Flood control dykes and dams that water conservancy construction used Download PDF

Info

Publication number
CN218090712U
CN218090712U CN202222430628.8U CN202222430628U CN218090712U CN 218090712 U CN218090712 U CN 218090712U CN 202222430628 U CN202222430628 U CN 202222430628U CN 218090712 U CN218090712 U CN 218090712U
Authority
CN
China
Prior art keywords
frame
dykes
dams
flood control
fixed mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222430628.8U
Other languages
Chinese (zh)
Inventor
张森
刘龙胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 9 Co Ltd
Original Assignee
Sinohydro Bureau 9 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 9 Co Ltd filed Critical Sinohydro Bureau 9 Co Ltd
Priority to CN202222430628.8U priority Critical patent/CN218090712U/en
Application granted granted Critical
Publication of CN218090712U publication Critical patent/CN218090712U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a flood control dykes and dams that water conservancy construction used, including dykes and dams main part, the upper surface of dykes and dams main part is close to one side fixed mounting and has the rail guard, the upper surface of dykes and dams main part and the outside fixed mounting that is located the rail guard have the coiling mechanism, one side fixed surface of dykes and dams main part installs the counter weight frame, the inside movable mounting of counter weight frame has solid soil frame, the front surface movable mounting of counter weight frame has the frame of decontaminating. A flood control dykes and dams that water conservancy construction used, when the installation is firm soil frame, inlay the fixture block of firm soil frame and establish in the draw-in groove of counter weight frame, alright with the inside of counter weight frame is installed with gliding mode to making firm soil frame, the installation of completion firm soil frame that like this can be convenient does not need artifical transport and installation, when the river course rises water, rubbish that the frame of decontaminating can be timely stops dam border position salvages, avoid rubbish to float the low reaches and cause the pollution for the low reaches.

Description

Flood control dykes and dams that water conservancy construction used
Technical Field
The utility model relates to a water conservancy construction field, in particular to flood control dykes and dams that water conservancy construction used.
Background
Flood control dykes and dams are one of the important projects of water conservancy construction, and the flood control dykes and dams refer to the dykes and dams of building in order to prevent the river flooding, and the flood control dykes and dams can effectively protect people who live in the river bank to keep away from flood every year, avoids property loss.
However, flood control dykes and dams at present stage have some not enough, when the river course rises water, flood control dykes and dams's edge can gather a large amount of river course rubbish, these rubbish can not clear up in the period of rising water like this, can only wait to carry out safe clearance after the water level descends, but the water level descends the back, most river course rubbish has drifted away along with rivers, be unfavorable for carrying out timely clearance to river course rubbish like this, the river course rubbish that drifts away can make the low reaches rubbish pile up the problem, and when placing solid soil frame, need artifical transport to place the relevant position at dykes and dams, it is harder like this, and influence the speed of construction.
SUMMERY OF THE UTILITY MODEL
A primary object of the present invention is to provide a flood control dam for water conservancy construction, which can effectively solve the technical problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a flood control dykes and dams of water conservancy construction usefulness, includes dykes and dams main part, the upper surface of dykes and dams main part is close to one side fixed mounting and has the rail guard, the upper surface of dykes and dams main part and the outside fixed mounting that is located the rail guard have the coiling mechanism, one side fixed surface of dykes and dams main part installs the counter weight frame, the inside movable mounting of counter weight frame has solid soil frame, the preceding surface movable mounting of counter weight frame has the frame of decontaminating.
Preferably, the front surface of the counterweight frame is provided with sliding grooves close to two sides, the surfaces of two sides in the counterweight frame are provided with clamping grooves, and lantern rings are fixedly mounted on two sides of the front surface of the counterweight frame close to the upper end.
Preferably, the upper surface of the solid soil frame is close to both sides fixed mounting and has a support column, the up end activity cover of support column is equipped with the buffering cap, the lower surface of the solid soil frame is close to both sides and has seted up the cover groove, the up end fixed mounting of support column has the backstop piece, the inside of buffering cap is equipped with the spring, the both sides fixed surface of the solid soil frame installs the fixture block.
Preferably, the lower fixed surface of the frame of decontaminating inlays and is equipped with the water leakage net, the rear surface of the frame of decontaminating is close to both sides fixed mounting and has the slider, the last fixed surface of slider installs rings.
Preferably, the inside one end fixed mounting of coiling mechanism has the rolling motor, the output fixed mounting of rolling motor has the rolling axle, the fixed cover in surface of rolling axle is equipped with the spacing ring, the quantity of spacing ring is twenty, the surface of rolling axle and be located the rolling between the spacing ring and have the rope.
Preferably, one end of the rope penetrates through the lantern ring to be connected with the hanging ring, the lower end of the sliding block is embedded in the sliding groove, and the clamping block is embedded in the clamping groove.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses in, through setting up the counter weight frame, gu soil frame, the mode that coiling mechanism and trash cleaning frame mutually supported, when installing gu soil frame, the fixture block with gu soil frame inlays to be established in the draw-in groove of counter weight frame, alright in order to make gu soil frame install the inside of counter weight frame with gliding mode, the installation of completion gu soil frame that so can be convenient, do not need artifical transport and installation, when a plurality of gu soil frames are piled up together, the buffering cap of next gu soil frame can carry out the buffering of impact force to gu soil frame that the top landing comes down, avoid two gu soil frames to take place violent collision, when the river course rises, trash cleaning frame can be submerged and covered, when the gathering of dam border position a large amount of river course rubbish, make rolling winding to take up the surface spool constantly, along with the rolling of rope, trash cleaning frame just can be pulled out the surface of water, when trash cleaning frame pulls out the surface of water rubbish, alright salvage together with the rubbish of dam border position, the river course that appears in time like this can be to the water in time carries out the timely clearance of rising, avoid floating to rise the low reaches.
Drawings
Fig. 1 is an overall structure diagram of a flood control dam for water conservancy construction according to the present invention;
fig. 2 is a schematic view of the installation of the counterweight frame and the soil fixation frame of the flood control dam for water conservancy construction according to the present invention;
FIG. 3 is a partial cross-sectional view of a soil-fixing frame of a flood control dam for water conservancy construction according to the present invention;
fig. 4 is an enlarged view of a portion a of a flood control dam for water conservancy construction according to the present invention in fig. 3;
FIG. 5 is a view of a structure of a cleaning frame of a flood control dam for water conservancy construction;
fig. 6 is the utility model relates to a local section view of coiling mechanism of flood control dykes and dams of water conservancy construction usefulness.
In the figure: 1. a dam body; 2. protecting the fence; 3. a winding device; 301. a winding motor; 302. a winding shaft; 303. a limiting ring; 4. a counterweight frame; 401. a chute; 402. a collar; 403. a card slot; 5. fixing soil frames; 501. sleeving a groove; 502. a support pillar; 503. a buffer cap; 504. a stop block; 505. a spring; 6. a dirt removing frame; 601. a water leakage net; 602. a slider; 603. a lifting ring.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in fig. 1-6, a flood control dam for water conservancy construction comprises a dam body 1, a guard rail 2 is fixedly mounted on the upper surface of the dam body 1 near one side, a winding device 3 is fixedly mounted on the upper surface of the dam body 1 and on the outer side of the guard rail 2, a counterweight frame 4 is fixedly mounted on the surface of one side of the dam body 1, a soil fixing frame 5 is movably mounted in the counterweight frame 4, and a cleaning frame 6 is movably mounted on the front surface of the counterweight frame 4.
The front surface of the counterweight frame 4 close to two sides is provided with a sliding chute 401, the inner two side surfaces of the counterweight frame 4 are provided with a clamping groove 403, the front surface of the counterweight frame 4 close to two sides of the upper end is fixedly provided with a lantern ring 402, and the lantern ring 402 can sweep the soil on the surface of the rope; support columns 502 are fixedly installed on the upper surface of the soil fixing frame 5 close to two sides, buffering caps 503 are movably sleeved on the upper end surfaces of the support columns 502, sleeve grooves 501 are formed on the lower surface of the soil fixing frame 5 close to two sides, stop blocks 504 are fixedly installed on the upper end surfaces of the support columns 502, springs 505 are arranged inside the buffering caps 503, clamping blocks are fixedly installed on the surfaces of the two sides of the soil fixing frame 5, the soil fixing frame 5 can be used for pressing, fixing and limiting soil of a dam, and a large amount of soil is prevented from losing; a water leakage net 601 is fixedly embedded in the lower surface of the cleaning frame 6, sliding blocks 602 are fixedly mounted on the rear surface of the cleaning frame 6 close to the two sides, hanging rings 603 are fixedly mounted on the upper surface of the sliding blocks 602, and the sliding blocks 602 can assist the cleaning frame 6 to move up and down stably; a winding motor 301 is fixedly installed at one end inside the winding device 3, a winding shaft 302 is fixedly installed at the output end of the winding motor 301, limit rings 303 are fixedly sleeved on the surface of the winding shaft 302, the number of the limit rings 303 is twenty, ropes are wound on the surface of the winding shaft 302 and between the limit rings 303, and the limit rings 303 can prevent the ropes wound on the winding shaft 302 from deviating; one end of the rope passes through the lantern ring 402 to be connected with the hanging ring 603, the lower end of the sliding block 602 is embedded in the sliding groove 401, the clamping block is embedded in the clamping groove 403, and the clamping groove 403 is matched with the clamping block, so that the soil fixing frame 5 can stably slide into the counterweight frame 4.
What need to explain, the utility model relates to a flood control dykes and dams that water conservancy construction used, when using, when installation solid soil frame 5, inlay the fixture block of solid soil frame 5 in the draw-in groove 403 of counterweight housing 4, alright in order to make solid soil frame 5 install the inside of counterweight housing 4 with the gliding mode, the installation of completion solid soil frame 5 that can facilitate like this, do not need artifical transport and installation, when a plurality of solid soil frames 5 are piled up together, next solid soil frame 5's buffering cap 503 can carry out the buffering of impact force to the solid soil frame 5 that the top landing falls, avoid two solid soil frames 5 to take place violent collision, when the river course rises, clear water frame 6 can be submerged by rivers, when a large amount of rubbish of accumulations of dykes and dams border position, start-up winding motor 301 of coiling mechanism 3, make rope receive the spool 302 surface, along with the continuous rolling of rope, clear water frame 6 just can be pulled out the surface of water when clear water frame 6 pulls out the surface of water, alright in order to get up, can in time clear water when the rolling up the rolling, the river course is salvage, the river course, the rolling rubbish that the rolling rubbish appears.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a flood control dykes and dams that water conservancy construction used which characterized in that: including dyke main part (1), the upper surface of dyke main part (1) is close to one side fixed mounting and has rail guard (2), the upper surface of dyke main part (1) and the outside fixed mounting that is located rail guard (2) have coiling mechanism (3), one side fixed surface of dyke main part (1) installs counterweight housing (4), the inside movable mounting of counterweight housing (4) has solid soil frame (5), the preceding surface movable mounting of counterweight housing (4) has frame of decontaminating (6).
2. A flood protection dam according to claim 1, wherein: the front surface of counterweight frame (4) is close to both sides and has seted up spout (401), draw-in groove (403) have been seted up to the inside both sides surface of counterweight frame (4), the front surface of counterweight frame (4) is close to upper end both sides fixed mounting and has lantern ring (402).
3. A flood control dam according to claim 2 wherein: the upper surface of firm soil frame (5) is close to both sides fixed mounting has support column (502), the up end activity cover of support column (502) is equipped with buffering cap (503), the lower surface of firm soil frame (5) is close to both sides and has seted up trepanning (501), the up end fixed mounting of support column (502) has backstop piece (504), the inside of buffering cap (503) is equipped with spring (505), the both sides fixed surface of firm soil frame (5) installs the fixture block.
4. A flood control dam according to claim 3 wherein: the lower fixed surface of frame of decontaminating (6) inlays and is equipped with water leakage net (601), the rear surface of frame of decontaminating (6) is close to both sides fixed mounting has slider (602), the last fixed surface of slider (602) installs rings (603).
5. A flood control dam according to claim 4 wherein: the inside one end fixed mounting of coiling mechanism (3) has coiling motor (301), the output fixed mounting of coiling motor (301) has rolling axle (302), the fixed surface cover of rolling axle (302) is equipped with spacing ring (303), the quantity of spacing ring (303) is twenty, the surface of rolling axle (302) just is located the rolling between spacing ring (303) and has the rope.
6. A flood control dam according to claim 5 wherein: one end of the rope penetrates through the lantern ring (402) to be connected with the hanging ring (603), the lower end of the sliding block (602) is embedded in the sliding groove (401), and the clamping block is embedded in the clamping groove (403).
CN202222430628.8U 2022-09-14 2022-09-14 Flood control dykes and dams that water conservancy construction used Active CN218090712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222430628.8U CN218090712U (en) 2022-09-14 2022-09-14 Flood control dykes and dams that water conservancy construction used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222430628.8U CN218090712U (en) 2022-09-14 2022-09-14 Flood control dykes and dams that water conservancy construction used

Publications (1)

Publication Number Publication Date
CN218090712U true CN218090712U (en) 2022-12-20

Family

ID=84453278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222430628.8U Active CN218090712U (en) 2022-09-14 2022-09-14 Flood control dykes and dams that water conservancy construction used

Country Status (1)

Country Link
CN (1) CN218090712U (en)

Similar Documents

Publication Publication Date Title
CN211113550U (en) A slidingtype protective structure for water conservancy dam
CN211340639U (en) River channel dam reinforcing mechanical equipment
CN210917256U (en) Water conservancy water and electricity dam water inlet floater clean-up equipment
CN211816540U (en) Dredging device for water conservancy and hydropower dam
CN218090712U (en) Flood control dykes and dams that water conservancy construction used
CN214168964U (en) Culvert gate structure
KR101051452B1 (en) Device for collecting floating wastes
CN208685580U (en) A kind of hydraulic and hydroelectric engineering dam
CN209493927U (en) A kind of irrigation system for high standard farmland
CN216973345U (en) River channel garbage cleaning and bleaching machine and river channel garbage cleaning and bleaching system
CN112523161B (en) Device for beach maintenance, wave dissipation and floater collection
CN214783723U (en) Water conservancy river trash blocking flood prevention device convenient to maintain
CN113481935B (en) Concrete bored concrete pile foundation combined type dyke
CN215367143U (en) Dam ecological flow discharge pipe mouth of pipe rubbish intercepting device
CN210031673U (en) Seepage-proofing water conservancy flood bank
CN207003395U (en) A kind of floating sewage blocking structure
CN113322902A (en) Hydraulic engineering construction is filtration intercepting device for ditch
CN216428188U (en) Trash device
CN215165386U (en) Hydraulic engineering is with fence of decontaminating
CN211113527U (en) Floater filtering device for hydraulic engineering
CN220414165U (en) Water conservancy water and electricity water inlet arrangement structure
CN219604269U (en) Protective sea wall structure
CN218786820U (en) Water gate retaining wall
CN212956458U (en) Sundry intercepting device of floating wharf
CN218757374U (en) Equipment is salvaged to dam water inlet floating garbage

Legal Events

Date Code Title Description
GR01 Patent grant