CN218145121U - Pipeline laying device for electrical construction - Google Patents

Pipeline laying device for electrical construction Download PDF

Info

Publication number
CN218145121U
CN218145121U CN202221688855.4U CN202221688855U CN218145121U CN 218145121 U CN218145121 U CN 218145121U CN 202221688855 U CN202221688855 U CN 202221688855U CN 218145121 U CN218145121 U CN 218145121U
Authority
CN
China
Prior art keywords
main casing
casing body
sets
swing joint
electrical construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221688855.4U
Other languages
Chinese (zh)
Inventor
张博
宣添星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221688855.4U priority Critical patent/CN218145121U/en
Application granted granted Critical
Publication of CN218145121U publication Critical patent/CN218145121U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a pipeline laying device for electrical construction, including the main casing body and horizontal section of thick bamboo, two sets of horizontal sections of thick bamboos of the outside left side fixedly connected with of the main casing body, the left side of horizontal barrel is provided with the disc, the inside of main casing body left side top is provided with the slip track, the orbital inside swing joint that slides has the framework, the top of the main casing body inside is provided with the cavity, the front end of cavity vertically is provided with the fluting. This pipeline laying device for electrical construction is through two sets of horizontal section of thick bamboos of left side fixedly connected with in the main casing body outside, hold the holding rod, and promote to the left side with strength, make two sets of locating levers derive one section distance of horizontal section of thick bamboo respectively, screw up the third bolt of barrel left side installation behind the hole on alignment locating lever and horizontal section of thick bamboo surface, peg graft the cable dish on the body of rod of disc front end, use behind the fixed cover of first bolt locking, can adjust the position of disc, the nonadjustable problem in drum position has been solved.

Description

Pipeline laying device for electrical construction
Technical Field
The utility model relates to a pipeline laying device technical field specifically is a pipeline laying device for electrical construction.
Background
Laying is auxiliary laying in the literal sense, pipeline laying is to install and bury pipelines and cables used in electrical construction, cables and the like are often wound on special coils and need to be conducted by wire feeding equipment, the distance of a coil fixing position of an ordinary laying device is short and cannot be adjusted, installation and adjustment are difficult to carry out according to the number of the cables, inconvenience is very high, and tension treatment is not carried out on the outer portion of the cables in the conveying process, so that the cables are easy to twist and loosen.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline laying device for electrical construction to provide the nonadjustable problem in drum position in solving above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline laying device for electrical construction, includes the main casing body and a horizontal section of thick bamboo, two sets of horizontal sections of thick bamboo of the outside left side fixedly connected with of the main casing body, the left side of a horizontal section of thick bamboo is provided with the disc, the inside of main casing body left side top is provided with the slip track, the orbital inside swing joint that slides has the framework, the inside top of the main casing body is provided with the cavity, the front end of cavity vertically is provided with the fluting, the inside both sides of cavity are provided with the spacing groove respectively, swing joint has two-way screw rod between the top of the inside center department of cavity and the bottom, there are two sets of leading wheels in two-way screw rod's outside through screw thread axle sleeve swing joint.
Preferably, the inside swing joint of horizontal section of thick bamboo has the locating lever, the inside of locating lever is provided with the locating hole between waiting, swing joint has the third bolt between one section of horizontal section of thick bamboo and locating hole, the vertical welding in left side between the locating lever outside has the holding rod, the welding has fixed cover between the locating lever left side, the central body of rod of disc inlays in fixed cover, movable mounting has four first bolts of group between disc and the fixed cover.
Preferably, the positioning rod and the transverse cylinder are positioned on the same horizontal plane, and the positioning rod can slide left and right along the inner wall of the transverse cylinder.
Preferably, the two sides in the frame body are respectively provided with a groove, two groups of wiping plates are movably connected between one side in the groove, four groups of springs are fixedly welded between the wiping plates and the frame body, and two ends in the right side of the frame body are respectively movably connected with two groups of pulleys.
Preferably, the both sides of leading wheel rear end axle sleeve and weld respectively the quarter butt, one side of quarter butt inlays the inside in spacing groove, top swing joint between two-way screw rod and the main casing body one end has the second bolt.
Preferably, the grooved inside swing joint has two sets of mounting panels, the front end fixedly connected with servo motor of mounting panel, fixed mounting between mounting panel and the main casing body has four groups of fourth bolts, servo motor's output shaft and leading wheel front end fixed connection.
Compared with the prior art, the beneficial effects of the utility model are that: the pipeline laying device for electrical construction not only realizes convenient installation of the wire coil, realizes auxiliary correction of the cable, but also realizes quick cable conveying;
(1) Two groups of transverse cylinders are fixedly connected to the left side of the outer part of the main shell, the holding rod is held and is forcibly pushed to the left side, so that two groups of positioning rods are respectively led out of the transverse cylinders for a distance, a third bolt arranged on the left side of the cylinder body is screwed after the positioning rods and holes on the surfaces of the transverse cylinders are aligned, a cable disc is inserted into a rod body at the front end of the disc, and the position of the disc can be adjusted according to the thickness of a wound cable after the fixing sleeve is locked by using a first bolt;
(2) The frame body is movably connected in the sliding track, one end of the cable penetrates through the frame body and enters the main shell, the wiping plate connected by the spring in the frame body is immediately attached to the surface of the transmitted cable, dust and dirt are cleaned, the normal flow of the object cannot be obstructed, and the pulleys matched with the sliding track are also arranged at the edges of the two ends of the right side of the frame body, so that the height of the frame body can be automatically adjusted along with the change of the disc and the change of the position of a wire harness, pressure is applied to the cable, and the cable is prevented from loosening and twisting;
(3) Through being provided with the cavity on main casing body inside's top, twist the top of two-way screw rod in advance, under the meshing transmission between the screw thread, the position of subtend adjustment leading wheel rear end axle sleeve relies on the two-way screw rod of second bolt locking, and the mounting panel of block also can move along the slide in the fluting together, uses the fourth bolt after fixing, under servo motor's drive, through the leading-in cable of subtend rotatory leading wheel fast conveying framework, it is simple convenient.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
FIG. 2 is a schematic view of a cross-sectional front view of the present invention;
FIG. 3 is a schematic view of the front cross-sectional structure of the frame body of the present invention;
fig. 4 is a schematic view of the front view structure of the main casing body of the present invention.
In the figure: 1. a main housing; 2. a transverse cylinder; 3. a disc; 4. fixing a sleeve; 5. a first bolt; 6. positioning a rod; 7. a frame body; 8. wiping the board; 9. a sliding track; 10. a cavity; 11. a bidirectional screw; 12. a second bolt; 13. a limiting groove; 14. a guide wheel; 15. a short bar; 16. a holding rod; 17. a third bolt; 18. Positioning holes; 19. a pulley; 20. a groove; 21. a spring; 22. mounting a plate; 23. a servo motor; 24. Slotting; 25. and a fourth bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Example 1: referring to fig. 1-4, a pipeline laying device for electrical construction comprises a main housing 1 and transverse cylinders 2, wherein two groups of transverse cylinders 2 are fixedly connected to the left side of the outer portion of the main housing 1, a disc 3 is arranged on the left side of each transverse cylinder 2, a sliding rail 9 is arranged inside the upper portion of the left side of the main housing 1, a frame 7 is movably connected inside the sliding rail 9, a cavity 10 is arranged at the top end of the inner portion of the main housing 1, a slot 24 is longitudinally formed in the front end of the cavity 10, limiting grooves 13 are respectively arranged on two sides of the inner portion of the cavity 10, a bidirectional screw 11 is movably connected between the top end and the bottom end of the inner center of the cavity 10, and two groups of guide wheels 14 are movably connected to the outer portion of the bidirectional screw 11 through a threaded shaft sleeve;
the inner part of the transverse cylinder 2 is movably connected with a positioning rod 6, positioning holes 18 are arranged in the positioning rod 6 at equal intervals, a third bolt 17 is movably connected between the transverse cylinder 2 and one section of the positioning hole 18, a holding rod 16 is longitudinally welded on the left side between the outer parts of the positioning rods 6, a fixing sleeve 4 is welded between the left sides of the positioning rods 6, a central rod body of the disc 3 is embedded in the fixing sleeve 4, four groups of first bolts 5 are movably mounted between the disc 3 and the fixing sleeve 4, the positioning rods 6 and the transverse cylinder 2 are positioned on the same horizontal plane, and the positioning rods 6 can slide left and right along the inner wall of the transverse cylinder 2;
specifically, as shown in fig. 1 and fig. 2, the holding rod 16 is held and pushed to the left side with force, so that the two sets of positioning rods 6 are led out of the transverse cylinder 2 by a distance, the third bolt 17 installed on the left side of the cylinder body is screwed after aligning the positioning rods 6 and the holes on the surface of the transverse cylinder 2, the cable tray is inserted into the rod body at the front end of the disc 3, and the position of the disc 3 can be adjusted according to the thickness of the wound cable after the fixing sleeve 4 is locked by the first bolt 5.
Example 2: grooves 20 are respectively formed in two sides of the interior of the frame body 7, two groups of wiping plates 8 are movably connected between one side of the interior of each groove 20, four groups of springs 21 are fixedly welded between each wiping plate 8 and the frame body 7, and two groups of pulleys 19 are respectively movably connected at two ends of the interior of the right side of the frame body 7;
specifically, as shown in fig. 1 and 3, one end of the cable penetrates through the frame 7 and enters the main casing 1, the wiping plate 8 connected by the spring 21 in the frame 7 immediately adheres to the surface of the transmitted cable, so as not to obstruct the normal flow of the cable while cleaning dust and dirt, and the pulleys 19 matched with the sliding rails 9 are also installed at the edges of the two ends of the right side of the frame 7, so that the height of the frame 7 can be automatically adjusted along with the change of the disc 3 and the change of the position of the wire harness, and the cable is stressed to prevent the cable from loosening and twisting.
Example 3: short rods 15 are respectively welded on two sides of a shaft sleeve at the rear end of the guide wheel 14, one side of each short rod 15 is embedded in the limiting groove 13, a second bolt 12 is movably connected to the top between the bidirectional screw 11 and one end of the main shell 1, two groups of mounting plates 22 are movably connected to the inside of the groove 24, a servo motor 23 is fixedly connected to the front end of each mounting plate 22, four groups of fourth bolts 25 are fixedly mounted between the mounting plates 22 and the main shell 1, and an output shaft of each servo motor 23 is fixedly connected with the front end of the guide wheel 14;
specifically, as shown in fig. 1 and 4, the top of the bidirectional screw 11 is screwed in advance, the position of the rear end shaft sleeve of the guide wheel 14 is adjusted in an opposite direction by the meshing transmission between the threads, the bidirectional screw 11 is locked by the second bolt 12, the mounting plate 22 engaged in the slot 24 is also moved along the slide, and after being fixed by the fourth bolt 25, the cable introduced into the frame 7 is rapidly transmitted by the guide wheel 14 rotating in an opposite direction by the servo motor 23, which is simple and convenient.
The working principle is as follows: the utility model discloses when using, at first hold the holding rod 16, promote to the left side with power, make two sets of locating levers 6 derive one section distance of horizontal section of thick bamboo 2 respectively, screw up the third bolt 17 of barrel left side installation behind the hole on alignment locating lever 6 and horizontal section of thick bamboo 2 surface, peg graft the cable dish on the body of rod of disc 3 front end, use behind the first bolt 5 locking fixed cover 4, can be according to the position of the thickness adjustment disc 3 of winding cable, later run through framework 7 and enter main casing 1 with the one end of cable, the cable surface of the conveying of laminating immediately of wiping board 8 of being connected by spring 21 in the framework 7, can not hinder this thing normal flow when cleaning the dust dirt, and the both ends edge on framework 7 right side also installs the pulley 19 that matches slip track 9, can adjust the height of framework 7 voluntarily along with the change of disc 3 and the change of pencil position, exert pressure for the cable, prevent its pine and take off, twist in advance twist the top of two-way screw rod 11, under the meshing transmission between the subtend adjustment leading-in guide wheel 14 rear end axle sleeve, second bolt 12 relies on the bolt locking bolt 11, and the servo bolt can also pass through the quick transport of the grooving of the quick transport of the drive screw rod that the rear end of the servo motor that the servo screw rod can pass through the rear end, the transport chute 23, the transport the servo motor is the rear side that the transport chute that the cable is the rear side can be in the cable is the transport chute is the cable is the same.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. A pipelaying device for electrical construction, comprising a main housing (1) and a transverse barrel (2), characterized in that: the utility model discloses a two-way screw rod of cavity (10) inside center department, including main casing body (1), the outside left side fixedly connected with of main casing body (1) two sets of horizontal section of thick bamboo (2), the left side of horizontal section of thick bamboo (2) is provided with disc (3), the inside of main casing body (1) left side top is provided with slip track (9), the inside swing joint of slip track (9) has framework (7), the inside top of main casing body (1) is provided with cavity (10), the front end of cavity (10) vertically is provided with fluting (24), the inside both sides of cavity (10) are provided with spacing groove (13) respectively, swing joint has two-way screw rod (11) between the top of cavity (10) inside center department and the bottom, there are two sets of leading wheels (14) in the outside of two-way screw rod (11) through screw thread axle sleeve swing joint.
2. A pipelaying apparatus for electrical construction according to claim 1, wherein: the inside swing joint of a horizontal section of thick bamboo (2) has locating lever (6), the inside of locating lever (6) is provided with locating hole (18) between waiting, swing joint has third bolt (17) between one section of a horizontal section of thick bamboo (2) and locating hole (18), vertical welding in left side between locating lever (6) outside has holding rod (16), the welding has fixed cover (4) between locating lever (6) left side, the center of disc (3) inlays in the fixed cover of the body of rod (4), movable mounting has four first bolts of group (5) between disc (3) and fixed cover (4).
3. A pipelaying apparatus for electrical construction according to claim 2, wherein: the positioning rod (6) and the transverse barrel (2) are positioned on the same horizontal plane, and the positioning rod (6) can slide left and right along the inner wall of the transverse barrel (2).
4. The pipelaying apparatus for electrical construction according to claim 1, wherein: the inside both sides of framework (7) are provided with recess (20) respectively, swing joint has two sets of boards (8) of wiping between the inside one side of recess (20), it has four groups of springs (21) to wipe fixed welding between board (8) and framework (7), the inside both ends in framework (7) right side swing joint has two sets of pulleys (19) respectively.
5. The pipelaying apparatus for electrical construction according to claim 1, wherein: the two sides of the shaft sleeve at the rear end of the guide wheel (14) are respectively welded with a short rod (15), one side of the short rod (15) is embedded in the limiting groove (13), and a second bolt (12) is movably connected to the top between the two-way screw rod (11) and one end of the main shell (1).
6. A pipelaying apparatus for electrical construction according to claim 1, wherein: the inside swing joint of fluting (24) has two sets of mounting panels (22), the front end fixedly connected with servo motor (23) of mounting panel (22), fixed mounting between mounting panel (22) and main casing body (1) has four sets of fourth bolts (25), the output shaft and leading wheel (14) front end fixed connection of servo motor (23).
CN202221688855.4U 2022-07-02 2022-07-02 Pipeline laying device for electrical construction Expired - Fee Related CN218145121U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221688855.4U CN218145121U (en) 2022-07-02 2022-07-02 Pipeline laying device for electrical construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221688855.4U CN218145121U (en) 2022-07-02 2022-07-02 Pipeline laying device for electrical construction

Publications (1)

Publication Number Publication Date
CN218145121U true CN218145121U (en) 2022-12-27

Family

ID=84591059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221688855.4U Expired - Fee Related CN218145121U (en) 2022-07-02 2022-07-02 Pipeline laying device for electrical construction

Country Status (1)

Country Link
CN (1) CN218145121U (en)

Similar Documents

Publication Publication Date Title
EP2183143B1 (en) Rail system and monorail system
CN218145121U (en) Pipeline laying device for electrical construction
CN116960657B (en) Cable butt joint reinforcing means
CN218732808U (en) Guide wheel with auxiliary power for cable laying
CN211141130U (en) Cable winding machine
CN215885869U (en) Optical cable production is with drawing guider with protection machanism
CN212114565U (en) Cable laying device
CN213763556U (en) Full-automatic pipe bending machine
CN215236477U (en) Material box carrying platform structure of plasma cleaning machine
CN215175617U (en) Rack-type air conditioner installation device and air conditioner cabinet
CN214641396U (en) Clamping mechanism for welding liner and welding liner clamping structure
CN110629600A (en) Four-way shuttle transfer connecting piece device
CN214641397U (en) Welding liner supporting device, tool and U-rib welding system
CN202443157U (en) Pullout type optical fiber distribution frame device
CN216592622U (en) Drying equipment for producing low-shrinkage fabric
CN217036674U (en) Thermotechnical instrument junction box connecting device
CN221009694U (en) Communication cable auxiliary installation equipment
CN216923675U (en) Gathering and transportation pipeline safety device
CN213172743U (en) Yarn guide device with uniform tension of yarn guide yarns on spinning frame
CN113020875A (en) Welding liner supporting device, tool, U-rib welding system and method
CN201489137U (en) Inclined block type joint box
CN215941932U (en) Magnetic base for welding pipeline under pressure
CN211733443U (en) Communication optical cable fixed mounting device
CN213502473U (en) Carrying vehicle bearing mechanism for U-shaped beam
CN216944893U (en) Locomotive for guide rail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20221227