CN218150951U - Data verification grouting structure for pipe jacking construction - Google Patents

Data verification grouting structure for pipe jacking construction Download PDF

Info

Publication number
CN218150951U
CN218150951U CN202222254680.2U CN202222254680U CN218150951U CN 218150951 U CN218150951 U CN 218150951U CN 202222254680 U CN202222254680 U CN 202222254680U CN 218150951 U CN218150951 U CN 218150951U
Authority
CN
China
Prior art keywords
mud
liquid level
pipe
level control
data verification
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222254680.2U
Other languages
Chinese (zh)
Inventor
袁果
阚保忠
朱永平
肖帅宏
陈娴雯
李杨
黄兴跃
李明泽
谢虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No6 Construction Co ltd
Original Assignee
Ycih No6 Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ycih No6 Construction Co ltd filed Critical Ycih No6 Construction Co ltd
Priority to CN202222254680.2U priority Critical patent/CN218150951U/en
Application granted granted Critical
Publication of CN218150951U publication Critical patent/CN218150951U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The utility model provides a push pipe construction is with data verification slip casting structure relates to push pipe construction technical field, produce the jar including mud, the side that the jar was produced to mud is equipped with the mud holding vessel, the side of mud holding vessel is equipped with the liquid level control case, the tip of liquid level control case is equipped with the conveyer pipe, the middle part of conveyer pipe is equipped with flow control device and goes, flow control device's internally mounted has the valve body, the inside of liquid level control case is equipped with the push pedal, and the push pedal with the inside swing joint of liquid level control case. Adopt liquid level control case and flow controller, at the in-process of push pipe work, can detect through the geology detection device in the push pipe, after detecting, according to the geology of difference, decide the transport condition of mud to the pressure that control mud was carried and the efficiency of carrying.

Description

Data verification grouting structure for pipe jacking construction
Technical Field
The utility model relates to a push pipe construction technical field especially relates to a push pipe construction is with data verification slip casting structure.
Background
At present, more and more subway entrance/exit pedestrian passageways and street underground pedestrian passageways are constructed by adopting shield pipe-jacking machines, and the key for pipe-jacking tunnel construction is to reduce the friction force between a pipe-jacking pipe joint and the ground. Therefore, thixotropic slurry is injected in the pipe-jacking tunnel construction process, and the thixotropic slurry mainly plays two roles in the pipe-jacking construction process, namely, the thixotropic slurry plays a lubricating role, dry friction between a pipeline and a soil body is changed into wet friction, and resistance is reduced; and secondly, the support function is realized, the tunnel becomes stable under the grouting pressure, and the deformation caused by pipe jacking construction is reduced. The grouting device injects thixotropic slurry according to the actual conditions in the pipe jacking construction process. The injected thixotropic slurry diffuses towards the periphery by taking the circle center of the grouting hole as the center, and the diffusion diameter and the grouting amount are mainly related to the grouting pressure.
Because thixotropic mud can carry out slip casting after needing to stand for 24 hours after stirring, current slip casting device lacks and stores up thick liquid mechanism, often can need to wait for longer time because thixotropic mud is used up, delays construction, and simultaneously in the in-process of slip casting, because geology is different, slip casting pressure and slip casting volume will need to change in real time, consequently need adjust according to actual conditions.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the slip casting structure is verified to a push pipe construction data that proposes.
In order to realize the purpose, the utility model adopts the following technical scheme: the utility model provides a push pipe construction is with data verification slip casting structure, produces the jar including mud, the side that the jar was produced to mud is equipped with the mud holding vessel, the side of mud holding vessel is equipped with liquid level control case, liquid level control case's tip is equipped with the conveyer pipe, the middle part of conveyer pipe is equipped with flow control device, and flow control device and conveyer pipe flange joint, flow control device's internally mounted has the valve body, and valve body and flow control device flange joint, liquid level control case's inside is equipped with the push pedal, and the push pedal with the inside swing joint of liquid level control case.
Preferably, a second connecting pipe is arranged between the slurry production tank and the slurry storage tank, and a first pump body is arranged in the middle of the second connecting pipe.
Preferably, a first connecting pipe is arranged between the slurry storage tank and the liquid level control box, a second pump body is arranged at the end part of the first connecting pipe, and the second pump body is arranged on the top surface of the liquid level control box.
Preferably, the surface of push pedal is connected with two connecting rods, the tip of connecting rod is equipped with the connecting plate, the side of connecting plate is equipped with the pneumatic cylinder, and the flexible end and the connecting plate of pneumatic cylinder are connected.
Preferably, the bottom of pneumatic cylinder is equipped with the base, the base bottom is equipped with the bottom plate, and mud production tank, mud holding vessel, liquid level control case all install the top surface at the bottom plate.
Preferably, the inside of mud output tank and mud holding vessel all is equipped with the puddler, the top of puddler is equipped with the motor, and the output shaft and the puddler of motor are connected, the surface mounting of puddler has stirring vane.
Preferably, the edge of push pedal is equipped with the sealing washer, and the sealing washer parcel is in the edge of push pedal, and the inner wall of sealing washer and liquid level control case laminates mutually.
Advantageous effects
The utility model discloses in, adopt the mud holding vessel, carry the mud holding vessel at the thixotropic mud of producing through mud output jar through the second connecting pipe in to set up stirring vane in the mud holding vessel, can keep mud can not solidify, and thixotropic mud need stew 24 hours after the stirring is accomplished and just can carry out the slip casting, the mud holding vessel just can be saved the mud of output, guarantee that the supply of mud is sufficient, avoided the not enough construction that leads to of grouting in-process thixotropic mud to stop.
The utility model discloses in, adopt liquid level control case and flow controller, at the in-process of push pipe work, can detect through the geology detection device in the push pipe, after detecting, according to the geology of difference, the transport condition of decision mud, and the efficiency of pressure and the transport of control mud transport, can guarantee at the in-process of push pipe work, along with the increase of infiltration volume, the soil body will form the infiltration piece that the one deck is fine and close with mud, simultaneously under the effect of mud pressure, closely combine between piece and the piece, just so formed the mud cover that a stable mud and soil body combination formed around the pipeline, can play the effect of strutting to the soil body, balanced soil pressure, make the soil body around the pipeline become stable, prevent that ground from subsiding.
Drawings
Fig. 1 is an isometric view of the present invention;
fig. 2 is a top view of the present invention;
fig. 3 is a cross-sectional view of the present invention;
fig. 4 is a partial sectional view of the present invention.
Illustration of the drawings:
1. a slurry production tank; 2. a motor; 3. a first pump body; 4. a slurry storage tank; 5. a first connecting pipe; 6. a base plate; 7. a hydraulic cylinder; 8. a base; 9. a connecting plate; 10. a connecting rod; 11. a second pump body; 12. a liquid level control box; 13. a delivery pipe; 14. a valve body; 15. a flow control device; 16. a second connection pipe; 17. pushing a plate; 18. a stirring blade; 19. a stirring rod.
Detailed Description
In order to make the technical means, creation features, achievement objects and functions of the present invention easy to understand, the present invention will be further explained below with reference to the following embodiments and the accompanying drawings. Based on the embodiments in the embodiment, those skilled in the art can obtain other embodiments without making creative efforts, and all of them belong to the protection scope of the present invention.
Specific embodiments of the present invention will be described below with reference to the accompanying drawings.
The specific embodiment is as follows:
referring to fig. 1-4, a data verification grouting structure for pipe jacking construction, including mud production tank 1, the side of mud production tank 1 is equipped with mud holding vessel 4, the side of mud holding vessel 4 is equipped with liquid level control box 12, the tip of liquid level control box 12 is equipped with conveyer pipe 13, the middle part of conveyer pipe 13 is equipped with flow control device 15 and goes, and flow control device 15 and conveyer pipe 13 flange joint, flow control device 15's internally mounted has valve body 14, and valve body 14 and 15 flange joint of flow control device, the inside of liquid level control box 12 is equipped with push pedal 17, and push pedal 17 and the inside swing joint of liquid level control box 12, the edge of push pedal 17 is equipped with the sealing washer, and the sealing washer parcel is in the edge of push pedal 17, and the inner wall of sealing washer and liquid level control box 12 is laminated mutually.
A second connecting pipe 16 is arranged between the slurry production tank 1 and the slurry storage tank 4, a first pump body 3 is arranged in the middle of the second connecting pipe 16, a first connecting pipe 5 is arranged between the slurry storage tank 4 and the liquid level control box 12, a second pump body 11 is arranged at the end part of the first connecting pipe 5, and the second pump body 11 is arranged on the top surface of the liquid level control box 12.
Adopt mud holding vessel 4, thixotropic mud through jar 1 production is produced to mud in second connecting pipe 16 carries mud holding vessel 4, and set up stirring vane 18 in mud holding vessel 4, can keep mud can not solidify, and thixotropic mud need stew 24 hours after the stirring is accomplished and just can carry out the slip casting, mud holding vessel 4 just can be saved the mud of output, guarantee that the supply of mud is sufficient, it leads to the construction to stop to have avoided the not enough of thixotropic mud among the slip casting process.
The second concrete embodiment:
the surface of push pedal 17 is connected with two connecting rods 10, and the tip of connecting rod 10 is equipped with connecting plate 9, and the side of connecting plate 9 is equipped with pneumatic cylinder 7, and pneumatic cylinder 7's flexible end and connecting plate 9 are connected, and the bottom of pneumatic cylinder 7 is equipped with base 8, and base 8 bottom is equipped with bottom plate 6, and the top surface at bottom plate 6 is all installed to mud output tank 1, mud holding vessel 4, level control box 12. The inside of mud production jar 1 and mud holding vessel 4 all is equipped with puddler 19, and the top of puddler 19 is equipped with motor 2, and motor 2's output shaft and puddler 19 are connected, and the surface mounting of puddler 19 has stirring vane 18.
Through the activity of pneumatic cylinder 7 drive push pedal 17 to adjust the inside space of liquid level control case 12, the main function of liquid level control case 12 plays the transfer effect before carrying, according to flow control device 15, judges the velocity of flow condition of mud, adjusts the inside space of liquid level control case 12 in real time, the condition that solidification or sediment have appeared inadequately or too much when preventing to have the mud to carry liquid level control case 12 inside.
Adopt liquid level control case 12 and flow controller, at the in-process of push pipe work, can detect through the geology detection device in the push pipe, after detecting, according to the geology of difference, the transport condition of decision mud, and the pressure of control mud transport and the efficiency of carrying, can guarantee at the in-process of push pipe work, along with the increase of infiltration volume, the soil body will form the infiltration piece that the one deck is fine and close with mud, simultaneously under the effect of mud pressure, closely combine between piece and the piece, just so formed the mud cover that a stable mud and soil body combination formed around the pipeline, can play the supporting effect to the soil body, balanced soil pressure, make the soil body around the pipeline become stable, prevent that ground subsides.
The third concrete embodiment:
in the jacking process, a certain amount of anti-drag slurry is injected to the outer wall of the joint through the grouting ring pipe, and the multi-point symmetrical injection is adopted to ensure that the slurry is uniformly filled in the gap between the outer wall of the pipe joint and the surrounding soil body, so that the frictional resistance between the pipe joint and the soil body is reduced, and the effect of reducing the jacking resistance is achieved.
The main points to be noticed in the grouting construction are as follows:
1. standing the uniformly stirred slurry for a certain time, and then pouring the slurry;
2. before grouting, checking grouting equipment through water injection, and confirming that the grouting can be carried out after the equipment is normal;
3. the grouting flow and pressure in the grouting process are adjusted according to the soil quality and the soil covering depth;
4. the pressure of grouting is greater than the pressure of a mud bin;
5. and (5) jacking and synchronously grouting, and supplementing grout along the line.
In the present disclosure, unless expressly stated or limited otherwise, the first feature "on" or "under" the second feature may comprise direct contact between the first and second features, or may comprise contact between the first and second features not directly. Also, the first feature being "on," "above" and "over" the second feature includes the first feature being directly on and obliquely above the second feature, or merely indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a push pipe construction is with data verification slip casting structure, produces jar (1) including mud, its characterized in that: the side of mud production tank (1) is equipped with mud holding vessel (4), the side of mud holding vessel (4) is equipped with liquid level control case (12), the tip of liquid level control case (12) is equipped with conveyer pipe (13), the middle part of conveyer pipe (13) is equipped with flow control device (15), and flow control device (15) and conveyer pipe (13) flange joint, the internally mounted of flow control device (15) has valve body (14), and valve body (14) and flow control device (15) flange joint, the inside of liquid level control case (12) is equipped with push pedal (17), and push pedal (17) and liquid level control case (12) inside swing joint.
2. The data verification grouting structure for pipe jacking construction according to claim 1, characterized in that: a second connecting pipe (16) is arranged between the slurry production tank (1) and the slurry storage tank (4), and a first pump body (3) is arranged in the middle of the second connecting pipe (16).
3. The data verification grouting structure for pipe jacking construction according to claim 1, characterized in that: a first connecting pipe (5) is arranged between the slurry storage tank (4) and the liquid level control box (12), a second pump body (11) is arranged at the end part of the first connecting pipe (5), and the second pump body (11) is installed on the top surface of the liquid level control box (12).
4. The data verification grouting structure for pipe jacking construction according to claim 1, characterized in that: the surface of push pedal (17) is connected with two connecting rods (10), the tip of connecting rod (10) is equipped with connecting plate (9), the side of connecting plate (9) is equipped with pneumatic cylinder (7), and the flexible end and the connecting plate (9) of pneumatic cylinder (7) are connected.
5. The data verification grouting structure for pipe jacking construction according to claim 4, wherein: the bottom of pneumatic cylinder (7) is equipped with base (8), base (8) bottom is equipped with bottom plate (6), and the top surface at bottom plate (6) is all installed in mud output tank (1), mud holding vessel (4), liquid level control case (12).
6. The data verification grouting structure for pipe jacking construction according to claim 1, wherein: the mud is produced the inside of jar (1) and mud holding vessel (4) and all is equipped with puddler (19), the top of puddler (19) is equipped with motor (2), and the output shaft and puddler (19) of motor (2) are connected, the surface mounting of puddler (19) has stirring vane (18).
7. The data verification grouting structure for pipe jacking construction according to claim 1, characterized in that: the edge of push pedal (17) is equipped with the sealing washer, and the sealing washer parcel is in the edge of push pedal (17), and the inner wall of sealing washer and liquid level control case (12) is laminated mutually.
CN202222254680.2U 2022-08-26 2022-08-26 Data verification grouting structure for pipe jacking construction Active CN218150951U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222254680.2U CN218150951U (en) 2022-08-26 2022-08-26 Data verification grouting structure for pipe jacking construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222254680.2U CN218150951U (en) 2022-08-26 2022-08-26 Data verification grouting structure for pipe jacking construction

Publications (1)

Publication Number Publication Date
CN218150951U true CN218150951U (en) 2022-12-27

Family

ID=84555657

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222254680.2U Active CN218150951U (en) 2022-08-26 2022-08-26 Data verification grouting structure for pipe jacking construction

Country Status (1)

Country Link
CN (1) CN218150951U (en)

Similar Documents

Publication Publication Date Title
CN109208589B (en) Implanted large-diameter rock-socketed single pile grouting system and construction method
CN205046588U (en) Marine fan jacket basis grout of shutoff formula under water connection structure
CN104929144A (en) Deepwater suction type barrel-shaped foundation intermittent penetration equipment and installation method
CN108301435B (en) A kind of automation prevents and treats liquefied offshore type bucket base and its construction method
CN109707444A (en) A kind of automatic starting formula tunnel drainage system
JP6640891B2 (en) Grouting method for joints of submerged boxes
CN112647533A (en) Construction system and construction method for preventing slurry leakage in jacket foundation pile by pile-first method
CN218150951U (en) Data verification grouting structure for pipe jacking construction
CN206607576U (en) A kind of full-automatic well-point back pumping system
CN203701121U (en) Island building caisson without leveling of foundation bed
CN110374585A (en) It is a kind of to simulate the experimental provision and method that mud is spread in oil shale fracturing stratum
CN206971247U (en) Concrete toe board foundation reinforcing structure arranged on unloading rock mass
CN105776797B (en) Riverway sludge vacuum dehydration handles vehicle
CN107587497B (en) A method of improving hydraulic reclamation flatness
CN110241827A (en) A kind of underwater concreting construction method
CN207498973U (en) A kind of power station grout curtain cuts dirty drainage tube
CN201416147Y (en) Horizontally-hinged rotating disc of bridge in horizontal rotating body construction
CN213926276U (en) Deep foundation pit grouting device
CN208167743U (en) A kind of concrete sealing bottom magazine attachment
CN209099349U (en) A kind of embedding rock single pile grouting system of embedded type major diameter
CN210684745U (en) Dredging and dewatering pipe well
CN105650345B (en) The construction method and detection device that push pipe outer wall sludge lubricant cover shapes in a kind of loose overburden
CN102359117B (en) Concrete gravity type foundation applied to ocean engineering and installation method thereof
CN108316303A (en) A kind of instillation process of embedded rock pile underwater concrete