CN218091854U - Plastering rod for building construction - Google Patents

Plastering rod for building construction Download PDF

Info

Publication number
CN218091854U
CN218091854U CN202222122380.9U CN202222122380U CN218091854U CN 218091854 U CN218091854 U CN 218091854U CN 202222122380 U CN202222122380 U CN 202222122380U CN 218091854 U CN218091854 U CN 218091854U
Authority
CN
China
Prior art keywords
handle
fixed mounting
dividing
hawk
collecting vat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222122380.9U
Other languages
Chinese (zh)
Inventor
高耿坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hongjianda Construction Engineering Co ltd
Original Assignee
Guangzhou Hongjianda Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hongjianda Construction Engineering Co ltd filed Critical Guangzhou Hongjianda Construction Engineering Co ltd
Priority to CN202222122380.9U priority Critical patent/CN218091854U/en
Application granted granted Critical
Publication of CN218091854U publication Critical patent/CN218091854U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model provides a plastering rod for building construction relates to the building construction field. Including the collecting vat and scrape the hawk, the collecting vat with scrape hawk fixed connection, the top fixed mounting of collecting vat has the connecting rod, one side fixed mounting of connecting rod cuts apart the arris, the bottom fixed mounting who cuts apart the arris has the segmentation block, the bottom fixed mounting of collecting vat has the slide, the inboard slidable mounting of slide has the movable block, the handle is installed to the below of slide, the one end and the movable block screw thread installation of handle. This plastering rod for construction, when taking up the collecting vat and scraping the hawk and promoting to plaster through holding the handle and smearing, the cooperation is cut apart the arris and is cut apart the piece very and to cutting apart of hawk, can reduce the resistance of scraping the hawk when retrieving the hawk, reduces staff's intensity of labour that plasters, through the setting of collecting vat, can hold the lime material of retrieving, avoids spilling over, the unnecessary lime material of better recovery.

Description

Plastering rod for building construction
Technical Field
The utility model relates to a construction technical field specifically is a construction is with pole of plastering.
Background
The plastering in the building refers to the process of plastering the surface layer of the building and plastering the gypsum slurry by adopting lime mortar, mixed mortar, polymer water mortar, hemp cut ash, paper reinforcement ash, heat-preservation mortar particles and the like; plastering is a basic decoration project in building construction, and mortar is smeared on walls, floors, ceilings and surfaces of building construction, so that the plastering has the effects of protecting a base layer and improving the appearance.
When using the pole of plastering to plaster, promote to the lime-aggregate and plaster at ordinary times, because the pole of plastering and lime-aggregate are the bulk contact, can increase the resistance of pole of plastering when retrieving the lime-aggregate, the pole of plastering that has now in addition is the bar lever shape mostly, retrieves the lime-aggregate and spills over easily.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a plastering rod for construction has solved the problem mentioned in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a plastering rod for building construction, includes the collecting vat and scrapes the hawk, the collecting vat with scrape hawk fixed connection, the top fixed mounting of collecting vat has the connecting rod, one side fixed mounting of connecting rod has the segmentation arris, the bottom fixed mounting who cuts apart the arris has the segmentation piece, the bottom fixed mounting of collecting vat has the slide, the inboard slidable mounting of slide has the movable block, the handle is installed to the below of slide, the one end and the movable block threaded mounting of handle, the outside fixed mounting of handle has spacing dish, the equal fixed mounting in both ends has the baffle about the hawk.
Preferably, the ash scraping plate is of an arc-shaped structure, and the ash scraping plate and the collecting tank are installed smoothly.
Preferably, the number of the dividing edges is multiple, the dividing edges are arranged in an equidistant array, and the dividing edges are in a triangular structure.
Preferably, the bottom end of the dividing block is fixedly installed with the ash scraping plate, and the dividing block and the dividing edges are arranged in a one-to-one correspondence mode.
Preferably, the number of the handles is two, and the outer side of each handle is provided with anti-skidding threads.
Preferably, the dividing ribs are perpendicular to the connecting bar, the dividing ribs are perpendicular to the dividing blocks, and the plurality of dividing ribs are parallel to each other.
Preferably, the limiting disc is in pressing contact with the slide way, and the handle is perpendicular to the slide way.
(III) advantageous effects
The utility model provides a construction is with pole of plastering. Has the following beneficial effects:
according to the plastering rod for building construction, when a handle is held to take up the collecting groove and the plastering plate to push and plaster the plaster, the dividing edges are matched to divide the plaster by the dividing blocks, so that the resistance of the plastering plate can be reduced when the plaster is recovered, the plastering labor intensity of workers is reduced, the collected plaster can be held by the collecting groove, the overflow is avoided, and the redundant plaster can be better recovered; can make spacing dish keep away from the slide through rotating the handle to can remove the handle and change the position, to two handle adjustment intervals, can adapt to staff's operation custom, reduce partial fatigue.
Drawings
FIG. 1 is a schematic view of the complete structure of the present invention;
FIG. 2 is a second complete structural diagram of the present invention;
FIG. 3 is a schematic sectional view of the present invention;
fig. 4 is a schematic view of the local structure of the present invention.
In the figure: 1 collecting groove, 2 dust scraping plates, 3 slideways, 4 handles, 5 connecting rods, 6 dividing ribs, 7 dividing blocks, 8 movable blocks, 9 limiting discs and 10 baffle plates.
Detailed Description
The invention is explained in more detail below with reference to the figures and examples.
The embodiment of the utility model provides a plastering rod for construction, as shown in fig. 1-4, including collecting vat 1 and scraping hawk 2, collecting vat 1 and scraping hawk 2 fixed connection, collecting vat 1's top fixed mounting has connecting rod 5, one side fixed mounting of connecting rod 5 has segmentation arris 6, the bottom fixed mounting who cuts apart arris 6 has segmentation block 7, collecting vat 1's bottom fixed mounting has slide 3, slide 3's inboard slidable mounting has movable block 8, handle 4 is installed to slide 3's below, handle 4's one end and 8 threaded mounting of movable block, handle 4's outside fixed mounting has spacing dish 9, scrape about hawk 2 the equal fixed mounting in both ends there is baffle 10, through holding handle 4 take up collecting vat 1 and scraping hawk 2 promote when plastering, the cooperation is cut apart the very segmentation block 7 of hawk to the lime, can reduce the resistance of scraping hawk 2 when retrieving the lime, reduce staff's the intensity of labour who plasters collecting vat that plasters, through setting of holding collecting vat 1, can hold the surplus recovery of retrieving, better, can make the handle 4 through rotating the adjustment hand change the adaptation of handle, thereby the handle 4 reduces the adaptation of the fatigue, thereby the adaptation of two hand 4, the adaptation of the hand can reduce the adaptation of the hand.
Specifically, the ash scraping plate 2 is of an arc-shaped structure, and the ash scraping plate 2 and the collecting tank 1 are installed smoothly; the number of the dividing edges 6 is multiple, the dividing edges 6 are arranged in an equidistant array, and the dividing edges 6 are in a triangular structure; cut apart the bottom of piece 7 and scrape 2 fixed mounting of hawk, cut apart piece 7 and cut apart 6 one-to-one settings of arris, collect collection tank 1 through scraping hawk 2 unnecessary lime stone on with the wall in, withdraw unnecessary lime stone, make things convenient for other local uses of wall, carry out the floating treatment through scraping hawk 2 to the lime stone of wall, the lime stone on the wall promotes floating, to the lime stone can cut apart through cutting apart arris 6 and cutting apart piece 7, can collect unnecessary lime stone.
The number of the handles 4 is two, and anti-skid grains are arranged on the outer side of each handle 4; the dividing edges 6 are perpendicular to the connecting rods 5, the dividing edges 6 are perpendicular to the dividing blocks 7, and the dividing edges 6 are parallel to each other; spacing dish 9 and 3 extrusion contact of slide, handle 4 is perpendicular with slide 3, through cutting apart arris 6 and cutting apart 7 to the cutting apart of lime, can reduce the resistance of lime to scraping board 2 for the lime is level and smooth to be retrieved to collection tank 1 through scraping board 2, makes things convenient for the staff to smooth the wall and retrieves the lime.
The working principle is as follows: during the use, can make spacing dish 9 keep away from slide 3 through rotating handle 4, thereby can remove handle 4 change position, to two handle 4 adjustment intervals, conveniently adapt to staff's operation custom, it makes spacing dish 9 and slide 3 extrusion contact to rotate handle 4 after adjusting, fix handle 4, then hold handle 4 and take up this pole of plastering, the lime-ash on the wall is smoothed and is promoted, to the lime-ash can be cut apart through cutting apart arris 6 and cutting apart piece 7, can collect unnecessary lime-ash, carry out smoothing processing to the lime-ash of wall through scraping hawk 2, unnecessary lime-ash collects in collecting tank 1 through scraping hawk 2, retrieve unnecessary lime-ash, make things convenient for other places of wall to use, and when meetting the wall face that the lime-ash is few, through changing collecting tank 1 and scraping the gradient of hawk 2, can level the wall with the lime-ash of retrieving in collecting tank 1, carry out smoothing operation to the wall.
The utility model discloses the standard part that uses all can purchase from the market, and dysmorphism piece all can be customized according to the description with the record of attached drawing, and the concrete connected mode of each part all adopts conventional means such as ripe rivet, welding among the prior art, and machinery, part and equipment all adopt among the prior art, conventional model, and circuit connection adopts conventional connected mode among the prior art, and the details are not repeated here, and the content that does not make detailed description in this description belongs to the prior art that the professional technical staff in this field is known.
In the description of the present invention, it should be noted that the terms "vertical", "upper", "lower", "horizontal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise explicitly specified or limited, the terms "disposed," "mounted," "connected," and "connected" are to be construed broadly, e.g., as meaning either a fixed connection, a removable connection, or an integral connection; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those of ordinary skill in the art.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a construction is with pole of plastering, includes collecting vat (1) and scraping board (2), its characterized in that: collecting vat (1) and scraping hawk (2) fixed connection, the top fixed mounting of collecting vat (1) has connecting rod (5), one side fixed mounting of connecting rod (5) cuts apart arris (6), the bottom fixed mounting who cuts apart arris (6) has segmentation block (7), the bottom fixed mounting of collecting vat (1) has slide (3), the inboard slidable mounting of slide (3) has movable block (8), handle (4) are installed to the below of slide (3), the one end and the movable block (8) screw thread installation of handle (4), the outside fixed mounting of handle (4) has spacing dish (9), scrape the equal fixed mounting in both ends has baffle (10) about hawk (2).
2. The trowel bar for construction according to claim 1, characterized in that: the ash scraping plate (2) is of an arc-shaped structure, and the ash scraping plate (2) and the collecting tank (1) are installed smoothly.
3. A troweling rod for construction according to claim 1, characterized in that: the number of dividing arris (6) is a plurality of, and a plurality of arris (6) of dividing are the equidistance array setting, it is the triangle-shaped structure to divide arris (6).
4. A troweling rod for construction according to claim 1, characterized in that: the bottom end of the dividing block (7) is fixedly installed with the ash scraping plate (2), and the dividing block (7) and the dividing edges (6) are arranged in a one-to-one correspondence mode.
5. The trowel bar for construction according to claim 1, characterized in that: the number of the handles (4) is two, and the outer side of each handle (4) is provided with anti-skid grains.
6. The trowel bar for construction according to claim 1, characterized in that: the dividing edges (6) are perpendicular to the connecting rods (5), the dividing edges (6) are perpendicular to the dividing blocks (7), and the dividing edges (6) are parallel to each other.
7. A troweling rod for construction according to claim 1, characterized in that: spacing dish (9) and slide (3) extrusion contact, handle (4) are perpendicular with slide (3).
CN202222122380.9U 2022-08-11 2022-08-11 Plastering rod for building construction Active CN218091854U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222122380.9U CN218091854U (en) 2022-08-11 2022-08-11 Plastering rod for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222122380.9U CN218091854U (en) 2022-08-11 2022-08-11 Plastering rod for building construction

Publications (1)

Publication Number Publication Date
CN218091854U true CN218091854U (en) 2022-12-20

Family

ID=84445989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222122380.9U Active CN218091854U (en) 2022-08-11 2022-08-11 Plastering rod for building construction

Country Status (1)

Country Link
CN (1) CN218091854U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115961764A (en) * 2022-12-22 2023-04-14 胡雪华 Pigment separation equipment for wall painting

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115961764A (en) * 2022-12-22 2023-04-14 胡雪华 Pigment separation equipment for wall painting

Similar Documents

Publication Publication Date Title
CN218091854U (en) Plastering rod for building construction
CN210459895U (en) Plastering device for building construction
CN207553532U (en) A kind of construction and decoration solidifies waste cleaning device with ground
CN214090645U (en) Architectural design roof eaves mouth waterproof construction
CN209323922U (en) Ceramic tile rapid application cement mortar device
CN211807065U (en) Stone groove broacher
CN215484456U (en) Floor tile mounting and caulking device for architectural decoration
CN213897998U (en) Water-saving ceramic tile soak device for construction
CN109537822A (en) Gutter construction technology
CN213823646U (en) Mortar filtering device
CN217871653U (en) Building engineering wall surface strickle
CN212078737U (en) Device is paintd to building wall body concrete high efficiency
CN210887967U (en) Automatic floating device of wall surface concrete for building construction
CN216076160U (en) Building construction plastering unit based on adjustable
CN210552228U (en) Ceramic tile cutting device
CN218292521U (en) Green building energy-saving roof
CN220226125U (en) Assembled ceramic tile paving construction equipment
CN215092608U (en) Automatic edge grinding and dust collecting equipment for producing light partition wall batten for building
CN211041978U (en) Measuring scale for building foundation construction
CN211937870U (en) Sand sorting unit that municipal building used
CN220502747U (en) Sewage treatment pond dross collection device
CN113122286B (en) Multifunctional trolley auxiliary device for coke oven masonry
CN218406324U (en) Vertical automatic wall tile sticking device for building construction
CN219732234U (en) Anti-sedimentation drainage device for building construction
CN211472059U (en) A insert and smash ware that is used for big particle size asphalt concrete road surface to be under construction

Legal Events

Date Code Title Description
GR01 Patent grant