CN218091803U - Warm up mushroom board convenient to lay - Google Patents

Warm up mushroom board convenient to lay Download PDF

Info

Publication number
CN218091803U
CN218091803U CN202221878279.XU CN202221878279U CN218091803U CN 218091803 U CN218091803 U CN 218091803U CN 202221878279 U CN202221878279 U CN 202221878279U CN 218091803 U CN218091803 U CN 218091803U
Authority
CN
China
Prior art keywords
main part
section
mounting bar
lay
part board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221878279.XU
Other languages
Chinese (zh)
Inventor
孙常亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Hongxinyuan Energy Saving Technology Co ltd
Original Assignee
Wuhan Hongxinyuan Energy Saving Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Hongxinyuan Energy Saving Technology Co ltd filed Critical Wuhan Hongxinyuan Energy Saving Technology Co ltd
Priority to CN202221878279.XU priority Critical patent/CN218091803U/en
Application granted granted Critical
Publication of CN218091803U publication Critical patent/CN218091803U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Abstract

The utility model belongs to the technical field of warm up, concretely relates to warm up mushroom board convenient to lay, including the main part board, the top equipartition of main part board is fixed with the fixture block, one side of main part board is fixed with the mounting bar, the one end of main part board also is fixed with the mounting bar, and two places the mounting bar is adjacent, and the mounting bar is than the height-wise of main part board low, the mounting groove has been seted up to the inside of mounting bar, the fixed slot has all been seted up to the bottom of two other places of main part board week side, just the position of fixed slot is corresponding with the mounting bar, the main part plate thickness at fixed slot top is the same with the difference in height of mounting bar and main part board. The utility model discloses can be more convenient lay work to the mushroom board, and connect more firmly between the plate, still be convenient for lay work to the pipeline simultaneously.

Description

Ground heating mushroom plate convenient to lay
Technical Field
The utility model belongs to the technical field of warm up, concretely relates to warm up mushroom board convenient to lay.
Background
The floor heating is short for floor radiation heating, the whole floor is used as a radiator, the whole floor is uniformly heated through a heating medium in a floor radiation layer, heat is supplied to the indoor through the floor in a radiation and convection heat transfer mode, the purpose of comfortable heating is achieved, the floor heating is divided into water floor heating and electric floor heating according to different heat transfer media, and the water heating is generally fixed by adopting mushroom plates.
The existing device is spliced only by means of simple concave-convex matching, when mushroom plates are laid, the connection between the two plates is not firm enough, the mushroom plates are easy to loosen, and after the next plate is spliced, the last plate can be displaced and needs to be continuously adjusted, so that time and labor are wasted.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a warm up mushroom board convenient to lay can be more convenient lay work to the mushroom board, and connect more firmly between the plate.
The utility model discloses the technical scheme who takes specifically as follows:
the utility model provides a warm up mushroom board convenient to lay, includes the main part board, the top equipartition of main part board is fixed with the fixture block, one side of main part board is fixed with the mounting bar, the one end of main part board also is fixed with the mounting bar, and two places the mounting bar is adjacent, and the mounting bar is than the highly low of main part board, the mounting groove has been seted up to the inside of mounting bar, the fixed slot has all been seted up to the bottom of two other places of main part board week side, just the position of fixed slot is corresponding with the mounting bar, the main part plate thickness at fixed slot top is the same with the difference in height of mounting bar and main part board, the interior roof of fixed slot is fixed with the connecting strip, the bottom equipartition of connecting strip is fixed with the spacing piece, the cross section of stopper is down trapezoidal, and the top is provided with logical groove, makes stopper both sides shaping slice.
The cross section of mounting groove is type of protruding, and the mounting bar is run through at the mounting groove top.
The fixture block is divided into a G section and an F section from top to bottom.
The two mounting bars are matched with the fixing grooves formed at the bottoms of the opposite end surfaces of the mounting bars.
The top of the mounting groove is as long as the bottom of the limiting block.
The G section is a cylinder, the peripheral side face of the G section is arranged as a round angle and protrudes towards the outside, and the F section is also a cylinder and the diameter of the F section is gradually increased from the top to the bottom.
The gap between the G section and the F section of each two adjacent clamping blocks is changed from narrow to wide from top to bottom and then from wide to narrow.
The utility model discloses the technological effect who gains does:
the utility model discloses, when laying, lay a main part board, set up the position of one side of fixed slot bottom another main part board afterwards, aim at the position of one side that first main part board is fixed with the mounting bar and lay, make it overlap, through stepping on the overlap section, exert pressure to the connecting bar, make it drive the stopper and continue to move downwards, the stopper can insert the mounting bar, get into the inboard of mounting groove, because the stopper top is provided with logical groove, make stopper both sides shaping slice, can play spacing effect when making it insert the mounting groove, make to connect more firmly between a plurality of main part boards, the work of laying of being convenient for simultaneously, the main part plate thickness at fixed slot top is the same with the difference in height of mounting bar and main part board, when a plurality of plates of being convenient for are laid, the junction is more level and more pleasing to the eye, reduce thermal loss simultaneously.
The utility model discloses, the mounting groove top runs through the mounting bar, be convenient for the stopper gets into the mounting groove, the top of mounting groove is the same with the bottom length of stopper, be convenient for carry on spacingly to the stopper, it is spacing to the stopper both sides when inserting the mounting groove, when the stopper inserts the mounting groove completely, through stopper both sides and mounting groove cooperation, joint strength between the reinforcing plate piece, the fixed slot looks adaptation that two mounting bars were seted up rather than the bottom of relative terminal surface, be convenient for carry out horizontal and vertical laying work to it, lay the completion back when the plate, still need lay work to the pipeline, when carrying out the pipe laying, earlier through the G section, its week side is protruding to the outside, make the pipeline pass through the G section after, carry on spacingly to it, greatly reduce the possibility that the pipeline shifted out, get into the F section behind the G section, F section bottom plays the effect of holding up to the pipeline, its bottom is in unsettled state, when being convenient for subsequent concrete is filled, carry out omnidirectional parcel to the pipeline, accelerate the radiating rate.
Drawings
FIG. 1 is a schematic structural view of the whole body of the present invention;
fig. 2 is a schematic cross-sectional view of the middle body plate of the present invention;
FIG. 3 is an enlarged schematic view of the structure at A of the present invention;
fig. 4 is a schematic bottom view of the middle body plate of the present invention.
In the drawings, the reference numbers indicate the following list of parts:
1. a main body plate; 11. a clamping block; 12. mounting a bar; 13. mounting grooves; 14. a fixing groove; 15. a connecting strip; 16. and a limiting block.
Detailed Description
In order to make the objects and advantages of the present invention more apparent, the present invention will be described in detail with reference to the following embodiments. It is to be understood that the following text is merely illustrative of one or more specific embodiments of the invention, and is not intended to strictly limit the scope of the claims.
As shown in fig. 1-4, a ground heating mushroom plate convenient to lay, including main body plate 1, the top equipartition of main body plate 1 is fixed with fixture block 11, one side of main body plate 1 is fixed with mounting bar 12, the one end of main body plate 1 is also fixed with mounting bar 12, two mounting bar 12 are adjacent, and mounting bar 12 is than the height of main body plate 1 low, mounting groove 13 has been seted up to the inside of mounting bar 12, fixed slot 14 has all been seted up to the bottom of the other two places of main body plate 1 week side, and the position of fixed slot 14 is corresponding with mounting bar 12, the thickness of the main body plate 1 at fixed slot 14 top is the same with the difference in height of mounting bar 12 and main body plate 1, the inside roof of fixed slot 14 is fixed with connecting strip 15, connecting strip 15's bottom equipartition is fixed with stopper 16, the cross section of stopper 16 is the inverted trapezoid, and the top is provided with logical groove, make stopper 16 both sides shaping slice.
When laying, lay a main part board 1, set up the position of one side of fixed slot 14 with another main part board 1 bottom afterwards, aim at the position of one side that first main part board 1 is fixed with mounting bar 12 and lay, make it overlap, through stepping on the overlap portion, apply pressure to connecting strip 15, make it drive stopper 16 and continue to move downwards, stopper 16 can insert mounting bar 12, get into the inboard of mounting groove 13, lead to the groove and make stopper 16 both sides shaping slice, can play spacing effect when making it insert mounting groove 13, make to connect more firmly between a plurality of main part boards 1, the work of laying of being convenient for simultaneously, the thickness of the main part board 1 at fixed slot 14 top is the same with the difference in height of mounting bar 12 and main part board 1, when being convenient for a plurality of plates are laid, the junction is more level and more pleasing to the eye, reduce thermal loss simultaneously.
Referring to fig. 2 and 3, the cross section of mounting groove 13 is type, and mounting bar 12 is run through at the mounting groove 13 top, and the top of mounting groove 13 is the same with stopper 16's bottom length, is convenient for carry on spacingly to stopper 16, and is spacing to stopper 16 both sides when inserting mounting groove 13, when stopper 16 inserts mounting groove 13 completely, cooperates with mounting groove 13 through stopper 16 both sides, strengthens the joint strength between the plate.
Referring to the attached drawing 3, the fixture blocks 11 are divided into a G section and an F section from top to bottom, the G section is a cylinder, the circumferential side of the G section is a fillet, the G section protrudes to the outside, the F section is also a cylinder, the diameter of the G section gradually increases from top to bottom, after the plate is laid, the pipeline is required to be laid, when the pipeline is laid, the circumferential side of the G section protrudes to the outside, the pipeline is limited after passing through the G section, the possibility of shifting out the pipeline is greatly reduced, two adjacent fixture blocks 11, the gap between the G section and the F section changes from top to bottom, the gap changes from narrow to wide and then narrow, the pipeline enters the F section after passing through the G section, when the pipeline is located in the F section, the bottom of the F section plays a supporting effect, the bottom of the F section is in a suspended state, when subsequent concrete filling is facilitated, the pipeline is wrapped in an all-round manner, and the heat dissipation speed is accelerated.
Referring to fig. 4, two mounting bars 12 are fitted with fixing grooves 14 formed at the bottoms of the opposite end surfaces thereof, so as to facilitate transverse and longitudinal laying work.
The utility model discloses a theory of operation does: when laying, one main body plate 1 is laid, then the position of one side of the bottom of the other main body plate 1, which is provided with the fixing groove 14, is aligned with the position of one side of the first main body plate 1, which is fixed with the mounting strip 12, so that the main body plate is overlapped, the connecting strip 15 is pressed by treading the overlapped part, so that the connecting strip drives the limiting block 16 to move downwards continuously, the limiting block 16 can be inserted into the mounting strip 12 and enter the inner side of the mounting groove 13, because the top of the limiting block 16 is provided with the through groove, the two sides of the limiting block 16 are shaped into sheets, so that the limiting effect can be achieved when the limiting block is inserted into the mounting groove 13, the connection among the main body plates 1 is firmer, the laying work is convenient, the thickness of the main body plate 1 at the top of the fixing groove 14 is the same as the height difference between the mounting strip 12 and the main body plate 1, the connection is flatter and more beautiful, and the heat loss is reduced at the same time, the cross section of the mounting groove 13 is in a convex shape, the top of the mounting groove 13 penetrates through the mounting strip 12, so that the limiting block 16 can enter the mounting groove 13, the top of the mounting groove 13 is as long as the bottom of the limiting block 16, so that the limiting block 16 can be limited, the limiting block 16 can be limited when inserted into the mounting groove 13, when the limiting block 16 is completely inserted into the mounting groove 13, the two sides of the limiting block 16 are matched with the mounting groove 13, the connection strength between plates is enhanced, the two mounting strips 12 are matched with the fixing grooves 14 formed in the bottoms of the opposite end surfaces of the two mounting strips, so that the transverse and longitudinal laying work of the mounting strips is facilitated, after the plate laying is completed, the pipeline still needs to be laid, when the pipeline laying is performed, the pipeline firstly passes through the G section, the peripheral side of the pipeline protrudes outwards, so that the pipeline is limited after passing through the G section, the possibility of moving out of the pipeline is greatly reduced, and the pipeline enters the F section after passing through the G section, the F section is by top bottom diameter crescent for two adjacent fixture blocks 11, the change in clearance between its G section and the F section is by narrow widen from top to bottom, narrow down by the width again, when the pipeline is located the F section, F section bottom played the effect of holding up to the pipeline, and its bottom is in unsettled state, when being convenient for subsequent concrete filling, carries out omnidirectional parcel to the pipeline for the radiating rate.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention. Structures, devices and methods of operation not specifically described or illustrated in the present application are not specifically illustrated or described, but are generally practiced in the art without limitation.

Claims (7)

1. The utility model provides a ground warm mushroom board convenient to lay, includes main part board (1), its characterized in that: the top equipartition of main part board (1) is fixed with fixture block (11), one side of main part board (1) is fixed with mounting bar (12), the one end of main part board (1) also is fixed with mounting bar (12), and two places mounting bar (12) are adjacent, and mounting bar (12) are than the height-wise low of main part board (1), mounting groove (13) have been seted up to the inside of mounting bar (12), fixed slot (14) have all been seted up to the bottom of main part board (1) week side in two other places, just the position of fixed slot (14) is corresponding with mounting bar (12), the thickness of the main part board (1) at fixed slot (14) top is the same with the difference in height of mounting bar (12) and main part board (1), the interior roof of fixed slot (14) is fixed with connecting strip (15), the bottom equipartition of connecting strip (15) is fixed with spacing piece (16), the cross section of stopper (16) is inverted trapezoid, and the top is provided with logical groove, makes stopper (16) both sides shaping slice.
2. The ground heating mushroom plate convenient to lay of claim 1, characterized in that: the cross section of mounting groove (13) is type of protruding, and mounting bar (12) are run through at mounting groove (13) top.
3. The ground heating mushroom plate convenient to lay of claim 1, characterized in that: the fixture block (11) is divided into a G section and an F section from top to bottom.
4. The ground heating mushroom plate convenient to lay of claim 1, characterized in that: the two mounting bars (12) are matched with fixing grooves (14) formed in the bottoms of the opposite end surfaces of the mounting bars.
5. The ground heating mushroom plate convenient to lay of claim 2, characterized in that: the top of the mounting groove (13) is as long as the bottom of the limiting block (16).
6. The ground heating mushroom plate convenient to lay of claim 3, characterized in that: the G section is a cylinder, the peripheral side face of the G section is arranged as a round angle and protrudes towards the outside, and the F section is also a cylinder and the diameter of the F section is gradually increased from the top to the bottom.
7. Ground heating mushroom floor convenient to lay according to claim 6, characterized in that: the gap between the G section and the F section of each two adjacent clamping blocks (11) is changed from narrow to wide from top to bottom and then from wide to narrow.
CN202221878279.XU 2022-07-18 2022-07-18 Warm up mushroom board convenient to lay Active CN218091803U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221878279.XU CN218091803U (en) 2022-07-18 2022-07-18 Warm up mushroom board convenient to lay

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221878279.XU CN218091803U (en) 2022-07-18 2022-07-18 Warm up mushroom board convenient to lay

Publications (1)

Publication Number Publication Date
CN218091803U true CN218091803U (en) 2022-12-20

Family

ID=84481723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221878279.XU Active CN218091803U (en) 2022-07-18 2022-07-18 Warm up mushroom board convenient to lay

Country Status (1)

Country Link
CN (1) CN218091803U (en)

Similar Documents

Publication Publication Date Title
CN110005153A (en) A kind of decorative wall panels
CN218091803U (en) Warm up mushroom board convenient to lay
CN107190944A (en) A kind of novel ground heater module
CN102121305A (en) Nail-free clamped floor board system and nail-free clamped floor board thereof
CN211691245U (en) Floor block for laying floor heating
CN210105213U (en) Ground heating structure of aluminum floor
CN104818776B (en) Outer wall external hanging thermal insulation system and construction method thereof
CN211037665U (en) Keel component, floor heating insulation board and floor heating system
CN211736183U (en) Metal edge-closing reinforcing structure of floor tile
CN209819653U (en) A module warms up in foam ceramic piece and dry-type for warming up heat preservation
CN111550863A (en) Assembled skirting line and door and window sleeve line dual-purpose slow-release heat dissipation type heating radiator
CN211372596U (en) Assembled skirting line and door and window covering line dual-purpose universal radiator
CN208734001U (en) A kind of fast-assembling water-proof floor
CN215254233U (en) Dry-method floor heating rapid paving structure
CN207363200U (en) A kind of novel rapid-installation formula floor heater template
CN209128831U (en) A kind of anti-tilting floor tile
CN106481049A (en) A kind of floor base plate and the floor panel structure using this substrate and its installation method
CN203131929U (en) Ultrathin heating type skirting board
CN212427673U (en) Thermal insulation external wall concrete non-dismantling formwork
CN210772453U (en) Assembled skirting line and door and window sleeve line dual-purpose slow-release heat dissipation type heating radiator
CN208586845U (en) A kind of ceramic tile
CN116336533B (en) Fixed knot constructs is laid to ground heating coil pipe
CN202359791U (en) Solid-wood floor for ground heating
CN220453775U (en) Building floor heating installation base
CN202734019U (en) Geothermal moudle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant