CN218116106U - High-efficient mounting structure of bridge steel construction - Google Patents

High-efficient mounting structure of bridge steel construction Download PDF

Info

Publication number
CN218116106U
CN218116106U CN202222501982.5U CN202222501982U CN218116106U CN 218116106 U CN218116106 U CN 218116106U CN 202222501982 U CN202222501982 U CN 202222501982U CN 218116106 U CN218116106 U CN 218116106U
Authority
CN
China
Prior art keywords
rod
plate
mounting
montant
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222501982.5U
Other languages
Chinese (zh)
Inventor
黄福英
胡朝各
李春秀
李伟
刘四琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Runchuan Construction Engineering Co ltd
Original Assignee
Yunnan Runchuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Runchuan Construction Engineering Co ltd filed Critical Yunnan Runchuan Construction Engineering Co ltd
Priority to CN202222501982.5U priority Critical patent/CN218116106U/en
Application granted granted Critical
Publication of CN218116106U publication Critical patent/CN218116106U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge steel construction technical field discloses a high-efficient mounting structure of bridge steel construction, the upper surface symmetry of bridge plate is provided with the mounting panel, the last surface mounting of mounting panel has the second montant, the top slidable mounting of second montant has the regulation pole, the upper end of adjusting the pole is connected with first montant, the upper end of first montant is provided with the adapter sleeve, the last surface mounting of adapter sleeve has the fixed plate, the front surface and the rear surface of fixed plate all are provided with the limiting plate, utilize first electric telescopic handle's work can make the regulation pole remove in the inside of adjustment tank to in the work that utilizes second electric telescopic handle, can make the gag lever post imbed spacing downthehole portion, can fix the regulation pole after adjusting like this, satisfy not co-altitude steel horizontal pole and bridge plate installation, its work efficiency of effectual improvement through the distance of adjusting between first montant and the second montant.

Description

High-efficient mounting structure of bridge steel construction
Technical Field
The utility model relates to a bridge steel construction technical field specifically is a high-efficient mounting structure of bridge steel construction.
Background
The bridge refers to a building constructed for a road to cross a natural or artificial obstacle, when the bridge is constructed, the application of a steel structure is also a key point, most of the bridge steel is used, the bridge steel is welded and processed for the construction of the bridge, and in the bridge construction process, the installation structure of the bridge steel structure is also a key point, for example, a Chinese patent discloses an efficient installation structure (with an authorization publication number of CN 209798506U) for the bridge steel structure, when the bridge is used for installing a vertical rod, firstly two screw rods simultaneously penetrate through the upper ends of a base block and the vertical rod, and after the screw rods penetrate through the base block and the vertical rod, the fixing piece is screwed, so that the end part of the screw rod is assembled on the fixing piece in a threaded manner; when the vertical rod is disassembled, the fixing piece is screwed, and the threaded assembly between the end part of the screw rod and the fixing piece is released; compared with the prior art, the utility model discloses in, through foretell settlement, reached montant installation, maintenance and changed all convenient purpose.
According to the combination of the above-mentioned prior patents, the mounting structure of the bridge steel structure is manually adjusted through manpower when the length between the vertical rods is adjusted, the operation not only wastes manpower, but also has low adjusting efficiency. Accordingly, those skilled in the art have provided an efficient installation structure of a bridge steel structure to solve the problems set forth in the above background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a high-efficient mounting structure of bridge steel construction to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a high-efficient mounting structure of bridge steel construction, includes the bridge slab and sets up the steel horizontal pole in the bridge slab top, the upper surface symmetry of bridge slab is provided with the mounting panel, the last surface mounting of mounting panel has the second montant, the top slidable mounting of second montant has the regulation pole, the upper end of adjusting the pole is connected with first montant, the upper end of first montant is provided with the adapter sleeve, the last surface mounting of adapter sleeve has the fixed plate, the front surface and the rear surface of fixed plate all are provided with the limiting plate.
As the utility model discloses further scheme again: the front surface of the limiting plate is provided with a first bolt in front of the steel cross rod, the front surface and the rear surface of the steel cross rod are provided with fixing holes, and the tail end of the first bolt penetrates through the inside of the limiting plate and is in threaded connection with the fixing holes.
As a further aspect of the present invention: the upper surface symmetry of mounting panel is provided with fastening bolt, the front surface and the rear surface of second montant all are provided with anti-light strip, and the length of second montant is the same with the length of first montant.
As a further aspect of the present invention: an adjusting groove is formed in the second vertical rod, sliding rails are symmetrically arranged on two sides of the adjusting rod, and sliding grooves which slide relative to the sliding rails are formed in the inner side of the adjusting groove.
As the utility model discloses further scheme again: the lower surface of adjusting the pole is provided with fixed cover, the inside of adjustment tank is provided with an electric telescopic handle, electric telescopic handle's flexible end embedding utilizes the screw fixation to the inside of fixed cover.
As a further aspect of the present invention: the inner side of the second vertical rod is provided with a groove, a second electric telescopic rod is arranged inside the groove, the telescopic end of the second electric telescopic rod is connected with a limiting rod, limiting holes are symmetrically formed in two sides of the adjusting rod, and one end of the limiting rod is embedded into the limiting holes.
As a further aspect of the present invention: the upper surface of first montant is provided with the installation pole, the mounting hole with installation pole threaded connection is seted up to the lower surface of adapter sleeve.
As a further aspect of the present invention: the outer side of the first vertical rod is symmetrically provided with a supporting plate, the upper surface of the supporting plate is provided with a connecting plate below the fixing plate and the limiting plate, and the lower surface of the connecting plate is symmetrically provided with second bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a fastening bolt can fix the mounting panel on the bridge board, and utilize the work of the inside first electric telescopic handle who sets up of adjustment tank, can make the regulation pole remove in the inside of adjustment tank, can adjust the distance between first montant and the second montant like this, and adjust back usable second electric telescopic handle's work, can make the gag lever post imbed the inside in spacing hole, can fix the regulation pole after adjusting like this, through adjusting the distance between first montant and the second montant, thereby satisfy the installation between the steel horizontal pole of co-altitude and the bridge board, should set up can be automatic highly adjust first montant and second montant, its work efficiency of effectual improvement.
2. Utilize the mounting hole threaded connection that installation pole and adapter sleeve lower surface were seted up, can install the adapter sleeve in the top of first montant like this, utilize the setting of first bolt, can install the steel horizontal pole at the upper surface of fixed plate, utilize the setting of the second bolt that surface symmetry set up under the connecting plate simultaneously, can make the lower surface that the fixed plate was installed to the connecting plate, through the setting of backup pad like this, can improve the support nature of steel horizontal pole to improve the stability and the intensity of steel horizontal pole.
Drawings
FIG. 1 is a schematic structural diagram of an efficient installation structure of a bridge steel structure;
FIG. 2 is an enlarged view of portion A of FIG. 1;
FIG. 3 is a schematic diagram of an internal structure of a second vertical rod in the efficient installation structure of the bridge steel structure;
FIG. 4 is an enlarged view of portion B of FIG. 3;
fig. 5 is a schematic structural view of a connecting sleeve in an efficient installation structure of a bridge steel structure.
In the figure: 1. a steel cross bar; 2. a limiting plate; 3. a support plate; 4. a first vertical bar; 5. adjusting a rod; 6. a second vertical bar; 7. a reflective strip; 8. fastening a bolt; 9. a bridge plate; 10. mounting a plate; 11. a first bolt; 12. a limiting hole; 13. a slide rail; 14. a chute; 15. an adjustment groove; 16. fixing a sleeve; 17. a first electric telescopic rod; 18. a limiting rod; 19. a groove; 20. a second electric telescopic rod; 21. a connecting plate; 22. mounting holes; 23. a fixing plate; 24. a second bolt; 25. mounting a rod; 26. a connecting sleeve.
Detailed Description
Referring to fig. 1 to 5, in an embodiment of the present invention, a high-efficiency mounting structure of a bridge steel structure includes a bridge plate 9 and a steel cross bar 1 disposed above the bridge plate 9, a mounting plate 10 is symmetrically disposed on an upper surface of the bridge plate 9, a second vertical bar 6 is mounted on an upper surface of the mounting plate 10, an adjusting rod 5 is slidably mounted above the second vertical bar 6, a first vertical bar 4 is connected to an upper end of the adjusting rod 5, a fastening bolt 8 is symmetrically disposed on an upper surface of the mounting plate 10, a reflective strip 7 is disposed on a front surface and a rear surface of the second vertical bar 6, a length of the second vertical bar 6 is the same as that of the first vertical bar 4, an adjusting groove 15 is formed in the second vertical bar 6, a sliding rail 13 is symmetrically disposed on both sides of the adjusting rod 5, a sliding groove 14 sliding with the sliding rail 13 is formed in an inner side of the adjusting groove 15, a lower surface of the adjusting rod 5 is provided with a fixing sleeve 16, a first electric telescopic rod 17 is disposed in the adjusting groove 15, a telescopic end of the first electric telescopic rod 17 is embedded into an inner portion of the adjusting sleeve 16 and fixed by a screw, a groove 19 is formed in an inner portion of the second vertical bar 6, a groove 12 is disposed in an inner side of the adjusting rod, a second vertical bar 12, a limiting hole 12 is formed in the adjusting rod 12, the adjusting rod, and a distance of the adjusting rod 12 is formed in the adjusting rod 12, the adjusting rod is formed in the adjusting rod, the adjusting rod 12, can fix the regulation pole 5 after adjusting like this, through adjusting the distance between first montant 4 and the second montant 6 to satisfy the installation of not co-altitude steel horizontal pole 1 and bridge plate 9, this setting can be automatic highly adjust first montant 4 and second montant 6, effectual improvement its work efficiency.
In fig. 1 and 5: the upper end of first montant 4 is provided with adapter sleeve 26, adapter sleeve 26's last surface mounting has fixed plate 23, the front surface and the rear surface of fixed plate 23 all are provided with limiting plate 2, limiting plate 2's front surface is provided with first bolt 11 in the place ahead of steel horizontal pole 1, the fixed orifices has all been seted up with the rear surface to the front surface of steel horizontal pole 1, first bolt 11 end run through limiting plate 2's inside and with fixed orifices threaded connection, the upper surface of first montant 4 is provided with installation pole 25, the mounting hole 22 with installation pole 25 threaded connection is seted up to adapter sleeve 26's lower surface, the outside symmetry of first montant 4 is provided with backup pad 3, the upper surface of backup pad 3 is provided with connecting plate 21 in fixed plate 23 and limiting plate 2's below, the lower surface symmetry of connecting plate 21 is provided with second bolt 24, utilize the setting of installation pole 25 and the mounting hole 22 threaded connection that adapter sleeve 26 lower surface set up, so can install adapter sleeve 26 in the top of first montant 4, utilize the setting of first bolt 11, can install steel horizontal pole 1 at the upper surface of fixed plate 23, utilize the setting of second bolt 21's lower surface symmetry to set up, can make the backup pad 21 install the stability of supporting plate 23 through the improvement of steel horizontal pole 1 and the stability of steel horizontal pole 1.
The utility model discloses a theory of operation is: when using, install this bridge plate 9 on the pier, and install mounting panel 10 on bridge plate 9 through fastening bolt 8, install the top of first montant 4 with fixed plate 23 simultaneously, can install adapter sleeve 26 and the installation pole 25 threaded connection that fixed plate 23 lower surface set up when the installation, installation pole 25 and the inside mounting hole 22 threaded connection who offers of adapter sleeve 26, so can install fixed plate 23, can install the upper surface of fixed plate 23 with steel horizontal pole 1 after the installation, and utilize the rotation of first bolt 11, can fix steel horizontal pole 1, while utilizing the rotation of the second bolt 24 of surface symmetry setting under connecting plate 21, can install connecting plate 21 to the lower surface of fixed plate 23 and limiting plate 2, so can improve the intensity of steel horizontal pole 1 through the backup pad 3 that connecting plate 21 lower surface set up, and adjusting the distance between first montant 4 and the second bolt 6 according to the distance between steel horizontal pole 1 and the bridge plate 9, at first electronic telescopic link 17's work of utilizing the inside setting of adjusting groove 15 at first montant 15 at the inside the regulation pole that the distance of adjusting groove 15 can make the regulation pole 19 and the regulation pole 19 that the regulation pole can make the inside the regulation pole set up the regulation pole 19 and the regulation efficiency of second montant can make the regulation pole that the regulation pole can make the inside the regulation pole 19 and the recess of this montant 18 and the regulation pole set up, thereby the efficiency of this montant 18 can make the regulation pole.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (8)

1. The utility model provides a high-efficient mounting structure of bridge steel construction, includes bridge plate (9) and sets up steel horizontal pole (1) in bridge plate (9) top, a serial communication port, the upper surface symmetry of bridge plate (9) is provided with mounting panel (10), the last surface mounting of mounting panel (10) has second montant (6), the top slidable mounting of second montant (6) has regulation pole (5), the upper end of adjusting pole (5) is connected with first montant (4), the upper end of first montant (4) is provided with adapter sleeve (26), the last surface mounting of adapter sleeve (26) has fixed plate (23), the front surface and the rear surface of fixed plate (23) all are provided with limiting plate (2).
2. The efficient mounting structure of the bridge steel structure according to claim 1, wherein the front surface of the limiting plate (2) is provided with a first bolt (11) in front of the steel cross rod (1), the front surface and the rear surface of the steel cross rod (1) are both provided with fixing holes, and the tail end of the first bolt (11) penetrates through the inside of the limiting plate (2) and is in threaded connection with the fixing holes.
3. The efficient mounting structure of the bridge steel structure as claimed in claim 1, wherein the mounting plate (10) is symmetrically provided with fastening bolts (8) on the upper surface, the front surface and the rear surface of the second vertical rod (6) are both provided with reflective strips (7), and the length of the second vertical rod (6) is the same as that of the first vertical rod (4).
4. The efficient mounting structure of the bridge steel structure according to claim 1, wherein an adjusting groove (15) is formed inside the second vertical rod (6), sliding rails (13) are symmetrically arranged on two sides of the adjusting rod (5), and sliding grooves (14) which slide with the sliding rails (13) are formed in the inner side of the adjusting groove (15).
5. The efficient installation structure of the bridge steel structure as claimed in claim 4, wherein the lower surface of the adjusting rod (5) is provided with a fixing sleeve (16), the inside of the adjusting groove (15) is provided with a first electric telescopic rod (17), and the telescopic end of the first electric telescopic rod (17) is embedded into the inside of the fixing sleeve (16) and fixed by screws.
6. The efficient mounting structure of the bridge steel structure according to claim 1, wherein a groove (19) is formed in the inner side of the second vertical rod (6), a second electric telescopic rod (20) is arranged inside the groove (19), a limiting rod (18) is connected to the telescopic end of the second electric telescopic rod (20), limiting holes (12) are symmetrically formed in two sides of the adjusting rod (5), and one end of the limiting rod (18) is embedded into the limiting holes (12).
7. The efficient mounting structure of the bridge steel structure according to claim 1, wherein the upper surface of the first vertical rod (4) is provided with a mounting rod (25), and the lower surface of the connecting sleeve (26) is provided with a mounting hole (22) in threaded connection with the mounting rod (25).
8. The efficient mounting structure of a bridge steel structure according to claim 1, wherein the outer side of the first vertical rod (4) is symmetrically provided with a support plate (3), the upper surface of the support plate (3) is provided with a connecting plate (21) below the fixing plate (23) and the limiting plate (2), and the lower surface of the connecting plate (21) is symmetrically provided with a second bolt (24).
CN202222501982.5U 2022-09-21 2022-09-21 High-efficient mounting structure of bridge steel construction Active CN218116106U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222501982.5U CN218116106U (en) 2022-09-21 2022-09-21 High-efficient mounting structure of bridge steel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222501982.5U CN218116106U (en) 2022-09-21 2022-09-21 High-efficient mounting structure of bridge steel construction

Publications (1)

Publication Number Publication Date
CN218116106U true CN218116106U (en) 2022-12-23

Family

ID=84530598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222501982.5U Active CN218116106U (en) 2022-09-21 2022-09-21 High-efficient mounting structure of bridge steel construction

Country Status (1)

Country Link
CN (1) CN218116106U (en)

Similar Documents

Publication Publication Date Title
CN204934670U (en) A kind of electric drill auxiliary stand
CN213038918U (en) Foundation ditch faces limit protective structure
CN218116106U (en) High-efficient mounting structure of bridge steel construction
CN216110297U (en) Unitized transverse continuous frame aluminum alloy window system
CN212323891U (en) Height-adjustable roller drill walking motor bracket
CN215484886U (en) Adjustable strutting arrangement for building
CN112031225A (en) Unit type curtain wall connecting mechanism
CN212478486U (en) Civil engineering is with overhanging type scaffold subassembly
CN210370448U (en) Scaffold inclined ladder
CN209339377U (en) A kind of installation fixed structure of building wall board
CN217949346U (en) Energy-concerving and environment-protective steel construction stabilising arrangement
CN221053247U (en) High-rise protective fence for building construction
CN215336082U (en) Staple bolt formula solar energy integration lithium cell street lamp
CN219410563U (en) Improved bridge construction hanging bracket
CN213627018U (en) Fixing device is used in civil engineering construction
CN215759540U (en) Building corridor structure
CN210117159U (en) Walking rail supporting structure
CN215520317U (en) Energy-saving building fence structure made of materials
CN216471665U (en) Elevator car roof maintenance box mounting structure
CN220319270U (en) Transverse beam structure of metal guardrail
CN218813365U (en) Road fence convenient to equipment
CN218324307U (en) Engineering protective fence
CN218061813U (en) Adjustable assembly type building limb protective railing
CN218449961U (en) High-strength photovoltaic support
CN218205230U (en) Mounting and fixing structure of factory building lattice column