CN218116583U - Building engineering foundation pit monitoring devices - Google Patents

Building engineering foundation pit monitoring devices Download PDF

Info

Publication number
CN218116583U
CN218116583U CN202222233771.8U CN202222233771U CN218116583U CN 218116583 U CN218116583 U CN 218116583U CN 202222233771 U CN202222233771 U CN 202222233771U CN 218116583 U CN218116583 U CN 218116583U
Authority
CN
China
Prior art keywords
fixed
lifter
dead lever
wall
seted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222233771.8U
Other languages
Chinese (zh)
Inventor
秦斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222233771.8U priority Critical patent/CN218116583U/en
Application granted granted Critical
Publication of CN218116583U publication Critical patent/CN218116583U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building engineering foundation pit monitoring device, including the dead lever, the top of dead lever is inside to be provided with mobilizable lifter, top one side fixedly connected with monitoring camera of lifter, the surface symmetry of lifter has seted up the guide way, the inner wall symmetry of dead lever is fixed with the guide block, the guide block is connected with the guide way block, the inner wall of dead lever runs through and has seted up the spout, inner wall one side equidistance of spout has seted up the spacing groove; the utility model discloses a spout, spacing groove, gag lever post, operating handle and fixed knot of design can realize according to the free height of adjusting the lifter of site operation condition to let monitoring operation that monitoring camera can be better, the guide way and the guide block of cooperation design simultaneously can also play the removal guide effect to the lifter, current technique compares, has made things convenient for monitoring devices's altitude mixture control work greatly.

Description

Building engineering foundation pit monitoring devices
Technical Field
The utility model belongs to the technical field of the building engineering foundation ditch, concretely relates to building engineering foundation ditch monitoring devices.
Background
In the process of building construction, in order to ensure that the building can not sink and incline in the construction process, and simultaneously, in order to ensure the subsequent safety of the building, usually, the building is required to be excavated at the building position, a building foundation pit is excavated, then the foundation of the building is constructed in the foundation pit, in the process of excavation of the foundation pit, monitoring cameras are generally arranged at the periphery of the foundation pit, so that the construction safety and the real-time monitoring of the construction progress are ensured, when the existing monitoring device is used, the monitoring cameras are generally supported and fixed by support rods, in the using process, because the excavation depth of the foundation pit is changed every day, the height of the support rods needs to be adjusted according to the field construction condition, so that the monitoring cameras can better perform foundation pit monitoring work, but the height of the support rods of the existing monitoring device is fixed, when the height is adjusted, stone slabs with different heights are stacked at the bottom of the support rods, and the height adjusting effect is achieved, the operation mode is troublesome, and is not convenient enough, and the stability of the support rods can be influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering foundation ditch monitoring devices to solve the problem that this monitoring devices who provides in the above-mentioned background art can't come the height-adjusting that freedom according to on-the-spot in service behavior.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering foundation pit monitoring devices, includes the dead lever, the inside mobilizable lifter that is provided with in top of dead lever can adjust the height of monitoring camera, top one side fixedly connected with monitoring camera of lifter can monitor the foundation ditch, the guide way has been seted up to the surface symmetry of lifter, the inner wall symmetry of dead lever is fixed with the guide block, the guide block is connected with the guide way block fastening, can play the removal guide effect to the lifter, the inner wall of dead lever runs through and has seted up the spout, the spacing groove has been seted up to the inner wall one side equidistance of spout, the surface symmetry of lifter is fixed with and runs through the inside gag lever post of spout, the gag lever post is connected with the spacing groove block, can fix a position the lifter at the inside height of dead lever, the tip of gag lever post is seted up flutedly, the inside of recess is provided with the operating handle, can spur the gag lever and remove, be connected with the connecting axle between operating handle and the recess, can drive the operating handle and rotate, the surface of dead lever is fixed with fixed knot for one side of spacing groove, the operating handle is connected with the fixed buckle, can fix a position the gag lever post, the operating handle is seted up the fixed buckle, the fixed buckle on the surface of operating handle, the fixed buckle can's fixed draw-in the inside buckle, the fixed buckle can the buckle with the fixed buckle, the buckle, can the fixed buckle.
Preferably, a bottom plate is fixed to the bottom end of the fixing rod, a through hole is symmetrically formed in the bottom end of the bottom plate in a penetrating mode, a bolt is arranged inside the through hole and can be inserted into soil to increase the stability of the bottom plate, a pedal plate is fixed to the top end of the bolt and can push the bolt to move, a positioning hole is formed in the inner wall of the through hole in a penetrating mode, a positioning rod connected with the positioning hole in a screwing mode is arranged on the side face of the bottom plate, and the bolt can be positioned.
Preferably, a knob is fixed at the end of the positioning rod, the positioning rod can be easily screwed to rotate, and anti-skid stripes are arranged on the surface of the knob.
Preferably, handles are symmetrically fixed on the surface of the pedal plate, a bolt inserted into the ground can be pulled, and granular protrusions are arranged on the surface of the pedal plate.
Preferably, the end part of the buckle is a semicircular ring, so that the buckle can be clamped and connected with the clamping groove, and the buckle is attached to the inner wall of the clamping groove.
Preferably, the cross section of the operating handle is U-shaped, so that the operating handle has an anti-skidding effect, and a rubber strip is arranged on the surface of the operating handle.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a spout, spacing groove, gag lever post, operating handle and fixed knot of design can realize according to the free height of adjusting the lifter of site operation condition to let monitoring operation that monitoring camera can be better, the guide way and the guide block of cooperation design simultaneously can also play the removal guide effect to the lifter, current technique compares, has made things convenient for monitoring devices's altitude mixture control work greatly.
2. The utility model discloses a bolt and running-board of design can realize when bottom plate and ground laminating are placed, can insert the stability of placing that increases the dead lever in the soil through the bolt, and the constant head tank and the locating lever of cooperation design can also accomodate the location to it when the bolt does not use simultaneously.
Drawings
Fig. 1 is a schematic view of the appearance structure of the present invention;
fig. 2 is an enlarged schematic view of the point a of fig. 1 in the present invention;
FIG. 3 is a sectional view of the elevating rod structure of the present invention;
fig. 4 is an enlarged schematic view of the utility model at the point B in fig. 1;
in the figure: 1. a fixing rod; 2. a lifting rod; 3. monitoring a camera; 4. a guide groove; 5. a guide block; 6. a chute; 7. a limiting groove; 8. a limiting rod; 9. a groove; 10. an operating handle; 11. a connecting shaft; 12. a fixing buckle; 13. a card slot; 14. buckling; 15. a base plate; 16. a through hole; 17. a bolt; 18. a foot pedal; 19. positioning holes; 20. and (5) positioning the rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: the utility model provides a building engineering foundation pit monitoring devices, including dead lever 1, the inside mobilizable lifter 2 that is provided with in top of dead lever 1, top one side fixedly connected with monitoring camera 3 of lifter 2, can carry out real-time supervision to the foundation pit construction condition, guide way 4 has been seted up to the surface symmetry of lifter 2, the inner wall symmetry of dead lever 1 is fixed with guide block 5, guide block 5 is connected with guide way 4 block, the inner wall of dead lever 1 runs through and has seted up spout 6, can drive gag lever post 8 and carry out the slide adjusting height in its inside, spacing groove 7 has been seted up to inner wall one side equidistance of spout 6, the surface symmetry of lifter 2 is fixed with the gag lever post 8 that runs through spout 6 inside, be connected with spacing groove 7 block through gag lever post 8, can drive operating handle 10 and rotate in the inside of recess 9, the surface of dead lever 1 is fixed with fixed knot 12 for one side of gag lever post 7, through operating handle 10 and fixed knot 12, operating handle 10 and recess 9 are connected with connecting axle 11, can drive operating handle 10 and pass through the fixed buckle 14 that the inner wall symmetry of fixed knot can's buckle 13 and the fixed knot 12, the fixed buckle that can's inner wall can's that the fixed knot 14 can's buckle can's that the fixed buckle has been connected.
In this embodiment, preferably, a bottom plate 15 is fixed to the bottom end of the fixing rod 1, the fixing rod 1 can be supported, a through hole 16 is symmetrically formed in the bottom end of the bottom plate 15 in a penetrating mode, a bolt 17 is arranged inside the through hole 16, a pedal plate 18 is fixed to the top end of the bolt 17, the pedal plate 18 can be trampled to enable the bolt 17 to be inserted into soil, a positioning hole 19 is formed in the inner wall of the through hole 16 in a penetrating mode, a positioning rod 20 connected with the positioning hole 19 in a screwed mode is arranged on the side face of the bottom plate 15, and the bolt 17 can be fixed inside the through hole 16 and cannot move through the fastening positioning rod 20.
In this embodiment, it is preferable, the end fixing of locating lever 20 has the knob, can twist locating lever 20 through the knob, the surface of knob is provided with anti-skidding stripe, the surface symmetry of running-board 18 is fixed with the handle, can mention the bolt 17 of inserting in the soil through the handle, the surface of running-board 18 is provided with the graininess arch, the tip of buckle 14 is the semicircle ring, can let buckle 14 be connected with draw-in groove 13 extrusion block, buckle 14 is laminated with the inner wall of draw-in groove 13, the cross section of operating handle 10 is the U type, can play anti-skidding effect when gripping and using operating handle 10, the surface of operating handle 10 is provided with the rubber strip.
The utility model discloses a theory of operation and use flow: when the height of the monitoring camera 3 is required to be adjusted according to the depth of a foundation pit, firstly, the operating handle 10 is shifted to rotate in the groove 9 through the connecting shaft 11, then the guide block 5 rotates on the surface of the guide groove 4, and the surface of the operating handle 10 is driven to move out of the inside of the fixing buckle 12, meanwhile, the clamping groove 13 and the buckle 14 are driven to be extruded and separated, the limit of the limiting rod 8 can be relieved, then the limiting rod 8 is driven to move to the inside of the sliding groove 6 through the operating handle 10, then, the operating handle 10 is lifted to drive the limiting rod 8 to slide in the inside of the sliding groove 6, meanwhile, the lifting rod 2 is driven to move upwards in the fixing rod 1 to change the height of the monitoring camera 3, when the monitoring camera 3 moves to a proper height, the operating handle 10 stops moving, then the operating handle 10 is pulled leftwards, the operating handle 8 is driven to be clamped into the corresponding limiting groove 7 from the inside of the sliding groove 6, after the inner wall end part of the monitoring camera 3 and the positioning rod 7 move to a proper height, when the positioning handle 10 is pressed, the positioning buckle is pressed, the positioning handle 10 is pressed, the positioning rod can be clamped into the positioning buckle 14, and the positioning buckle can be placed in the positioning buckle, when the positioning rod 13 is pressed, the positioning rod 14, the positioning rod can be pressed, the positioning rod can be clamped in the positioning rod 1, and the positioning buckle, the positioning rod can be pressed, the positioning buckle, the positioning rod can be pressed, the positioning rod 14, then, the foot pedal 18 is stepped on by the sole of a foot to drive the bolt 17 to move in the through hole 16, and the bolt 17 is inserted into soil beside the foundation pit, so that the stability of the fixing rod 1 is improved, and the monitoring camera 3 can be better supported.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering foundation ditch monitoring devices, includes dead lever (1), inside mobilizable lifter (2) that is provided with in the top of dead lever (1), top one side fixedly connected with monitoring camera (3) of lifter (2), its characterized in that: guide way (4) have been seted up to the surface symmetry of lifter (2), the inner wall symmetry of dead lever (1) is fixed with guide block (5), guide block (5) are connected with guide way (4) block, the inner wall of dead lever (1) runs through and has seted up spout (6), spacing groove (7) have been seted up to inner wall one side equidistance of spout (6), the surface symmetry of lifter (2) is fixed with and runs through inside gag lever post (8) of spout (6), gag lever post (8) are connected with spacing groove (7) block, recess (9) have been seted up to the tip of gag lever post (8), the inside of recess (9) is provided with operating handle (10), be connected with connecting axle (11) between operating handle (10) and recess (9), the surface of dead lever (1) is fixed with fixed knot (12) for one side of spacing groove (7), operating handle (10) are connected with fixed knot (12) block, draw-in groove (10) have been seted up to the surface symmetry, the inner wall symmetry of fixed knot (12) is fixed with buckle (14), buckle (13) are connected with buckle (13).
2. The building engineering foundation pit monitoring device of claim 1, wherein: the bottom end of the fixing rod (1) is fixed with a bottom plate (15), the bottom end of the bottom plate (15) is symmetrically provided with a through hole (16) in a penetrating mode, a bolt (17) is arranged inside the through hole (16), a pedal plate (18) is fixed to the top end of the bolt (17), the inner wall of the through hole (16) is provided with a positioning hole (19) in a penetrating mode, and a positioning rod (20) connected with the positioning hole (19) in a screwed mode is arranged on the side face of the bottom plate (15).
3. The building engineering foundation pit monitoring device of claim 2, wherein: the end part of the positioning rod (20) is fixed with a knob, and the surface of the knob is provided with anti-skid stripes.
4. The building engineering foundation pit monitoring device of claim 2, wherein: handles are symmetrically fixed on the surface of the pedal plate (18), and granular protrusions are arranged on the surface of the pedal plate (18).
5. The building engineering foundation pit monitoring device of claim 1, wherein: the end part of the buckle (14) is a semicircular ring, and the buckle (14) is attached to the inner wall of the clamping groove (13).
6. The building engineering foundation pit monitoring device of claim 1, wherein: the cross section of the operating handle (10) is U-shaped, and a rubber strip is arranged on the surface of the operating handle (10).
CN202222233771.8U 2022-08-24 2022-08-24 Building engineering foundation pit monitoring devices Active CN218116583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222233771.8U CN218116583U (en) 2022-08-24 2022-08-24 Building engineering foundation pit monitoring devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222233771.8U CN218116583U (en) 2022-08-24 2022-08-24 Building engineering foundation pit monitoring devices

Publications (1)

Publication Number Publication Date
CN218116583U true CN218116583U (en) 2022-12-23

Family

ID=84524210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222233771.8U Active CN218116583U (en) 2022-08-24 2022-08-24 Building engineering foundation pit monitoring devices

Country Status (1)

Country Link
CN (1) CN218116583U (en)

Similar Documents

Publication Publication Date Title
CN210151775U (en) Reinforcement type civil engineering pile foundation construction structures
CN212742570U (en) Combined foundation pit support
CN218116583U (en) Building engineering foundation pit monitoring devices
CN208534180U (en) The wall body structure of pitching pile formula
CN212405158U (en) Impervious type nail wall supporting construction of convenient change fixed position
CN215210855U (en) Prevent soil erosion and water conservancy grid of soil erosion and water loss
CN211113589U (en) Rammer of adjustable rammer soil area
CN115404880A (en) Supporting pile construction process
CN206053827U (en) A kind of extending insulating ladder
CN214657074U (en) Civil engineering is safety support structure for excavation supporting
CN212079188U (en) Small-size hole equipment that draws suitable for finite space
CN111021942A (en) Small-size hole equipment that draws suitable for finite space
CN217924713U (en) Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast
CN217976063U (en) Foot nail that antiskid nature is good
CN110331635A (en) A kind of town road and its construction method
CN218148454U (en) Steel sheet pile cofferdam
CN213603154U (en) Digging device for planting trees and forestation
CN216304364U (en) Bar planting auxiliary device
CN218771044U (en) Bridge cover plate locking device
CN216948230U (en) Engineering building pile
CN217298945U (en) Auxiliary sinking device for inserting deep-buried section steel into cement-soil mixing wall
CN211341674U (en) Scaffold for civil engineering
CN216163262U (en) Banana seedling planting perforating device
CN218122790U (en) Foundation pit horizontal displacement alarm device
CN219023173U (en) Rod climbing device for power distribution construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant