CN218154281U - Cyclone and outlet flue combined supporting and hanging structure - Google Patents
Cyclone and outlet flue combined supporting and hanging structure Download PDFInfo
- Publication number
- CN218154281U CN218154281U CN202222483281.3U CN202222483281U CN218154281U CN 218154281 U CN218154281 U CN 218154281U CN 202222483281 U CN202222483281 U CN 202222483281U CN 218154281 U CN218154281 U CN 218154281U
- Authority
- CN
- China
- Prior art keywords
- cyclone
- otic placode
- supporting beam
- export flue
- flue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Fluidized-Bed Combustion And Resonant Combustion (AREA)
Abstract
The utility model relates to a boiler hoist and mount part technical field specifically is a cyclone jointly hangs structure with export flue, and it can reduce the total height of boiler, thereby reduces the use of jib and reduces steel consumption, shortens product production cycle, and it includes cyclone and export flue, cyclone with it props up a supporting beam rigid layer to be provided with between the export flue, it has first otic placode to prop up supporting beam rigid layer bottom welded fastening, cyclone outer wall interval welding has the second otic placode, first otic placode with the position corresponds and connects through the connecting rod about the second otic placode, export flue side outer wall welding have support in prop up the support on the supporting beam rigid layer.
Description
Technical Field
The utility model relates to a boiler hoist and mount part technical field specifically is a cyclone and export flue joint hang structure.
Background
Traditional cyclone hangs on the roof of boiler export flue top through many jibs respectively with the export flue, has increased the total height of boiler, has increased the quantity of jib to boiler steel consumption has been increased. In addition, the hanger rod needs a certain period for production, the period of product production is prolonged, and the workload of workshop production is increased.
Disclosure of Invention
In order to solve the problem that current boiler height is too high, boiler steel consumption is big, product production cycle is long, the utility model provides a cyclone jointly props up with the export flue and hangs the structure, its total height that can reduce the boiler reduces thereby the use of jib and reduces steel consumption, shortens product production cycle.
The technical scheme is as follows: the utility model provides a cyclone and export flue are jointly supported and hang structure, its includes cyclone and export flue, its characterized in that, cyclone with be provided with a supporting beam rigidity layer between the export flue, a supporting beam rigidity layer bottom welded fastening has first otic placode, cyclone outer wall interval welding has the second otic placode, first otic placode with the second otic placode is upper and lower position corresponds and is connected through the connecting rod, export flue side outer wall welding have support in support on the supporting beam rigidity layer.
The connecting rod is further characterized in that two ends of the connecting rod are respectively hinged with the first lug plate and the second lug plate through pin shafts.
Adopt the utility model discloses afterwards, cyclone and export the hanging in midair of flue and support all concentrate on a supporting beam rigidity layer, saved the jib of pulling up originally for the total height of boiler obtains reducing, and the jib replaces with ordinary connecting rod and otic placode, and processing is simple, and length also shortens in addition, has reduced the steel quantity, has shortened product production cycle.
Drawings
FIG. 1 is a schematic view of the present invention;
fig. 2 is an enlarged view ofbase:Sub>A sectionbase:Sub>A-base:Sub>A in fig. 1.
Detailed Description
See fig. 1 and fig. 2, a cyclone and outlet flue combined supporting and hanging structure comprises a cyclone 1 and an outlet flue 2, a supporting beam rigid layer 3 is arranged between the cyclone 1 and the outlet flue 2, a first lug plate 4 is welded and fixed at the bottom of the supporting beam rigid layer 3, second lug plates 5 are welded on the outer wall of the cyclone 1 at intervals, the first lug plates 4 correspond to the second lug plates 5 in the upper-lower positions and are connected through connecting rods 6, and a support 7 supported on the supporting beam rigid layer 3 is welded on the outer wall of the side face of the outlet flue 2.
Two ends of the connecting rod 6 are respectively hinged with the first lug plate 4 and the second lug plate 5 through a pin shaft 8, and the connecting rod 6 is arranged to avoid a connecting flue of the cyclone separator 1 and the hearth.
The utility model discloses on concentrating on a supporting beam rigidity layer 3 with cyclone 1's hoist and mount, export flue 2 changes the support into from hoist and mount, and at side outer wall welded support 7, support on a supporting beam rigidity layer 3, the whole height of boiler obtains reducing, and the steel quantity also significantly reduces reduce cost.
Claims (2)
1. The utility model provides a cyclone and export flue are jointly supported and hang structure, its includes cyclone and export flue, its characterized in that, cyclone with be provided with a supporting beam rigidity layer between the export flue, a supporting beam rigidity layer bottom welded fastening has first otic placode, cyclone outer wall interval welding has the second otic placode, first otic placode with the second otic placode is upper and lower position corresponds and is connected through the connecting rod, export flue side outer wall welding have support in support on the supporting beam rigidity layer.
2. The cyclone separator and outlet flue combined supporting and hanging structure as claimed in claim 1, wherein two ends of the connecting rod are respectively hinged with the first ear plate and the second ear plate through pin shafts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222483281.3U CN218154281U (en) | 2022-09-20 | 2022-09-20 | Cyclone and outlet flue combined supporting and hanging structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222483281.3U CN218154281U (en) | 2022-09-20 | 2022-09-20 | Cyclone and outlet flue combined supporting and hanging structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218154281U true CN218154281U (en) | 2022-12-27 |
Family
ID=84563529
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222483281.3U Active CN218154281U (en) | 2022-09-20 | 2022-09-20 | Cyclone and outlet flue combined supporting and hanging structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218154281U (en) |
-
2022
- 2022-09-20 CN CN202222483281.3U patent/CN218154281U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201268938Y (en) | Corner hanging cradle for working aloft | |
CN218154281U (en) | Cyclone and outlet flue combined supporting and hanging structure | |
CN104925680B (en) | A kind of method of stabilizer tower crane body | |
CN101665211A (en) | Lifting appliance for installing last furnace shell | |
CN201343543Y (en) | Movable hanging scaffold for installing hot blast furnace | |
CN204782207U (en) | Supporting structure of be used for chimney steel inner tube | |
CN205476397U (en) | Bayonet supporting platform of chimney inner tube | |
CN201261681Y (en) | Sling for mounting RH furnace circulating pipe | |
CN209618648U (en) | A kind of lifting lift hanger | |
CN201809040U (en) | Mobile loading platform for hoisting coal economizer of alkali recovery boiler | |
CN209442510U (en) | A kind of suspender for brake hub lifting | |
CN203568661U (en) | Built-in tail-sliding lifting lug | |
CN214090329U (en) | Roof horizontal support hanging device | |
CN208561432U (en) | A kind of composite plate lifting stiffening device | |
CN212334396U (en) | Upper arch type balance beam | |
CN212562391U (en) | Hanging flower basket support device that convenient removed | |
CN212835455U (en) | Supporting angle device for steel suspension box cofferdam lowering system | |
CN209760032U (en) | Bottom die of truss hanging basket | |
CN206188210U (en) | Gasifier drive arrangement dismouting special lifting device | |
CN218754763U (en) | Internal support sleeve mechanism for lifting and supporting pole inverted assembly | |
CN217478836U (en) | Be used for fluidized bed boiler drum hanging beam arrangement structure | |
CN212050435U (en) | Pneumatic lifting device for hanging basket | |
CN216807892U (en) | Variable cross-section tower crane section | |
CN220845904U (en) | Hanging bridge brick for combined tin bath top cover brick structure | |
CN202625608U (en) | Double-hook three-in-one lifting device for electric-arc furnace cover, upper furnace shell and lower furnace shell |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |