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.
参照图1-3,一种市政工程施工安全管理围栏,包括若干支撑柱1,支撑柱1底部固定设有配重块10,配重块10为钢板材质,具有一定的重量,对支撑柱1起到稳定支撑的作用,可使得支撑柱1保持竖直设置,其中每两个支撑柱1之间匹配设有围栏框2,围栏框2匹配固定设有若干围栏杆3,若干围栏杆3呈竖直设置,且均匀设置在围栏框2中部,若干围栏杆3与围栏框2高度匹配,围栏框2和若干围栏杆3组成一个整体围栏,围栏框2侧面匹配设有告示板4,告示板4形状呈矩形,告示板4四个边角处均固定设有连接卡块11,四个连接卡块11分别与两个围栏杆3位置对应,且与围栏杆3卡接匹配,即上下对应的两个连接卡块11与同一个围栏杆3卡接固定,告示板4用于粘贴施工警示,告示板4可通过连接卡块11进行便捷设置,可设置在围栏框2的正反方位;Referring to Figures 1-3, a municipal construction safety management fence includes a number of
围栏框2下端两侧对称固定设有两个下连接块5,支撑柱1侧面固定设有与下连接块5匹配的下固定块6,下连接块5与下固定块6上下位置对应,下固定块6上侧竖直固定设有竖直圆杆12,下连接块5设有与竖直圆杆12匹配的圆孔,下连接块5可套设在竖直圆杆12上,实现连接的效果,并具有转动的效果,围栏框2上端两侧对称固定设有两个上连接块7,支撑柱1侧面固定设有与上连接块7匹配的上固定块8,上连接块7与上固定块8上下位置对应,上固定块8上侧固竖直固定设有圆柱块13,上连接块7设有与圆柱块13匹配的通孔,上连接块7可套设在圆柱块13上,实现连接的效果,且可转动,圆柱块13与竖直圆杆12同轴对应,通过圆柱块13与竖直圆杆12,围栏框2可进行便捷设置,且可进行同轴心转动,与支撑柱1之间进行角度的调节,不局限与直接对接;Both sides of the lower end of the
上固定块8与上连接块7之间通过紧固螺栓9固定连接,圆柱块13内部竖直设有与紧固螺栓9匹配的螺纹孔,紧固螺栓9可竖直拧入圆柱块13中固定,紧固螺栓9上端转动设有环状块14,环状块14可自由转动,环状块14内部直径与圆柱块13直径匹配,环状块14可套入圆柱块13中,环状块14侧面固定设有限位块15,限位块15呈折弯状,且上连接块7上侧设有与限位块15下端匹配的凹槽,限位块15可卡入凹槽中,通过将对应的限位块15与对应的上连接块7的凹槽匹配,并拧入紧固螺栓9,紧固螺栓9向下挤压对应的环状块14,环状块14和限位块15挤压上连接块7,进而实现对围栏框2的固定,实现围栏框2和支撑柱1的对接和固定。The
本实用新型中,该装置的工作原理如下:In the utility model, the working principle of the device is as follows:
在设置围栏时,先竖直放置好两个支撑柱1,在两个支撑柱1之间设置围栏框2,将两个上连接块7和上固定块8对应,两个下连接块5和两个下固定块6对应,并将上连接块7套入到圆柱块13中,将下连接块5套入到竖直圆杆12中,完成初步设置;之后通过紧固螺栓9进行固定,此时也可对围栏框2与支撑柱1之间进行角度调节,进行固定时,通过将对应的限位块15与对应的上连接块7的凹槽卡接匹配,并拧入对应的紧固螺栓9,紧固螺栓9向下挤压对应的环状块14,环状块14和限位块15挤压上连接块7,将上连接块7与对应的上固定块8挤压固定,进而对围栏框2进行固定,最后使得围栏框2和支撑柱1的对接和固定,通过相同的步骤,最后完成围栏的设置。When setting up the fence, first place two
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. The equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221329150.3U CN218815630U (en) | 2022-05-31 | 2022-05-31 | Municipal works construction safety control rail |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202221329150.3U CN218815630U (en) | 2022-05-31 | 2022-05-31 | Municipal works construction safety control rail |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218815630U true CN218815630U (en) | 2023-04-07 |
Family
ID=87250530
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202221329150.3U Expired - Fee Related CN218815630U (en) | 2022-05-31 | 2022-05-31 | Municipal works construction safety control rail |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218815630U (en) |
-
2022
- 2022-05-31 CN CN202221329150.3U patent/CN218815630U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211083849U (en) | Liftable street lamp | |
| CN214942376U (en) | Green building materials guardrail template strutting arrangement convenient to adjust | |
| CN211743932U (en) | Cable support for municipal works | |
| CN210722260U (en) | LED display screen provided with solar cell panel | |
| CN206477678U (en) | The detachable color steel of construction site is gone along with sb. to guard him | |
| CN213773821U (en) | Green building steel structure frame convenient to dismantle | |
| CN215443431U (en) | Municipal construction engineering construction safety control rail | |
| CN211851241U (en) | An easy-to-remove municipal building fence | |
| CN205918227U (en) | Can have enough to meet need interim enclosure | |
| CN211777140U (en) | A protective device suitable for civil engineering in water plants | |
| CN114352116A (en) | Can realize fixed concatenation formula rail of multi-angle | |
| CN211526251U (en) | Assembled solar street lamp | |
| CN212156981U (en) | A combined solar street light | |
| CN218508285U (en) | Warning rod powered by solar energy | |
| CN209653570U (en) | A kind of transformable building construction security protection enclosing | |
| CN220868982U (en) | Auxiliary mounting structure of street lamp | |
| CN223793605U (en) | Foundation pit supporting protection frame for hydraulic engineering construction | |
| CN219138339U (en) | Construction template with circular structure | |
| CN218233222U (en) | Traffic sign pole suitable for roads with different topography | |
| CN218581296U (en) | Foundation pit guardrail for building construction | |
| CN218263357U (en) | A road side ditch support form fixture | |
| CN222414361U (en) | A construction fence | |
| CN221218834U (en) | Building deep foundation pit support plate | |
| CN222333473U (en) | An auxiliary tool for high-speed railway foundation fence column construction | |
| CN220319281U (en) | Municipal road protector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230407 |