CN218176593U - Scaffold frame is with drawing connected node outward - Google Patents

Scaffold frame is with drawing connected node outward Download PDF

Info

Publication number
CN218176593U
CN218176593U CN202221876249.5U CN202221876249U CN218176593U CN 218176593 U CN218176593 U CN 218176593U CN 202221876249 U CN202221876249 U CN 202221876249U CN 218176593 U CN218176593 U CN 218176593U
Authority
CN
China
Prior art keywords
mounting
connecting part
scaffold
installation
clamping blocks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN202221876249.5U
Other languages
Chinese (zh)
Inventor
张一�
丁光修
马鹏
刘磊
肖桁
刘德荣
熊胜权
候继峰
吴相贵
冉江铃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202221876249.5U priority Critical patent/CN218176593U/en
Application granted granted Critical
Publication of CN218176593U publication Critical patent/CN218176593U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a pull-out connecting node for scaffold, which comprises an embedded part, a second connecting part, an installation part and a locking part; the embedded part is embedded in the concrete outer wall and comprises a first connecting part extending out of the concrete outer wall; the second connecting part is detachably connected with the second connecting part; the two mounting parts are arranged on the second connecting part in a separated mode and respectively comprise a first mounting hole formed in the vertical direction and a second mounting hole formed in the horizontal direction, and the second mounting holes are located on one side of the first mounting holes; each first mounting hole is used for mounting one of the upright columns arranged in the scaffold along the vertical direction, and the two second mounting holes are matched for mounting one of the cross columns arranged in the scaffold along the horizontal direction; the locking piece is arranged on the second connecting part and used for abutting and locking the upright post installed in each first installation hole; compared with the prior art, the utility model, the installation stability of scaffold frame has been improved.

Description

Scaffold frame is with drawing connected node outward
Technical Field
The utility model relates to a architectural equipment field, concretely relates to scaffold frame is with drawing connected node outward.
Background
At present, external scaffolds need to be erected in the construction process of a large number of domestic buildings, and more external pulling nodes need to be arranged when the external scaffolds are erected.
Patent document with application number CN202020174027.3 discloses a fast and convenient construction scaffold connection node device, which comprises a transverse column, a vertical column and a connection node device, wherein the transverse column and the vertical column are arranged vertically to each other, and the connection node device is connected to the rear side of a vertical contact point of the transverse column and the vertical column; wherein the connecting node device consists of a clamping plate tightening arm, a stand column clamping plate, a transverse column clamping hook and a fixing groove block.
The quick and convenient building scaffold connecting node device is only used for connecting the transverse columns and the upright columns, and when the quick and convenient building scaffold connecting node device is arranged on the outer side of a building with a certain height, the stability of the top side of the scaffold is poor; simultaneously to the fixed of spreader be through the counterbalance of stand and the spreader presss from both sides the suppression of colluding at the spreader top and accomplish, there is the relatively poor problem of stability in the installation of spreader.
SUMMERY OF THE UTILITY MODEL
To the not enough that exists among the prior art, the utility model aims to provide a scaffold frame is with drawing connected node outward to solve prior art, there is the relatively poor problem of stability in the relatively poor and installation of spreader of stability on scaffold frame top side.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a scaffolding stay-out coupler comprising:
the embedded part is embedded in the concrete outer wall and comprises a first connecting part extending out of the concrete outer wall;
the second connecting part is detachably connected with the first connecting part;
the two installation parts are arranged on the second connecting part in a separated mode and respectively comprise a first installation hole formed in the vertical direction and a second installation hole formed in the horizontal direction, and the second installation holes are located on one side of the first installation holes; each first mounting hole is used for mounting one of the upright posts arranged in the scaffold along the vertical direction, and the two second mounting holes are matched for mounting one of the cross posts arranged in the scaffold along the horizontal direction;
the locking piece is arranged on the second connecting part and used for abutting and locking the upright post installed in each first installation hole; when the upright posts are abutted and locked, the upright posts are abutted and locked with the cross posts.
Compared with the prior art, the utility model discloses following beneficial effect has:
after the embedded part is embedded in the concrete outer wall, the whole scaffold is stably and fixedly connected with the concrete outer wall through the connection of the first connecting part and the second connecting part by using the pull-out connecting node, and the scaffold is connected with the top side of the scaffold by using the pull-out connecting node, so that the mounting stability of the scaffold is greatly improved; meanwhile, the upright posts are arranged in the two first mounting holes, and the same transverse post is arranged in the two second mounting holes, so that the transverse posts are stably mounted; when the locking piece locks with the stand column installed in the two first installation holes, the two stand columns still prop against the cross column, and the stability of the installation of the cross column is further improved.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Reference numerals in the drawings of the specification include: the vertical type embedded part comprises an embedded part 1, an installation plate 11, a connecting plate 12, a second connecting part 2, an installation part 3, a transverse plate 31, a vertical plate 32, a locking part 4, a first clamping block 41, a second clamping block 42, an installation block 43, a movable adjusting block 44, an adjusting screw 45, a vertical column 5 and a transverse column 6.
Detailed Description
As shown in fig. 1, an embodiment of the present invention provides a pull-out connection node for a scaffold, which includes an embedded part, a second connection part 2, an installation part 3, and a locking part 4;
the embedded part is embedded in the concrete outer wall and comprises a first connecting part extending out of the concrete outer wall;
the second connecting part 2 is detachably connected with the second connecting part 2;
the two mounting parts 3 are arranged on the second connecting part 2 in a separated mode and respectively comprise a first mounting hole formed in the vertical direction and a second mounting hole formed in the horizontal direction, and the second mounting holes are located on one side of the first mounting holes; each first mounting hole is used for mounting one of the upright posts 5 arranged in the scaffold along the vertical direction, and the two second mounting holes are matched for mounting one of the cross posts 6 arranged in the scaffold along the horizontal direction;
the locking piece 4 is arranged on the second connecting part 2 and is used for locking the upright post 5 installed in each first installation hole in an abutting mode; when the upright posts 5 are locked against each other, the upright posts 5 are locked against the cross posts 6.
In this embodiment: after the embedded parts are embedded in the concrete outer wall, the whole scaffold is stably and fixedly connected with the concrete outer wall through the connection of the first connecting parts and the second connecting parts 2 by using the pull-out connecting nodes, and the scaffold is connected with the top side of the scaffold by using the pull-out connecting nodes, so that the mounting stability of the scaffold is greatly improved; meanwhile, the upright posts 5 are installed in the two first installation holes, and the same transverse post 6 is installed in the two second installation holes, so that the transverse posts 6 are stably installed; when the locking piece 4 abuts against the upright posts 5 installed in the two first installation holes for locking, the two upright posts 5 also abut against the cross post 6, and the installation stability of the cross post 6 is further improved;
wherein: the first mounting hole is of a larger diameter than the outer diameter of the post 5 so that the post 5 is mounted in the first mounting hole to be movable into engagement with the latch member 4 and the cross-post 6.
In order to improve the installation stability of the scaffold, a plurality of outwards-pulling connecting nodes for the scaffold can be arranged on the upright post 5 installed on the concrete outer wall in the scaffold at intervals along the upright post 5, and the scaffold has enough installation stability.
As shown in fig. 1, according to another embodiment of the present invention, the scaffold external pulling connection node comprises a locking member 4 including a first clamping block 41, a second clamping block 42 and a driving part;
the two first clamping blocks 41 are in one-to-one corresponding sliding connection with the two mounting parts 3, the first clamping blocks 41 are in sliding connection with the corresponding mounting parts 3 through connecting rods, and the first clamping blocks 41 move between first mounting holes and second mounting holes in the corresponding mounting parts 3;
two second clamping blocks 42 are arranged in opposite direction corresponding to the two first clamping blocks 41 one by one;
the driving part is arranged on the second connecting part 2 and connected with the two second clamping blocks 42, and is used for driving the two second clamping blocks 42 to synchronously approach or leave from the corresponding first clamping blocks 41.
In this embodiment: the driving part provides power to enable the two second clamping blocks 42 to move synchronously, when the two second clamping blocks 42 move towards the direction of the first clamping blocks 41 which are respectively matched with the two second clamping blocks 42, the two second clamping blocks 42 enable the upright posts 5 in the two first mounting holes to move towards the direction close to the transverse post 6, and the first clamping blocks 41 move towards the direction close to the transverse post 6; until the second clamping blocks 42, the upright columns 5, the first clamping blocks 41 and the cross columns 6 can not move, at this time, the two first clamping blocks 41 abut against the cross columns 6 and the two upright columns 5, and the two first clamping blocks 41 and the two second clamping blocks 42 are correspondingly matched one by one to clamp and fix the two upright columns 5.
Each first clamping block 41 is provided with a first arc-shaped clamping surface and a second arc-shaped clamping surface which are arranged in a separated mode, the first arc-shaped clamping surface is close to one side of the first mounting hole and is arranged in a penetrating mode in the vertical direction, and the second arc-shaped clamping surface is close to one side of the second mounting hole and is arranged in a penetrating mode in the horizontal direction.
When the first clamping block 41 is abutted against the corresponding part between the upright post 5 and the transverse post 6, the contact area between the first clamping block 41 and the corresponding upright post 5 and the corresponding transverse post 6 is increased through the design of the first arc-shaped clamping surface and the second arc-shaped clamping surface, so that the stability of the upright post 5 and the transverse post 6 in locking and fixing is improved.
Every second grip block 42 is formed with the third arc clamping face near the terminal surface that corresponds first mounting hole, and the third arc clamping face link up along vertical direction and arranges to have enough big area of contact when making second grip block 42 offset with corresponding stand 5, improve centre gripping stability.
Based on the scheme, the adopted driving part comprises a mounting block 43, a movable adjusting block 44 and an adjusting screw rod 45;
wherein, the mounting block 43 is fixedly connected to the second connecting part 2;
the movable adjusting block 44 is connected between the two mounting parts 3 in a sliding manner, and the movable adjusting block 44 is fixedly connected with the two second clamping blocks 42;
the adjustment screw 45 is threadedly coupled to the mounting block 43 and is also rotatably coupled to the movable adjustment block 44.
The adjusting screw rod 45 is rotated to drive the moving adjusting block 44 to move, and then the two second clamping blocks 42 are driven to be close to or far away from the upright post 5 installed in the corresponding first installation hole, so that the clamping and fixing state of the upright post 5 is controlled, and the adjusting process is convenient and rapid.
As shown in fig. 1, according to the utility model discloses a scaffold frame is with drawing connecting node outward, wherein every installation department 3 all includes diaphragm 31, diaphragm 31's one end and second connecting portion 2 are fixed to be linked to each other, and the other end top all is connected with the riser 32 of arranging along vertical direction, and first mounting hole is seted up on diaphragm 31, and the second mounting hole is seted up on riser 32.
In this embodiment: the transverse plate 31 and the vertical plate 32 are arranged in an L shape, so that the first mounting hole and the second mounting hole can be conveniently and reasonably arranged; the movable adjusting block 44 is connected between the vertical plates 32 of the two mounting parts 3 in a sliding manner.
According to another embodiment of the present invention, as shown in fig. 1, the external pulling connection node for scaffold further comprises a mounting plate 11 and a connection plate 12;
two mounting plates 11 are arranged at intervals, and a first connecting part is connected to the side wall of one mounting plate 11 far away from the other mounting plate 11;
at least one connecting plate 12 is connected between the two mounting plates 11.
In this embodiment: the connecting plates 12 are arranged in two and spaced-apart relationship between the mounting plates 11 to provide sufficient stability to the embedment.
Furthermore, the first connecting part can be a connecting screw connected with the corresponding mounting plate 11 in a welding manner, and the second connecting part 2 is a connecting cylinder in threaded connection with the connecting screw, so that the connection is convenient and quick; except for the embedded parts, the external pulling connecting node for the scaffold can be repeatedly used.
Finally, it is noted that the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the scope of the claims of the present invention.

Claims (6)

1. A scaffold frame is with outer connected node that draws, includes:
the embedded part is embedded in the concrete outer wall and comprises a first connecting part extending out of the concrete outer wall;
the second connecting part is detachably connected with the first connecting part;
the two installation parts are arranged on the second connecting part in a separated mode and respectively comprise a first installation hole formed in the vertical direction and a second installation hole formed in the horizontal direction, and the second installation holes are located on one side of the first installation holes; each first mounting hole is used for mounting one of the upright posts arranged in the scaffold along the vertical direction, and the two second mounting holes are matched for mounting one of the cross posts arranged in the scaffold along the horizontal direction;
the locking piece is arranged on the second connecting part and used for abutting and locking the upright post installed in each first installation hole; when the upright posts are abutted and locked, the upright posts are abutted and locked with the cross posts.
2. A scaffolding telescopic coupler according to claim 1, wherein: the lock member includes:
the two first clamping blocks are in one-to-one corresponding sliding connection with the two mounting parts, and the first clamping blocks move between the first mounting holes and the second mounting holes on the corresponding mounting parts;
the two second clamping blocks are arranged correspondingly and oppositely to the two first clamping blocks one by one;
and the driving part is arranged on the second connecting part and is connected with the two second clamping blocks and used for driving the two second clamping blocks to be synchronously close to or far away from the corresponding first clamping blocks.
3. A scaffolding telescopic coupler according to claim 2, wherein: the driving part includes:
the mounting block is fixedly connected to the second connecting part;
the movable adjusting block is connected between the two mounting parts in a sliding manner and is fixedly connected with the two second clamping blocks;
and the adjusting screw rod is in threaded connection with the mounting block and is also in rotating connection with the movable adjusting block.
4. A scaffold flare-out connecting node according to claim 1, wherein: every the installation department all includes the diaphragm, the one end and the second connecting portion of diaphragm are fixed to be linked to each other, and other end top all is connected with the riser of arranging along vertical direction, and first mounting hole is seted up on the diaphragm, and the second mounting hole is seted up on the riser.
5. A scaffolding telescopic coupler according to claim 2, wherein: every all be equipped with first arc clamping face and the second arc clamping face of arranging apart from each other on the first grip block, first arc clamping face is close to first mounting hole one side and link up along vertical direction and arranges, and second arc clamping face is close to second mounting hole one side and link up along the horizontal direction and arranges.
6. A scaffolding telescopic coupler according to claim 1, wherein: the embedded part further comprises:
the mounting plates are arranged at intervals, and the first connecting part is connected to the side wall of one mounting plate far away from the other mounting plate;
and at least one connecting plate is connected between the two mounting plates.
CN202221876249.5U 2022-07-20 2022-07-20 Scaffold frame is with drawing connected node outward Withdrawn - After Issue CN218176593U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221876249.5U CN218176593U (en) 2022-07-20 2022-07-20 Scaffold frame is with drawing connected node outward

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221876249.5U CN218176593U (en) 2022-07-20 2022-07-20 Scaffold frame is with drawing connected node outward

Publications (1)

Publication Number Publication Date
CN218176593U true CN218176593U (en) 2022-12-30

Family

ID=84615698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221876249.5U Withdrawn - After Issue CN218176593U (en) 2022-07-20 2022-07-20 Scaffold frame is with drawing connected node outward

Country Status (1)

Country Link
CN (1) CN218176593U (en)

Similar Documents

Publication Publication Date Title
CN218176593U (en) Scaffold frame is with drawing connected node outward
CN210195199U (en) Assembled climbing frame for building
CN212104724U (en) Unit formula aluminum plate connection structure for curtain convenient to use
CN210421872U (en) Laminated slab overhanging scaffold I-steel embedded pipe
CN220645158U (en) Scaffold with adjustable dish knot
CN210713397U (en) Connecting piece for avoiding steel truss and scaffold of special-shaped curtain wall
CN217053742U (en) Steel structure node component
CN214696062U (en) Platform frame modular structure of green steel construction
CN211597651U (en) Structure system of I-steel encorbelments
CN216406012U (en) Externally-hung wallboard and building main body convenient to connect
CN219773575U (en) Multifunctional building safety protection scaffold board frame board
CN114278071B (en) Climbing frame for building construction
CN219034083U (en) Beam frame device easy to install
CN212176101U (en) Connection structure for steel construction
CN215631611U (en) Hang mould bearing structure
CN214942430U (en) Novel template support for building engineering construction device
CN220377812U (en) Adjustable climbing frame fixing device
CN212715901U (en) Building post-cast strip aluminum alloy template supporting scaffold
CN213837689U (en) Civil construction is with bracing securing device of full hall frame
CN217206212U (en) Building envelope of building engineering
CN218815124U (en) Hanging basket device for erecting on high-rise building slope roof
CN211647264U (en) Wallboard connecting component
CN209855216U (en) Scaffold convenient to installation for curtain wall construction
CN215717186U (en) Building engineering construction is with hanging mould device
CN220014553U (en) Window construction is built with protection safety fence in room

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20221230

Effective date of abandoning: 20230601

AV01 Patent right actively abandoned

Granted publication date: 20221230

Effective date of abandoning: 20230601

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned