CN218176871U - Safety protective guard for building engineering management - Google Patents

Safety protective guard for building engineering management Download PDF

Info

Publication number
CN218176871U
CN218176871U CN202221942311.6U CN202221942311U CN218176871U CN 218176871 U CN218176871 U CN 218176871U CN 202221942311 U CN202221942311 U CN 202221942311U CN 218176871 U CN218176871 U CN 218176871U
Authority
CN
China
Prior art keywords
fixedly connected
rod
engineering management
splicing
piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221942311.6U
Other languages
Chinese (zh)
Inventor
杨章本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221942311.6U priority Critical patent/CN218176871U/en
Application granted granted Critical
Publication of CN218176871U publication Critical patent/CN218176871U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a safety protective guard for building engineering management, which comprises two support rods, wherein two support rods are provided with a splicing mechanism and a telescopic mechanism respectively, the splicing mechanism comprises mounting seats fixedly connected to the top and the bottom of each support rod respectively, the right side of each mounting seat is fixedly connected with a splicing block, a splicing groove is formed in each mounting seat, and the splicing groove is communicated with the left side of each mounting seat; the top fixedly connected with of mount pad is spacing, the inside sliding connection of spacing has the atress piece, the bottom fixedly connected with stopper of atress piece, the mount pad has been alternate to the lower extreme of stopper and extends to the inside of splice groove, the top fixedly connected with pull rod of atress piece, the upper end of pull rod has alternate the atress piece and extends to the top of atress piece. This safety protective guard for building engineering management has the convenient dismantlement installation of protective guard, the convenient advantage of transportation.

Description

Safety protective guard for building engineering management
Technical Field
The utility model relates to a guardrail technical field specifically is a safety protective guard for building engineering management.
Background
The upright post of the guardrail is fixed with the ground through expansion bolts or pre-buried. Are usually installed on the sides of logistics channels, the periphery of production equipment, building corners, the sides of doors and the edges of cargo beds, etc.
Protective guards are often used for protection around building engineering, the protective guards are often formed by splicing a plurality of single-section protective guards together, the protective guards are sent to a building site for splicing and installation, or the protective guards need to be disassembled and transported after the building engineering is completed, the protective guards can be often transported as the protective guards are often disassembled and installed, the conventional protective guards and the protective guards are usually connected in a bolt mode, tools are needed during splicing, the bolts need to be screwed down one by one, the installation and the disassembly are complicated, the installation and the disassembly efficiency are low, the disassembled protective guards occupy too much space, and the transportation is inconvenient; to the above, the utility model discloses the device has the convenient dismantlement installation of rail guard, transports convenient advantage.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a safety protective guard for building engineering management possesses the guardrail and conveniently dismantles the installation, and the guardrail advantage of convenient transportation has solved traditional guardrail installation and has dismantled trouble, transports the big problem of occupation space.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a safety protective guard for building engineering management, including the bracing piece, the bracing piece has two, two install grafting mechanism and telescopic machanism on the bracing piece respectively, grafting mechanism is including the mount pad of fixed connection respectively in bracing piece top and bottom, the right side fixedly connected with of mount pad splices the piece, the splice groove has been seted up to the inside of mount pad, the splice groove is put through with the left of mount pad mutually.
The utility model discloses a spacing frame of mount pad, including mount pad, stress piece, stopper, mount pad, splicing groove, compression spring's upper end and lower extreme difference fixed connection are on the top of the inner wall top of spacing frame and stress piece, the inside sliding connection of spacing frame has the stress piece, the bottom fixedly connected with stopper of stress piece, the lower extreme of stopper has alternated the mount pad and extends to the inside of splicing groove, the top fixedly connected with pull rod of stress piece, the upper end of pull rod has alternated the stress piece and extends to the top of stress piece, compression spring has cup jointed on the pull rod, compression spring's upper end and lower extreme difference fixed connection are on the top of the inner wall top of spacing frame and stress piece.
Furthermore, telescopic machanism is including the montant, the montant is between two bracing pieces.
Further, a sliding groove is formed in the vertical rod, and a sliding block is connected to the inside of the sliding groove in a sliding mode.
Furthermore, the number of the vertical rods is five, an adjusting rod is arranged between each vertical rod and the corresponding vertical rod, and an adjusting rod is also arranged between each supporting rod and the corresponding vertical rod.
Furthermore, the one end of adjusting the pole is connected on bracing piece and montant through the articulated elements respectively, the other end of adjusting the pole rotates to be connected on the slider.
Furthermore, wherein the bottom fixedly connected with inserted bar of below the mount pad, the inserted bar has two.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this safety protective guard for building engineering management through set up the mount pad on the bracing piece, when a plurality of guardrails were installed, pegged graft splice on the guardrail inside the splice groove of another guardrail to accomplish the concatenation to the guardrail, when needs are dismantled the guardrail, only need upwards stimulate the pull rod, thereby realize the convenient advantage of installing and dismantling the guardrail.
2. This safety protective guard for building engineering management protects through setting up regulation pole and montant between two bracing pieces, through adjusting pole swing joint between bracing piece and montant, when will carrying the guardrail, can contract regulation pole and montant, reduces the occupation space of guardrail to it is more convenient when making the transportation.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is a schematic structural diagram of the plugging mechanism of the present invention;
FIG. 3 is an enlarged view of portion A of FIG. 1 according to the present invention;
fig. 4 is a top view of a specific positional relationship between the vertical rod and the sliding block.
In the figure: the device comprises a supporting rod 1, a mounting seat 2, an adjusting rod 3, a vertical rod 4, an inserting rod 5, a splicing block 6, a splicing groove 7, a limiting block 8, a compression spring 9, a limiting frame 10, a pull rod 11, a stress block 12 and a sliding block 13.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the safety guard rail for building engineering management in this embodiment includes two support rods 1, two support rods 1 are respectively provided with an inserting mechanism and a telescopic mechanism, the inserting mechanism includes a mounting seat 2 respectively fixedly connected to the top and the bottom of the support rod 1, a splicing block 6 is fixedly connected to the right side of the mounting seat 2, a splicing groove 7 is formed in the mounting seat 2, and the splicing groove 7 is communicated with the left side of the mounting seat 2.
The inner wall diameter of splice groove 7 is greater than the external diameter of splice block 6, and splice block 6 can insert inside splice groove 7, through inserting splice block 6 inside splice groove 7 to make two mount pads 2 link together, splice block 6's top is provided with the barb mouth.
Spacing frame 10 of top fixedly connected with of mount pad 2, the inside sliding connection of spacing frame 10 has atress piece 12, the bottom fixedly connected with stopper 8 of atress piece 12, mount pad 2 has been alternate to stopper 8's lower extreme and extends to the inside of splice groove 7, the top fixedly connected with pull rod 11 of atress piece 12, atress piece 12 has been alternate and extends to the top of atress piece 12 in the upper end of pull rod 11, compression spring 9 has been cup jointed on pull rod 11, compression spring 9's upper end and lower extreme difference fixed connection are on the top of the inner wall top of spacing frame 10 and atress piece 12.
Splice 6 is pegged graft inside splice 7, splice 6 contacts with stopper 8 inside splice 7, the bottom of stopper 8 sets up to the inclined plane, splice 6 upwards promotes stopper 8 with stopper 8 contact, the barb mouth has been seted up at splice 6's top, when stopper 8 is directly over splice 6 barb mouth, compression spring 9 is under self elastic potential energy this moment, promote stopper 8 downwards, splice 8's bottom is pegged graft downwards inside splice 6, thereby spacing splice 6 carries on, splice 6 can't so splice 7 inside take out this moment, upwards stimulate pull rod 11, pull rod 11 drives atress piece 12 and stopper 8 upward movement together, stopper 8 upward movement and splice 6 separation this moment, it is spacing to splice 6 contact, splice 6 can take out splice from splice 7 inside this moment.
In this embodiment, telescopic machanism is including montant 4, montant 4 is between two bracing pieces 1, the spout has been seted up to the inside of montant 4, slider 13 sliding connection is inside the spout, montant 4 has five, be provided with between montant 4 and the montant 4 and adjust pole 3, also be provided with between bracing piece 1 and the montant 4 and adjust pole 3, the one end of adjusting pole 3 is connected on bracing piece 1 and montant 4 through the articulated elements respectively, adjust the other one end of pole 3 and rotate and connect on slider 13, wherein the bottom fixedly connected with inserted bar 5 of below mount pad 2, inserted bar 5 has two, when will transporting the guardrail, can promote two bracing pieces 1, make two bracing pieces 1 draw close each other, adjust pole 3 this moment and can rotate the shrink, adjust pole 3 when rotating the shrink, adjust pole 3 and can drive slider 13 and slide on montant 4 this moment, make and be close to and gather together between a plurality of montants 4, two bracing pieces 1 also draw together this moment, splice 7 inside of seting piece 6 grafting on left bracing piece 1 set up on mount pad 2, carry out the right-hand splice piece 6 through stopper 8, make two bracing pieces 1 draw together slowly, thereby the separation of the space is saved and the regulation pole, it can not make the pull more convenient pull to make the connection of 3 remove the pull rod 3, thereby the pull rod 3, any more separate of connecting rod, thereby the pull rod can make the pull rod 3, the connection of connecting rod.
The working principle of the above embodiment is as follows:
when a plurality of guardrails are spliced together for installation, splicing blocks 6 on the guardrails can be spliced inside a splicing groove 7 of another guardrail, the splicing blocks 6 are in contact with limiting blocks 8 inside the splicing groove 7, the bottoms of the limiting blocks 8 are set to be inclined planes, the splicing blocks 6 are in contact with the limiting blocks 8 to push the limiting blocks 8 upwards, barb openings are formed in the tops of the splicing blocks 6, when the limiting blocks 8 are right above the barb openings of the splicing blocks 6, compression springs 9 are under elastic potential energy of the compression springs at the moment, the limiting blocks 8 are pushed downwards, the bottoms of the limiting blocks 8 are spliced downwards inside the splicing blocks 6, so that the splicing blocks 6 are limited, the splicing blocks 6 cannot be taken out from the inside of the splicing groove 7 at the moment, mounting seats 2 on different guardrails are spliced together, two guardrails are connected together, splicing installation on the guardrails is realized, when the guardrail is to be disassembled, only the pull rod 11 needs to be pulled upwards, the pull rod 11 drives the stressed block 12 and the limiting blocks 8 to move upwards together, the limiting blocks 8 are separated from the splicing block 6 at the splicing groove 6 at the moment, the splicing groove 6 is contacted, the splicing groove 7 can be pulled out from the splicing groove 7, the splicing groove 7 is convenient for disassembling process of the disassembling process, the whole disassembling process of disassembling and the splicing groove can be conveniently.
When will transporting the guardrail, can promote two bracing pieces 1, make two bracing pieces 1 draw close each other, the one end that the pole 3 of adjusting was connected through the articulated elements this moment can rotate, the other one end of adjusting pole 3 can drive slider 13 and slide on montant 4, make and slowly be close to between a plurality of montants 4 and draw close, two bracing pieces 1 also draw close each other this moment, 7 inside the splice groove of seting up on right-hand mount pad 2 up to splice piece 6 on the bracing piece 1 of left, carry on spacingly through stopper 8 to splice piece 6, make two bracing pieces 1 draw close together, can't separate, thereby the space has been saved, it is more convenient to make the transportation.
Has the advantages that:
1. this safety protective guard for building engineering management through set up mount pad 2 on bracing piece 1, when a plurality of guardrails were installed, pegged graft splice 6 on the guardrail inside splice groove 7 of another guardrail to accomplish the concatenation to the guardrail, when needs are dismantled the guardrail, only need upwards stimulate pull rod 11, thereby realize conveniently installing and the advantage of dismantling the guardrail to the guardrail
2. This safety protective guard for building engineering management protects through setting up regulation pole 3 and montant 4 between two bracing pieces 1, through adjusting 3 swing joint of pole between bracing piece 1 and montant 4, when will carrying the guardrail, can contract regulation pole 3 and montant 4, reduces the occupation space of guardrail to it is more convenient during the messenger transports.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a safety protective guard for building engineering management, including bracing piece (1), bracing piece (1) has two, two install grafting mechanism and telescopic machanism, its characterized in that on bracing piece (1) respectively: the splicing mechanism comprises a mounting seat (2) fixedly connected to the top and the bottom of the supporting rod (1) respectively, a splicing block (6) is fixedly connected to the right side of the mounting seat (2), a splicing groove (7) is formed in the mounting seat (2), and the splicing groove (7) is communicated with the left side of the mounting seat (2);
the top fixedly connected with of mount pad (2) is spacing frame (10), the inside sliding connection of spacing frame (10) has atress piece (12), the bottom fixedly connected with stopper (8) of atress piece (12), the inside that mount pad (2) and splice groove (7) were penetrated and crossed to the lower extreme of stopper (8), the top fixedly connected with pull rod (11) of atress piece (12), atress piece (12) and the top that extends to atress piece (12) have been penetrated and crossed to the upper end of pull rod (11), compression spring (9) have been cup jointed on pull rod (11), the upper end and the lower extreme of compression spring (9) are fixed connection respectively on the top of the inner wall top of spacing frame (10) and the top of atress piece (12).
2. The safety guard rail for construction engineering management according to claim 1, wherein: the telescopic mechanism comprises a vertical rod (4), and the vertical rod (4) is arranged between the two supporting rods (1).
3. The safety guard rail for construction engineering management according to claim 2, wherein: the inside of montant (4) has seted up the spout, the inside sliding connection of spout has slider (13).
4. A safety guard rail for construction engineering management according to claim 3, wherein: five vertical rods (4) are provided, an adjusting rod (3) is arranged between the vertical rods (4) and the vertical rods (4), and the adjusting rod (3) is also arranged between the supporting rod (1) and the vertical rods (4).
5. The safety guard rail for construction engineering management according to claim 4, wherein: one end of the adjusting rod (3) is connected to the supporting rod (1) and the vertical rod (4) through the hinged parts respectively, and the other end of the adjusting rod (3) is connected to the sliding block (13) in a rotating mode.
6. The safety guard rail for construction engineering management according to claim 1, wherein: wherein the bottom fixedly connected with inserted bar (5) of below mount pad (2), inserted bar (5) have two.
CN202221942311.6U 2022-07-26 2022-07-26 Safety protective guard for building engineering management Active CN218176871U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221942311.6U CN218176871U (en) 2022-07-26 2022-07-26 Safety protective guard for building engineering management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221942311.6U CN218176871U (en) 2022-07-26 2022-07-26 Safety protective guard for building engineering management

Publications (1)

Publication Number Publication Date
CN218176871U true CN218176871U (en) 2022-12-30

Family

ID=84615689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221942311.6U Active CN218176871U (en) 2022-07-26 2022-07-26 Safety protective guard for building engineering management

Country Status (1)

Country Link
CN (1) CN218176871U (en)

Similar Documents

Publication Publication Date Title
CN113235948B (en) Spatial vertical rotation construction method for steel structure roof of large-scale venue
CN218176871U (en) Safety protective guard for building engineering management
CN214245799U (en) Pile foundation connecting device convenient to dismantle and install
CN103352600A (en) Support frame for climbing electric pole
CN217175873U (en) Assembled building used screen
CN217400307U (en) Make things convenient for quick assembly disassembly's template supporting disk to detain frame
CN211285306U (en) Preceding operation platform of bridge hanging basket
CN211549090U (en) On-spot safety device for construction
CN213330119U (en) Wisdom building site faces limit protective structure
CN215254365U (en) Movable steel structure scaffold convenient to disassemble and assemble
CN114351866B (en) Large-scale steel sheet beam type shed frame
CN217712077U (en) Building protective fence convenient to install
CN218205220U (en) Fabricated building truss for building construction
CN214062588U (en) High altitude building construction rail guard
CN217205000U (en) Guardrail bar is prevented temporarily in construction
CN219175812U (en) Beam side rear embedded part construction operation platform
CN215978821U (en) Removable supporting is used in building engineering construction
CN220580041U (en) Open caisson formwork platform
CN213539281U (en) Large-span net rack steel structure
CN219451715U (en) Assembled guard rail for house construction
CN216007877U (en) Climbing frame protective net for building climbing engineering
CN215254413U (en) Supporting platform device for building construction
CN220598706U (en) Steel structure connection structure for assembled building
CN214943090U (en) Road pit fence protection device
CN218406051U (en) Split type steel construction building crossbeam of dismantling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant