CN218091935U - Novel combined type aluminum alloy climbing frame - Google Patents

Novel combined type aluminum alloy climbing frame Download PDF

Info

Publication number
CN218091935U
CN218091935U CN202221585457.XU CN202221585457U CN218091935U CN 218091935 U CN218091935 U CN 218091935U CN 202221585457 U CN202221585457 U CN 202221585457U CN 218091935 U CN218091935 U CN 218091935U
Authority
CN
China
Prior art keywords
support frame
frame
bracing piece
aluminum alloy
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221585457.XU
Other languages
Chinese (zh)
Inventor
宋江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shengmin Construction Technology Co ltd
Original Assignee
Shandong Shengmin Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shengmin Construction Technology Co ltd filed Critical Shandong Shengmin Construction Technology Co ltd
Priority to CN202221585457.XU priority Critical patent/CN218091935U/en
Application granted granted Critical
Publication of CN218091935U publication Critical patent/CN218091935U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a novel combined type aluminum alloy climbs frame relates to and climbs frame technical field, include the utility model discloses in fix the support frame and erect the fixed plate through the bolt, spread groove and bolted connection are two at least, can improve the stability of connecting, pass the through-hole that support frame one end was seted up with the bracing piece inside, two bracing pieces are installation from top to bottom, peg graft the both ends of bracing piece on the side support body, can support the both ends of support frame to can guarantee the firm of footboard on the support frame. The utility model discloses in fix the support frame and erect the fixed plate through the bolt, spread groove and bolted connection are two at least, can improve the stability of connecting, pass the through-hole that support frame one end was seted up with the bracing piece inside, two bracing pieces are installation from top to bottom, peg graft the both ends of bracing piece on the side support body, can support the both ends of support frame to can guarantee the firm of the footboard on the support frame.

Description

Novel combined type aluminum alloy climbing frame
Technical Field
The utility model belongs to the technical field of climb the frame, more specifically says, in particular to novel combined type aluminum alloy climbs frame.
Background
The climbing frame, also called a lifting frame, can be classified into hydraulic, electric, manual, etc. according to its power source. The scaffold is a novel scaffold system developed in recent years and is mainly applied to high-rise shear wall type floors. It can climb up or down along the building. This system makes the scaffold technology completely improved: firstly, the frame does not need to be turned over; and secondly, the scaffold is free from the dismounting and mounting process, the scaffold is not limited by the height of a building, and manpower and materials are greatly saved. And also has a great improvement on the traditional scaffold in the safety angle. Has great development advantages in high-rise buildings.
Based on the above, the present inventors found that the following problems exist: the frame of climbing that uses at present stage when supporting the footboard, supports it through triangular supports frame mostly, and this dynamics that just leads to footboard both sides to support is different, and the support ability that is located inside portion is not high enough, appears the potential safety hazard easily.
Therefore, in view of the above, research and improvement are performed on the existing structure and defects, and a novel composite aluminum alloy climbing frame is provided in order to achieve the purpose of higher practical value.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a novel combined type aluminum alloy climbs frame to solve present supporting through the triangular supports frame, make the problem that the dynamics that the footboard both sides supported is different.
The utility model relates to a novel purpose and efficiency of combined type aluminum alloy climbing frame are reached by following concrete technical means:
the utility model provides a novel combined type aluminum alloy climbs frame, includes the side bearer body and well support body, the inboard fixed mounting of well support body has perpendicular fixed plate, the spread groove has been seted up on the surface of perpendicular fixed plate, the inside demountable installation of spread groove has the bolt, it is connected with the support frame to erect the fixed plate and can dismantle through the bolt, the through-hole has been seted up to the one end of support frame, the inside of through-hole is provided with the bracing piece.
Further, the quantity of through-hole and bracing piece is two, the diameter of through-hole and the diameter phase-match of bracing piece, the both ends of bracing piece are pegged graft to the inboard of side support body.
Further, the quantity of support frame is a plurality of, is the equidistance installation respectively, the bracing piece runs through in a plurality of the one end of support frame.
Furthermore, a clamping groove is formed in the upper surface of the supporting frame, a pedal is arranged inside the clamping groove, and the width of the pedal is matched with that of the clamping groove.
Furthermore, a first connecting hole is formed in the clamping groove, and a second connecting hole is formed in the surface of the pedal.
Furthermore, the positions of the first connecting hole and the second connecting hole correspond to each other up and down, and fixing screws are movably mounted in the first connecting hole and the second connecting hole.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses in fix the support frame and erect the fixed plate through the bolt, spread groove and bolted connection are two at least, can improve the stability of connecting, pass the through-hole that support frame one end was seted up with the bracing piece inside, two bracing pieces are the upper and lower installation, peg graft the both ends of bracing piece on the side support body, can support the both ends of support frame to can guarantee the firm of the footboard on the support frame.
The utility model discloses in be provided with the footboard in the inside of draw-in groove, and the width phase-match of the width of footboard and draw-in groove can avoid the footboard to the skew of both sides, then the footboard passes through clamping screw and the support frame is connected, can avoid footboard lateral shifting to the stability of integral connection has been improved.
Drawings
Fig. 1 is the middle assembly schematic view of the novel combined type aluminum alloy climbing frame of the utility model.
Fig. 2 is the whole schematic view of the novel combined type aluminum alloy climbing frame of the utility model.
Fig. 3 is a schematic view of the split of the middle part of the novel composite aluminum alloy climbing frame.
Fig. 4 is an enlarged schematic view of the a part of the novel combined aluminum alloy climbing frame of the present invention.
In the drawings, the corresponding relationship between the component names and the reference numbers is as follows:
1. a side frame body; 2. a middle frame body; 3. a vertical fixing plate; 4. connecting grooves; 5. a bolt; 6. a support frame; 7. a card slot; 8. a through hole; 9. a support bar; 10. a pedal; 11. a first connection hole; 12. a second connection hole; 13. and fixing the screw rod.
Detailed Description
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
In the description of the present invention, "a plurality" means two or more unless otherwise specified; the terms "upper", "lower", "left", "right", "inner", "outer", "front", "rear", "head", "tail", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are merely for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," "third," and the like are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "connected" and "connected" should be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; may be directly connected or indirectly connected through an intermediate. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The embodiment is as follows:
as shown in figures 1 to 4:
the utility model provides a novel combined type aluminum alloy climbs frame, including side support body 1 and well support body 2, the inboard fixed mounting of well support body 2 has perpendicular fixed plate 3, the spread groove 4 has been seted up on the surface of perpendicular fixed plate 3, the inside demountable installation of spread groove 4 has bolt 5, spread groove 4 and bolt 5 are connected and are two at least, can improve the stability of connecting, it is connected with support frame 6 to erect fixed plate 3 and can dismantle through bolt 5, through-hole 8 has been seted up to support frame 6's one end, through-hole 8's inside is provided with bracing piece 9, pass through-hole 8 that support frame 6 one end was seted up with bracing piece 9 inside, the quantity of through-hole 8 and bracing piece 9 is two, two bracing pieces 9 are installation from top to bottom, then peg graft on side support body 1 with the both ends of bracing piece 9, can support the both ends of support frame 6.
Wherein, the quantity of through-hole 8 and bracing piece 9 is two, and the diameter of through-hole 8 and the diameter phase-match of bracing piece 9, the both ends of bracing piece 9 are pegged graft to the inboard of side support body 1.
Wherein, the quantity of support frame 6 is a plurality of, is the equidistance installation respectively, and bracing piece 9 runs through in the one end of a plurality of support frame 6, can support the one end of support frame 6.
Wherein, draw-in groove 7 has been seted up to the upper surface of support frame 6, and the inside of draw-in groove 7 is provided with footboard 10, and the width of footboard 10 and the width phase-match of draw-in groove 7 can avoid footboard 10 to the skew of both sides.
Wherein, the inside of the slot 7 is opened with a first connecting hole 11, and the surface of the pedal 10 is opened with a second connecting hole 12 for installing a fixing screw 13.
Wherein, the position of first connecting hole 11 and second connecting hole 12 corresponds from top to bottom, and the inside movable mounting of first connecting hole 11 and second connecting hole 12 has clamping screw 13, and footboard 10 passes through clamping screw 13 and support frame 6 to be connected, can avoid footboard 10 lateral shifting to the stability of integral connection has been improved.
The specific use mode and function of the embodiment are as follows:
the utility model discloses in, when the installation, at first 6 cards of support frame are on erecting fixed plate 3, make hole and spread groove 4 on the support frame 6 correspond each other, fix support frame 6 and perpendicular fixed plate 3 through bolt 5, spread groove 4 and bolt 5 are connected and are two at least, can improve the stability of connection, then pass through-hole 8 inside that 6 one end of support frame was seted up with bracing piece 9, through-hole 8 and bracing piece 9's quantity is two, two bracing pieces 9 are the installation from top to bottom, then peg graft the both ends of bracing piece 9 on side support body 1, can support the both ends of support frame 6, thereby can guarantee the firm of footboard 10 on the support frame 6, be provided with footboard 10 in the inside of draw-in groove 7 simultaneously, and the width phase-match of footboard 10 and draw-in groove 7, can avoid footboard 10 to the skew to both sides, then footboard 10 passes through clamping screw 13 and support frame 6 connects, can avoid footboard 10 lateral shifting, thereby whole stability of connection has been improved.
The embodiments of the present invention have been presented for purposes of illustration and description, and are not intended to be exhaustive or limited to the invention in the form disclosed. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiment was chosen and described in order to best explain the principles of the invention and the practical application, and to enable others of ordinary skill in the art to understand the invention for various embodiments with various modifications as are suited to the particular use contemplated.

Claims (6)

1. The utility model provides a novel combined type aluminum alloy climbs frame which characterized in that: including side support body (1) and well support body (2), the inboard fixed mounting of well support body (2) has perpendicular fixed plate (3), spread groove (4) have been seted up on the surface of perpendicular fixed plate (3), the inside demountable installation of spread groove (4) has bolt (5), it is connected with support frame (6) to erect fixed plate (3) through bolt (5) demountable installation, through-hole (8) have been seted up to the one end of support frame (6), the inside of through-hole (8) is provided with bracing piece (9).
2. The novel combined type aluminum alloy climbing frame of claim 1, which is characterized in that: the quantity of through-hole (8) and bracing piece (9) is two, the diameter of through-hole (8) and the diameter phase-match of bracing piece (9), the both ends of bracing piece (9) are pegged graft to the inboard of side support body (1).
3. The novel composite aluminum alloy climbing frame as claimed in claim 1, wherein: the quantity of support frame (6) is a plurality of, is the equidistance installation respectively, bracing piece (9) run through in a plurality of the one end of support frame (6).
4. The novel composite aluminum alloy climbing frame as claimed in claim 1, wherein: the upper surface of support frame (6) has seted up draw-in groove (7), the inside of draw-in groove (7) is provided with footboard (10), the width of footboard (10) and the width phase-match of draw-in groove (7).
5. The novel composite aluminum alloy climbing frame as claimed in claim 4, wherein: a first connecting hole (11) is formed in the clamping groove (7), and a second connecting hole (12) is formed in the surface of the pedal (10).
6. The novel composite aluminum alloy climbing frame as claimed in claim 5, wherein: the positions of the first connecting hole (11) and the second connecting hole (12) are vertically corresponding, and a fixing screw rod (13) is movably mounted inside the first connecting hole (11) and the second connecting hole (12).
CN202221585457.XU 2022-06-23 2022-06-23 Novel combined type aluminum alloy climbing frame Active CN218091935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221585457.XU CN218091935U (en) 2022-06-23 2022-06-23 Novel combined type aluminum alloy climbing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221585457.XU CN218091935U (en) 2022-06-23 2022-06-23 Novel combined type aluminum alloy climbing frame

Publications (1)

Publication Number Publication Date
CN218091935U true CN218091935U (en) 2022-12-20

Family

ID=84477109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221585457.XU Active CN218091935U (en) 2022-06-23 2022-06-23 Novel combined type aluminum alloy climbing frame

Country Status (1)

Country Link
CN (1) CN218091935U (en)

Similar Documents

Publication Publication Date Title
CN218091935U (en) Novel combined type aluminum alloy climbing frame
CN110714607A (en) Climb adjustable adaptor for frame
CN115162728A (en) Double-layer steel structure cantilever formwork platform cantilever support frame and construction method thereof
CN213597400U (en) Elevator shaft
CN213204848U (en) Cover plate structure of elevator shaft frame
CN213509888U (en) Covering or awning on a car, boat, etc. room auxiliary erection instrument
CN210927519U (en) Embedded support fixing table post for small solar power supply electric system
CN217172858U (en) Support column for building elevator derrick
CN214885360U (en) Assembled device for construction in elevator shaft
CN217400294U (en) Angle joint piece for building construction climbing frame
CN212176623U (en) Stable form bed-jig convenient to adjustment prefabricated assembled buckling-restrained steel plate wall state
CN215859026U (en) Lightweight aluminum formwork for building
CN212405517U (en) Sunshine room section bar connection structure
CN215905652U (en) Elevator shaft frame
CN219011972U (en) Stay cable auxiliary tensioning tool
CN215859305U (en) Improved structure of audio-visual truss for performance stage
CN220538963U (en) Steel construction partition wall
CN217054407U (en) Auxiliary device for rapid assembly of assembly type building
CN217998552U (en) Aluminum alloy curtain wall structure
CN212716019U (en) Elevator shaft
CN214034740U (en) Easily-disassembled double-bevel internal corner aluminum template
CN219240997U (en) Connecting structure on telescopic fixed unit type curtain wall
CN212689545U (en) Corner pole setting device for lifting aluminum alloy climbing frame
CN221119147U (en) Mounting platform of elevator well
CN216713775U (en) Pole setting for frame is climbed in construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant