CN217924713U - Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast - Google Patents

Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast Download PDF

Info

Publication number
CN217924713U
CN217924713U CN202221258624.XU CN202221258624U CN217924713U CN 217924713 U CN217924713 U CN 217924713U CN 202221258624 U CN202221258624 U CN 202221258624U CN 217924713 U CN217924713 U CN 217924713U
Authority
CN
China
Prior art keywords
fixedly connected
base
threaded rod
supporting platform
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221258624.XU
Other languages
Chinese (zh)
Inventor
张利斌
宁文龙
陈湘
艾其旭
黄师伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHB Sixth Engineering Co Ltd
Original Assignee
CCCC SHB Sixth Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHB Sixth Engineering Co Ltd filed Critical CCCC SHB Sixth Engineering Co Ltd
Priority to CN202221258624.XU priority Critical patent/CN217924713U/en
Application granted granted Critical
Publication of CN217924713U publication Critical patent/CN217924713U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model relates to a foundation ditch construction equipment technical field specifically is a large-scale deep basal pit construction supporting platform of engineering is built in room that can build fast, including the base, the base both sides are equipped with the fixing base, every the fixed slot has all been seted up to fixing base one side, the inside cavity of having seted up of base, the inside one side fixedly connected with motor of cavity, motor output end fixedly connected with pivot, the first threaded rod of pivot one end fixedly connected with, the first gear of first threaded rod outer wall one side fixedly connected with, the inside rotation of cavity is connected with the second threaded rod, second threaded rod outer wall one side fixedly connected with second gear is convenient for fix the operation panel between two fixing bases fast through two movable blocks and two fixed slot phase-matches, avoids the operation panel to take place the skew when operating, is convenient for improve the efficiency that the operation panel was built, and is convenient for improve operating personnel's work efficiency, and inner structure is simple, and the practicality is strong person of facilitating the use.

Description

Large-scale deep basal pit construction supporting platform of building engineering that can build fast
Technical Field
The utility model relates to a foundation ditch construction equipment technical field especially relates to a large-scale deep basal pit construction supporting platform of engineering is built in room that can build fast.
Background
The foundation pit is a soil pit excavated according to the elevation of a base and the plane size of the base at the design position of the base, an excavation scheme is determined according to geological and hydrological data and the conditions of buildings nearby on site before excavation, waterproof and drainage work is carried out, a slope can be placed for people who do not excavate deeply to stabilize the soil slope, the slope is determined according to relevant construction engineering regulations, people who excavate deeper and nearby buildings can excavate by using a foundation pit wall supporting method and a concrete spraying wall protecting method, a large foundation pit even adopts a method of interlocking an underground continuous wall and a columnar column type bored pile, and the like to prevent the collapse of an outer soil layer, people who do not influence nearby buildings can reduce the underground water level by using a pit point method, slope open excavation is adopted, the excavation can be carried out by using a natural cold air freezing method in cold regions, the foundation is not buried deeply, the construction period is short, the safety of the adjacent buildings is not influenced when the foundation pit is excavated, the safety of the adjacent buildings is not influenced when the adjacent buildings are excavated, the underground is lower than the base, or the seepage amount is small, the stability of the pit wall is not influenced, and the main forms of the vertical supporting wall, the slope, the pit wall and the pit depth and the pit degree are changed.
The existing deep foundation pit construction supporting platform is fixed through a plurality of bolts when being built, the operation process is complex, the construction process is delayed, the building working efficiency is reduced, and the deep foundation pit construction supporting platform is low in practicability and inconvenient to use.
Therefore, there is a need to design a supporting platform for large deep foundation pit construction in building construction engineering, which can solve the above problems and can be built quickly.
SUMMERY OF THE UTILITY MODEL
For solving the one or more problem that exists among the prior art, the utility model provides a large-scale deep basal pit construction supporting platform of building engineering that can build fast.
The utility model adopts the technical proposal that the purpose is achieved: the utility model provides a large-scale deep basal pit construction supporting platform of engineering is built in room that can build fast, includes the base, the base both sides are equipped with the fixing base, every the fixed slot has all been seted up to fixing base one side, the inside cavity that has seted up of base, the inside one side fixedly connected with motor of cavity, motor output end fixedly connected with pivot, the first threaded rod of pivot one end fixedly connected with, the first gear of first threaded rod outer wall one side fixedly connected with, the inside rotation of cavity is connected with the second threaded rod, second threaded rod outer wall one side fixedly connected with second gear, the second gear meshes with first gear mutually, the spout has all been seted up to the cavity both sides, first threaded rod and second threaded rod one side all are equipped with the movable block, two the inside thread groove that has all seted up of movable block, first threaded rod and second threaded rod one end respectively with two thread groove threaded connection, every the equal fixedly connected with slider in movable block both sides, every the slider all with every spout sliding connection, the opening has all been seted up to the base both sides, every the movable block runs through every opening respectively, every the movable block all matches with every fixed slot.
Preferably, the bottom of the base is fixedly connected with a plurality of fixing nails which are uniformly distributed at the bottom of the base.
Preferably, each fixing base top is fixedly connected with a plurality of reinforcing columns, and the plurality of reinforcing column tops are fixedly connected with fixing frames.
Preferably, the top of the base is fixedly connected with a plurality of electric push rods, and the output ends of the electric push rods are fixedly connected with an operating table.
Preferably, the top of the operating platform is provided with a non-slip mat, and the non-slip mat is made of rubber.
Preferably, the equal fixedly connected with railing of operation panel both sides, two the railing is the symmetric distribution about the operation panel axis.
The utility model has the advantages that:
1. move through two movable blocks opposite and be convenient for to match with two fixed slots, be convenient for fix the operation panel between two fixing bases fast through two movable blocks and two fixed slot phase-matchs, avoid the operation panel to take place the skew when operating, be convenient for improve the efficiency that the operation panel was built, and be convenient for improve operating personnel's work efficiency, inner structure is simple, low in production cost, the practicality is strong and the person of facilitating the use uses.
2. Through the setting of staple, be convenient for fix the base in the assigned position, be convenient for guarantee the fixed stability of base, setting through a plurality of electric putter, be convenient for carry out height-adjusting to the operation panel, be convenient for adjust not co-altitude according to the difference condition, and be convenient for guarantee the stability of operation panel, setting through the slipmat, avoid operating personnel sole to skid the operation panel of falling, avoid causing the phenomenon of threat to operating personnel's life safety to appear, setting through the railing, the operating personnel of being convenient for ensure operating personnel's life safety when operating.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the base of the present invention;
FIG. 3 is a schematic view of the overall structure of the fixing base and the reinforcing post of the present invention;
FIG. 4 is a schematic view of the overall structure of the base and the fixing nail of the present invention;
fig. 5 is a schematic view of the overall structure of the operation table of the present invention.
Reference numerals are as follows: 1. a base; 2. a fixed seat; 3. a fixing groove; 4. a cavity; 5. a motor; 6. a rotating shaft; 7. a first threaded rod; 8. a first gear; 9. a second threaded rod; 10. a second gear; 11. a port; 12. a moving block; 13. a thread groove; 14. a slider; 15. a chute; 16. fixing nails; 17. reinforcing columns; 18. a fixed mount; 19. an electric push rod; 20. an operation table; 21. a non-slip mat; 22. a railing.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. The invention may be embodied in many other forms different from those described herein and similar modifications may be made by those skilled in the art without departing from the spirit and scope of the invention and, therefore, the invention is not to be limited to the specific embodiments disclosed below.
As shown in figures 1-5, the utility model provides a supporting platform for building construction large deep foundation pit, which can be built quickly, comprising a base 1, fixing bases 2 are arranged on both sides of the base 1, a fixing groove 3 is arranged on one side of each fixing base 2, a cavity 4 is arranged in the base 1, a motor 5 is fixedly connected with one side in the cavity 4, a rotating shaft 6 is fixedly connected with the output end of the motor 5, one end of the rotating shaft 6 is fixedly connected with a first threaded rod 7, one side of the outer wall of the first threaded rod 7 is fixedly connected with a first gear 8, a second threaded rod 9 is rotatably connected in the cavity 4, one side of the outer wall of the second threaded rod 9 is fixedly connected with a second gear 10, the second gear 10 is meshed with the first gear 8, sliding grooves 15 are arranged on both sides of the cavity 4, moving blocks 12 are arranged on one side of the first threaded rod 7 and one side of the second threaded rod 9, threaded grooves 13 are respectively formed in the two movable blocks 12, one end of each of the first threaded rod 7 and the second threaded rod 9 is in threaded connection with the two threaded grooves 13, a sliding block 14 is fixedly connected to each of the two sides of each of the movable blocks 12, each of the sliding blocks 14 is in sliding connection with each of the sliding grooves 15, through holes 11 are respectively formed in the two sides of the base 1, each of the movable blocks 12 respectively penetrates through each of the through holes 11, each of the movable blocks 12 is matched with each of the fixed grooves 3, the position of the base 1 is fixed through the fixing seats 2 at the two sides, the base 1 is fixed at a specified position through a plurality of fixing nails 16, the two movable blocks 12 are fixed by aligning the two fixed grooves 3, after the fixing is completed, an operator remotely operates the driving motor 5, the output end of the motor 5 rotates to drive the rotating shaft 6 to rotate, and the rotating shaft 6 rotates to drive the first threaded rod 7 to rotate, the first threaded rod 7 rotates to drive the first gear 8 to rotate, the first gear 8 rotates to drive the second gear 10 to rotate oppositely, the second gear 10 rotates oppositely to drive the second threaded rod 9 to rotate oppositely, the first threaded rod 7 and the second threaded rod 9 rotate oppositely, each sliding block 14 is connected with each sliding groove 15 in a sliding mode, the two moving blocks 12 move oppositely to be matched with the two fixing grooves 3, the operating platform 20 is fixed between the two fixing seats 2 rapidly due to the fact that the two moving blocks 12 are matched with the two fixing grooves 3, the operating platform 20 is prevented from being deviated when the operating platform 20 is operated, the efficiency of building the operating platform 20 is improved conveniently, the working efficiency of operators is improved conveniently, the internal structure is simple, the production cost is low, the practicability is strong, and the use is convenient for users.
Further, in above-mentioned technical scheme, base 1 bottom fixedly connected with a plurality of staple 16, it is a plurality of staple 16 evenly distributed is in base 1 bottom, through the setting of staple 16, is convenient for fix base 1 in the assigned position, is convenient for guarantee the fixed stability of base 1.
Further, in the above technical solution, a plurality of reinforcing columns 17 are fixedly connected to the top of each of the fixing seats 2, and a fixing frame 18 is fixedly connected to the top of each of the reinforcing columns 17, so as to facilitate the reinforcement.
Furthermore, in above-mentioned technical scheme, a plurality of electric putter 19 of base 1 top fixedly connected with, it is a plurality of the equal fixedly connected with operation panel 20 of electric putter 19 output through a plurality of electric putter 19's setting, is convenient for carry out height-adjusting to operation panel 20, is convenient for adjust not co-altitude according to the difference, and is convenient for guarantee operation panel 20's stability.
Further, in the above technical scheme, the top of the operation platform 20 is provided with the non-slip mat 21, the non-slip mat 21 is made of rubber, and the operation platform 20 is prevented from slipping down from the sole of the operator due to the arrangement of the non-slip mat 21, so that the life safety of the operator is prevented from being threatened.
Further, in above-mentioned technical scheme, the equal fixedly connected with railing 22 in operation panel 20 both sides, two railing 22 is the symmetric distribution about operation panel 20 axis, through railing 22's setting, is convenient for operating personnel be convenient for ensure operating personnel's life safety when operating, convenient to use.
The working principle is as follows: when the device is used, the position of the base 1 is fixed through the fixing seats 2 on the two sides, the base 1 is fixed at a designated position through the fixing nails 16, the two moving blocks 12 are aligned with the two fixing grooves 3 for fixing, after the fixing is completed, an operator remotely operates the driving motor 5 again, the output end of the motor 5 rotates to drive the rotating shaft 6 to rotate, the rotating shaft 6 rotates to drive the first threaded rod 7 to rotate, the first threaded rod 7 rotates to drive the first gear 8 to rotate, the first gear 8 rotates to drive the second gear 10 to rotate oppositely, the second gear 10 rotates oppositely to drive the second threaded rod 9 to rotate oppositely, each sliding block 14 is in sliding connection with each sliding groove 15, the two moving blocks 12 move oppositely, and the two moving blocks 12 move oppositely to be matched with the two fixing grooves 3 conveniently, the operation table 20 is conveniently and quickly fixed between the two fixed seats 2 by matching the two moving blocks 12 with the two fixed grooves 3, the operation table 20 is prevented from shifting during operation, the efficiency of building the operation table 20 is convenient to improve, the working efficiency of an operator is convenient to improve, the internal structure is simple, the production cost is low, the practicability is strong, the operation table is convenient for a user to use, the base 1 is convenient to be fixed at a specified position by arranging the fixed nails 16, the stability of fixing the base 1 is convenient to ensure, the height of the operation table 20 is convenient to adjust by arranging the plurality of electric push rods 19, different heights are convenient to adjust according to different conditions, the stability of the operation table 20 is convenient to ensure, the operation table 20 is prevented from slipping down from the sole of the operator by arranging the anti-slip mat 21, the phenomenon of threatening the life safety of the operator is avoided, and the handrail 22 is arranged, the operation personnel of being convenient for be convenient for guarantee operating personnel's life safety when carrying out the operation, convenient to use.
The above-described embodiments are merely illustrative of one or more embodiments of the present invention, and the description thereof is more specific and detailed, but the scope of the invention is not limited thereto. It should be noted that, for those skilled in the art, without departing from the concept of the present invention, several variations and modifications can be made, which all fall within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.

Claims (6)

1. A large deep foundation pit construction supporting platform capable of being built quickly for a building construction project comprises a base (1) and is characterized in that fixing seats (2) are arranged on two sides of the base (1), a fixing groove (3) is formed in one side of each fixing seat (2), a cavity (4) is formed in the base (1), a motor (5) is fixedly connected to one side of the interior of the cavity (4), a rotating shaft (6) is fixedly connected to the output end of the motor (5), a first threaded rod (7) is fixedly connected to one end of the rotating shaft (6), a first gear (8) is fixedly connected to one side of the outer wall of the first threaded rod (7), a second threaded rod (9) is rotatably connected to the interior of the cavity (4), a second gear (10) is fixedly connected to one side of the outer wall of the second threaded rod (9), the second gear (10) is meshed with the first gear (8), sliding grooves (15) are formed in two sides of the cavity (4), sliding blocks (12) are arranged on one side of the first threaded rod (7) and two threaded rods (9), and sliding blocks (14) are connected with two sliding blocks (12), each sliding block (14) is connected with each sliding groove (15) in a sliding mode, through openings (11) are formed in the two sides of the base (1), each moving block (12) penetrates through each through opening (11) respectively, and each moving block (12) is matched with each fixing groove (3).
2. The rapidly-erected large-scale deep foundation pit construction supporting platform for building construction engineering according to claim 1, which is characterized in that: the base (1) bottom fixedly connected with a plurality of staple (16), it is a plurality of staple (16) evenly distributed is in base (1) bottom.
3. The rapidly-erected large-scale deep foundation pit construction supporting platform for building construction engineering according to claim 1, which is characterized in that: every fixing base (2) top is a plurality of reinforcement post (17) of equal fixedly connected with, and is a plurality of reinforcement post (17) top fixedly connected with mount (18).
4. The large-scale deep foundation pit construction supporting platform of building construction engineering that can build fast according to claim 1, its characterized in that: the base (1) top fixedly connected with a plurality of electric putter (19), it is a plurality of electric putter (19) output is equal fixedly connected with operation panel (20).
5. The large-scale deep foundation pit construction supporting platform of building construction engineering that can build fast according to claim 4, its characterized in that: the top of the operating platform (20) is provided with an anti-skid pad (21), and the anti-skid pad (21) is made of rubber.
6. The rapidly-erected large-scale deep foundation pit construction supporting platform for building construction engineering according to claim 4, which is characterized in that: the equal fixedly connected with railing (22) in operation panel (20) both sides, two railing (22) are the symmetric distribution about operation panel (20) axis.
CN202221258624.XU 2022-05-24 2022-05-24 Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast Active CN217924713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221258624.XU CN217924713U (en) 2022-05-24 2022-05-24 Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221258624.XU CN217924713U (en) 2022-05-24 2022-05-24 Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast

Publications (1)

Publication Number Publication Date
CN217924713U true CN217924713U (en) 2022-11-29

Family

ID=84178143

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221258624.XU Active CN217924713U (en) 2022-05-24 2022-05-24 Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast

Country Status (1)

Country Link
CN (1) CN217924713U (en)

Similar Documents

Publication Publication Date Title
CN112681342B (en) Deep foundation pit supporting structure and deep foundation pit construction method
CN113653066B (en) Foundation pit side slope supporting structure
CN109235450B (en) Supporting frame for foundation pit of arched balance beam structure
CN105155602A (en) Multi-support foundation strengthening comprehensive controlling method
CN217924713U (en) Large-scale deep basal pit construction supporting platform of building construction engineering that can build fast
CN215373775U (en) Building engineering manages and uses foundation ditch measuring device
CN110409459A (en) A kind of building lot hole suspension device convenient for adjusting
CN212294696U (en) Building underground works slope support reinforced structure
CN101886385B (en) Construction process of long-auger jet-grouting mixing curtain pile
CN215562672U (en) Novel retaining wall supporting structure for foundation pit excavation
CN215562642U (en) Foundation ditch side slope is strutted and is built with interim strutting arrangement
CN108166553A (en) A kind of foundation pit Rapid Excavation equipment and excavation method
CN114263187A (en) Foundation pit bottom plate force transmission structure and construction method thereof
CN111764398A (en) Foundation pit supporting and reinforcing device
CN214783987U (en) Foundation pit supporting device for constructional engineering
CN205591216U (en) Foundation ditch erect column pile for housing construction
CN212452657U (en) Foundation ditch supporting device for civil engineering
CN219862839U (en) Foundation pit excavation protection structure
CN216810060U (en) Ditch construction is with digging device based on hydraulic engineering
CN211006699U (en) Deep foundation pit supporting structure
CN115434332B (en) Building construction safety protection foundation pit and protection method thereof
CN217601542U (en) Foundation reinforcing device for building construction
CN214460376U (en) Novel building engineering pile device
CN213390148U (en) Crawler-type planetary stirring and spraying machine for foundation pit
CN214574234U (en) A foundation ditch excavating gear for municipal civil engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant